Top Banner
Paolo Guglielmini TS / CV / DC 08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the LHCb detector Technical Specification
18

Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.

Dec 26, 2015

Download

Documents

Morris Short
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.

Paolo Guglielmini TS / CV / DC 08th April 2005

BIDDERS’ CONFERENCEInvitation to Tender 3307

Supply and Installation of water cooling equipment for the LHCb detector

Technical Specification

Page 2: Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.

Main scopes of the work

1. construction of a cooling unit at demineralised water for the Outer Tracker sub-detector

2. installation of:- supply/return transfer lines and distribution manifolds for the OT- supports for pipelines on the RB84 side of the cavern

3. supply and installation of pipelines and equipments for primary water networks and compressed air line

4. control and electricity works for the OT

5. tests on hydraulic performances and control functionalities

6. commissioning, training and validation of both the OT and primary systems

7. supply of all required technical documents

Paolo Guglielmini TS / CV / DC 08th April 2005

Page 3: Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.

Underground areas – Point 8

Paolo Guglielmini TS / CV / DC 08th April 2005

Page 4: Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.

Experimental cavern UX 85 – Layout

Page 5: Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.

LHCb detector – Overview

Page 6: Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.

Positioning of the platform

Page 7: Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.

Passage around shielding wall

Page 8: Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.

Transfer lines – Passage through the TX84

Page 9: Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.

Installation of supports for the pipelines

Page 10: Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.

Outer Tracker distribution manifolds

Outer Tracker

manifolds represented in light blue

Page 11: Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.

Primary water systems on RB86 side

Page 12: Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.

Primary water systems - Details

1

2 3

1. Connections to barracks D1 and D2

2. Connections to barracks D3/A and D3/B

3. Connections to cooling systems

Page 13: Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.

Compressed air and demineralised water networks

RB84

RB86

- the arrows indicate from where the existing pipelines have to be prolonged

- in light blue on the RB84 side the demineralised water network

- in white on both sides the compressed air network

Page 14: Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.

Outer Tracker – Requirements

Pressure drop inside the detector (including all piping located after the manifolds) 1.5 bars

Flow rate10 m3/h (flow to the detector)

1 m3/h (flow in the demineralization loop)

Inlet temperature 19 ± 1 °C

Temperature increasing inside the detector 2 °C

Volume of coolant in the detector (including all piping located after the manifolds) 50 litres

Demineralised water conductivity 0.1 to 1 mS/cm

Cooling capacity 23 kW

CERN Mixed water network: - Inlet temperature - ΔT available - Inlet pressure - ΔP available

13 °C5 °C (!)

10 bar (a)2 bar

Ambient conditions inside the cavern: - Dry temperature - Dew point

17 to 27 °C≤12 °C

Paolo Guglielmini TS / CV / DC 08th April 2005

Page 15: Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.

Outer Tracker – Principle Schema

PTPI

PT

HPS

HPS

Demineralizationcartridge

PI FT

TT

TS

TS

FT CT

PressureControl

TemperatureControl

PressureControl

Connection to the mixedwater CERN network

(13 - 19 C)

Connection to thedemineralized water

CERN network

FTTT

TT

FS

FS

FS

FS

FS

FS

Supply / return manifoldspositioned on both sides

of the detector

Waterpumps

Heat exchanger

Tank

Vacuumpump

Strainer

By-passline

Demineralizationloop (1 m3/h)

TT

FS

TT

FS

FS

FS

FS

FS

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

LT

O/C

O/C

O/C

Paolo Guglielmini TS / CV / DC 08th April 2005

Page 16: Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.

Pipe works in the UX85 experimental cavern

Activities related to WORK LOT 1- fixation of the supports for 16 transfer lines (OT included) along the

RB84 side and on top of the vault TX84- installation of the OT transfer lines in stainless steel (multilayer

pipes use to be quoted as an option)- installation of the supply/return OT distribution manifolds

Activities related to WORK LOT 4- installation of pipelines for chilled and mixed water (RB86), demineralised water (RB84), compressed air (both sides) networks, including supports and required equipments

Due to INTEGRATION matters

the detailed activities shall be scheduled and performed during:

JUNE – JULY 2005

Paolo Guglielmini TS / CV / DC 08th April 2005

Page 17: Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.

Integration in the SCADA local supervision

IT 3307 – Paragraph 4.2.2.1 “Communication”Four additional cooling systems will also be locally supervised and operated from the

SCADA local supervision platform. These cooling systems are controlled by 3 PLCs, which are also built on Schneider Premium TSX equipment.

These PLCs are not included in the scope of the supply of this Technical Specification. 1 PLC Inner Tracker - Tracker Trigger1 PLC RICH 1 & 21 PLC VELO

The Contractor shall integrate in the SCADA local supervision platform database the process data from these 3 external PLCs.

The Contractor shall develop, test, install and validate on-site the local supervision means corresponding to these external cooling stations...

Provided commissioning of the cooling systems whose PLCs shall be integrated:

end of FEBRUARY 2006

Paolo Guglielmini TS / CV / DC 08th April 2005

Page 18: Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.

Provided delivery scheduleContract signature April 2005

Design Meeting May 2005

Pipe works in the UX85 cavern June – July 2005

Complete installation of the OT cooling station at Contractor’s premises September

2005

Performance tests at Contractor’s premises October 2005

Installation of the unit in the cavern, connection to CERN networks, tests, commissioning End 2005

Integration in the SCADA of the additional cooling systems February