Top Banner
PANDA collaboration meeting 2.-4. June 2004 simulation status Overview Overview New Framework why status schedule Simulation subdetector Forward spectrometer EMC (TS) Status PID Benchmark channel Status
17

PANDA collaboration meeting2.-4. June 2004 simulation statusOverview New Framework why status schedule Simulation subdetector Forward spectrometer.

Jan 16, 2016

Download

Documents

Dorthy Hawkins
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PANDA collaboration meeting2.-4. June 2004 simulation statusOverview New Framework  why  status  schedule Simulation subdetector  Forward spectrometer.

PANDA collaboration meeting 2.-4. June 2004

simulation statusOverviewOverview

• New Framework why status schedule

• Simulation subdetector Forward spectrometer EMC (TS)

• Status PID

• Benchmark channel Status

Page 2: PANDA collaboration meeting2.-4. June 2004 simulation statusOverview New Framework  why  status  schedule Simulation subdetector  Forward spectrometer.

PANDA collaboration meeting 2.-4. June 2004

simulation statusNew FrameworkNew Framework

• not enough manpower for development

• switch to well proved framework only few on the market

• decision: BaBar framework • experiences in PANDA collaboration

• request to BaBar computing management O.k but with Copyright

Page 3: PANDA collaboration meeting2.-4. June 2004 simulation statusOverview New Framework  why  status  schedule Simulation subdetector  Forward spectrometer.

PANDA collaboration meeting 2.-4. June 2004

simulation statusNew FrameworkNew Framework

• object-oriented

• environment: Compilation time for develpment shorter

• digitization, event-mixing, detector response

• reconstruction: vertexing , tracking, PID

• analysis: many fit routines available

Advantages

Page 4: PANDA collaboration meeting2.-4. June 2004 simulation statusOverview New Framework  why  status  schedule Simulation subdetector  Forward spectrometer.

PANDA collaboration meeting 2.-4. June 2004

simulation statusNew FrameworkNew Framework

Simulation Architecture

Page 5: PANDA collaboration meeting2.-4. June 2004 simulation statusOverview New Framework  why  status  schedule Simulation subdetector  Forward spectrometer.

PANDA collaboration meeting 2.-4. June 2004

simulation statusNew FrameworkNew Framework

Status

• PANDA source code in new environment embedded (done)

• implementation in CVS (done)

• removal of database (30% done)

• implementation of detector geometry in Bogus removal of BaBar geometry: dummy version (done) implementation of PANDA geometry (to do)

• modification of reconstruction & analysis (to do)

Page 6: PANDA collaboration meeting2.-4. June 2004 simulation statusOverview New Framework  why  status  schedule Simulation subdetector  Forward spectrometer.

PANDA collaboration meeting 2.-4. June 2004

simulation statusNew FrameworkNew Framework

Time schedule

• idea: study of benchmark channels for TR in new framework

• deadline event production: Second week of August

• implementation has to be finished until beginning of August

Page 7: PANDA collaboration meeting2.-4. June 2004 simulation statusOverview New Framework  why  status  schedule Simulation subdetector  Forward spectrometer.

PANDA collaboration meeting 2.-4. June 2004

simulation statusDetector development: FSDetector development: FS

• simulation and reconstruction of EMC (FS) is working

• idealized setup: appr. 11000 PWO crystals

• implementation of more realistic setup has to be done lead glass calorimeter?

(talk in subgroup meeting: Piotr Hawranek)

Page 8: PANDA collaboration meeting2.-4. June 2004 simulation statusOverview New Framework  why  status  schedule Simulation subdetector  Forward spectrometer.

PANDA collaboration meeting 2.-4. June 2004

simulation statusDetector development: FSDetector development: FS

• new idea: Forward dipol (HERMES) iron plate shields the beam from the dipol field

• advantage: no dipol behind FS

• disadvantage: no acceptance between 0°-1°

• first calculations: magnetic field: 1T beam region: 100 mT

HERMES: Side view of dipol with shielding

Page 9: PANDA collaboration meeting2.-4. June 2004 simulation statusOverview New Framework  why  status  schedule Simulation subdetector  Forward spectrometer.

PANDA collaboration meeting 2.-4. June 2004

simulation statusDetector development: EMC (TS)Detector development: EMC (TS)

events8

• gamma-efficiency vs. space between crystals• default value: 2.0 mm• space variation: 2.0mm-0.3mm• 2000 events simulated:

• eff. increases dramaticaly by reducing the space• target point geometry• modification: point of intersection app. 2cm backward

cGeVpp /5@822 0

Page 10: PANDA collaboration meeting2.-4. June 2004 simulation statusOverview New Framework  why  status  schedule Simulation subdetector  Forward spectrometer.

PANDA collaboration meeting 2.-4. June 2004

simulation statusReconstruction: PIDReconstruction: PID

• PID problem with DIRC and RICH

• different efficiency for positive and negative particles

• reco with old tracker interface

• modified reconstruction: PID works properly

(Carsten Schwarz, GSI)

Page 11: PANDA collaboration meeting2.-4. June 2004 simulation statusOverview New Framework  why  status  schedule Simulation subdetector  Forward spectrometer.

PANDA collaboration meeting 2.-4. June 2004

simulation statusBenchmark channelBenchmark channel

copp @62,2,3 00 (Jan Zhong, Bochum)

• problem: assignment of gammas to corresponding mesons

• possiblilities:

• requirement: No kinematic fit spatial & energy resolution for each setup

• strategy: Probabilities for each hypothesis

ji

ij mm

,2

22

30

0

0

)(

45:2,2

15:300

0

Page 12: PANDA collaboration meeting2.-4. June 2004 simulation statusOverview New Framework  why  status  schedule Simulation subdetector  Forward spectrometer.

PANDA collaboration meeting 2.-4. June 2004

simulation statusBenchmark channelBenchmark channel(Jan Zhong, Bochum)

• calculation and via

• best combination least

• cuts total energy, momentum

• efficiency: more than 20%

0 M

2/1.70 cMeV

2/7.1340 cMeVM

152

3 0

2

3 0

copp @62,2,3 00

]/[ 2cMeVM

2

3 0(talk in subgroup meeting)

Page 13: PANDA collaboration meeting2.-4. June 2004 simulation statusOverview New Framework  why  status  schedule Simulation subdetector  Forward spectrometer.

PANDA collaboration meeting 2.-4. June 2004

simulation statusBenchmark channelBenchmark channel

(Alexander Golischewski, Bochum)(Agnes Lundborg, Uppsala)

2 cpp

• comparison: EMC setup with constant crystal length and extended cystal length

• improved efficiency and resolution with extended crystal length

• background studies still under investigation

500:50:1:: 000 c

]/[ 2cGeVM

Page 14: PANDA collaboration meeting2.-4. June 2004 simulation statusOverview New Framework  why  status  schedule Simulation subdetector  Forward spectrometer.

PANDA collaboration meeting 2.-4. June 2004

simulation statusBenchmark channelBenchmark channel

(Francesca Ottone, Pavia)0sc KKpp

• 10000 events analysed with

• cuts energy 2.479 <E(CM)<3.479 GeV momentum P(CM)<0.5 GeV position of vertex D0<0.5mm; -0.5mm<Z0<0.5mm distance: primary to vertex < 2.5mm

]/[ 20 cGeVMsKK

[mm] K vertex :distance 0s

0SK

0SK

Page 15: PANDA collaboration meeting2.-4. June 2004 simulation statusOverview New Framework  why  status  schedule Simulation subdetector  Forward spectrometer.

PANDA collaboration meeting 2.-4. June 2004

simulation statusBenchmark channelBenchmark channel

(Andrei Sokolov, GSI/Giessen)cGeVDDpp /8@

• • selector for most important D°-decay modes• mass difference method

improvement of resolution

• still problems: Kaon & Pion identification matching: charged particles

with Cluster in EMC(TS)

]/[ 2

)(cGeVM

K

00* DPDG

Dinv

Dinv MMM

(talk in subgroup meeting)

0* DD

Page 16: PANDA collaboration meeting2.-4. June 2004 simulation statusOverview New Framework  why  status  schedule Simulation subdetector  Forward spectrometer.

PANDA collaboration meeting 2.-4. June 2004

simulation statusBenchmark channelBenchmark channel

(Marco Destefanis, Giessen)cGeVpp /4@

• asymmetry in efficiency:

• lifetime 60mm instead 78.9mm no energy loss in track reco new framework: Kalman fitter

][GeV/c and of Masses 2

than more 10%

(talk in subgroup meeting)

Page 17: PANDA collaboration meeting2.-4. June 2004 simulation statusOverview New Framework  why  status  schedule Simulation subdetector  Forward spectrometer.

PANDA collaboration meeting 2.-4. June 2004

simulation statusAgenda Agenda

Simulation subgroup meeting June 2th

• 15:30-15:36: General

• 15:36-15:50: Status of new framework (Matthias Steinke)

• 15:50-16:04: Simulation of FS (Piotr Hawranek)

• 16:04-16:18: (Andrei Sokolov)

• 16:18-16:32: (Olaf Hartmann)

• 16:32-16:46: (Jan Zhong)

• 16:46-17:00: (Marco Destefanis)

cGeVDDpp /8@

Xpp

cGeVpp /4@

copp @62,2,3 00