24970㎡ 313person s 2016/2 Environmental Communication FY2017 0persons Message from Compliance Administrator Compliance Administrators Main activities in FY2017 Target Result 285 Jalan Ahmad Ibrahim Singapore 639931 25176m² Lot area Total floor area Address Establishment day Employees Panasonic Group Site Report 2017 FY2017 :April 1, 2016 - March 31, 2017 Panasonic Factory Solutions Asia Pacific (PFSAP) Major Products 1978/12 ISO14001certificatio n date #VALUE! visitors on factory tour Information disclosure 1items Contact +65 6861 6665 To achieve Chemical BP plan ≦ 195 HEI count CO2 emissions actual result = 3,469 Ton (115%) Waste generation actual result = 178.28 Ton (151%) ISO14001renewe d AI set, CM602 set, NPM-W2, NPM-VF, Parts Making, SBD & CS, Agricultural Business Tatsuyoshi Ishii To achieve CO2 BP plan ≦ 3,985 Ton To achieve Waste BP plan ≦ 270 Ton 6items TEL: collaboration with municipality Corporate Management Centre Chemical actual result = 130 HEI count (150%) To achieve Water BP plan ≦ 28,620 m3 Water consumption actual result = 9,951 m3 (288%) Panasonic Factory Solutions Asia Pacific (PFSAP), Singapore has achieved yet another fruitful year in FY2017 from 1 April 2016 to 31 March 2017 in terms of environmental contribution and sustainability. Even as business and environmental conditions are becoming more and more challenging year after year, nevertheless through the strong efforts of our ISO 14001 Committee, PFSAP could still achieve all the key environmental targets for the Panasonic Group for energy usage (CO2 emissions), water usage, waste generation, chemical substance usage and the required number of environmental promotion activity carried out for the year. This year, the most important highlight of significant achievement by PFSAP to be mentioned would be the implementation of the solar panel leasing scheme project which resulted in completing the installation of 3,479 number of Panasonic HIT®2 294Wp solar panels on 3 of the buildings’ rooftop areas from July to September 2016. The entire solar panel PV system was officially commissioned and turned on for full operation in October 2016 by the Singapore Power authority. Based on the total solar panel capacity, PFSAP could expect to generate clean and renewable energy power of 1,194,660 kWh annually which is equivalent to about 20% of the total company’s annual energy consumption and thus able to reduce CO2 emissions by 630 tons per year. For information, PFSAP is the second company within the Panasonic Group in Singapore to have completed the solar panel installation. The first company was Panasonic Appliances Refrigeration Devices Singapore (PAPRDSG) which completed their solar panel system in 2015. Other environmental conservation activities carried out by PFSAP also included the painting of solar reflective paint for all the exterior buildings, air conditioning temperature audits, air leak diagnosis checks, water reduction measures for agricultural production, wasteisnotwaste recycling program and the various promotion activities conducted during the annual QES (QualityEnvironmentSafety) Month campaign in November 2016 including the environmental cleanup day. For OnePanasonic environmental events completed would include eco tour and solar light craft workshop at Marina Barrage, water awareness program and clean up activity at Kallang waterways and 10% energy and water challenge to encourage all Panasonic employees to save electricity and water at home. Next year FY2018 would be an important year for PFSAP for preparation to convert our existing ISO 14001 environmental management system to the new 2015 international standards. Our company targets to achieve the conversion audit by AprilMay 2018 ahead of the new standard transition timeline of September 2018. As part of global Panasonic corporate commitment, PFSAP would continue to drive environmental programs and activities for the good of environmental protection and conservation.
8

Panasonic Group Site Report 2017...Venue: Marina Barrage FY2016 PFSAP E‐Waste Recycling Collection Drive (24Jan 2017 ‐10 Feb 2017) Purpose: To raise the environmental awareness

Jul 19, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Panasonic Group Site Report 2017...Venue: Marina Barrage FY2016 PFSAP E‐Waste Recycling Collection Drive (24Jan 2017 ‐10 Feb 2017) Purpose: To raise the environmental awareness

24970㎡

313persons

2016/2

Environmental Communication FY2017

0persons

Message from Compliance Administrator

Compliance Administrators

Main activities in FY2017

Target Result

285 Jalan Ahmad Ibrahim Singapore 639931

25176m²Lot area Total floor area

Address

Establishment day Employees

Panasonic Group Site Report 2017FY2017 :April 1, 2016 - March 31, 2017

Panasonic Factory Solutions Asia Pacific (PFSAP)

Major Products

1978/12

ISO14001certification date

#VALUE!

visitors onfactory tour

Informationdisclosure

1items

Contact +65 6861 6665

To achieve Chemical BP plan ≦ 195 HEI count

CO2 emissions actual result = 3,469 Ton (115%)

Waste generation actual result = 178.28 Ton (151%)

ISO14001renewed

 AI set, CM602 set, NPM-W2, NPM-VF, Parts Making, SBD & CS,Agricultural Business

Tatsuyoshi Ishii

To achieve CO2 BP plan ≦ 3,985 Ton

To achieve Waste BP plan ≦ 270 Ton

6items

TEL:

collaboration withmunicipality

Corporate Management Centre

Chemical actual result = 130 HEI count (150%)

To achieve Water BP plan ≦ 28,620 m3 Water consumption actual result = 9,951 m3 (288%)

Panasonic Factory Solutions Asia Pacific (PFSAP), Singapore has achieved yet another fruitful year in FY2017 from 1 April 2016 to 31 March 2017 in terms of environmental contribution and sustainability.

Even as business and environmental conditions are becoming more and more challenging year after year, nevertheless through the strong efforts of our ISO 14001 Committee, PFSAP could still achieve all the key environmental targets for the Panasonic Group for energy usage (CO2 emissions), water usage, waste generation, chemical substance usage and the required number of environmental promotion activity carried out for the year.

This year, the most important highlight of significant achievement by PFSAP to be mentioned would be the implementation of the solar panel leasing scheme project which resulted in completing the installation of 3,479 number of Panasonic HIT®2 294Wp solar panels on 3 of the buildings’ roof‐top areas from July to September 2016. The entire solar panel PV system was officially commissioned and turned on for full operation in October 2016 by the Singapore Power authority. Based on the total solar panel capacity, PFSAP could expect to generate clean and renewable energy power of 1,194,660 kWh annually which is equivalent to about 20% of the total company’s annual energy consumption and thus able to reduce CO2 emissions by 630 tons per year. For information, PFSAP is the second company within the Panasonic Group in Singapore to have completed the solar panel installation.The first company was Panasonic Appliances Refrigeration Devices Singapore (PAPRDSG) which completed their solar panel systemin 2015.

Other environmental conservation activities carried out by PFSAP also included the painting of solar reflective paint for all the exterior buildings, air conditioning temperature audits, air leak diagnosis checks, water reduction measures for agriculturalproduction, waste‐is‐not‐waste recycling program and the various promotion activities conducted during the annual QES (Quality‐Environment‐Safety) Month campaign in November 2016 including the environmental clean‐up day.

For One‐Panasonic environmental events completed would include eco tour and solar light craft workshop at Marina Barrage, water awareness program and clean up activity at Kallang waterways and 10% energy and water challenge to encourage all Panasonic employees to save electricity and water at home.

Next year FY2018 would be an important year for PFSAP for preparation to convert our existing ISO 14001 environmental management system to the new 2015 international standards. Our company targets to achieve the conversion audit by April‐May 2018 ahead of the new standard transition timeline of September 2018.

As part of global Panasonic corporate commitment, PFSAP would continue to drive environmental programs and activities for the good of environmental protection and conservation.

Page 2: Panasonic Group Site Report 2017...Venue: Marina Barrage FY2016 PFSAP E‐Waste Recycling Collection Drive (24Jan 2017 ‐10 Feb 2017) Purpose: To raise the environmental awareness

Panasonic Group Site Report 2017FY2017 :April 1, 2016 - March 31, 2017

Panasonic Factory Solutions Asia Pacific (PFSAP)

Products of Environmentally-conscious information

Below are the environmentally friendly products (machine and agricultural business) produced by PFSAP:- Assembly of Surface Mounting Machines, Automated Old-Form / Axial / Radial Insertion, Jumper Wire Machines

Auto Insertion Machines

RG131RL132AV 132 JV131RG131‐S

NPM‐W2CM602‐L

Surface Mounting Machines

NPM‐VF

Surface Mounting Machines

PFSAP Agriculture Products

Nourish Mix Antioxidant Mix Vibrant Mix

Consumer Sales – Salad Pack Consumer Sales – SKU

Veggie Life Signature Salad

Mix

Mini Red Radish Mizuna Rainbow ChardKale

Salad Bowl Plus

Page 3: Panasonic Group Site Report 2017...Venue: Marina Barrage FY2016 PFSAP E‐Waste Recycling Collection Drive (24Jan 2017 ‐10 Feb 2017) Purpose: To raise the environmental awareness

Panasonic Group Site Report 2017FY2017 :April 1, 2016 - March 31, 2017

Panasonic Factory Solutions Asia Pacific (PFSAP)

Environmental performance data Year displayed in graph ex) 2017: April 1, 2016 - March 31, 2017

Energy Unit: 1000kl CO2 Emission Unit: 1000t-CO2

Natural Energy FY20

1000kW/h

Calculation standards

Water Unit: 1000m³ Waste Unit: 1000t, %

Circulated water Rain-water FY20m³ m³

Chemical substances Unit:t Chemical substances Unit:Count

Material balance of controlled substances FY20 Human/Environment Impact

into air

Handled 0.11 Recycled

0.16 0.00

Removed as Products

0.00 0.03

into waterway Transferred

0.00 into soil 0.02

0.00

About The Panasonic Group's Chemical Substances Management in Factories

About the above data http://panasonic.net/eco/factory/chemical_substance/

0.00 0.00

642.65

Numerical values for respective countries listed on the Calculation Tools in GHG Protocol website by World Business Council forSustainable Development (WBCSD) and World Resource Institute (WRI). Levels for 2002 (Electricity-Heat Steam Purchase_tool1.0_final)has been used for all years.

0.00 0.00 0.00 0.00 0.00

0.18 0.17 0.20 0.19 0.18

100 100 100 100 100

13 14 15 16 17

Final disposal Total Recycle rate

9.2 10.5

6.1

9.5 10.0

1.8

0.0

0.00.0

13 14 15 16 17

Municipal Industrial

3.013.20 3.17 3.31 3.47

13 14 15 16 17

1.47 1.56 1.55 1.62 1.69

13 14 15 16 17

Electricity

248.00212.90 220.80 236.40

163.10130.00 130.40

11 12 13 14 15 16 17

Page 4: Panasonic Group Site Report 2017...Venue: Marina Barrage FY2016 PFSAP E‐Waste Recycling Collection Drive (24Jan 2017 ‐10 Feb 2017) Purpose: To raise the environmental awareness

Panasonic Group Site Report 2017FY2017 :April 1, 2016 - March 31, 2017

Panasonic Factory Solutions Asia Pacific (PFSAP)

Compliance FY2017

<Air pollutant measurement results>

Unit Legal limitVoluntary

limitAverage

measuredMaximummeasured

Measuring frequency

SOx Nm³/h

NOx ppm

Particulate g/Nm³

<Water pollutant measurement results>

Unit Legal limitVoluntary

limitAveragemeasured

Maximummeasured

Measuring frequency

COD mg/l

BOD mg/l

Nitrogen mg/l

Phosphorus mg/l

<Noise and vibration>

Unit Legal limitVoluntary

limitAverage

measuredMaximummeasured

Measuring frequency

Noise dB DT

NT

Vibration dB DT

NT

*Legal limit: The strictest value out of those specified by laws, ordinances or agreements.

*N/A(not applicable):The meaning when the facility is exempted from the regulation.

About excess of legal limit value

Improvement of direction by government, or point outs by neighborOccurrence situation Countermeasure

Once every 3 yearsNA Once every 3 yearsNA

Once every 3 yearsOnce every 3 years

Once every 3 years

Once every 3 years

Once every 3 yearsOnce every 3 yearsOnce every 3 yearsOnce every 3 years

Once every 3 yearsOnce every 3 years

Once every 3 years

Measurement Area

Facility name

Once every 3 years

NANA

NA

Facility name

NA

NANA

0

Once every 3 yearsOnce every 3 yearsOnce every 3 years

00

Once every 3 years

NA

NA

NA

NA

NA

NA

NA

NA

NANA

NA

NA

NA Once every 3 years

0

NA

NANA

00

NA

Page 5: Panasonic Group Site Report 2017...Venue: Marina Barrage FY2016 PFSAP E‐Waste Recycling Collection Drive (24Jan 2017 ‐10 Feb 2017) Purpose: To raise the environmental awareness

Panasonic Group Site Report 2017FY2017 :April 1, 2016 - March 31, 2017

Panasonic Factory Solutions Asia Pacific (PFSAP)

Environmental Policy

Panasonic Factory Solutions Asia Pacific (PFSAP)285 Jalan Ahmad Ibrahim Singapore 639931

PFSAP ENVIRONMENTAL POLICY

Panasonic Factory Solutions Asia Pacific (PFSAP) is fully committed and pledged to promote environmental protection activities and awareness among employees, involving them to continuously work towards implementing measures to improve the environmental performance.

In implementing this policy, we are committed to:‐

• Ensure our activities, products and services comply with the environmental legislation and regulations and the requirements of Panasonic Corporation, Japan.

• Establish and achieve our environmental objectives and targets.

• Formulate and review environmental procedures to ensure effective support of the environmental management system. 

• Promote actively and ensure prudent use of materials such as oil, coolant and utilities so as to prevent pollution and minimize wastage.

• Communicate our Environmental Policy to our employees,   sub‐contractors and suppliers and make it available to the interested parties upon request.

________________________Revision 00 TATSUYOSHI ISHII

Environmental Awards for PFSAP

ISO 14001 EMS Certification Award by TUV SUD PSB,                                         

Singapore

Water Efficient Building AwardBCA Green Mark Gold Award  BCA Green Mark Gold Plus Award  Water Efficient Building 

BCA Green Mark Award by Building & Construction Authority, Singapore

Water Efficient Building Award by

Page 6: Panasonic Group Site Report 2017...Venue: Marina Barrage FY2016 PFSAP E‐Waste Recycling Collection Drive (24Jan 2017 ‐10 Feb 2017) Purpose: To raise the environmental awareness

Panasonic Group Site Report 2017FY2017 :April 1, 2016 - March 31, 2017

Panasonic Factory Solutions Asia Pacific (PFSAP)

Aiming to reduction of environmental impact

PFSAP SOLAR PANEL INSTALLATION PROJECTSolar Panel installation project for PFSAP was fully completedon 28 Sep 2016. The official PV System Turn‐On by SingaporePower (SP) was then carried out to effectively commence theoperation of solar panels (go “LIVE”) on 14 Oct 2016 in PFSAP.

Solar Reflective Painting

Sep 2016: Painting of Solar Reflective paint for all building To reduce in‐door temperature & air‐con energy consumption

Air Con Temperature Audit

Feb 2017: Completed Air Con Temperature Audit for PFSAP

To check no abnormality of air con system

Compress Air Supply Audit

Mar 2017: Conducted air leak diagnosis check in MFG, PM, Training Center, R&D room & Air compressor Room

Water Conservation Activities for Agricultural

Sep 2016: Reviewed pot washing method & procedure To reduce water waste & process time improvement

Soak pots/trays Wash Recycle water for next pre‐wash

Water Conservation Activities for Agricultural Apr 2016: Implement irrigation cart To reduce water waste & process time improvement

Water spillage & Discard excess mixed water/fertilizer

Irrigation cart:No excess mixed water/fertilizer

No water spillage

Page 7: Panasonic Group Site Report 2017...Venue: Marina Barrage FY2016 PFSAP E‐Waste Recycling Collection Drive (24Jan 2017 ‐10 Feb 2017) Purpose: To raise the environmental awareness

Panasonic Group Site Report 2017FY2017 :April 1, 2016 - March 31, 2017

Panasonic Factory Solutions Asia Pacific (PFSAP)

Environmental Communication

Panasonic Environment Month (Jun 16)

PFSAP Environment Month Promotional Activities:a. Dissemination of President’s Message

• Email (1 June)• Morning Assembly (13 June by EMR)

b. PFSAP Environmental Quiz Contest (1 to 17 June)• Received 47 entries and given out 10 prizes x $10 

voucher each to winnersc. PFSAP Environmental Toolbox Briefing (10 to 30 June)

• Topic: Awareness of PFSAP Environmental Regulations and Other Requirements

d. Make your Pledge and Take Action on Eco Action Day

Panasonic 10% Energy & Water Challenge (Jul – Oct 16)

To encourage employees to save energy & water in their household.

Employees who manage to reduce 10% of energy or water usage at home from Jul to Oct (vs. the period Mar to Jun), are eligible for the draw.  

PFSAP : 6 winners ($1,700)

Bring Your Own Reusable Container for Take‐Away Food (Dec 16)

Purpose: To encourage employees on eco‐practice to bring their own container for food take‐aways from Cafeteria

PFSAP QES Month Campaign (Nov 16)

1. Environmental Puzzle ContestDate: 2 – 14 Nov 2016 (2 weeks) Total received 118 entries and result has been announced to all employees on 25 Nov 2016. 

2. Salvation Army Donation Drive

Date: 14 ‐ 18 Nov 2016 (1 week)Venue: Outside PFSAP Cafeteria

3. PFSAP Environment Clean Up Day 

Date: 23 Nov 2016 (Wednesday)

Time: 3.30 pm ‐ 5.00 pmA total of 59 members participated, 73 kg (est.) of rubbish collected. 

4. Eco Tour & Solar Light Craft Workshop (by One Panasonic)

Date: 19 Nov 2016 (Saturday)

Time: 9.00 am to 12.30 pm

Venue: Marina Barrage

FY2016 PFSAP E‐Waste Recycling Collection Drive(24 Jan 2017 ‐ 10 Feb 2017)

Purpose: To raise the environmental awareness of waste recycling (3Rs ‐Reduce, Reuse, Recycle) of our employees.

Panasonic Eco Relay : Water Awareness Programme –Clean Up Activity (3 Mar 2017)

Page 8: Panasonic Group Site Report 2017...Venue: Marina Barrage FY2016 PFSAP E‐Waste Recycling Collection Drive (24Jan 2017 ‐10 Feb 2017) Purpose: To raise the environmental awareness

Panasonic Group Site Report 2017FY2017 :April 1, 2016 - March 31, 2017

Panasonic Factory Solutions Asia Pacific (PFSAP)

Emergency preparedness and response

FIRE DRILL @ 9DEC 16 IPP DRILL @ 29 MAR 16

PFSAP EMERGENCY DRILL (IPP / FIRE DRILL)

WSH TRAINING 

Forklift & Stacker Refresher Briefing  Manual Lifting Refresher Briefing 

Risk Assessment Refresher Briefing 

First Aider In House Refresher Training 

Table Top Exercise for Management & WSH Committee Members 

Emergency Response Team (ERT) Refresher Training