December 6, 2006. Panama City – Bay County International Airport Project Update. 1970. 1942. 1995. Source: Panama City – Bay County Airport Authority. Sector Overlay Plan Land Uses. Economic Development. Airline / General Aviation Aviation Related Industry - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Panama City –  Bay County International Airport Project Update

Panama City – Panama City – Bay County International AirportBay County International Airport

ProjectProject UpdateUpdate

December 6, 2006

Page 2: Panama City –  Bay County International Airport Project Update

1942

Source: Panama City – Bay County Airport Authority

1970 1995

Page 3: Panama City –  Bay County International Airport Project Update

Sector Sector Overlay Overlay

Plan Plan Land UsesLand Uses

Page 4: Panama City –  Bay County International Airport Project Update

Economic Development

• Airline / General Aviation

• Aviation Related Industry

• Thru-the-Fence Aviation Operations

• West Bay Area Sector Plan

• Regional Economic Development

Page 5: Panama City –  Bay County International Airport Project Update
Page 6: Panama City –  Bay County International Airport Project Update

Major Milestones

• Feasibility Study• Site Selection Study• Sector Plan and DSAP• State Permits• FAA Environmental

Impact Statement (EIS)

• Land Donation Agreement

• Design• USCOE 404 Permit• Permit Challenge• Zoning Regulations• Existing Airport Sale• Finalize Funding• Construction

Page 7: Panama City –  Bay County International Airport Project Update

Design – Percent Complete

• Site Development - 95%

• Paving/Lighting/Navaids – 50%

• Utilities – 50%

• Terminal Building – 50%

• Facilities (Rental Car, ATC, Maint., General Aviation, Public Safety) – 10%

• Landscaping, Irrigation, & Signage – 30%

Page 8: Panama City –  Bay County International Airport Project Update

Terminal Design

• Leadership In Energy and Environmental Design (LEED) Certification

• Silver Level – U.S. Green Building Council

• 20% reduction in energy use required (30% design goal)

• Approximately 100,000 sq. ft. (56,000 existing)

• Includes Customs and Immigration

Page 9: Panama City –  Bay County International Airport Project Update
Page 10: Panama City –  Bay County International Airport Project Update
Page 11: Panama City –  Bay County International Airport Project Update
Page 12: Panama City –  Bay County International Airport Project Update
Page 13: Panama City –  Bay County International Airport Project Update
Page 14: Panama City –  Bay County International Airport Project Update
Page 15: Panama City –  Bay County International Airport Project Update
Page 16: Panama City –  Bay County International Airport Project Update