Palisades Recreation Center - | dgs · 2004. 4. 17. · Palisades Recreation Center Palisades Citizens Association Meeting April 4th, 2017 5200 Sherier Place NW Washington, DC 20016
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
architectscox graae + spackPalisades Recreation Center CoverApril 4th 2017
Following Areas Located at Lower Level or Elsewhere on SiteGeneral Build. Equip. and Stor.Janitor's Closets/Mop SinkTrash /RecyclingServer/MDF RoomMechanical / Electrical Rooms
Subtotal
Total
Area
200incl. abv.
175
4201,670
130
incl. abv.
1,030
2500
6050
8,580
4,350
150170
100
120
3,200220930
incl. abv.
31037055
2,825
incl. abv.
375
1/16" = 1'
34
65
1211
98
1
7
10
1314
15 Overlook/Terrace
1
34
5
6
7
8
9
10
1112
13
14
15
Classroom
Lounge2
2
12
April 4th 2017
April 4th 2017
architectscox graae + spackPalisades Recreation Center Building ElevationsMarch 6th, 2017
1. Repair paint, wood structure2. Repair, paint wood dormer3. Repair metal roofing4. New wood shutter to match
original, typ.5. Repl. windows to closely match
original. Repair, paint wood trim6. Wood trim repair, repaint7. Repair gutters and downspouts8. New entry doors9. New Stair10. Clean, repair, repaint brick11. Not Used12. Not Used
Notes (Existing)
1. Not Used2. Brick3. Rusticated brick4. Slat mechanical equip. screen5. Metal coping color matched to
slate wall6. Slate wall cladding7. Horiz. Aluminum louvers color
matched to storefront8. Aluminum storefront9. Concrete wall10. Not Used11. New ramp12. Metal awning over entry doors13. Pre-finished metal wall panel
3 4 65
2
98
1
7
10
11
1 6
2
8
82 35 6
9
13
8 7
April 4th 2017
architectscox graae + spackPalisades Recreation Center Building ElevationsMarch 6th, 2017
1. Repair paint, wood structure2. Repair, paint wood dormer3. Repair metal roofing4. New wood shutter to match
original, typ.5. Repl. windows to closely match
original. Repair, paint wood trim6. Wood trim repair, repaint7. Repair gutters and downspouts8. New entry doors9. New Stair10. Clean, repair, repaint brick11. Not Used12. Not Used13. New ramp
Notes (Existing)
1. Scupper and Downspout2. Brick3. Rusticated brick4. Slat mechanical equip. screen5. Metal coping color matched to
slate wall6. Slate wall cladding7. Horiz. Aluminum louvers color
matched to storefront8. Aluminum storefront9. Concrete wall10. Not Used11. New Ramp12. Metal awning over entry doors13. Pre-finished metal wall panel
9
8
12 16
7
2 34 5 612 12
13
13 13
8 23 56
9
88
84 1
1111
April 4th 2017
April 4th 2017
April 4th 2017
April 4th 2017
April 4th 2017
April 4th 2017
April 4th 2017
April 4th 2017architectscox graae + spackPalisades Recreation Center Title BlockJanuary 5th, 2017