Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

Aug 19, 2018

Download

Documents

TrầnKiên
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief
Page 2: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

Pali Highway Improvement Projects

Page 3: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

Pali Highway Improvements ProjectsProposed Construction Schedules

2017

Pali Hwy Imprv –Phase 1

Dowsett Highlands Relief Sewers

2018 2019 2020

Pali Hwy Imprv –Phase 2

2021

WINTER 2020

SUMMER 2019

SPRING 2020

Page 4: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

NOISE VARIANCE CONSULTATIONPROJECT SCOPE OF WORK

NUUANU AVENUE • Installation of relief sewer along Nuuanu Avenue from

School Street to Wyllie Interchange.

• Open cut excavation which includes trenching, excavation and backfill, paving, new sewer line and manholes, traffic controls, and pavement markings shall be utilized along Nuuanu Avenue from School Street to Wyllie Interchange.

Page 5: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

NOISE VARIANCE CONSULTATIONPROJECT SCOPE OF WORK

PALI HIGHWAY • Installation of relief sewer along Pali Highway from

Wyllie Interchange to Nuuanu Pali Drive.

• Utilization of Guided Boring Method (GBM) for installation of relief sewers within Pali Highway where feasible. GBM is a trenchless installation method however still requires excavated 10’ diameter pits strategically situated at new sewer manhole locations for the tunneling / jacking machine.

• Contractor shall also be installing sewers within PaliHighway via open-cut excavation where required.

Page 6: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

Pali Highway ImprovementsTraffic Control between Country Club Road and Nuuanu Avenue – Honolulu Bound

Page 7: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

stream streamPali

Highway

EXISTING CONDITION

existing sewer

existing sewer

Proposed Relief Sewer Line

Page 8: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

existing sewer

existing sewernew

sewer

PROPOSED CONDITION

stream stream

Proposed Relief Sewer Line

PaliHighway

Page 9: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

existing sewer

existing sewernew

sewer

PROPOSED CONDITION

stream stream

Proposed Relief Sewer Line

PaliHighway

Page 10: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

Guided Boring Method

Access Shaft

Pilot Tube Drilling

Tunnel Boring & Pipe Jacking

Page 11: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

Open Cut Excavation

Trench Excavation

Pipe Laying

Backfilling Trench

Page 12: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

travel lane travel lanetravel lane

shoulder

medianside walk

paved shoulder

Current Conditions

FALL 2017

Pali Highway Construction Proposed Work Coordination

Page 13: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

travel lane travel lanetravel lane

widened shoulder

SPRING 2018

Pali Highway Construction Proposed Work Coordination

Pali Highway Improvements –Phase 1 – Shoulder Widening

medianside walk

paved shoulder

Page 14: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

new electrical

line

temporary lane markings

SUMMER 2018

reconstruct sidewalk

new highway

light

Pali Highway Improvements –Phase 1 – Lighting

Pali Highway Construction Proposed Work Coordination

work zone paved shoulder

10’ travel lane

10’ travel lane

10’ travel lane

medianside walk

paved shoulder

barricade

Page 15: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

barricade

new sewer

line

temporary lane markings

SPRING 2019

Dowsett Highlands Relief Sewer

new highway

light

new electrical

line

Pali Highway Construction Proposed Work Coordination

work zone paved shoulder

10’ travel lane

10’ travel lane

10’ travel lane

medianside walk

paved shoulder

Page 16: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

work zone

new sewer

line

temporary lane markings

reconstruct pavement

WINTER 2019

Dowsett Highlands Relief Sewer

new highway

light

new electrical

line

Pali Highway Construction Proposed Work Coordination

paved shoulder

10’ travel lane

10’ travel lane

10’ travel lane

medianside walk

paved shoulder

Page 17: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

paved shoulder

reconstruct pavement

SUMMER 2020

permanent lane markings

Pali Highway Improvements –Phase 2 – Repaving

Provide finished surface layer

new highway

light

new electrical

line

Pali Highway Construction Proposed Work Coordination

new sewer

line

11’ travel lane

11’ travel lane

11’ travel lane

medianside walk

widenedpaved

shoulder

Page 18: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

All Projects CompletedNew Sewer, Lighting, Pavement & Markings

WINTER 2020

new highway

light

new electrical

line

Pali Highway Construction Proposed Work Coordination

new sewer

line

11’ travel lane

11’ travel lane

11’ travel lane

medianside walk

widenedpaved

shoulder

paved shoulder

permanent lane markings

Page 19: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

NOISE VARIANCE CONSULTATIONNoise Regulations• HAR Title 11, Chapter 46 sets the rules and restrictions

on sound levels for construction projects. It states: “No permit shall allow any construction activities which emit noise:

• Monday thru Friday before 7 a.m. and after 6 p.m. of the same day

• Saturday before 9 a.m. and after 6 p.m. • Sundays and on Holidays”

• A Noise Variance must be obtained for any construction activities to occur outside the permissible hours (i.e. after 6 p.m. weekdays).

Page 20: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

• Noise Meeting was initially held July 26, 2017. Comments were received and revisions to the Noise Variance App have been incorporated.

• Requesting work be allowed 24 hours, 7 days a week during project schedule of June 2018 to June 2020.

• Night work enables project to meet Consent Decree deadline.

• Night work will increase safety to both motorists and pedestrians in the construction area to minimize the interaction between construction equipment and passenger vehicles.

NOISE VARIANCE CONSULTATION

Page 21: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

NOISE VARIANCE CONSULTATION

Begin Project LimitNuuanu Ave/School St

Nuuanu Ave PhaseSchool St to Wyllie St

Pali Hwy PhaseWyllie St to Dowsett Ave

Dowsett Ave DAYTIME

WORK

End Project LimitNuuanu Pali Dr

Pali HwyDowsett Ave to

DAYTIME WORK

Wyllie StreetDAYTIME WORK

Jack LaneDAYTIME WORK

Page 22: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

NOISE VARIANCE CONSULTATIONSOUND PROPAGATION

• Sound propagates uniformly outward in a spherical pattern and decreases with distance and shielding.

• As sound propagates over a distance, it changes in level and frequency. The sound level attenuates (or decreases) at a rate of 6 dB for each doubling of distance from the point source.

• As sound propagates over terrain with large objects or barriers in the path between a source and a receiver, the sound level can decrease at least 5 dB.

Page 23: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

NOISE VARIANCE CONSULTATIONCONSTRUCTION EQUIPMENT SOUND LEVELThis table illustrates sound levels of typical construction equipment anticipated to be used during construction.

Most of the equipment generates sound at a levels in the mid 80s at a distance of 50 feet however the distance is typically greater which reduces the sound level.

Page 24: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

ORIGINAL NOISE VARIANCE APPNIGHTWORK LIMITS

NUUANU AVE (SCHOOL ST TO WYLLIE ST)

Page 25: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

50’ DISTANCE FROM CONSTRUCTION(~85 dB outdoor)

(~80 dB indoor – garbage disposal)

NUUANU AVE (SCHOOL ST TO WYLLIE ST)

Page 26: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

100’ DISTANCE FROM CONSTRUCTION(~79 dB outdoor)

(~74 dB indoor – toilet, vacuum)

NUUANU AVE (SCHOOL ST TO WYLLIE ST)

Page 27: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

200’ DISTANCE FROM CONSTRUCTION(~73 dB outdoor)

(~68 dB indoor–shower, dishwasher)

NUUANU AVE (SCHOOL ST TO WYLLIE ST)

Page 28: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

400’ DISTANCE FROM CONSTRUCTION(~67 dB outdoor)

(~62 dB indoor– AC, conversation)

NUUANU AVE (SCHOOL ST TO WYLLIE ST)

Page 29: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

800’ DISTANCE FROM CONSTRUCTION(~61 dB outdoor)

(~56 dB indoor – refrigerator)

NUUANU AVE (SCHOOL ST TO WYLLIE ST)

Page 30: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

PALI HWY (WYLLIE TO NUUANU PALI DRIVE)

ORIGINAL NOISE VARIANCE APPNIGHTWORK LIMITS

Page 31: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

PALI HWY (WYLLIE TO NUUANU PALI DRIVE)

50’ DISTANCE FROM CONSTRUCTION(~85 dB outdoor)

(~80 dB indoor – garbage disposal)

Page 32: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

PALI HWY (WYLLIE TO NUUANU PALI DRIVE)

100’ DISTANCE FROM CONSTRUCTION(~79 dB outdoor)

(~74 dB indoor – toilet, vacuum)

Page 33: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

PALI HWY (WYLLIE TO NUUANU PALI DRIVE)

200’ DISTANCE FROM CONSTRUCTION(~73 dB outdoor)

(~68 dB indoor–shower, dishwasher)

Page 34: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

PALI HWY (WYLLIE TO NUUANU PALI DRIVE)

400’ DISTANCE FROM CONSTRUCTION(~67 dB outdoor)

(~62 dB indoor– AC, conversation)

Page 35: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

PALI HWY (WYLLIE TO NUUANU PALI DRIVE)

800’ DISTANCE FROM CONSTRUCTION(~61 dB outdoor)

(~56 dB indoor – refrigerator)

Page 36: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

• Out to bid in early 2018

• Once a Contractor has been awarded the project, coordination will begin to establish a viable construction schedule which minimizes impact to the public.

• Contractor shall notify residents of construction in their neighborhood with at least one week advance notice. Website will be used to update the public on project status and activities. Website: www.palisewer.org

NOISE VARIANCE CONSULTATION

Page 37: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

NOISE VARIANCE CONSULTATIONNOISE ABATEMENT

• Limit excavation work at night along the project areas.

• The louder construction equipment which includes hoe rams, jackhammers, and walk behind saw shall be limited to be used no later than 10:00 PM.

• Guided Boring Method work continuing uninterrupted from day operations into the night hours optimizes construction progress. GBM equipment such as the Horizontal Boring Hydraulic Jack Machine will be located at bottom of ~20’ deep excavated pit which provides a solid barrier all around and reduces the sound level at least an additional 5dB.

Page 38: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

NOISE VARIANCE CONSULTATIONNOISE ABATEMENT

Noise Abatement measures include the following:

• Contractor will be required to maintain all equipment in good working order.

• All equipment with an exhaust of gas or air will have mufflers.

• City personnel and Contractor will monitor all equipment and construction activities to ensure utilization of noise abatement measures.

• Instructional training sessions for construction crews and truck drivers to discuss proper noise abatement procedures for use of engine brakes, loading and unloading cargo, shouting, use of signal callers, and best management practices to reduce sound.

Page 39: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

NOISE VARIANCE CONSULTATIONNOISE ABATEMENT (CONT’D)

• Contractor shall have a hotline phone number available 24 hours to receive inquiries and any complaints answered by a live person.

• A job-site representative will be designated to immediately field any complaints for prompt response and will have the responsibility of monitoring quiet work procedures. The Contractor will have a corrective action program to respond to complaints and correct deficiencies.

Page 40: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

Potential impact if Noise Variance is not granted:

• Interaction between construction equipment and the public will increase.

• Project may not meet Consent Decree deadline.• Construction time and traffic duration will increase.• May delay and extend construction period for all

projects on Pali Highway.

40

NOISE VARIANCE CONSULTATION

Page 41: Pali Highway Improvement Projectspalisewer.org/wp-content/uploads/DOWSETT-Noise-Variance... · NOISE VARIANCE CONSULTATION PROJECT SCOPE OF WORK PALI HIGHWAY • Installation of relief

NOISE VARIANCE CONSULTATIONPUBLIC COMMENTS AND QUESTIONS

• Q&A SESSION

• Please be respectful to those speaking

• Please keep focused on the Noise Variance

• Any other project-related questions can be answered after the meeting once we complete the Noise Variance discussion.

• Any comments regarding the proposed Noise Variance for the City’s Dowsett Highlands Relief Sewer Project? Please make the comments tonight.