Water Exploration When you want to be sure about underground water quantity and quality in your properties We are more helpful then Google for search water!!
Water Exploration When you want to be sure about underground water quantity and quality in your properties
We are more helpful then
Google for search water!!
The Nature of Underground Water Most fresh groundwater occurs in the pore spaces
of sedimentary rocks and sediments. It has the
ability to flow laterally through these pore spaces
and establish a “water table” that is generally
horizontal or slightly sloping,
Why landowners need a geological resistivity survey?
Drilling for underground water is going costly day by day. It is a major
investment that many landowners are hesitant to make without
professional consultation. They want to be sure that the well is drilled
in a location where it will produce water of adequate quantity and
quality. This is why many people hire a geological resistivity survey.
Original picture of a survey for AL TARIQ CONTRACTING (Pvt Ltd) (LLC) The company need huge amount of water for LPG and other kind of tanks of hydro tests.
No need to be thirstier for water!!
How we do that’s?
HOW WE DO THAT’S By geophysical prospecting instrument, modern technology for find underground water quantity and quality.
Original survey picture of Jaffrani Steel Mills Karachi
Professional back support
An institutes with more than 50 years’ experience in water
technology, working institutes, location in China, Germany, USA,
Australia and Hong Kong. We share survey data with the team in
case understanding problems for any of projects.
How the instruments find underground water
By generate electrical currents in the ground, whose secondary
magnetic fields are in turn detected at the planetary surface. In this
way, the electrical conductivity of the subsurface can be
reconstructed; the device radars have been very useful in imaging
through ice and through very dry lands and low-density rocks. The
way of electromagnetic induction methods are widely used in
groundwater exploration.
Few simple images and water production data of Geological Resistivity Survey Report of project
Line 2 Signals image, find one curve
Line 2 Process Image, find one good location
FW2517 unit 3, Line 2 Point at 5.05/meter Point # 2 Best value # 1/BEST Bore depth Bit Casing Production Bit Casing Production
170/meter 7.5/inch 5/inch 20000/liter 12/inch 8/inch 30000/liter
270/meter 12/inch 8/inch 45000/liter 16/inch 12/inch 55000/liter
Line 3 Signals image, find two curves
Line 3 Process Image, find two good location
FW2517 unit 3, Line 6 Point at 7 /meter Point # 5 Best value # 6
Bore depth Bit Casing Production Bit Casing Production 160/meter 7.5/inch 5/inch 15000/liter 10/inch 7/inch 25000/liter
FW2517 unit 3, Line 6 Point at 11 /meter Point # 6 Best value # 3
Bore depth Bit Casing Production Bit Casing Production
170.meter 7.5/inch 5/inch 20000/liter 10/inch 7/inch 30000/liter
Line 7 Signals image, no any curves
Line 7 Process Image, No any good location
Note: The line not recommend for any of bore point, However water table is good, but the projects are more 7/point good then the line location
Survey types and costs
300/meter depth survey for huge amount of water requires industries:
1- Survey cover area 160 square meter or extra as per client require
2- Provide a main/best location for well or drill of bore.
3- Provide 5~9/other points for well or drill of bore.
4- Provide a complete information for depth of well/bore include
production of water and idea about test of underground water
150/meter depth survey for small amount of water requires industries:
1- Survey cover area 100 square meter or Extra as per client require
2- Provide a main/best location for well or drill of bore.
3- Provide 3~4/other points for well or drill of bore.
4- Provide a complete information for depth of well/bore include
production of water and idea about test of underground water
Time frame:
As client provides work Oder, Our best try will be within
2~4/days to do the survey.
Complete survey report we provide within 7/working days, after
the date of survey.
Normally we take 6~8/hours to complete the survey at site for
300/meter depth and 4~6 Hours for 150/meter depth
Charges:
For 300/meter depth Survey
PKR: 25,000+taxes are fixed for Karachi City
PKR: 125 for each extra square meter
For 150/meter depth Survey
PKR: 15,000+taxes are fixed for Karachi City
PKR: 125 for each extra square meter
Note:
The charges are 100% with money back guaranty in case our
provide data not match after well/Bore as 20%/+
Money back guaranty apply within 90/days
T.A.D.A apply for outside of Karachi city locations
Note:
Production of raw water is basic of 24/hours a day
Above only 3 result are shown of a project, each project result we provide for 10/line, and mostly we find near to 10 good location of in each project
The Klong Chao Waterfall of Koh Kood,
In Thailand, is an amazing water fact!!
Thailand's tropical climate is characterised by high temperatures and humidity
throughout the year. April and May feature the hottest temperatures while the
weather in June sees the monsoon pattern bringing heavy rain through to
October. November to February is the best time to visit Thailand as the weather is
relatively mild and sunny with humidity levels dropping and temperatures cooling
from the North East breeze. Thailand's average climate ranges from 30°C at its
lowest in December and up to 36°C from January to April. Rainfall generally
averages from 5mm in December to 300mm in September in central parts of
Thailand.
Don’t lose your hope because the Klong Chao Waterfall in an island,
nearest Glaciers maybe near to 5000/KM of the location, but water
continually fall in 24/hours and 365/days
You just need to know a good location for well/bore
Please contact Pakistan water treatment “technical team” for more details and plan for your project survey. Contact Person: Mr. Suleman Mandra (Technical Team Head) Cellphone/whatapp: +923223344402. +923362477983 Office phones: +922132272007 & 8 Email: [email protected] Web: www.pakistaniwater.com Like us at social media: https://web.facebook.com/Pakistani.water/ Office address: 1508/B, Saima Trade Tower, I I Chundrigar Road, Karachi. Workshop addeess: Workshop: Main Suparco Road, Mawach Goth, Baldia Town, Karachi,
Please consider the environment before printing