Pakistan Power Sector General Overview Mian. Muhammad Hamid Chief Engineer Peshawar Electric Supply Company (PESCO)
11

Pakistan Power Sector - SAARC Energy · 2018-05-16 · Power Sector - Background WAPDA was established in 1958 with the following mandate: •Meet electricity demand of the country

May 21, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Pakistan Power Sector - SAARC Energy · 2018-05-16 · Power Sector - Background WAPDA was established in 1958 with the following mandate: •Meet electricity demand of the country

Pakistan Power SectorGeneral Overview

Mian. Muhammad Hamid

Chief Engineer

Peshawar Electric Supply Company (PESCO)

Page 2: Pakistan Power Sector - SAARC Energy · 2018-05-16 · Power Sector - Background WAPDA was established in 1958 with the following mandate: •Meet electricity demand of the country

Power Sector - Background

WAPDA was established in 1958 with the following mandate:

• Meet electricity demand of the country (except area of Karachi) by constructing new power plants, transmission lines and distribution system.

• Develop hydro storage projects for meeting irrigation demand of the country and construct hydro power plants.

Page 3: Pakistan Power Sector - SAARC Energy · 2018-05-16 · Power Sector - Background WAPDA was established in 1958 with the following mandate: •Meet electricity demand of the country

Existing Installed Generation Capacity as on 30-06-2017

3

Sr.

No.Description Installed Capacity (MW)

1. WAPDA Hydro 6,902

2. GENCOs Thermal 4,837

3. Nuclear 1,345

4. IPPs Hydro 281

5. IPPs Thermal 12,717

6. Bagasse 281

7. Wind 784

8. Solar 400

Total 27,266

Page 4: Pakistan Power Sector - SAARC Energy · 2018-05-16 · Power Sector - Background WAPDA was established in 1958 with the following mandate: •Meet electricity demand of the country

Existing Installed Capacity

WAPDA Hydro, 6,902, 26%

GENCOs Thermal, 4,837,

18%

Nuclear,1,005, 4%IPPs Hydro,

195, 1%

IPPs Thermal, 12,372, 46%

Bagasse, 281, 1%

Wind,684, 3%

Solar,400, 1%

Page 5: Pakistan Power Sector - SAARC Energy · 2018-05-16 · Power Sector - Background WAPDA was established in 1958 with the following mandate: •Meet electricity demand of the country

• NTDC is responsible for Control and Monitoring of power plants and 500/220 kV Power Network of the country excluding Karachi.

▪ Power Plants: 76 Nos.

▪ 500 kV Grid Stations: 14 Nos.

▪ 220 kV Grid Stations: 39 Nos.

▪ 500 kV Transmission Lines: 5271 KM

▪ 220 kV Transmission Lines: 9686 KM

5

Existing System as of June 2017

Page 6: Pakistan Power Sector - SAARC Energy · 2018-05-16 · Power Sector - Background WAPDA was established in 1958 with the following mandate: •Meet electricity demand of the country

Existing Transmission Network of NTDC

Page 7: Pakistan Power Sector - SAARC Energy · 2018-05-16 · Power Sector - Background WAPDA was established in 1958 with the following mandate: •Meet electricity demand of the country

7

Page 8: Pakistan Power Sector - SAARC Energy · 2018-05-16 · Power Sector - Background WAPDA was established in 1958 with the following mandate: •Meet electricity demand of the country

Generation Mix For Peak Generation as on 03-06-2017,

19020 MW

Hydel32%

Gencos17%

Thermal Ipps44%

Nuclear5%

Wind2%

Solar0%

Page 9: Pakistan Power Sector - SAARC Energy · 2018-05-16 · Power Sector - Background WAPDA was established in 1958 with the following mandate: •Meet electricity demand of the country

Transmission System Information

Description 500 kV 220 kVGeneration

Addition

No. of

Grid

Stations

Capacity

(MVA)

T/L

(km)

No. of

Grid

Stations

Capacity

(MVA)

T/L

(km)(MW)

Installed Capacity as

of April 201716 19,824 5,278 41 26,763 9,199 27,266

Proposed addition

upto:

2017-18

02 4,800 2,049 10 7,110 761 6,112

2018-19 03 4,950 152 03 10,306 485 2,965

2019-20 01 1,500 501 04 2,500 573 4,086

2020-21 01 1,500 131 01 500 44 5,448

2021-22 - - 815 03 1,500 73 4,740

Total 23 32,574 8,926 62 48,679 11,135 50,617

Page 10: Pakistan Power Sector - SAARC Energy · 2018-05-16 · Power Sector - Background WAPDA was established in 1958 with the following mandate: •Meet electricity demand of the country

Planned Transmission Network of NTDC (2021-22)

Page 11: Pakistan Power Sector - SAARC Energy · 2018-05-16 · Power Sector - Background WAPDA was established in 1958 with the following mandate: •Meet electricity demand of the country