Page 1
NAME OF PROJECT : CONSTRUCTION OF WOMEN UNIVERSITY MARDAN
PAKAGE- 01
BILL OF QUANTITY
Estimated Cost
in (Millions) Rs. 474.081/-
GENERAL ABSTRACT OF COST
S.No. DESCRIPTIONS TOTAL AMOUNT RS. TOTAL AMOUNT
RS. (M) REMARKS
1 CONSTRUCTION OF ACADEMIC BLOCK (SCIENCES)
Civil Works 444,105,471.550 Rs. 444.105
Internal Electrification 24,250,579.320 Rs. 24.251
Internal Water Supply & Sewerage System 5,725,033.740 Rs. 5.725
Total Amount Rs. 474,081,084.610 Rs. 474.081
Add % Above / Below / AT-Par on all BOQ items (Schedule
items and Non Schedule items)
Sign & Seal of the Bidder
______________
Project Manager
________________ Director P&D
________________
Vice Chancellor MAK Engineering Services
In Association With WADAN
Consultants Peshawar
Women University Mardan Women University
Mardan
Page 2
Package-01_Academic Block-01
CONSTRUCTION OF ACADEMIC BLOCK (SCIENCES)
SECTION : 01
CIVIL WORKS
S.No MRS 2017
Item No. Description of Items Units Quantity
Item Rate
(Rs) Total Amount (Rs)
SCHEDULE ITEMS
1.1 - WORKS IN SUB-STRUCTURE
1 03-23-d Excavation in foundation of building, bridges etc complete : in shingle/gravel
m3 14,410.92 273.34 3,939,080.87
2 03-17-a+18-
a,b,c,d
Transportation of earth all types for every
1 km extra lead or part thereof beyond8 km.(Upto 2 KM)
m3
4,323.28
272.09
1,176,321.26
3
03-22
Dressing of earthwork (done by machinery
or otherwise & left undressed) to designed section
m2
4,113.41
9.81
40,352.55
4
03-16-a
Filling, watering and ramming earth under
floor with surplus earth from foundation, etc
m3
7,205.46
103.30
744,324.02
5 26-15 Spraying anti-termite liquid mixed with water in the ratio of 1:40
m2 4,856.44 13.59 65,999.02
6
06-05-i
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:4:8)
m3
413.53
5,481.08
2,266,591.01
7
06-06-b-03
RCC in raft foundation slab, base slab of
column & ret. wall etc, not including in 06- 06. Type C(1:2:4)
m3
2,532.28
8,330.73
21,095,740.96
8
06-06-b-02
RCC in raft foundation slab, base slab of
column & ret. wall etc, not including in 06- 06 Type B (1:1.5:3)
m3
644.72
9,724.42
6,269,528.06
9
06-38-b Erecting & removing formwork to concrete
in any shape / position (Vertical)
m2
512.08
552.50
282,924.20
10
06-07-b
Supply & fabricate M.S. reinforcement for
cement concrete (Hot rolled deformed bars Grade 60)
Tonne
712.78
111,598.88
79,545,449.69
11 07-04-a-03 Pacca brick work in foundation and plinth in Cement, sand mortar 1:4
m3 437.09 8,052.81 3,519,802.72
12
12-56-a
Supply and Fixing MS Sheet 16
guage(10x20 feet) box type chowkats
including fixing in position with all charges
for Hold fast, Hinges and Painting etc
m
712.65
1,160.97
827,365.27
13
12-07-c
First class deodar wood wrought joinery in
doors and windows etc. complete : 1.5" thick
m2
479.23
14,144.77
6,778,598.13
14 12-41-a Fixing Door including chowkats Each 94.00 590.63 55,519.22
15
12-53-d-01
Supply and Fixing aluminium
door/window, Premium 4" sect. Sliding window
m2
286.90
8,300.02
2,381,275.74
16
12-54-e-03
Supply and Fixing aluminium
bronze/black. Other items : Flyscreen shutter with separate outer frame
m2
286.90
3,653.29
1,048,128.90
17
10-26-d
### Providing and Laying marble fine
dressed stone 2-6 feet and 12" wide 1"
thick for Window sills, as per Design and
Drawings, instructions and approval of the Engineer.
m2
48.79
2,023.17
98,710.46
18 07-30 Supplying and filling sand under floor or plugging in wells
m3 3,077.06 1,059.40 3,259,837.36
Page 3
Package-01_Academic Block-01
S.No MRS 2017
Item No. Description of Items Units Quantity
Item Rate
(Rs) Total Amount (Rs)
19
06-05-i
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:4:8)
m3
338.48
5,481.08
1,855,235.96
20
06-05-f
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4)
m3
256.42
7,257.86
1,861,060.46
21 11-10-b Cement plaster 3/8" thick under soffit of RCC roof slabs
m2 1,951.95 255.89 499,484.49
22
12-40
Supply and Fixing accoustic miller fibre
tile ceiling fixed with aluminium tee hung by GI wire fixed in roof
m2
1,540.93
1,785.48
2,751,299.70
23 11-09-b Cement plaster 1:4 upto 20' height 1/2" thick
m2 9,449.47 217.80 2,058,094.57
24
10-26-b
Provide & lay marble fine dressed stone
flooring on surface in white cement
complete: 1" thick (Badel, Silky black, Sunny white, Sunny Grey or eq)
m2
3,907.95
2,136.04
8,347,537.52
25
06-24-b-03
V. Damp proof c/s plaster, 1 layer
polythene 2 coats bitumen Ratio 1:3 (0.5"
thick), (Washrooms Kitchen wall)
m2
423.43
494.25
209,280.28
26
06-22-b-01
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene
& 2 coats bitumen (1.5"thick)
m2
139.85
611.86
85,568.62
27
10-38-b Glazed tile 1/4" thick dado jointed in white
cement complete : Coloured Plain tiles
m2
393.56
1,541.12
606,523.19
28
10-46-a P/F Ceramic Floor Tiles (Emco, National
or eq) Size : 12" x 12" (BathFloors)
m2
139.85
1,776.21
248,402.97
29 10-26-g Providing and fixing glazed tile colour printed border 3" wide
m 239.59 637.98 152,853.63
30
10-26-d
Providing and Laying marble fine dressed
stone 4-5 feet and 12" wide 1" thick for stairs steps.
m2
80.92
2,023.17
163,714.92
31
10-41-b
Provide & lay marble fine dressed and
polished stone dado or skirting in white
cement complete : 1/2" thick (Badel, Silky
black, Sunny white, Sunny Grey or eq)
m2
40.30
1,408.99
56,782.30
32
10-26-b
Provide & lay marble fine dressed stone
flooring on surface in white cement
complete: 1" thick (Badel, Silky black, Sunny white, Sunny Grey or eq)
m2
40.89
2,136.04
87,342.68
33 10-50 Chemical polishing of marble floor/Dado m2 4,070.06 253.49 1,031,719.51
34 12-20-a-01 Extra for providing/fixing approved quality Rim locks : Imported
Each 18.00 1,784.63 32,123.34
35 13-08-a French polishing complete: On new work m2 958.46 671.29 643,404.61
36 13-09-
a+b+c
Varnishing wood work, including cleaning
& preparing surface : Three coats.
m2
958.46
218.34
209,270.16
37 13-30-a+(b
x 2)
Preparing surface and painting with
emulsion paint : 2nd & each subsequent coat.
m2
8,451.72
323.25
2,732,018.49
38
13-38-(a+b)
Preparing surface & painting with
snowcem / weather shield paint : 2nd& subsequent coats
m2
3,375.09
266.05
897,942.69
39
16-43
Supply and Fixing poly strene fill in
Expansion joints & under diaphragms at
transoms.
m3
4.97
1,403.68
6,976.29
Page 4
Package-01_Academic Block-01
S.No MRS 2017
Item No. Description of Items Units Quantity
Item Rate
(Rs) Total Amount (Rs)
40 06-19 Providing and fixing 6" wide GI sheet 18 SWG. stopper to expansion joint.
m 141.46 266.99 37,768.41
1.2 - WORK AT GROUND FLOOR
41
06-06-a-03
RCC in roof slab, beam, column & other
structural members, insitu or precast.
Type C(1:2:4)
m3
1,454.36
9,538.28
13,872,092.90
42
06-06-a-02
RCC in roof slab, beam, column & other
structural members, insitu or precast.
Type B(1:1.5:3)
m3
135.93
10,561.09
1,435,568.96
43
06-07-b
Supply & fabricate M.S. reinforcement for
cement concrete (Hot rolled deformed
bars Grade60)
Tonne
254.85
111,598.88
28,440,974.57
44 07-05-a-04 Pacca brick work in ground floor Cement, sand mortar 1:5
m3 2,501.88 8,452.87 21,148,066.40
45 07-05-a-03 Pacca brick work in ground floor Cement, sand mortar 1:4
m3 1.23 8,623.05 10,606.35
46 07-16-b-04 Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:5
m2 2,346.05 829.85 1,946,869.59
47 11-18-a Cement pointing struck joints, on walls, upto 20' height : Ratio 1:2
m2 637.22 239.39 152,544.10
48
11-31
Extra cost of labour& material for red
oxide pigment in cement pointing to match bricks
m2
637.22
24.22
15,433.47
49
12-56-a
Supply and Fixing MS Sheet 16
guage(10x20 feet) box type chowkats
including fixing in position with all charges
for Hold fast, Hinges and Painting etc
m
745.58
1,160.97
865,596.01
50
12-07-c
First class deodar wood wrought joinery in
doors and windows etc. complete : 1.5"
thick
m2
350.33
14,144.77
4,955,337.27
51 12-41-a Fixing Door including chowkats Each 96.00 590.63 56,700.48
52
12-53-d-01
Supply and Fixing aluminium
door/window, Premium 4" sect.Sliding window
m2
278.53
8,300.02
2,311,804.57
53
12-54-e-03
Supply and Fixing aluminium
bronze/black. Other items : Flyscreen shutter with separate outer frame
m2
278.53
3,653.29
1,017,550.86
54
10-26-d
### Providing and Laying marble fine
dressed stone 2-6 feet and 12" wide 1"
thick for Window sills, as per Design and
Drawings, instructions and approval of the Engineer.
m2
47.40
2,023.17
95,898.26
55 07-30 Supplying and filling sand under floor or plugging in wells
m3 178.42 1,059.40 189,018.15
56
06-05-i
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:4:8)
m3
14.87
5,481.08
81,503.66
57
06-05-f
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio
1:2:4)
m3
268.85
7,257.86
1,951,275.66
58
10-15-e
Provide & lay topping of concrete 1:2:4,
including surface finishing & dividing in
panels : 2" thick
m2
745.82
577.81
430,942.25
59
10-43-d
Providing and Fixing marble strip 2" wide
and 3/8" thick for dividing the floor into
panels
m
815.55
25.84
21,073.81
60
10-45
P/F Precast Concrete 7000 psi TUFF
Tiles over bed of 2" thick sand & 4" thick
brick ballast comp
m2
212.39
1,089.11
231,316.07
Page 5
Package-01_Academic Block-01
S.No MRS 2017
Item No. Description of Items Units Quantity
Item Rate
(Rs) Total Amount (Rs)
61 11-10-b Cement plaster 3/8" thick under soffit of RCC roof slabs
m2 1,873.39 255.89 479,381.77
62
12-40
Supply and Fixing accoustic miller fibre
tile ceiling fixed with aluminium tee hung by GI wire fixed in roof
m2
1,515.65
1,785.48
2,706,162.76
63 11-09-b Cement plaster 1:4 upto 20' height 1/2" thick
m2 9,661.53 217.80 2,104,281.23
64
10-26-b
Provide & lay marble fine dressed stone
flooring on surface in white cement
complete: 1" thick (Badel, Silky black, Sunny white, Sunny Grey or eq)
m2
3,172.28
2,136.04
6,776,116.97
65
06-24-b-03
V. Damp proof c/s plaster, 1 layer
polythene 2 coats bitumen Ratio 1:3 (0.5" thick), (Washrooms Kitchen wall)
m2
390.26
494.25
192,886.01
66
06-22-b-01
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene
& 2 coats bitumen (1.5"thick)
m2
150.08
611.86
91,827.95
67
10-38-b Glazed tile 1/4" thick dado jointed in white
cement complete : Coloured Plain tiles
m2
377.94
1,541.12
582,450.89
68
10-46-a P/F Ceramic Floor Tiles (Emco, National
or eq) Size : 12" x 12" (BathFloors)
m2
150.08
1,776.21
266,573.60
69 10-26-g Providing and fixing glazed tile colour printed border 3" wide
m 213.37 637.98 136,125.79
70
10-26-d
Providing and Laying marble fine dressed
stone 4-5 feet and 12" wide 1" thick for stairs steps.
m2
218.02
2,023.17
441,091.52
71
10-41-b
Provide & lay marble fine dressed and
polished stone dado or skirting in white
cement complete : 1/2" thick (Badel, Silky
black, Sunny white, Sunny Grey or eq)
m2
105.14
1,408.99
148,141.21
72
10-26-b
Provide & lay marble fine dressed stone
flooring on surface in white cement
complete: 1" thick (Badel, Silky black, Sunny white, Sunny Grey or eq)
m2
129.01
2,136.04
275,570.52
73 10-50 Chemical polishing of marble floor/Dado m2 3,624.45 253.49 918,761.83
74 12-20-a-01 Extra for providing/fixing approved quality Rim locks : Imported
Each 18.00 1,784.63 32,123.34
75 13-08-a French polishing complete: On new work m2 591.36 671.29 396,974.05
76 13-09-
a+b+c
Varnishing wood work, including cleaning
& preparing surface : Three coats.
m2
591.36
218.34
129,117.54
77 13-30-a+(b
x 2)
Preparing surface and painting with
emulsion paint : 2nd & each subsequent coat.
m2
8,384.19
323.25
2,710,189.42
78
16-43
Supply and Fixing polystrene fill in
expansion joints & under diaphragms at transoms.
m3
4.97
1,403.68
6,976.29
79 06-19 Providing and fixing 6" wide GI sheet 18 SWG. stopper to expansion joint.
m 141.46 266.99 37,768.41
1.3- WORK AT FIRST FLOOR
80
06-06-a-03
RCC in roof slab, beam, column & other
structural members, insitu or precast.
Type C(1:2:4)
m3
764.92
9,538.28
7,296,021.14
Page 6
Package-01_Academic Block-01
S.No MRS 2017
Item No. Description of Items Units Quantity
Item Rate
(Rs) Total Amount (Rs)
81
06-06-a-02
RCC in roof slab, beam, column & other
structural members, insitu or precast. Type B (1:1.5:3)
m3
135.93
10,561.09
1,435,568.96
82 06-06-e Add extra labour for RCC in 2nd & subsequent storeys
m3 900.84 844.24 760,525.16
83
06-07-b
Supply & fabricate M.S. reinforcement for
cement concrete (Hot rolled deformed
bars Grade60)
Tonne
144.36
111,598.88
16,110,414.32
84 07-05-a-04 Pacca brick work in ground floor Cement, sand mortar 1:5
m3 1,285.92 8,452.87 10,869,714.59
85 07-05-a-03 Pacca brick work in ground floor Cement, sand mortar 1:4
m3 1.23 8,623.05 10,606.35
86 07-06-a Add extra on item No.07-05 for brick work in First floor
m3 1,287.15 417.29 537,114.82
87 07-16-b-04 Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:5
m2 2,346.05 829.85 1,946,869.59
88 07-17-a Add extra on item No. 07-16 for pacca brick work in First floor
m2 2,346.05 51.76 121,431.55
89 11-18-a Cement pointing struck joints, on walls, upto 20' height : Ratio 1:2
m2 637.22 239.39 152,544.10
90
11-31
Extra cost of labour& material for red
oxide pigment in cement pointing to match bricks
m2
637.22
24.22
15,433.47
91
12-56-a
Supply and Fixing MS Sheet 16
guage(10x20 feet) box type chowkats
including fixing in position with all charges
for Hold fast, Hinges and Painting etc
m
693.75
1,160.97
805,422.94
92
12-07-c
First class deodar wood wrought joinery in
doors and windows etc. complete : 1.5"
thick
m2
285.27
14,144.77
4,035,078.54
93 12-41-a Fixing Door including chowkats Each 94.00 590.63 55,519.22
94
12-53-d-01
Supply and Fixing aluminium
door/window, Premium 4" sect.Sliding window
m2
287.45
8,300.02
2,385,840.75
95
12-54-e-03
Supply and Fixing aluminium
bronze/black. Other items : Flyscreen shutter with separate outer frame
m2
287.45
3,653.29
1,050,138.21
96
10-26-d
### Providing and Laying marble fine
dressed stone 2-6 feet and 12" wide 1"
thick for Window sills, as per Design and
Drawings, instructions and approval of the Engineer.
m2
48.88
2,023.17
98,892.55
97
06-05-f
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4)
m3
253.98
7,257.86
1,843,351.28
98 06-12-b Extra labour for laying concrete (plain or reinforced) For every extra10' height
m3 253.98 397.29 100,903.71
99 11-10-b Cement plaster 3/8" thick under soffit of RCC roof slabs
m2 1,856.44 255.89 475,044.43
100
12-40
Supply and Fixing accoustic miller fibre
tile ceiling fixed with aluminium tee hung
by GI wire fixed in roof
m2
388.21
1,785.48
693,141.19
101 11-09-b Cement plaster 1:4 upto 20' height 1/2" thick
m2 8,056.50 217.80 1,754,705.70
102
10-26-b
Provide & lay marble fine dressed stone
flooring on surface in white cement
complete: 1" thick (Badel, Silky black, Sunny white, Sunny Grey or eq)
m2
3,159.85
2,136.04
6,749,565.99
103
06-24-b-03
V. Damp proof c/s plaster, 1 layer
polythene 2 coats bitumen Ratio 1:3 (0.5" thick), (Washrooms Kitchen wall)
m2
390.26
494.25
192,886.01
Page 7
Package-01_Academic Block-01
S.No MRS 2017
Item No. Description of Items Units Quantity
Item Rate
(Rs) Total Amount (Rs)
104
06-22-b-01
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene
& 2 coats bitumen (1.5"thick)
m2
150.08
611.86
91,827.95
105
10-38-b Glazed tile 1/4" thick dado jointed in white
cement complete : Coloured Plain tiles
m2
377.94
1,541.12
582,450.89
106
10-46-a P/F Ceramic Floor Tiles (Emco, National
or eq) Size : 12" x 12" (BathFloors)
m2
150.08
1,776.21
266,573.60
107 10-26-g Providing and fixing glazed tile colour printed border 3" wide
m 213.37 637.98 136,125.79
108
10-26-d
Providing and Laying marble fine dressed
stone 4-5 feet and 12" wide 1" thick for stairs steps.
m2
80.92
2,023.17
163,714.92
109
10-41-b
Provide & lay marble fine dressed and
polished stone dado or skirting in white
cement complete : 1/2" thick (Badel, Silky
black, Sunny white, Sunny Grey or eq)
m2
36.59
1,408.99
51,554.94
110
10-26-b
Provide & lay marble fine dressed stone
flooring on surface in white cement
complete: 1" thick (Badel, Silky black, Sunny white, Sunny Grey or eq)
m2
129.01
2,136.04
275,570.52
111 10-50 Chemical polishing of marble floor/Dado m2 3,406.36 253.49 863,478.20
112
10-18
Extra labour for each storey above ground
for mosaic, conglomerate, tiles, stone & wood floor
m2
4,048.31
45.39
183,752.79
113 12-20-a-01 Extra for providing/fixing approved quality Rim locks : Imported
Each 18.00 1,784.63 32,123.34
114 13-08-a French polishing complete: On new work m2 570.54 671.29 382,997.80
115 13-09-
a+b+c
Varnishing wood work, including cleaning
& preparing surface : Three coats.
m2
570.54
218.34
124,571.70
116 13-30-a+(b
x 2)
Preparing surface and painting with
emulsion paint : 2nd & each subsequent coat.
m2
7,114.64
323.25
2,299,807.38
117
16-43
Supply and Fixing polystrene fill in
expansion joints & under diaphragms at transoms.
m3
4.97
1,403.68
6,976.29
118 06-19 Providing and fixing 6" wide GI sheet 18 SWG. stopper to expansion joint.
m 141.46 266.99 37,768.41
1.4 - WORK AT SECOND FLOOR
119
06-06-a-03
RCC in roof slab, beam, column & other
structural members, insitu or precast.
Type C(1:2:4)
m3
764.92
9,538.28
7,296,021.14
120
06-06-a-02
RCC in roof slab, beam, column & other
structural members, insitu or precast.
Type B(1:1.5:3)
m3
135.93
10,561.09
1,435,568.96
121 06-06-ex2 Add extra labour for RCC in 2nd & subsequent storeys
m3 900.84 1,688.48 1,521,050.32
122
06-07-b
Supply & fabricate M.S. reinforcement for
cement concrete (Hot rolled deformed bars Grade 60)
Tonne
144.36
111,598.88
16,110,414.32
123 07-05-a-04 Pacca brick work in ground floor Cement, sand mortar 1:5
m3 1,285.92 8,452.87 10,869,714.59
124 07-05-a-03 Pacca brick work in ground floor Cement, sand mortar 1:4
m3 1.23 8,623.05 10,606.35
Page 8
Package-01_Academic Block-01
S.No MRS 2017
Item No. Description of Items Units Quantity
Item Rate
(Rs) Total Amount (Rs)
125 07-06-b Add extra on item No.07-05 for brick work in in Second floor
m3 1,287.15 794.71 1,022,910.98
126 07-16-b-04 Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:5
m2 2,346.05 829.85 1,946,869.59
127 07-17-b Add extra on item No. 07-16 for pacca brick work in Second floor
m2 2,346.05 109.26 256,329.42
128 11-18-a Cement pointing struck joints, on walls, upto 20' height : Ratio 1:2
m2 637.22 239.39 152,544.10
129
11-31
Extra cost of labour& material for red
oxide pigment in cement pointing to match bricks
m2
637.22
24.22
15,433.47
130
12-56-a
Supply and Fixing MS Sheet 16
guage(10x20 feet) box type chowkats
including fixing in position with all charges
for Hold fast, Hinges and Painting etc
m
693.75
1,160.97
805,422.94
131
12-07-c
First class deodar wood wrought joinery in
doors and windows etc. complete : 1.5" thick
m2
285.27
14,144.77
4,035,078.54
132 12-41-a Fixing Door including chowkats Each 94.00 590.63 55,519.22
133
12-53-d-01
Supply and Fixing aluminium
door/window, Premium 4" sect.Sliding window
m2
287.45
8,300.02
2,385,840.75
134
12-54-e-03
Supply and Fixing aluminium
bronze/black. Other items : Flyscreen shutter with separate outer frame
m2
287.45
3,653.29
1,050,138.21
135
10-26-d
### Providing and Laying marble fine
dressed stone 2-6 feet and 12" wide 1"
thick for Window sills, as per Design and
Drawings, instructions and approval of the Engineer.
m2
48.88
2,023.17
98,892.55
136
06-05-f
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio
1:2:4)
m3
253.98
7,257.86
1,843,351.28
137 06-12-b Extra labour for laying concrete (plain or reinforced) For every extra10' height
m3 253.98 397.29 100,903.71
138 11-10-b Cement plaster 3/8" thick under soffit of RCC roof slabs
m2 1,856.44 255.89 475,044.43
139
12-40
Supply and Fixing accoustic miller fibre
tile ceiling fixed with aluminium tee hung by GI wire fixed in roof
m2
388.21
1,785.48
693,141.19
140 11-09-b Cement plaster 1:4 upto 20' height 1/2" thick
m2 8,056.50 217.80 1,754,705.70
141
11-28
Extra for lime, mud or cement plaster &
pointing from 20' & above for each additional 10' height
m2
9,912.94
28.20
279,544.91
142
10-26-b
Provide & lay marble fine dressed stone
flooring on surface in white cement
complete: 1" thick (Badel, Silky black, Sunny white, Sunny Grey or eq)
m2
3,159.85
2,136.04
6,749,565.99
143
06-24-b-03
V. Damp proof c/s plaster, 1 layer
polythene 2 coats bitumen Ratio 1:3 (0.5"
thick), (Washrooms Kitchen wall)
m2
390.26
494.25
192,886.01
144
06-22-b-01
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene
& 2 coats bitumen (1.5"thick)
m2
150.08
611.86
91,827.95
145
10-38-b Glazed tile 1/4" thick dado jointed in white
cement complete : Coloured Plain tiles
m2
377.94
1,541.12
582,450.89
Page 9
Package-01_Academic Block-01
S.No MRS 2017
Item No. Description of Items Units Quantity
Item Rate
(Rs) Total Amount (Rs)
146
10-46-a P/F Ceramic Floor Tiles (Emco, National
or eq) Size : 12" x 12" (BathFloors)
m2
150.08
1,776.21
266,573.60
147 10-26-g Providing and fixing glazed tile colour printed border 3" wide
m 213.37 637.98 136,125.79
148
10-26-d
Providing and Laying marble fine dressed
stone 4-5 feet and 12" wide 1" thick for
stairs steps.
m2
80.92
2,023.17
163,714.92
149
10-41-b
Provide & lay marble fine dressed and
polished stone dado or skirting in white
cement complete : 1/2" thick (Badel, Silky
black, Sunny white, Sunny Grey or eq)
m2
36.59
1,408.99
51,554.94
150
10-26-b
Provide & lay marble fine dressed stone
flooring on surface in white cement
complete: 1" thick (Badel, Silky black, Sunny white, Sunny Grey or eq)
m2
129.01
2,136.04
275,570.52
151 10-50 Chemical polishing of marble floor/Dado m2 3,406.36 253.49 863,478.20
152
10-18x2
Extra labour for each storey above ground
for mosaic, conglomerate, tiles, stone & wood floor
m2
4,048.31
90.78
367,505.58
153 12-20-a-01 Extra for providing/fixing approved quality Rim locks : Imported
Each 18.00 1,784.63 32,123.34
154 13-08-a French polishing complete: On new work m2 570.54 671.29 382,997.80
155 13-09-
a+b+c
Varnishing wood work, including cleaning
& preparing surface : Three coats.
m2
570.54
218.34
124,571.70
156 13-30-a+(b
x 2)
Preparing surface and painting with
emulsion paint : 2nd & each subsequent coat.
m2
7,114.64
323.25
2,299,807.38
157
13-37
Extra labour for painting, varnishing etc
from 20' height & above, for every additional 10'
m2
7,738.20
10.89
84,269.00
158
16-43
Supply and Fixing polystrene fill in
expansion joints & under diaphragms at transoms.
m3
4.97
1,403.68
6,976.29
159 06-19 Providing and fixing 6" wide GI sheet 18 SWG. stopper to expansion joint.
m 141.46 266.99 37,768.41
1.5 - WORK AT ROOF TOP FLOOR
160
06-06-a-03
RCC in roof slab, beam, column & other
structural members, insitu or precast.
Type C(1:2:4)
m3
116.31
9,538.28
1,109,397.35
161
06-06-a-02
RCC in roof slab, beam, column & other
structural members, insitu or precast.
Type B(1:1.5:3)
m3
19.88
10,561.09
209,954.47
162
06-05-f
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio
1:2:4)
m3
28.48
7,257.86
206,703.85
163 06-06-ex3 Add extra labour for RCC in 2nd & subsequent storeys
m3 136.19 2,532.72 344,931.14
164
06-07-c
Supply & fabricate M.S. reinforcement for
cement concrete (Hot rolled deformed bars Grade 40)
Tonne
13.09
107,564.41
1,408,018.13
165 07-05-a-04 Pacca brick work in ground floor Cement, sand mortar 1:5
m3 391.13 8,452.87 3,306,171.04
166 07-06-c Add extra on item No.07-05 for brick work in Third floor
m3 391.13 1,172.14 458,459.12
167 07-16-b-04 Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:5
m2 1,575.79 829.85 1,307,669.33
Page 10
Package-01_Academic Block-01
S.No MRS 2017
Item No. Description of Items Units Quantity
Item Rate
(Rs) Total Amount (Rs)
168 07-17-c Add extra on item No. 07-16 for pacca brick work in Third floor
m2 1,575.79 168.72 265,867.29
169 11-18-a Cement pointing struck joints, on walls, upto 20' height : Ratio 1:2
m2 40.15 239.39 9,611.51
170
11-31
Extra cost of labour& material for red
oxide pigment in cement pointing to match bricks
m2
40.15
24.22
972.43
171
12-53-d-01
Supply and Fixing aluminium
door/window, Premium 4" sect.Sliding window
m2
41.82
8,300.02
347,106.84
172
12-54-e-03
Supply and Fixing aluminium
bronze/black. Other items : Flyscreen shutter with separate outer frame
m2
33.46
3,653.29
122,239.08
173
10-26-d
### Providing and Laying marble fine
dressed stone 2-6 feet and 12" wide 1"
thick for Window sills, as per Design and
Drawings, instructions and approval of the Engineer.
m2
5.58
2,023.17
11,289.29
174 06-19 Providing and fixing 6" wide GI sheet 18 SWG. stopper to expansion joint.
m 103.66 266.99 27,676.18
175
25-47-a
Supplying and Fixing 18 SWG MS Sheet
Door with angle iron frame
(1.5"x1.5"x1/8"), bolt, hinges, paint etc complete
m2
13.01
5,412.20
70,412.72
176 11-10-c Cement plaster 3/8" thick under soffit of RCC roof slabs
m2 852.86 237.75 202,767.47
177 11-09-b Cement plaster 1:4 upto 20' height 1/2" thick
m2 2,958.09 217.80 644,272.00
178
11-28x2
Extra for lime, mud or cement plaster &
pointing from 20' & above for each
additional 10' height
m2
3,810.95
56.40
214,937.58
179
09-05
Single layer of tiles 10"x5"x1.25" laid over
4" earth and 1" mud plaster on top of RC
roof slab
m2
3,654.18
1,401.62
5,121,771.77
180
09-45
Providing and Laying Prestressed Roof of
Slab/Girder, 2" thick PCC 1:2:4 with
chicken mesh, polythene, mud, tar
m2
3,654.18
2,229.74
8,147,871.31
181 09-15 Khuras on roof 2'x2'x6" Each 65.00 639.59 41,573.35
182 13-30-a+(b
x 2)
Preparing surface and painting with
emulsion paint : 2nd & each subsequent coat.
m2
749.91
323.25
242,408.41
183
13-38-(a+b)
Preparing surface & painting with
snowcem / weather shield paint : 2nd& subsequent coats
m2
2,554.46
266.05
679,614.08
184
13-37x2
Extra labour for painting, varnishing etc
from 20' height & above, for every additional 10'
m2
3,304.37
21.78
71,969.18
185
14-70-a
### uPVC Rain Water Down pipe type B
110mm dia including testing with all
accessories (using Dadex or eq) complete
in all respect as per Design and Drawings,
instructions and approval of the Engineer.
m
1,189.02
1,162.54
1,382,283.31
SUB TOTAL OF (S.I) = Rs. 413,509,441.02
IN (MILLION) = Rs. 413.509
NON-SCHEDULE ITEMS
WORKS IN SUB-STRUCTURE / GROUND FLOOR
Page 11
Package-01_Academic Block-01
S.No MRS 2017
Item No. Description of Items Units Quantity
Item Rate
(Rs) Total Amount (Rs)
186
NSI
Supply & Fixing Deodar wood Beading
2.5" Wide and 1/2" thick Complete, as per
Design and Drawings, instructions and
approval of the Engineer.
m
3,084.76
329.00
1,014,886.04
187
NSI
Supply & Fixing Special Quality of Main
Door Handel Locks (Italian CAL
Company) complete, as per Design and
Drawings, instructions and approval ofthe Engineer.
Each
190.00
8,754.00
1,663,260.00
188
NSI
Providing, fabricating and fixing in position
2'-9" high stair Hand railling fixed in each
step comprising of 2" diameter 16 SWG
(Non Magnet grade 304) stainless steel
pipe at top, 1-1/2" SS baluster fixed after
every 4 steps or as shown in drawings,
and middel 3/4" dia. SS bars horizontally
(3 No.), 3" Dai Master at start and end
point (commercial) including cost of base
plate, rawal bolts, rawal plugs, RCC
cuttings if required complete in all
respects by instructions and approval of
the Engineer. (Floormounted)
m
60.26
8,710.00
524,864.60
189
NSI
Providing, fabricating and fixing in position
3 ft high Terrace railling fixed in Position
comprising of 2" diameter 16 SWG(Non
Magnet grade 304 ) stainless steel pipe
at top, 1-1/2" SS baluster fixed as shown
in drawings, and middel 3/4" dia.SS bars
horizontally (3 No.), including cost of base
plate, rawal bolts, rawal plugs, RCC
cuttings if required complete in all
respects by instructions and approval of
theEngineer.
m
386.16
7,395.00
2,855,653.20
190
NSI
Providing and Fixing best quality 5mm
thick clear Glass ( Ghani Made) as
specified complete. as per instructions and approval of the Engineer.
m2
139.80
1,345.00
188,031.00
191
NSI
Providing, fabricating and fixing in position
Stainless steel Stair railling along wall
Mounted 2" diameter 16 SWG (Non
Magnet grade 304 ) stainless steel pipe
hand rail, 3/16" x 1-1/2" M.S.flate welded
to 1-1/2" dia brass pipe (baluster) and
screwed to stainless steel pipe hand rail. 1
1/2" dia brass pipe 1/8" wall thickness 5'
c/c etc. fixing with 1/4" thick 3" dia brass
plate srewed with rawal plugs as per hand
rail &Baluter fixing details, complete in all
respects as per drawings, instructions and
approval of the Engineer.( Wall mounted )
m
45.12
2,235.00
100,843.20
192
NSI
Providing and fixing 2" dia Baker rod and
2 part polysulphidesealent in expansion
joint upto 2" wide as directedby Engineer.
m
99.39
875.00
86,966.25
Page 12
Package-01_Academic Block-01
S.No MRS 2017
Item No. Description of Items Units Quantity
Item Rate
(Rs) Total Amount (Rs)
193
NSI
Providing and Fixing best quality 12 mm
thick clear Glass ( Ghani Made) as
specified complete. as per instructions and approval of the Engineer.
m2
111.25
3,427.00
381,253.75
194
NSI
Providing and Fixing Floor Mouted Double
action spring Hinges .as per instructions
and approval of the Engineer.
Each
6.00
5,582.00
33,492.00
195
NSI
Providing and Fixing best quality frostrate
paper on 12 mm glass as specified
complete. as per instructions and approval of the Engineer.
m2
46.35
959.00
44,449.65
196
NSI
Providing and Fixing handle for glass
doors as per instructions and approval of the Engineer.
Each
12.00
1,349.00
16,188.00
WORK AT FIRST FLOOR
197
NSI
Supply & Fixing Deodar wood Beading
2.5" Wide and 1/2" thick Complete, as per
Design and Drawings, instructions and
approval of the Engineer.
m
1,552.13
329.00
510,650.77
198
NSI
Supply & Fixing Special Quality of Main
Door Handel Locks (Italian CAL
Company) complete, as per Design and
Drawings, instructions and approval ofthe Engineer.
Each
94.00
8,754.00
822,876.00
199
NSI
Providing, fabricating and fixing in position
2'-9" high stair Hand railling fixed in each
step comprising of 2" diameter 16 SWG
(Non Magnet grade 304) stainless steel
pipe at top, 1-1/2" SS baluster fixed after
every 4 steps or as shown in drawings,
and middel 3/4" dia. SS bars horizontally
(3 No.), 3" Dai Master at start and end
point (commercial) including cost of base
plate, rawal bolts, rawal plugs, RCC
cuttings if required complete in all
respects by instructions and approval of
the Engineer. (Floormounted)
m
60.26
8,710.00
524,864.60
200
NSI
Providing, fabricating and fixing in position
3 ft high Terrace railling fixed in Position
comprising of 2" diameter 16 SWG(Non
Magnet grade 304 ) stainless steel pipe
at top, 1-1/2" SS baluster fixed as shown
in drawings, and middel 3/4" dia.SS bars
horizontally (3 No.), including cost of base
plate, rawal bolts, rawal plugs, RCC
cuttings if required complete in all
respects by instructions and approval of
theEngineer.
m
386.16
7,395.00
2,855,653.20
201
NSI
Providing and Fixing best quality 5mm
thick clear Glass ( Ghani Made) as
specified complete. as per instructions and approval of the Engineer.
m2
77.44
1,345.00
104,156.80
Page 13
Package-01_Academic Block-01
S.No MRS 2017
Item No. Description of Items Units Quantity
Item Rate
(Rs) Total Amount (Rs)
202
NSI
Providing, fabricating and fixing in position
Stainless steel Stair railling along wall
Mounted 2" diameter 16 SWG (Non
Magnet grade 304 ) stainless steel pipe
hand rail, 3/16" x 1-1/2" M.S.flate welded
to 1-1/2" dia brass pipe (baluster) and
screwed to stainless steel pipe hand rail. 1
1/2" dia brass pipe 1/8" wall thickness 5'
c/c etc. fixing with 1/4" thick 3" dia brass
plate srewed with rawal plugs as per hand
rail &Baluter fixing details, complete in all
respects as per drawings, instructions and
approval of the Engineer.( Wall mounted )
m
45.12
2,235.00
100,843.20
203
NSI
Providing and fixing 2" dia Baker rod and
2 part polysulphidesealent in expansion
joint upto 2" wide as directedby Engineer.
m
99.39
875.00
86,966.25
204
NSI
Providing and Fixing best quality 12 mm
thick clear Glass ( Ghani Made) as
specified complete. as per instructions and approval of the Engineer.
m2
111.25
3,427.00
381,253.75
205
NSI
Providing and Fixing Floor Mouted Double
action spring Hinges .as per instructions
and approval of the Engineer.
Each
6.00
5,582.00
33,492.00
206
NSI
Providing and Fixing best quality frostrate
paper on 12 mm glass as specified
complete. as per instructions and approval of the Engineer.
m2
46.35
959.00
44,449.65
207
NSI
Providing and Fixing handle for glass
doors as per instructions and approval of
the Engineer.
Each
12.00
1,349.00
16,188.00
WORK AT SECOND FLOOR
208
NSI
Supply & Fixing Deodar wood Beading
2.5" Wide and 1/2" thick Complete, as per
Design and Drawings, instructions and
approval of the Engineer.
m
1,552.13
329.00
510,650.77
209
NSI
Supply & Fixing Special Quality of Main
Door Handel Locks (Italian CAL
Company) complete, as per Design and
Drawings, instructions and approval ofthe Engineer.
Each
94.00
8,754.00
822,876.00
210
NSI
Providing, fabricating and fixing in position
2'-9" high stair Hand railling fixed in each
step comprising of 2" diameter 16 SWG
(Non Magnet grade 304) stainless steel
pipe at top, 1-1/2" SS baluster fixed after
every 4 steps or as shown in drawings,
and middel 3/4" dia. SS bars horizontally
(3 No.), 3" Dai Master at start and end
point (commercial) including cost of base
plate, rawal bolts, rawal plugs, RCC
cuttings if required complete in all
respects by instructions and approval of
the Engineer. (Floormounted)
m
60.26
8,710.00
524,864.60
Page 14
Package-01_Academic Block-01
S.No MRS 2017
Item No. Description of Items Units Quantity
Item Rate
(Rs) Total Amount (Rs)
211
NSI
Providing, fabricating and fixing in position
3 ft high Terrace railling fixed in Position
comprising of 2" diameter 16 SWG(Non
Magnet grade 304 ) stainless steel pipe
at top, 1-1/2" SS baluster fixed as shown
in drawings, and middel 3/4" dia.SS bars
horizontally (3 No.), including cost of base
plate, rawal bolts, rawal plugs, RCC
cuttings if required complete in all
respects by instructions and approval of
theEngineer.
m
386.16
7,395.00
2,855,653.20
212
NSI
Providing and Fixing best quality 5mm
thick clear Glass ( Ghani Made) as
specified complete. as per instructions and approval of the Engineer.
m2
77.44
1,345.00
104,156.80
213
NSI
Providing, fabricating and fixing in position
Stainless steel Stair railling along wall
Mounted 2" diameter 16 SWG (Non
Magnet grade 304 ) stainless steel pipe
hand rail, 3/16" x 1-1/2" M.S.flate welded
to 1-1/2" dia brass pipe (baluster) and
screwed to stainless steel pipe hand rail. 1
1/2" dia brass pipe 1/8" wall thickness 5'
c/c etc. fixing with 1/4" thick 3" dia brass
plate srewed with rawal plugs as per hand
rail &Baluter fixing details, complete in all
respects as per drawings, instructions and
approval of the Engineer.( Wall mounted )
m
45.12
2,235.00
100,843.20
214
NSI
Providing and fixing 2" dia Baker rod and
2 part polysulphidesealent in expansion
joint upto 2" wide as directedby Engineer.
m
99.39
875.00
86,966.25
215
NSI
Providing and Fixing best quality 12 mm
thick clear Glass ( Ghani Made) as
specified complete. as per instructions and approval of the Engineer.
m2
111.25
3,427.00
381,253.75
216
NSI
Providing and Fixing Floor Mouted Double
action spring Hinges .as per instructions
and approval of the Engineer.
Each
6.00
5,582.00
33,492.00
217
NSI
Providing and Fixing best quality frostrate
paper on 12 mm glass as specified
complete. as per instructions and approval of the Engineer.
m2
46.35
959.00
44,449.65
218
NSI
Providing and Fixing handle for glass
doors as per instructions and approval of the Engineer.
Each
12.00
1,349.00
16,188.00
1.2 - WORK AT ROOF TOP
219
NSI
S/F Fiberglass Shed 2 layer of imported
T.G.I mate i/c M.S square Pipe 1.5"x1.5"
SWG 18 witk vertical supporting pillars (4"
Dia) SWG 16 complete in all respect as
per the instruction of Engineer Incharge.
m2
496.63
6,953.00
3,453,068.39
220
NSI
Providing and fixing 2" dia Baker rod and
2 part polysulphidesealent in expansion
joint upto 2" wide as directedby Engineer.
m
99.39
875.00
86,966.25
Page 15
Package-01_Academic Block-01
S.No MRS 2017
Item No. Description of Items Units Quantity
Item Rate
(Rs) Total Amount (Rs)
221
NSI
Providing and laying waterproofing
membraine consisting of surface
preparation, clean and free from loose
particales, oil, grees, or any other
contaminant, 4mm thick torch applied
waterproofing membraine 4M" , as per
drawing, manufacturer's instructions, and
Specifications, as per approval of the Engineer.
m2
3,654.18
1,753.20
6,406,508.38
222
NSI
P/L of Jamboo Lawn board 1" thick of
approved Gage complete in all respect as
per Design and Drawings, instructions and
approval of the Engineer. (Roof Treatment)
m2
3,654.18
729.90
2,667,185.98
223
NSI
Supply and laying of Double layer of
heavy duty polythene sheet 50 SWG over
Bituminious coat as per instructions and
approval of the Engineer.(Roof Treatment)
m2
3,654.18
30.00
109,625.40
SUB TOTAL OF (N.S.I) = Rs. 30,596,030.53
IN MILLION = Rs. 30.596
GRAND TOTAL COST OF (S.I & N.S.I) = Rs. 444,105,471.55
IN MILLION = Rs. 444.105
Page 16
Package-01_Academic Block-01
SECTION : 02
INTERNAL ELECTRIFICATION
S.No MRS 2017
Item No. Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
NOTE
The Contractor should note that only
material Listed in Anouxer" A" from the
approval manufactures shall be
allowed to be used on this project.
Where more than one manufactures is
specified against any item the
contractor shall provide samples /
literature ect of the item to the
Engineer In Encharg for selection and
approval . Contractor should be bound
to provide certificate of material which
material they used at side .
Contractor should be bound to provide
Test certificate of Engineering
University, P C S I R Laborite &
Physicists Departments all size of
Cables , all type of Breaker,Other
Material which they used atsides.
NOTE
Supply, installation, testing and
commissioning of the following items
of work (unless specifically stated
otherwise) including all material,
labour, tools, accessories, etc.required
for proper completion of each item as
per specification and drawings and as
directed by theEngineer.
Supply an Erection of single core pvc
insulated copper conductor cable
250/440V &660/1100V Payments shall
be paid actual length installed at site
Complate in all Respects As per
Instruction of Engineer InCharge
1
15-50
Wiring of light/fan/call-bell point in 3/0.029
PVC insulated bare cable in PVC pipe
recessed
Each
2,225.00
906.65
2,017,296.25
2
15-51
Wiring of 2/3-pin 5-Amp. plug point in
3/0.029 PVC insulated bare cable in PVC
pipe recessed
Each
294.00
439.49
129,210.06
Providing & Installation Of following
Sizes P V C Pipe For wiring / main sub
main Cables purpose Payments shall
paid actual lenght installed at site
Complate in all Respects As per
Instruction of Engineer In Charge
3
15-02-b-02
Supply and Erection PVC pipe for wiring
purpose complete Recessed in walls
including chase etc : 3/4" i/d
m
1,660.00
312.69
519,065.40
Page 17
Package-01_Academic Block-01
S.No MRS 2017
Item No. Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
4
15-02-b-03
Supply and Erection PVC pipe for wiring
purpose complete Recessed in walls
including chase etc : 1" i/d
m
2,560.00
289.18
740,300.80
5
15-02-b-06
Supply and Erection PVC pipe for wiring
purpose complete Recessed in walls
including chase etc : 2" i/d
m
160.00
388.05
62,088.00
6
15-02-b-08
Supply and Erection PVC pipe for wiring
purpose complete Recessed in walls
including chase etc : 4" i/d
m
120.00
544.97
65,396.40
Supply an Erection of single core pvc
insulated copper conductor cable
250/440V &660/1100V Payments shall
be paid actual length installed at site
Complate in all Respects As per
Instruction of Engineer InCharge
7
15-05-a
Supply and Erection single core PVC
insulated copper conductor 250/440 V
grade cable : 3/0.029"
m
7,920.00
39.47
312,602.40
8
15-05-c
Supply and Erection single core PVC
insulated copper conductor 250/440 V
grade cable : 7/0.029"
m
12,600.00
66.66
839,916.00
9
15-05-d
Supply and Erection single core PVC
insulated copper conductor 250/440 V
grade cable : 7/0.036"
m
6,480.00
100.97
654,285.60
10
15-05-e
Supply and Erection single core PVC
insulated copper conductor 250/440 V
grade cable : 7/0.044"
m
9,010.00
164.83
1,485,118.30
11
15-05-f
Supply and Erection single core PVC
insulated copper conductor 250/440 V
grade cable : 7/0.064"
m
120.00
337.86
40,543.20
12
15-07-b
Supply and Erection single core PVC
insulated & sheathed copper conductor,
660/1 100V cable : 19/0.052"
m
120.00
500.64
60,076.80
13
15-07-c
Supply and Erection single core PVC
insulated & sheathed copper conductor,
660/1 100V cable : 19/0.064"
m
140.00
629.26
88,096.40
14
15-68-c
Supply and Erection best quality AC
ceiling fan complete with GI rod, canopy,
blades & regulator : 56"sweep
Each
280.00
3,926.86
1,099,520.80
15 15-78 Supply and Fixing bracket fan pak made
complete Each 40.00 3,307.00 132,280.00
16
15-77-c
Supply and fixing electric AC
exhaust/fresh air circulation(Double way)
220/230 single phase plastic framebody
and blade complete 12"x12"
Each
80.00
3,288.23
263,058.40
Supply & Erection of transpower auto
circuit breaker 3-phase , / 1 phase 400V
Complate in all Respects As per
Instruction of Engineer In Charge
14 15-71-a Supply and Erection single phase
imported auto circuit breaker 6Amp. Each 224.00 482.60 108,102.40
15 15-71-b Supply and Erection single phase
imported auto circuit breaker 15Amp. Each 288.00 507.00 146,016.00
Page 18
Package-01_Academic Block-01
S.No MRS 2017
Item No. Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
16 15-71-c Supply and Erection single phase
imported auto circuit breaker 20Amp. Each 432.00 539.54 233,081.28
17
15-70-a
Supply and Erection transpower auto
circuit breaker 3-phase, 400V fungus
moisture proofing : 30 Amp.
Each
16.00
2,302.10
36,833.60
18
15-70-b
Supply and Erection transpower auto
circuit breaker 3-phase, 400V fungus
moisture proofing : 60 Amp.
Each
16.00
3,320.80
53,132.80
19
15-70-c
Supply and Erection transpower auto
circuit breaker 3-phase, 400V fungus
moisture proofing : 100 Amp.
Each
24.00
5,482.94
131,590.56
20
15-72-b
Supply and Erection of bus bars 500 volts
3 phase AC supply with 4 copper bars -
100 Amp with bar size1 1 1/2" X 1/8"
Each
56.00
8,260.00
462,560.00
21
15-75-b
Supply and Erection cubical type factory
fabricated floor/wall mounting steel main
board comp. : Recessed
m2
15.60
58,286.03
909,262.07
22 15-25 Supply and Erection girder clamp hook,
5/8" dia.for hanging ceiling fans Each 280.00 318.11 89,070.80
TOTAL COST OF (S.I) = Rs. 10,678,504.32
IN (MILLION) = Rs. 10.679
GROUND FLOOR
NON-SCHEDULE ITEMS
Supply an Erection of four core pvc
insulated non armored copper
conductor600 /1000 Volt grid cable
with copper Thimbles of appropriate
size, all punching both sides
identification tags and nut bolt charges
Payments shall be paid actullenght
installed at site Complate in all
Respects As per Instruction of
Engineer InCharge
1 NSI 10 mm 4 Core PVC /PVC Cable m 70.00 990.00 69,300.00
2 NSI 16 mm 4 Core PVC /PVC Cable m 85.00 1,196.00 101,660.00
3 NSI 25 mm 4 Core PVC /PVC Cable m 90.00 1,634.00 147,060.00
4 NSI 95 mm 4 Core PVC /PVC Cable m 110.00 6,052.00 665,720.00
5 NSI 120 mm 4 Core PVC /PVC Cable m 120.00 8,150.00 978,000.00
6
NSI
Supply, Installation , Testing and
Commissioning of Fancy Calling Light
with 12 w L E D Lamp Complate in all
Respects As per Instruction of EngineerIn
Charge
Each
120.00
2,690.00
322,800.00
7
NSI
Supply & Installation Testing &
Commissioning Calling Recessed L E D
Panel Lights Fixture 33 w L E D & Driver (
Dimension 596 x 596 x 9 mm ) Comlate in
all Respects As per Instruction of Engineer In Charge
Each
30.00
9,638.00
289,140.00
8
NSI
Supply & Installation Testing
&Commisioning Calling Recessed
Mounted L E D Down Lights Fixture 12 w
L E D & Driver Comlate in all Respects
As per Instruction of Engineer InCharge
Each
520.00
3,215.00
1,671,800.00
Page 19
Package-01_Academic Block-01
S.No MRS 2017
Item No. Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
9
NSI
Supply & Installation Testing
&Commisioning Calling Recessed
Mounted L E D Down Lights Fixture 18 w
L E D & Driver Comlate in all Respects
As per Instruction of Engineer InCharge
Each
340.00
3,215.00
1,093,100.00
10
NSI
Supply & Installation Testing
&Commisioning Calling Mounted L E D
Lights Fixture 18 w L E D & Driver
Comlate in all Respects As per Instruction
of Engineer InCharge
Each
720.00
3,615.00
2,602,800.00
11
NSI
Supply, Installation , Testing and
Commissioning of 9 w 2 F L E D G M P
Wall Lights Complate in all Respects As per Instruction of Engineer In Charge
Each
80.00
2,635.00
210,800.00
12
NSI
Supply, Installation , Testing and
Commissioning of Out Door Fancy Wall
Lights UP & Down Type Water Proof
with 14 w L E D With Driver Complate
in all Respects As per Instructionof
Engineer In Charge
Each
40.00
9,700.00
388,000.00
13
NSI
Supply, Installation,Testingand
Commissioning of 2' X 2' VOLDAM
Invented Sqire Shape RemotControle 18"
diaCeailingFsansComplate in all Respects
As per Instruction of Engineer In Charge
Each
80.00
11,694.00
935,520.00
Supply, installation, testing &
commissioning of Switches & Socket
including appropriate size outlet box of
16 SWG MS sheet recessed in wall,
column, partition wall etc. complete in
all respect As per Instruction of
Engineer In Charge of following sizes.
14 NSI 2/3-pin 5 A 220 V switch socket
International Multi Socket Each 294.00 793.00 233,142.00
15 NSI 3-pin 15 amps 220 V switch socket Each 144.00 665.00 95,760.00
14 NSI 3-pin 20 amps 220 V switch socket Each 96.00 750.00 72,000.00
15 NSI 3 gang one way Each 75.00 435.00 32,625.00
16 NSI 4 gang one way Each 400.00 518.00 207,200.00
17 NSI 6 gang one way Each 250.00 894.00 223,500.00
18 NSI Bell press switch plate Each 30.00 550.00 16,500.00
19 NSI Fan Dimmer with Switch Each 280.00 921.00 257,880.00
20 NSI 1 gang two way Each 48.00 393.00 18,864.00
21 NSI T.V Points with T.V Sockets Each 10.00 3000.00 30,000.00
Page 20
Package-01_Academic Block-01
S.No MRS 2017
Item No. Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
22
NSI
S/E Earthling 24”x24”x1/4 copper plate
riveting Bear copper Conductor 2 x 70
mm 1.5” G.I Light gage ,Pipe Stall Net
Bolt , placing mixture of salt &chare cool
complete in all Respects 15 TO 20 Feet’s
Deeps Pitts Including the cost of E C P
Bus bar 12”long 2” wide and half inch
thick copper bus bare completed with
insulators washers nuts, bolts Complate in
all Respects As per Instruction of
Engineer InCharge
Each
8.00
47,885.00
383,080.00
23
NSI
Providing &Installation Testing
Commisioning of Sub L.T Panel Board
Lighting as per Drawing
&SpificationComplate in all Respects As
per Instruction of Engineer InCharge.
Each
1.00
486,800.00
486,800.000
24
NSI
Providing &Installation Testing
Commisioning of Sub L.T Panel Board
Power as per Drawing
&SpificationComplate in all Respects As
per Instruction of Engineer InCharge.
Each
1.00
604,500.00
604,500.000
25
NSI
Volt maters with selector switch v s s for
Distribution boards , 3 nos Indication
panel lights , Control fuses complete with
all respects as approved by theEngineer
Sets
56.00
6,039.00
338,184.00
Supply at site, installation following
size of perforated 16 SWG G I sheet
cable tray including joints, band,
Cover mounting brackets hanger or”L”
Type wall Brackets, Ankara Bolds
complete with all respects As per
Instruction of Engineer InCharge
26 NSI 6”x 3” cable tary Rft 1,240.00 848.00 1,051,520.00
27 NSI 12” x 12” Ladders Rft 60.00 747.00 44,820.00
TOTAL COST OF (N.S.I) = Rs. 13,572,075.00
IN MILLION = Rs. 13.572
GRAND TOTAL COST OF (S.I & N.S.I) = Rs. 24,250,579.32
IN MILLION = Rs. 24.251
Page 21
Package-01_Academic Block-01
SECTION : 03
INTERNAL WATER SUPPLY AND SEWERAGE SYSTEM
S.No MRS 2017
Item No. Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
SCHEDULE ITEMS
1
14-70-a
Providing and Fixing of pipe type B nikasi
system including testing in all respect 110
mm (using dadex, or eq)
m
523.00
1,162.54
608,008.42
2
14-70-b
Providing and Fixing of pipe type B nikasi
system including testing in all respect 75
mm (using dadex, or eq)
m
425.00
861.36
366,078.00
3
14-71-b
Providing and Fixing of poly dex high
pressure PPR(green including testing ect
complete 20 mm(including all special etc)
m
486.00
399.64
194,225.04
4 14-55-d Providing and Fixing GI pipe & including
specials complete 1" dia (light) m 470.00 426.59 200,497.30
5 14-55-e Providing and Fixing GI pipe & including
specials complete 3/4" dia (light) m 385.00 334.37 128,732.45
6 14-55-f Providing and Fixing GI pipe & including
specials complete 1/2" dia (light) m 325.00 255.64 83,083.00
7
14-31-b
Providing and Fixing CI floor trap including
CI grating & concrete chamber all round :
4"x3"
Each
160.00
806.00
128,960.00
8 14-32-a Providing and Fixing 'P' trap including GI
grating & PCC chamber 4" of cast iron Each 145.00 853.50 123,757.50
9 14-24-b Providing and Fixing CP bib-cock, heavy
type : 1/2" Each 175.00 518.72 90,776.00
10 14-25 Providing and Fixing 1/2" CP tee stop
cock Each 180.00 543.13 97,763.40
11 14-27 Providing and Fixing CP mixing valve for
WHB, sink or shower Each 215.00 2,129.13 457,762.95
12
14-10-a
Providing and Fixing glazed earthen ware
low down flushing cistern 3 gallons
capacity : White
Each
82.00
2,299.10
188,526.20
13 14-13 Providing and Fixing CP soap dish. Each 110.00 543.13 59,744.30
14 14-17 Providing and Fixing best quality 5mm
mirror 22"x16" size Each 110.00 1,463.81 161,019.10
15 14-15 Providing
holder
and Fixing CP toilet paper Each 110.00 482.13 53,034.30
16 14-16-a Providing and Fixing CP towel rail : 24"
long, 3/4" dia Each 110.00 787.13 86,584.30
17
14-18-a
Providing and Fixing best quality 5mm
glass shelf 24"x5" With chromium plated
brackets & railing
Each
110.00
612.00
67,320.00
18
14-47-c
Providing and Fixing 1/2" dia connection
including check nuts etc CP connection
Each
361.00
194.43
70,189.23
19 14-41-b Providing and Fixing CP waste coupling :
1.5" Each 65.00 520.50 33,832.50
20 14-43-b Providing and Fixing waste pipe of PVC :
1.5" Each 75.00 341.83 25,637.25
Page 22
Package-01_Academic Block-01
S.No MRS 2017
Item No. Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
21
14-03-b
Providing and Fixing glazed earthen ware
WC squatting type with built-in foot rests :
Coloured
Each
110.00
1,780.75
195,882.50
TOTAL COST OF (S.I) = Rs. 3,421,413.74
IN (MILLION) = Rs. 3.421
NON- SCHEDULE ITEMS
1
NSI
Supply and Fixing of best quality Muslim
Shower Complete.(Faisal made or
Equivalent)
Each
110.00
1,950.00
214,500.00
2
NSI
Providing and Fixing of best quality
Imported Vanity type wash hand basin
complete
Each
110.00
18,992.00
2,089,120.00
TOTAL COST OF (N.S.I) = Rs. 2,303,620.00
IN (MILLION) = Rs. 2.304
TOTALCOSTOF(N.S.I&S.I) = Rs. 5,725,033.74
IN (MILLION) = Rs. 5.725