Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power Company, Punjab for the Asian Development Bank.
41

PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

Jun 03, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

Social Monitoring Report Bi-annual Social Monitoring Report January 2015

PAK: MFF – Power Distribution Enhancement

Investment Program (Tranche 2)

Prepared by Gujranwala Electric Power Company, Punjab for the Asian Development Bank.

Page 2: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

NOTES

(i) The fiscal year (FY) of the Government of the Islamic Republic of Pakistan and its agencies ends on 30 June.

(ii) In this report “$” refer to US dollars. This social monitoring report is a document of the Borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 3: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

Re: Fwd:-"Submission of Bi-annual Environmental & Social Safeguard Monitorg. Reports (Period:June-Dec 2014)-Tr. # 2 I.R.0 PMU GEPCQ." Ashfaq Khokhai Liaqat Ali, Adnan Tareen 29/01/2015 11:27 AM

Cc Rizwan Haider, Michael J. Beauchamp

Dear Adnan/Liaqat,

The report can be disclosed. However for the comments to be properly addressed and a meaningful report

outline followed, I am attaching an outline of the monitoring report below which simplifies the effort and

helps in writing only the relevant information. This also helps easy and objective review and saves

everybody's time. Please replace the definitions with IR definitions attached below, get tables 3 and 4 and

annex D of the subject report inserted in the next monitoring report for which the outline is attached below.

Please contact Safia Shafiq for review of environmental monitoring report.

Best.

Ashfaq

Ashfaq Ahmed Khokhar

Sr. Social Safeguard Officer Pakistan Resident Mission

Asian Development Bank Tel (92) 051-2087300 Ext 230 Fax. +92 51 260 0365-66/208 7397-98 wwvv.adb.org

ADB PDEIP, T2 Ln 2727 GEPCO Social Monitoring Report Jul-Dec 2014 (ak comments Jan 2015).pdf

IR Terminology with standard definitions.docx Outline of Monitoring Report.docx

Chief Engineer Development

*Respected ADB Team* *Pakistan R... 21/01/2015 10:32:30 AM

From: Chief Engineer Development <[email protected]> To: lali <[email protected]>, Cc: [email protected], atareen <[email protected]>, akhokhar <[email protected]>, Atif

Raza <[email protected]>, "Schenck, Robert" <[email protected]>, Muazzam Mukhtar <[email protected]>, "Khalid, Altar <[email protected]>, [email protected], [email protected]

Date: 21/01/2015 10:32 AM Subject: Fwd:-"Submission of Bi-annual Environmental & Social Safeguard Monitorg. Reports

(Period:June-Dec 2014)-Tr. # 2 I.R.0 PMU GEPCO."

Respected ADB Team

Pakistan Resident Mission

A.O.A

Sir,

Ref-In awake of fulfillment of ADB requirements on subject cited above;

Page 4: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

Attached please find here with GEPCO-Biannual Environmental and Social Safeguard Monitoring Reports for the Period Jun-Dec. 2014 Tr # 2, for your kind perusal.

Earlier these reports were submitted in Ms-word format on 15-01-2015. Due to difficulty encountered by ADB staff during downloading; Now these reports are being re-submitted in PDF Format as desired.

Please acknowledge the receipt.

Note:-Due to limited space constraint of 25 MB, separate email on Tr. 2 & 3 will be sent by PMU GEPCO.

Thanks & Regards

0/o PMU Section

Chief Engineer (Development) GEPCO, Gujranwala

Page 5: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

ADB

Bi-annual Social Monitoring Report

Project Number: 2727-PAK

July - December 2014

Pakistan (Power Distribution Enhancement Investment Program-Multi-Tranche

Financing Facility-Tranche-2)

For period: July -December 2014

(Financed by the Asian Development Bank)

Prepared By: Assistant Manager (Social) PMU, GEPCO

Gujranwala Electric Power Company (GEPCO)

PMU Section 565-A Model Town G.T Road Gujranwala, Pakistan.

Executing Agency (EA) Pakistaq Electric Power Company (PEPCO)

Implementing Agency (IA) GEPC'0

This report does not necessarily reflect the views of ADB or the Government concerned. The ADB and

the Government cannot be held liable for its contents.

Asian Development Bank

Page 6: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

ABBREVIATIONS

ADB Asian Development Bank

AHs Affected rouseholds

CED Chief Engineer Development

E&SS Environmental and Social Safeguard

EA Executing Agency

EIA Environmental Impact Assessment

EPA Environmental Protection Agency

EPD Environmental Protection Department

GOP Government of Pakistan

GRC Grievance Redress Committee

GS Grid Substation

IA Implementing Agency

IEE Initial Environmental Examination

GEPCO Gujranwala Electric Power Company

LARP Land Acquisition and Resettlement Plan

MOW&P Ministry of Water and Power

MFF Multi — Tranche Financing Facility

NOC No Objection certificate

PAPs Project Affected Persons

PDEIP Power Distribution Enhancement Investment Program

PEPCO Pakistan Electric Power Company

PMU Project Management Unit

ROW Right of Way

TL Transmission Line

Page 7: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

DEFINITION OF TERMS

Affected l'ersons (AP'S) All the people affected by the project through land acquisition, relocation, or

loss of incomes and include any person, household (sometimes referred to as

affected households (AH's) or project affected family), firms, or public or

private institutions. AH's therefore include; i) persons affected directly by the

safety corridor, right-of-way, tower or pole foundations or construction work

area; (ii) persons whose agricultural land or other productive assets such as

trees or crops are affected; (iii) persons whose businesses are affected and

who might experience loss of income due to the project impact; (iv) persons

who lose work/employment as a result of project impact; and (v) people who

lose access to community resources/property as a result of the project.

Compensation Payment in cash or kind for an asset to be acquired or affected by a project at

replacement cost at current market value.

Cut-off Date

Due diligence Report

Environment

Environmental Aspect

EIA

The date after which people will NOT be considered eligible for

compensation i.e. they are not included in the list of AI-Is as defined by the

Census. Normally, the cut-off date is the last date of the Resettlement Field

Surveys (RFS).

Projects which do not have any significant social impacts hence do not

involve/ require any land acquisition therefore; a brief due diligence report

(DDR) is prepared for the documentary requirements.

Surroundings in which an organization operates, Including air, water, land,

natural resources, flora (Plants), fauna (Animals), humans, and their

Interactions.

Element of an organization's activities or products or services that can interact

with the environment; environmental aspects can be Significant or non-

significant based on environment risk Assessment and a significant aspect can

have.

Detailed study based on environmental assessment (EA) to determine the type

and level of effects an existing facility is having, or a proposed project would

have, on its natural environment

Encroachers Those people who move into project area after the cut-off date and are

therefore not eligible for compensation or other rehabilitation measures

provided by the project.

Page 8: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

Entitlement The range of measures comprising cash or kind compensation, relocation cost,

income rehabilitation assistance, transfer assistance, income substitution, and

relocation which are due to /business restoration which are due to AHs,

depending on the type and degree nature of their losses, to restore their social

and economic base.

I EE A Preliminary attempt to evaluate environmental impacts in order to

determine whether a full-scale environmental impact assessment is needed.

Land acquisition The process whereby a person is compelled by a public agency to alienate all

or part of the land s/he owns or possesses, to the ownership and possession of

that agency, for public purposes, in return for fair compensation.

LARP Projects which do have significant socio-economic impacts hence involve/

require land acquisition therefore; a detail land acquisition and resettlement

plan (LARP document) is prepared for the documentary requirements.

Non-Titled Those who have no recognizable rights or claims to the land that they are

occupying and includes people using private or state land without permission,

permit or grant i.e. those people without legal title to land and/or structures

occupied or used by them. ADB's policy explicitly states that such people

cannot be denied compensation.

Replacement Cost

Resettlement Field Survey

The method of valuing assets to replace the loss at current market value, or its

nearest equivalent, and is the amount of cash or kind needed to replace an

asset in its existing condition, without deduction of transaction costs or for

any material salvaged.

The detailed inventory of losses that is completed after detailed design and

marking of project boundaries on the ground, socioeconomic data on the

affected households/families, and stakeholder consultations.

Sharecropper The same as tenant cultivator or tenant farmer, and is a person who cultivates

land they do not own for an agreed proportion of the crop or harvest.

Significant Impact

Social Impact assessment

Vulnerable

200 People or more will experience major impacts, which are defined as; (i)

being physically displaced from housing, or (ii) losing ten per cent or more of

their productive assets (income generating).

Social Impact Assessment is analyzing, monitoring, and management of

social consequence of development interventions project infrastructure.

Any people who might suffer excessively or face the risk of being

Page 9: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

Resettlement Field Survey

marginalized from the effects of resettlement and includes; (i) female-headed

households with dependents; (ii) disabled household heads; (iii) poor

households (within the meaning given previously); (iv) landless; (v) elderly

households with no means of support; (vi) households without security of

tenure; (vii) ethnic minorities; and (viii) marginal farmers (with landholdings

of five acres or less).

The detailed inventory of losses that is completed after detailed design and

marking of project boundaries on the ground, socioeconomic data on the

affected households /families, and stakeholder consultations.

Sharecropper The same as tenant cultivator or tenant farmer, and is a person who cultivates

land they do not own for an agreed proportion of the crop or harvest.

Page 10: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

TABLE OF CONTENTS

Sr. No Brief Description Page No

I Abbreviation 2

2 Definition of terms 3

3 Introduction 7

4 ADB Involuntary Resettlement And Categorization 11

5 Social Monitoring 12

6 Grievance Redressal Committee (GRC) 16

7 ANNEXURES

20 A. Area of urisdiction

B. PMU Organogram 21

C. Verification/Checking of Kharaba/Compensation 22

files

D. ADB-PDE1P-Loan 2727-Power Distribution 25

Enhancement Investment Program (GEPCO)

Page 11: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

1-INTRODUCTION

1.1- GEPCO

Gujranwala Electric Power Company Ltd. GEPCO is a Public Limited Utility Company,

established in 1998 under Companies Ordinance 1984 and is responsible for distribution

of Electric Power within its territorial jurisdiction and presently serving approximately

2.5 Million Customers (Domestic, Commercial, Agricultural, Industrial and others) in the

six districts of Province Punjab (Gujranwala, Narowal, Gujrat, Hafizabad, Sialkot and

Mandi-Bahawal-din). Area of jurisdiction of GEPCO is attached at Annexure-A.

1.2 Power Distribution Enhancement Investment Program

Government of the Islamic Republic of Pakistan (GoP) through Ministry of Water and

Power (MOW&P) with assistance of Asian Development Bank (ADB) is implementing

the Power Distribution Enhancement Investment Program (PDEIP) under Multi Tranche

Financing Facility (MFF). This Program is part of the GoP long term energy security

strategy. Pakistan Electric Power Company (PEPCO) has been nominated by Ministry of

Water and Power (MOW&P) to act as the Executing Agency (EA) while Gujranwala

Electric Power Company (GEPCO) is the Implementing Agency (IA) for execution work

in its service area.

1.3 Power Distribution Enhancement Investment Project (PDEIP) — Tranche-II

The Power Distribution Enhancement Investment Project (PDEIP) Tranche-II is designed

to provide grid-connected customers with adequate and reliable supply of electricity. The

rehabilitation, augmentation, and expansion of power distribution infrastructure will

increase the reliability of supply to residential, agricultural, commercial, and industrial

customers across Pakistan. A reliable electricity supply will lead to social and economic

benefits and improved conditions for schools, hospitals, and social services, among

others. The main components of the program are given as under:

■ Conversion / Up-gradation of Grid Stations

■ Extension of Power Transformers in existing Grid Stations

■ Augmentation of Power Transformers in existing Grid Stations

■ New Transmission Lines

Page 12: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

■ Remodelling of Transmission Lines

■ Installation of capacitors on 11 KV

■ Rehabilitation works

• System Modernization

The projects basic information is provided in Table 1.

Table 1:

Program Basic Information

The Program Power Distribution Enhancement Investment Program

(PDEIP).

Multi — Tranche Financing Facility (MFF).

Subproject Tranche — II subproject.

Location of the Project 06 No. of Districts in the serving territory of GEPCO

i.e. Gujranwala, Sialkot, Narowal, Gujrat, Hafizabad

and Mandi-Bahawal-din

Sponsoring Agency Government of Pakistan.

Ministry of Water & Power (MoW&P).

Executing Agency Pakistan Electric Power Company (PEPCO).

Implement Agency Gujranwala Electric Power Company (GEPCO).

Type of Financing Loan amount 48.55 Million US$

Loan No. ADB 2727 — PAK; Tranche — II Subproject.

Loan Signing Date January 28, 2011.

Loan Effectiveness Date 29-03-2011 (After 60 days of Signing the Agreement).

Page 13: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

Closing Date March 31, 2015.

Date of Last ADB Review

Mission

November, 2014.

Focal Person Chief Engineer (Development),

Project Management Unit ,

GEPCO Electric Power Company (GEPCO).

Focal Person for

Environment & Social

Safeguards

Deputy Manager (E&SS) is not hired,

AM (Environment) & AM (Social)

Project Management Unit,

GEPCO Electric Power Company (GEPCO).

1.4 Objective of the Project — PDEIP (Tranche-II)

The main objectives of this Investment Program are;

(1) Improve power distribution infrastructure through system rehabilitation,

augmentation, and expansion; and relieve the power system from distribution

bottlenecks and constraints;

(ii) Enable continued operation and maintenance in accordance with best international

practices; and

(iii) The system will be capable of meeting peak demand, with electricity outages

significantly reduced.

1.5 Scope of Work

There are 16 No. of GEPCO proposed projects under ADB Tranche-2. Its detail is here as

under:

1. Construction of 05 No. New 132kV Transmission Lines

2. Construction of 04 No. New 132kV Grid Substations

Page 14: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

3. Conversion of 02 No. Grid Substations from 66kV to 132kV along with associated

132kV Transmission Lines

4. 05 No. Extensions/ Augmentations

Overall the proposed MFF has been designed to address both investment and institutional aspects

in electric power sector. Development Objectives/ Project Purpose will be fully achieved after

completion of the proposed Sub-projects.

1.6 Management Structure - Directorate of CE (Development) / Project

Management Unit:

To carry out and handle the invest ment projects GEPCO has established Project

Management under the administrative control of Chief Engineer (Development). The

PMU comprises of 4 sections.

i. Planning Scheduling & Coordination: To take the responsibilities for (i) identifying

and proposing the subprojects to PEPCO / Donor Agency for approval and financing,

(ii) Scheduling and Monitoring (iii) preparing the necessary documentation in line

with the statutory, corporate and Donor policies including quarterly reports (iv)

coordinate with the consultants.

Procurement: To take care of all responsibilities and tasks related to procurement

(goods, works and services) and for the activities related to material planning,

preparation of bidding documents according to the requirement of the Donors, getting

the evaluation done and for placing the orders after approval of the Donors,

inspection and then transportation to the site. Arrange release of material thru CRR

Karachi and final delivery to the site.

iii.

Project Finance: They are responsible for taking care of counterpart financing,

funds flow arrangements, payments, recording and monitoring of both ADB & WB

funds. Also, will establish, monitor and manage the imprest account and statement of

expenditure (SOE) procedures. Furthermore ensure timely preparation of the annual

audited project accounts.

Page 15: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

iv. Environment & Social Safeguard: To take care of all the responsibilities and tasks

related to environment, land, and social (including involuntary resettlement and

indigenous people) and provide oversight on occupational health, safety and

environment safeguards in the working environment.

1.7 Environmental & Social Safeguard Section — PMU GEPCO

The Environmental & Social Safeguard (E&SS) Section of PMU, GEPCO provides an

overall supervision and advisory services during the Pre - Construction phase,

Construction phase & Post — Construction phase of the project. The E&SS also assists

and advises GSC Directorate, Construction Directorate and other GEPCO departments on

environmental and social matters. Presently, the E&SS Section has one Environmental

and one Social Impact expert under the supervision of a Deputy Manager Environmental

and Social Safeguard (E&SS). The organizational structure of E&SS — PMU GEPCO is

attached at Annexure —B.

2- ADB Involuntary Resettlement and Categorization

In Compliance to the ADB guidelines; all projects have been assigned Involuntary

Resettlement Categorization based on outcome of Initial Screening and Evaluation of

Significance of probable Social Resettlement Impacts i.e.

• Category (A) Significant Projects having significant social impacts that require land

acquisition on permanent basis, means 200 or more people will experience major

impacts, which are defined as being physically displaced from housing or losing 10%

or more of their productive assets. A full detail Resettlement plan is required for

Category- A projects.

• Category (B) Projects include involuntary resettlement impacts that non-

significant and require a short resettlement plan.

• Category (C) Non-Significant Projects having no involuntary resettlement impacts in

Category C. They neither require a resettlement plan nor a resettlement framework.

Category C projects only require a short DDR (Due Diligence Report).

Page 16: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

• There are 10 out of 16 Projects which falls in Category-B (05 No. of New Tr. / Lines +

03 No. New grid stations + 02 No. of conversion of grid stations) require short LARP

preparation, implementation, monitoring and uploading/ posting at ADB and GEPCO

official websites. 01 No. New grid station (Sheranwala bagh) along with 05 No. of

Augmentation/ Extensions (06 No. sub-projects) falls in Category-C does not require

any social assessment reports (neither LARP) nor DDR (Due Diligence Report)

preparation.

3- Social Monitoring

3.1 Land Acquisition & Resettlement Plans (LARP) AND DUE DILIGENCE REPORTS

(DDR)

• Proper compensation on account of loss of crops/ trees on actual basis is being

processed, paid to each affected person/ household as well Affectees details are

being updated/ revised accordingly. And all the compensation has been provided

to the Project Affected Persons (PAPs), Affected Persons (AP), Affected

Households (AH) before start up of civil works.

• Check distribution ceremony has been organized on different transmission lines.

• Environmental & Social Complaint Register has been implemented to record/ log

complaints of affected household/ persons at each project site (Tranche-2) but no

significant complain have been received yet.

• A revised entitlement matrix has been prepared covering verified list of affectees

and losses to their crops in three stages i-e Excavation, Erection and stringing.

• The staff met with the effected households to confirm their status.

• Documented procedure on Grievance Redressal is prepared and communicated to

P.D (("CSC), XEN TLC/ T&G for implementation.

• Standard Operating Procedure (SOP) on Kharaba compensation prepared and

submitted to both ADB and PEPCO.

• Capacity building programs were conducted at each sub-project site to train the

Contractor/sub-contractor/Labor to ensure following Social, health and safety

issues:-

• Comply with all applicable labor laws of the Islamic Republic of

Pakistan;

Page 17: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

• Comply with all pertinent occupational health and safety regulation;

• Use best efforts to employ local community /women living in the vicinity

of the project area;

• Disseminate information at worksites on risks of sexually transmitted

diseases and

• HIV/AIDS for those employed during construction, and take measures to

protect workers from potential exposure to sexually transmitted diseases;

• Do not differentiate between men and women's wages or benefits for

work of equal value;

• And abstain from child labor.

3.2 Visited Project Sites/ Inspections

E&SS PMU has conducted/ carried out both internal and external site inspections.

(Detail enclosed herewith at Annexure-C)

3.3 Construction Activities and Project Progress (During previous 6 months)

Contractors are carrying out/ executing civil & electrical work activities for the

Construction of new grid stations (Khiali-bypass, Sheranwala bagh in Gujranwala),

(Daska, Godhpur in Sialkot), Conversion of existing grid stations (Jalalpur-Nau and

Kolu-Tarrar in Hafizabad) has been completed on 19-05-2014 and Construction of

05 No. New 132kV Tr. Lines (127 KMs). Following civil work activities have been

carried out. (Detail enclosed herewith at Table -2).

Page 18: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program
Page 19: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

Progress of GEPCO 132 kV T/Lines Under ADB Funded Tranche # 2

Remarks

Energized on 17-04-2014

Energized on 19-05-2014

0

cc

Energized on 27-02-2014

Energized on 28-08-2014

The commencement date of

Towers Erect ion not

confirmed yet as line-A & C

on priority list.

0

cc

It will be completed by 31st

August, 2014.

Target Date

u-1 ,

,:.o

2

Mar 15

--,

2

Ln

L.

--,

2

Progress

Status (%)

?,. C

D

0

e.

0

0

,-1

e.

Ln n.

?,5,' 0

o

'0-!: 0

o

.--1

*

o

tO

*

0

VD

:,;,,' 0

,.0

Length of

Stringing

completed

(Km)

L.r,

eN

ul n

o

.-1

-. z v

.-,

,

.-

v- n

0

d

=

2

n,

u.

No.of

Erected

Towers

n

C

r..■

lf)

n,

n.)

0

,r,

r--. r•--

CO

,..0 =

2

,-,-,

No.of

Foundations

Completed

h.

cr h,

kr, .1. ci•

0

Lc h.

n

.,

,r ,

u", n ,

cr ,

"O

''' c .

6 3

Z

0

I-

h. .

C'

hs, ,.D

O

Lrl 0

Lc h. n

ct ,

h. ,

R

-c to

"E

. „

3

0

c7; hs,

Lrl ,

ai -,

,

0-; .1- Li; ,

to

u-i ,-.

,

h,

,

.-

,

,-.; r-,

Name of

Contractor/

Sub-

Contractor

SIEMENS/

NETRACON

6

7

SIEMENS/

PENSIC

U

L.+

l)

U

-..._,

0...

'0

7a3

2

0)

CO

0

<

CO

0

<

CO

0

<

CO

a

<

CO

0

<

CO

a

<

2

<

L-2

CO

a

<

Contract No.

ADB-2727-GEPCO-05

6,

7

ADB-2727-GEPCO-03

--

ADB-2727-GEPCO-06

6

-o

a ,

o

V

,

Name of Tr./ Lines

132KV Hafizabad -IIKolu-Tarar

T/L

132KV Kolu Tarar-Ja lalpur Nau

Shahowala-Godhpur 132 KV

T/L

In & Out for Hafizabad-II GS

from the ex isting Nokhar

Hafizabad T/L (C.C.T No.1) (D)

In & Out for Garhi GS from the

proposed Nokhar-Therisansi

T/ L (Feed for Garhi) (E)

132 KV Nokhar-Hafizabad-II T/L

(Alternate Feed for Hafizabad-II

GS) (C )

132KV Sahuwala-Pasrur

Transmission Line (B)

In & Out of existing 132KV

Hafiza bad Rd. Gujranwala

Therisansi T/L at 132 KV

Switchyard of SOOKV Nokhar

(A)

0

Z

to

..-1 rq

m

kr

..n

ko

N

co

Page 20: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

Progress Status of GEPCO Grid Stations Under ADB Funded Tranche # 2

Remarks

Energized on 17-04-2014

Energized on 19-05-2014

Test ing a nd Commissioning

Energized on 28-11-2014

Target Date

Mar-15

L.r) x-i

L._ rti

Mar-15

Civil &

Electrical

Work

0

0

0

0

0

0

e•.' 0

0

o''.-9 0

0

.8',

0

r--. Li-) r--.

Name of

Contractor/Sub-

Contractor

SIEMENS/NETRACON

6

7

SIEMENS/PENSIC

0

-o

ABB/NETRACON

o

-o

Funded

Head

aD

0

<

a3

0

<

ca 0

<

an

0

<

c0 0

<

ca 0

<

Contract No.

ADB-2727-GEPCO-05

0

ADB-2727-GEPCO-03

6

ADB-2727-GEPCO-04

0

Name of T/Line

Conversion of Kolu-Tarar GS from

66KV to 132 KV

, Conversion of Ja lalpur-Nau GS from

(66KV to 132 KV

Construction of Godhpur 132 KV GS

Construct ion of New Daska 132 KV

GS

Construction of Khiali-Bypass 132 KV

Grid Station

Construction of Sheranwala Bagh

132 KV Grid Station

Izt

V)

,o

lN

rn

•zr L.r)

LiD

Page 21: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

3.4 Social Awareness & Trainings

An Awareness campaign regarding Communicable Diseases has been initiated to

educate the workers regarding communicable diseases especially HIV/AIDS,

Hepatitis and Tuberculosis (TB). Pamphlets / Leaflets for awareness regarding

TB, HIV/AIDS and Hepatitis have been prepared, printed and distributed to

PESCO's GSC Directorate. The concerned Staff has been trained on ADB social

policy i.e payment to affected household before damages and identification of

indigenous people and other vulnerable groups falling in the project area.

3.5 Internal Monitoring & Field Visits

Internal monitoring of the projects will be carried out by Environmental and

Social Safeguard (E&SS) section PMU, GEPCO during the execution phase for

the smooth and effective implantation of EMMP & Monitoring plan.

4. GRIEVANCE REDRESS COMMITTEE (GRC)

To address and resolve the complaints & issues of Project Affected Persons (PAPs)

related to the components of Tranche — II sub projects, GEPCO has been constituted

Grievance Redress Committee (GRC) inline of the ADB Social Safeguard Policy on

25/10/2011. The committee members are as follow:

• Manager (P.S&C) Convener

• P.D (GSC) Member/ Secretary

• Dy: Manager TLC Member

• A.M (Social Safeguard / Environment) Member

• ALAO/ LAO (GSC) Member

To facilitate Project Affects Person (PAPs) and Stakeholders for registering their

complaints for immediate and amicable resolution a complaint register has been placed at

the Office of Chief Engineer (Development). So far no complaint has been recorded as

per complaint register.

Page 22: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

4.1 Functioning Of the Grievance Redressal Commitee

• GEPCO normally takes care to prevent grievances rather than going through

a Redressal process/ procedure. This can be obtained through careful land

acquisition & resettlement design, establish full participation, coordination

and consultation/ communication b/w GEPCO and the community (affected

households/ persons).

• Environmental & Social Complaint Register both in English and Urdu

version is communicated and implemented by the Project Director (GSC),

XENs TLC/ T&G at each sub-projects site.

• This GRC is functioning / operate in i)-PMU office building GEPCO HQ ii)-

PD (GSC) office GRW. External monitoring is carried out by ADB

consultant SMEC, While internal monitoring at project site is carried out by

GSC/ /PMU team.

• When any problem about land resettlement arises, it shall be resolved by

PMU/ GRC in coordination with the Nazim/ Naib-Nazim/ Councilor of the

affected communities.

• This Committee listens and responds to the Complaints raised before and

during the execution of the projects. The complaints are registered / logged in

environmental & social complaint registers (ESCR) which are now available

at all project sites.

• Firstly, GEPCO try to rectify/ resolve the complaints at their own level in

coordination with Tehsil/ Union Councilor Nazim/ Naib-Nazim of the

affected communities within two weeks time.

• If complaint remains unresolved/ unsatisfactory, the complainant must

notify/ lodge his complaint to GEPCO GRC within one month time w.e.f

registering the original complaint in ESCR register.

• All necessary control measures/ arrangements are taken/ adopted for

Redressal (i.e. Resurvey/ Redesign and Amendment etc.). The grievance

redressed and the GEPCO GRC will provide the decision within 21 days of

registering the complaint. The Complainant shall be contacted and informed

accordingly.

Page 23: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

• If complaint still remains unresolved and the grievance redress system fails

to satisfy the AH/ AP, they can further submit their case to the appropriate

court of law as per the process set out in Sections 18 to 22 of the Land

Acquisition Act (LAA) 1894, the complainant can take legal action.

4.2 Meeting Schedule of GRC

• GEPCO GRC meeting held once in a month end in mid week. AM

Environment/ Social prepare minutes of meeting that shared/ communicated

to all concerns.

• The progress on MOM will be discussed in next meeting with special

emphasis given to pending concerns/ issues.

4.3 GRC budget

• PMU Section has obtained approval from the C.E.O (GEPCO) for

implementation of 11 No. LARP (Land Acquisition and Resettlement)

Reports in respect of ADB funded tranche-2 sub-projects (PDEIP-MFF).

• Compensation amount PAK. Rs. 71,650,116.00 (716,501.16 in US$) has

been allocated in the GRC Budget for the completion of all Sub-Projects.

(Details attached at Annexure- D)

• Compensation for foundation stage has been paid and compensation for

eraction / stringing stage is in progress. (Detail enclosed herewith at Table -

3).

4.4 Accessibility to the Community

• This draft grievance Redressal process/ procedure is accessible to anyone

/local Community. Grievance notice(s) with cut off date in local language

(Urdu) will be issued to affected household/ person and their complaints

registered/ logged in ESCR register.

• Similarly, this draft GRC process will be uploaded/ posted on GEPCO

official website Http ://( www.Gepco.com.pk/pmu) subject to the ADB

approval.

Page 24: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program
Page 25: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

Table -3

• •

pai3t1.00

Compensation Convicted

s

,

i N,_

208

GEPCO Monthly Progress of LARP(s) TRANCHE-I1 For the Month of December 2014

Remarks

2 f 8

P a k

'2 -p 8

s

5

k.

F c4 c

G/S tend has been accuired and compensation has bee n card to Land owner(s). TIL work not included in ADO's Sipe of

work,

Mc

Is A g v

, . , Ts'

-1

"t k n P

E 1 .

A

12 1

8 X 5

§

i

X I°

$-

0 ,,-,

g

6

-B %

o, .0 o,

.D Erection Stage

— „, *

,-:, ,

— ,

R

z '-1-'

_ , al

R

.-

Told No of DHFfs as

per Revised LARP

18 o, ,-.

>

1,.' —

2 .

Total No of DP's as

per Revised LARP

1P- .2

o, ,-,

Fi

Site Visit for

Monitor ing (Dale)

o, g

x..

... g

."-

30/12/2014

3 o ., '.1 c-,

3 -':4

1--g'-':

K.' c:, 7

,

-R .

ei

-R c.:, 7,

, — — -g

— 71

& F

_

5 o

I

an -E

N a >

f .,

Revised LARP

Submission

— —g

g

3/52013

,

"6 g

,

"g g

"' .0 ..,

— -.E, g

R

g

1

3`

g

': = '

k- - 4-

,..,

A e:3 ,,, ,, C

g

e

,.., —

._ c, _. 5

1 IS "E"

A I

.

---g . -

. -

.

-g

Z--

.

g

-• ,.. .. . R

-

g

: -- A

.

R

.....77 a

— -g

— R

R t..--

E h;

I

g R

23 Y.

132KVSahuwala-Pasru r Transmission Line Fec 2X9

Sub Project Name

Conversion of Kolu•arar GS from 66KV to 132 KV

and 137XV Hafizabal Kolu-Twar TAL

Conversion of Jalelpur-Nau GS from &SKY to 132

KV and 1321W Kolu Tarar-Ja4pur Nay

Construct ion of God hou r 132 KV GS and

Shahow4a-Godhpu r 132 KV TA.

8

Pt — .,T M 1

z

L z

E

A

I

3

FS — 1

4" ia

Is v, fr. a 2

E

132 KV Nokhar-Hallzabad-11 Tit (Alternate Feed for .

Hafizabad-II GS)

.1.° 1

N g &

.2 - I. A P

8 v

t.

3

1, r., 8

§

E

In & Out for Hafizabad-II GS from the existing

Nokhar Hafizabad TA. (C.C.T No.1)

In & Out of existi ng 132KV Hafizabad Rd.

Gujranwala Thensansi TA at 132 KV Switchyard

of 500K V Nokhar

g 'A

33" E

'c;

0. 6

o

6

cs, 6

cc., 6

... 6

co 6

_ ..

c., ...

o, co

,-.. co

c. —

Page 26: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

GEPCO LARP'S IMPLEMENTATION STATUS TRANCHE # II

Resettlement

Not Required

0

"Cf 1

0

-c$ 1 0

'CS 1

Crop Compensation

Cr) ,-4 0

N

-....... l0

LO

GEPCO's own Land, NO need of crop compensation.

G/S Land already in GEPCO's possession, for T/ Line

compensation Completed.

CO .-i 0

N

---,... If)

q)

,--4

Effective

Date

16/4/ 2012

N

,-t 0

N

--...,.. CT ....... 0

r-t

25/6/2012

12/3/2013

Contract #

GEPCO 03 (Godh pur New Daska with T/ Line)

GEPCO 04 (S/W Bagh KBP)

GEPCO 05 (Kolu Tarar, JalalPur with T/ Line)

GEPCO 06 (5 No. T/ Lines

ICC)

'-4

CV

C

O

cl•

Page 27: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

Dist. Sheikhupura

Annexure- A

Page 28: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

Annexure- B

, . . . ... . - iljIC:::. .. e i:CerT—j. '1 ,

rig nee ... , • ...J, . . P. • (GSC)

Consultants • ., = Elhatti

• z,7r. 'II

-11111

ranager8foordian":117. Sth

edu) "

manager (Procurement)

IP.* DM( EilViOninent & - Manc". I Safeguards) (Project finance)

Anar Khan Vacant Vacant Vacant

olarafaiffir

I 1 ..._,.-1 Lir 1 -

Dm Dm DM AM AM (Project finance) ( M.C&C) DM (P.S&C) (procurem:. (Procurement) (Social Impact) ( E , s 71 mehmood , •

M.B.Goraya Vacant H M Cheem :n- . Akhtar Ali Zunaira latif Faheem As - '. 1

. ;

AM AM AM AMAm . Am .. r.... (Me &C) (P.S&C) (Procurement) (Procurement) Muhammad Al . (Vacant)

Vacant Vacant Vacant Vacant , , .

Page 29: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

Annexure- C

Visited Project Sites/ Inspections/Verification of Kharaba Compensation Files

Page 30: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

.;•%-

-

"vivii#0401, - • "Aify.

Page 31: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program
Page 32: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program
Page 33: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

Social & Environment Inspection

042ANIVAL4 turntr 'viva COKPANY L14117£11

585-A MODEL TOWN CLT ROAD GUJRANWALA

Phone 0 055-9200836 PBX 0 055-9200519-26 FAX *055-9200594

Memo No: Cti? • 3 7/rol "

The Manager Project (Construction' ICC Pvt. Ltd

OFFICE OF THE

CHIEF EXECUTIVE OFFICER GEPCO, GUJRANWALA

Dated: 1 C/01/2015

Sub: Environmental and Safeguard Inspection At Under Construction Sahuwala Paster Tr. /Lines GEPCO sub-Project Funded Under ADB PDEP MFF Tranehe-2

Reif - PMT.: GEPCO Officers with SMEC (ADE, Consultiuitsi visit to subjected site on Friday dated 02.1/1-2015;

Dunng inspection and meeting with local Affectee's at subjected sites, following Observations were noted:-

1. No Dedicated Safety Offit:er/Supervisor found at work fate

2. Local Affectees were complaining about improper backftIling that was carried out during the execution of civil works at foundation stage Ensure proper site restoration after the completion of civil works

3 Internal/ 1n-house tramingo on fire fighting, first aid and communicable diseases be arranged at work site and furnish copy of training record to both GEPCO and SMEC.

You are directed to take-tip the above mentioned corrective actions within 13 day tinder intimation to office as desired .

)Ghulat uhammad) Chief EngM (Development)

GEPCO Q

CC

I. Mr. Adnan Tareen (Project Implementation Officer ADB), for information please 2- Ms_ Sofia Shaft() (Environmental Specialist) ADB, for kind information please

P.D (0SC) GEPCO. for his kind information and 4.11171pliance of the same please.

Page 34: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

January 10 2015

Yours truly, For•ICC (PVT) Limited,

I C C @No Limited 242 - A AP4APID ROAD. UPPER MALL. P.O BOX .1110, LAHORE toLJIIC PAPOS1OFE • E -,w1 calItx-pot aFrn

PHONE 042i ;ism In 28 • FAx 92 42 35712594 35755E64

• NM,

Ref. 301W c (4 r

Chief Engineer (Development),

GEPCO. 565-A Model Town. G T Road. Gujranwala

Subject: CONTRACT NO. ADS-2717-GEPCO-0b Procurement Of Plant. Design, Supply And Instaliation Of 05 Nos 132 kV Trans-riss:•ir

Lines (127 Km) Different Circuits In GEPCO Area "ENVIRONMENTAL & SAFEGUARD INSPECTION AT UNDER CONSTRUCTION SAHUWAI. A-PASRUR TUNE.

Dear Sir,

Please refer to your ema dated 0-U1-2016 rugardaig obsufv.it WS noted during PMU GEPCO Offt_ers and SMEC (ADO Consultants) visa to subject site on Friday dated 02.01-2015. Our pant by point reply to your observations is as follows

Sr. No.

1

Observations

No dedicated Safely Officer/Supervisor

at work site

Rot*

Mr Shah Faisal, AE is nominated HSE Mar at work site and was ava,lable during said visit.

Improper back filling and site restoration after completion of civil Waft 5

Trainings on Fire Fighting, First aid and Communicabte diseases

Thanks.

Foundation activity at subject mentioned Toting was

completed on 271. February 2014 Al' remaining

tecations are under ROW problems since then We have done proper backfiliing after completion of

foundations But due to heavy rains and flood during

last season some locations were damaged These will be repaired before handing over the line

We are conducting rainings at work sitei'office after regain intervals. Now we are planning to conduct Information. Education and Consultation communication campaign i IEC) on Sexually Transmitted diseases (STOs) and Silanielly Transmitted Infections (STK) and HSE Issues an the last week of January 2015 Training shall be furnished to both GEPCO a

Atique Nelms<

Or Chief Contracts Engineer

KARACHI OFFICE •TN FLOOR. PROGRESSIVE SQUARE PECKS, SHAPIRA/4 E • FAISAL P.O.BOX Jail KARACHI 14109 PARISIAN t-suoticcacre.• nal pi • PHONE 34545325-21 • TAX MUTSU row

Page 35: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

OUJRANWALA ELECTRIC POWER COMPANY LIMITED. 565-A MODEL TOWN 6 T ROAD 6WRANWALA

Taken Ovet fit

tine Superintendent I, h SSILT/I, Sub Division-I, IGSOI,

GEPCO, Guiranwala

A E ST/t

Sub Doi -1, (GS%

GEPCO, ansva

CIS

C/5

MEN 5

IGS0), GER nwala

e \LA

.51

SUB-PROJECT COMPLETION CERTIFICATE

Phone a OSS-9200636

OFFICE OF THE

PBX • 05S-9200S19,26

CHIEF EXECUTIVE OFFICER

FAX C 055.9200594

GEPCO- GUJRANWALA

Memo No: /69r —93 /Dev/PMU Dated:17 /05/ 2014

The E..ecutIve Engineer SS& I /I

Division (GS0), GEPCO,

Guiranwala

Sub: contract No. AD15-2727-GEPCO-06

PROCUREMENT OF PLANT, DESIGN, SUPPLY AND INSTALLATION OF 05 NO. 132 KV

TRANSMISSION LINES (121KM) DIFFERENT CIRCUITS IN GEPCO AREA

HANDING /TAKING OVER NEWLY 0301§331)CTED IN_ & OUT FOR HAFIZABAD-II GRID

STATION FROM EXISTING 132KV NORHARcHAFIZABAD-1TAINEIL-TNIE-OT

Ref

I. M/S +CC (Pvt.) Ltd, letter a 3616/3762 dated 17.04.2014.

2. Chief Ehgrneer (Dew) letter # 1186-13.9/PMU/GEPC0-06 doted 241-04-2014.

It tt reported that subject T/Line is completed in al! respects and is energized on 27-02-2014

Since then it is performing satisfactory

It is therefore requested to please take over the subject T/line in your control The copy or

line profile and plan tabling is attached. Please receive and acknowledge it.

DA/as abgiv

~iandt5i Over Cy

MIS ICC (Pvt.) Limited. Lahore

Atique Naimet

C hog Contracts Engineerr

..Cst2yag

tr.

ManageriPrcement) PMU GEPC Gulransvala

1 The C} (Ory ) GEPCO, Gupanwala for infornuit,on please

2. The S.E (GSO) Circle GEPCO, Guiranwida for information please

Page 36: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

AD

B-P

DE

1P

-Lo

an

27

27

-Pow

er D

istr

ibu

tio

n E

nh

an

cem

en

t In

vest

men

t P

ro

gra

m (

GE

PC

O)

Imp

lem

enta

tio

n

Sta

tus

Fin

al R

ev

ised

Ass

esse

d

Co

mp

ensa

tion

Co

st (

In P

AK

Rs.

)

4,9

37,7

62.0

0

-

8

i

-4-

'''.. .-

8 kr■

,c>

1 S

8

4

8cN`

•er . .-

8

.c.

Rev

ised

Est

imate

d

LA

RP

Imp

lem

enta

tio

n C

ost

(In

US

$)

es '4? r• eel ch <,-

Z

- 653.

24

. ; eei -4- 7

8,3

65.6

0

S

114,

167.

70 cz

el.

-

I--

oc - .r...

Co

mp

leti

on

Date

of

LA

RP

Imp

lem

enta

tio

n

(Expect

ed) en

G r.;4

9 r.,

en G c?

9 r•-■

en G r?

9 ■-•.,

en G ("'

9 r,-,

m

G rl

....

e.,--

M

G r.,

.....

m

in — 0 r? .....

tn

,, G c;'

7 , 31

-12

-201

3

Civ

il W

ork

s

Co

mm

cn

cem

e

nt

Da

te N

a; '11 s 9 - en

IN G ei4 s R -. en

N 8 rli s R .- en

N G eil s R ,- en

N G e;4 s 9 - en

N 8 e;1 s R - en

N 0 Q

7 -

N 8

g ■ .-

N 8. cv -6, - --- -

.., CO .0 04 w :, , ... as r: Ea cl o •,,,

G..) 29-1

2-2

011

.... G ell N

7, N

-. 8 ell

N ... ON N

-, 8 el

N

;* N 29

-03

-201

2

29-0

3-20

12 N

G ell VI R en N

N G ell WI

cell' N 23

-05-

2012

11

g 4 5 t al ''' 44 .4 es ;I .3.

0,.. 1.. Ci.

e4 8 <-4

4 4-4

e4

G N

4 ev

N 0 CI'

4 (4

el 8

.4- , r- ri

N 8 N

4 N 27

-04-2

012 N

8 (-4

g

N

N 8 (-4

g N

.--. c

N

"A o.. pg > ,,, cg z 2 7, -‹ CI C. CZ p■i '.-. c i .

. . , E

0 -<; (--;1 .-.

87 N - 4

0

G el .-•

g e 4

0 8 N ...

0 G N ....

e .4

0 G c? ...

c 4 4

0 G e? .... .--■

N - 4

0 G (-4 .... ...

< - • 4

0 - o 4-4 ... .•-•

N 1

c. - NI .--. .--•

N z I

c., =

o. = < .4

o. = < .4 L

AR

P

DD

R o.

rg < 04 .1

o.

< .-1

IX a.

< .-1

o. = < .-4

New

Sub

-Pro

ject

Na

mes

se

nt by

GE

PC

O

Co

nst

ruct

ion

of G

odhpu

r I

32k

V G

S a

nd

Sah

uw

ala-

God

hpu

r 1

32

kV T

L

Co

nst

ruct

ion

of

New

Das

ka

132k

V G

S

Cons

truct

ion

of K

hia

li-B

ypas

s 1

32kV

GS

Co

nst

ruct

ion

of

Sh

eran

wal

a B

agh I

32

kV

GS

Co

nv

ersi

on

of

Kolu

-Tar

ar G

S f

rom

66k

V t

o

132

kV

and

132k

V H

afiz

abad

-II

- K

olu

-Tar

ar T

L

Co

nv

ersi

on o

f Ja

lalp

ur

Nau

GS

fro

m 6

6k

V t

o 1

32

kV

and

I 32

kV

Kolu

-Tar

rar

- Ja

lalp

ur-

Nau

TL

13

2kV

No

khar

-Hafi

zabad

-11

T/L

ine

(Alt

ernat

e

Feed

for

Hatiza

bad-1

1 G

/S)

In &

Out

of

exis

tin

g 1

32

kV

Ha

fiza

bad

Rd

.

Guj

ran

wa

la T

heri

sansi

T/L

ine

at

132K

V

Sw

itch

yar

d o

f 5

00kV

Nok

har

G/S

In &

Ou

t fo

r H

afi

zab

ad-1

1 G/S

fro

m t

he

exis

ting

Nok

har

-Haf

tzab

ad T

/Lin

e (C

.C.T

No

. 1

)

- 1.- c/..

..e cr = ea 1. F,

01 18

C..)

GE

PC

O

...1 11 ,i

el ...I ,i

re) 1.4 4.4

•tr 1■1

ei

- r.se4--

eg . tr:41

V. _., 7.4

el el 'Nit

n , ei

ci Z

-, c..4 en ..i. kr) ...o r-- 00 a.,

An

nexu

re-D

Page 37: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

00'815'0517'1Z

O

kr;

".'

,..-

71,650,116.00

Pak. Rupees

oo

kr; O

n

-gr N

kr,

ei

Tt-

v-7,n

,4,

..1.-° o

41

,4.- r-

US $ Dollar

r•-. =

N N

(41

rn

3 1-12-2013

(,1

0

N

-.... 0

N

0

N

0

Total Estimated Compensation Cost

N

O

'''1 44

,n

N

N

O

c■I ‘`=' N

I

27-04-2012

N

G

'''' 4

(-,

0, G

''.1 —

O

N

0

G

e., -, c:7 N

t

4t

4

t e

...7

132kV Sahuwala-Pasrur Transmission Line

In & Out for Garhi G/S from the proposed Nokhar-

Therisansi T/Line (Feed for Garhi)

RPs (Resettlement Plans)= 10

et•

e,i e

4

U")

C."; (-4

TOTAL

cp

—,

Page 38: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

Re: Fwd:-"Submission of Bi-annual Environmental & Social Safeguard

Monitorg. Reports (Period:June-Dec 2014)-Tr. # 2 I.R.0 PMU GEPCO." D Ashfaq Khokhar to: Liaqat Ali, Adnan Tareen 29/01/2015 11:27 AM Cc: Rizwan Haider, Michael J. Beauchamp

Dear Adnan/Liaqat,

The report can be disclosed. However for the comments to be properly addressed and a meaningful report outline followed, I am attaching an outline of the monitoring report below which simplifies the effort and helps in writing only the relevant information. This also helps easy and objective review and saves everybody's time. Please replace the definitions with IR definitions attached below, get tables 3 and 4 and annex D of the subject report inserted in the next monitoring report for which the outline is attached below.

Please contact Safia Shafiq for review of environmental monitoring report.

Best, Ashfaq

Ashfaq Ahmed Khokhar

Sr. Social Safeguard Officer Pakistan Resident Mission Asian Development Bank Tel (92) 051-2087300 Ext 230

Fax. +92 51 260 0365-66/208 7397-98 www.adb.org

Al )1; PDEIP, T2 Ln 2727 GEPCO Social Monitoring Report Jul-Dec 2014 (ak comments Jan 2015).pdf

IR Terminology with standard definitions.docx Outline of Monitoring Report.docx

Chief Engineer Development *Respected ADB Team* *Pakistan R... 21/01/2015 10:32:30 AM

From: Chief Engineer Development <[email protected]> To: lali <[email protected]>, Cc: [email protected], atareen <[email protected]>, akhokhar <[email protected]>, Atif

Raza <[email protected]>, "Schenck, Robert" <[email protected]>, Muazzam Mukhtar <[email protected]>, "Khalid, Altar <[email protected]>, [email protected], [email protected]

Date: 21/01/2015 10:32 AM Subject: Fwd:-"Submission of Bi-annual Environmental & Social Safeguard Monitorg. Reports

(Period:June-Dec 2014)-Tr. # 2 I.R.0 PMU GEPCO."

Respected ADB Team

Pakistan Resident Mission

A.O.A

Sir,

Ref:-In awake of fulfillment of ADB requirements on subject cited above;

Page 39: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

Attached please find here with GEPCO-Biannual Environmental and Social Safeguard Monitoring Reports for the Period Jun-Dec. 2014 Tr # 2, for your kind perusal.

Earlier these reports were submitted in Ms-word format on 15-01-2015. Due to difficulty encountered by ADB staff during downloading; Now these reports are being re-submitted in PDF Format as desired.

Please acknowledge the receipt.

Note:-Due to limited space constraint of 25 MB, separate email on Tr. 2 & 3 will be sent by PMU GEPCO.

Thanks & Regards

0/o PMU Section

Chief Engineer (Development) GEPCO, Gujranwala

Page 40: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

Social Monitoring Report Bi-annual Social Monitoring Report January 2015

PAK: MFF – Power Distribution Enhancement

Investment Program (Tranche 2)

Prepared by Gujranwala Electric Power Company, Punjab for the Asian Development Bank.

Page 41: PAK: MFF – Power Distribution Enhancement …...Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program

NOTES

(i) The fiscal year (FY) of the Government of the Islamic Republic of Pakistan and its agencies ends on 30 June.

(ii) In this report “$” refer to US dollars. This social monitoring report is a document of the Borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.