Page 1 Akshay Prakash Yojana… Driven by Consumer Participation
Dec 28, 2015
Page 2
Akshay Prakash Yojana (APY)
Collective Responsibility
Demand Side Measures
Voluntary Program for Load curtailment
Voluntary supply
regulations
System Stability
Social benefits
Improved Quality of
Supply
Driven by Consumer Participation
Page 3
The TriggerSimple Questions by children ….
Social awareness of electricity being a scarce and precious resource
Long term benefits of sparing electricity for education against short term illegal uses
Page 4
Akshay Prakash Yojana
Voluntary Supply Regulations
TRANSFER OF LOAD FROM
PEAK TO OFF-PEAK PERIOD
DEMAND SIDE MEASURES
Villagers not to use any 3 phase load during 1800 hrs to 0500 hrs. Only lighting load to be allowed
Restrict Load during 1800 hrs to 0500 hrs. to 20% of full load
Removal of illegal / inefficient heavy consumption devices like heaters, cooking heaters etc.
Adopt use of energy saving lighting, pumps and other devices; Use of capacitors
Page 5
Akshay Prakash Yojana Self Monitoring
PILFERAGE REDUCTION
COLLECTIVE RESPONSIBILITY
Formation of surveillance committees for monitoring electricity use (Veej Dakshata Committee – VDC)
Removal of all unauthorized connections
Gram Sabhas pass resolution to carry out above activities
Page 6
BENEFITS
Akshay Prakash YojanaConsumer Benefits
Elimination of unplanned load shedding
Enhanced Quality of Supply
Reduction in consumer complaints
Consumer Benefits
Optimum utilisation of power for social benefits like education, cottage industry etc.
Reduction in transformer break-downs and improvement in voltage
Page 7
BENEFITS
Akshay Prakash YojanaMAHAVITARAN Benefits
Better load management
Reduction in commercial losses
System stability
Organization Benefits
Resulting in improved commercial and operational performance
Reduction in transformer repairs and maintenance cost
… “We must help ourselves and opt for Akshay Prakash Yojana. I think this is the only alternative available with us”
...“I declare a reward of Rs. 10,000 to anyone finding people misusing power in my native place. However I will ensure that the guilty party pays a penalty of Rs. 1 lakh”
Devidas PawarVice President
Shetkari SangathanaNashik District
Page 9
Case Study of Kalvan: Bej Village
SYMPTOMS
REASONS
Highly irregular supply for past 6 years
Feeders hand tripped every 10-15 mins
LT and HT fuse faults at frequent intervals
Highly overloaded transformers and transformer failures
Heavy misuse of power
183 households but only 2 residential connections
Use of electricity for cooking and heating water
(Hotplate-2hp and water heater-5 hp)
Page 10
Case Study of Kalvan: Bej Village
SOLUTION
BENEFITS
Mass movement in village to reduce theft and conserve power-Initiated by Shri. Devidas Pawar
Patrols by villagers to undercover theft and misuse
Adoption of metered connections by all consumers
23 villages in Kalvan adopted Akshay Prakash Yojana
Partial coverage of Kalvan Taluka
Uninterrupted Power for 23 Hours
Facilitating education, irrigation and quality of life
Maximum Load reduction from 285A to 90A for Bej & New Bej due to theft reduction
Present evening load of 20A under APY Scheme
Page 11
Load Profile of Bej FeederPre and Post Akshay Prakash Yojana
0
20
40
60
80
100
120
140
160
180
200
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Before APY After APY as on 23.11.2005
Hours
Page 12
Impact Analysis: Kalvan Division
0
20
40
60
80
100
120
140
160
180
Bej Mirzapur Mangalapur
Before APY After APY
Load Profile of Kalvan Division-Typical Day
Pre and Post Akshay Prakash Yojana0
5000
10000
15000
20000
25000
30000
35000
40000
45000
Bej
Bej Village – Daily Units Consumed
In MU
Page 13
Impact Analysis
0
50
100
150
200
250
Pimparne Kharadi Nimaj Vadgaon Wadgaon Mirzapur
Before APY After APY
Load Profile of Sanganmer Division Pre and Post Akshay Prakash Yojana
Page 14
Impact Analysis
0
20
40
60
80
100
120
140
160
Janori Chandori Thangaon Hivare Peinth Harsul
Before APY After APY
Load Profile of Nasik Division Pre and Post Akshay Prakash Yojana
Page 15
Impact Analysis
0
50
100
150
200
250
Pimparne Kharadi Nimaj Vadgaon Wadgaon Mirzapur
Before APY After APY
Load Profile of Nasik U/ Chadigaon Division Pre and Post Akshay Prakash Yojana
Page 18
Akshay Prakash YojanaMahaVitaran Initiatives
Need for better utilisation as electricity is scarce and precious ;Educate to remove pilferage and avail continuous supply
Educate
Assured light load in evening peak time;Load Monitoring to ensure that demand remains within 20%
Technical Support
Consumer awareness programs ; advertisements, workshops, video films and school visits
Communicate
Recognise and Felicitate villages ; Visits by Energy Minister and MD MahaVitaran
Recognition