FM No. 422713-2-22-01 Efficient Transportation Decision Making (ETDM): 12756 Project Advisory Group (PAG) Meeting No. 4 May 16, 2017 Florida Department of Transportation - District 6 VENETIAN CAUSEWAY (Venetian Way) Project Development & Environment (PD&E) Study FROM NORTH BAYSHORE DRIVE TO PURDY AVENUE
38
Embed
PAG 4 Final Presentation [Read-Only] 4 Final... · Project Team 2 Cooperating Agencies United States Coast Guard. VENETIAN CAUSEWAY Project Development & Environment (PD&E) Study
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
FM No. 422713-2-22-01Efficient Transportation Decision Making (ETDM): 12756
Project Advisory Group (PAG)Meeting No. 4May 16, 2017
Florida Department of Transportation - District 6
VENETIAN CAUSEWAY(Venetian Way)
Project Development & Environment (PD&E) StudyFROM NORTH BAYSHORE DRIVE TO PURDY AVENUE
FM No. 422713‐2‐22‐01 ETDM: 12756VENETIAN CAUSEWAY Project Development & Environment (PD&E) Study from North Bayshore Drive to Purdy Avenue
Project Team
2
Cooperating Agencies
United States Coast Guard
FM No. 422713‐2‐22‐01 ETDM: 12756VENETIAN CAUSEWAY Project Development & Environment (PD&E) Study from North Bayshore Drive to Purdy Avenue
Purpose and Need for Project
3
The purpose of the proposed project is to address identified structural and functional deficiencies of the twelve existing bridges (ten low‐level fixed spans and two movable bascules), through potential alternatives such as no build, replacement or rehabilitation.
FM No. 422713‐2‐22‐01 ETDM: 12756VENETIAN CAUSEWAY Project Development & Environment (PD&E) Study from North Bayshore Drive to Purdy Avenue
FO= Functionally Obsolete SD= Structurally Deficient* Based on FDOT Bridge Information, April 3rd 2017
Structural and Functional Deficiencies
4
FM No. 422713‐2‐22‐01 ETDM: 12756VENETIAN CAUSEWAY Project Development & Environment (PD&E) Study from North Bayshore Drive to Purdy Avenue
Agenda1. Project Status
2. Alternatives Analysis
‒ Screening Matrix
‒ Alt. 6 – High Level Fixed Bridge
3. Viable Alternatives
‒ No‐Build
‒ Build
4. Estimated Costs
5. Anticipated Schedule
6. Environment
7. Evaluation Matrix
8. Next Steps
5
FM No. 422713‐2‐22‐01 ETDM: 12756VENETIAN CAUSEWAY Project Development & Environment (PD&E) Study from North Bayshore Drive to Purdy Avenue
Project StatusClass of Action (COA) Determination
• In October 2016, the Federal Highway Administration (FHWA) agreed the ProjectDevelopment & Environment (PD&E) Study would proceed under the NationalEnvironmental Policy Act (NEPA).
• Class of Action (COA) determination of Environmental Assessment (EA) wasapproved on November 10, 2016.
6
FM No. 422713‐2‐22‐01 ETDM: 12756VENETIAN CAUSEWAY Project Development & Environment (PD&E) Study from North Bayshore Drive to Purdy Avenue
Pursuant to 23 United States Code (U.S.C.) 327, the Florida Department ofTransportation (FDOT) has assumed Federal Highway Administration’s (FHWA’s)responsibilities under the National Environmental Policy Act (NEPA) for highwayprojects on the State Highway System (SHS) and Local Agency Program (LAP) projectsoff the SHS. In general, FDOT’s assumption includes all highway and roadway projectsin Florida whose sources of federal funding comes from FHWA or which constitute afederal action through FHWA. This includes responsibilities for environmental review,interagency consultation and other regulatory compliance‐related actions pertainingto the review or approval of NEPA projects. Therefore, whereas FHWA was previouslyidentified as the Lead Federal Agency, this function is now served by FDOT withapproval authority resting in the Office of Environmental Management (OEM).
7
FM No. 422713‐2‐22‐01 ETDM: 12756VENETIAN CAUSEWAY Project Development & Environment (PD&E) Study from North Bayshore Drive to Purdy Avenue
Project Status
Project Scope Development PD&E / NEPA Study
11/10/20
16CO
A De
term
ination
5/16
/17
PAG M
tg. 4
8
FM No. 422713‐2‐22‐01 ETDM: 12756VENETIAN CAUSEWAY Project Development & Environment (PD&E) Study from North Bayshore Drive to Purdy Avenue
Alternatives Analysis
Alternatives considered for additional study shown in Red
9
Screening Matrix – Reasonable Alternatives
Further Analysis to Address Comments from the Alternatives Workshop
FM No. 422713‐2‐22‐01 ETDM: 12756VENETIAN CAUSEWAY Project Development & Environment (PD&E) Study from North Bayshore Drive to Purdy Avenue
Alternatives AnalysisReplacement Alternative – Fixed Bridges