PAITON PRIVATE POWER PHASE I I SEPTEMBER 2004 SEPTEMBER 2004 WELCOME to Unit 7&8 WELCOME to Unit 7&8 Coal Fire Power Plant Coal Fire Power Plant
24
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Pa It On

PAITON PRIVATE POWER PHASE I I

SEPTEMBER 2004SEPTEMBER 2004

WELCOME to Unit 7&8WELCOME to Unit 7&8Coal Fire Power PlantCoal Fire Power Plant

Page 2: Pa It On

PAITON COMPLEX

Unit 5 & 6 (Jawa Power) Capacity 2 x 600 MWUnit 5 & 6 (Jawa Power) Capacity 2 x 600 MW

Unit 7 & 8 (Paiton Energy) Capacity 2 x 615 MWUnit 7 & 8 (Paiton Energy) Capacity 2 x 615 MW

Unit 1 & 2 (PLN) Capacity 2 x 400 MWUnit 1 & 2 (PLN) Capacity 2 x 400 MW Unit 3/4 Capacity 1 x 800 MWUnit 3/4 Capacity 1 x 800 MW

Coal Handling plant Capacity 750,000 mTonsCoal Handling plant Capacity 750,000 mTons

Page 3: Pa It On

General InformationCoal Fire Power PlantPaiton Private Power Phase IUnit 7 & 8

Location :Village : BhinorSub District : PaitonDistrict : ProbolinggoProvince : East Java

Owner :Name : PT. Paiton EnergyStatus & Activity : Foreign Investment

2 x 615 MW Coal Fire Power PlantAddress : Jl. K.H. Mas Mansyur Kav. 126 Jakarta

Page 4: Pa It On

PT. Paiton Energy Share Holder :

- Edison Mission Energy 40 %- Mitsui Corp.(Japan) 32.5 %- General Electric 12.5 %- Batu Hitam Perkasa 15 %

Coal Fire Power Plant Paiton supply electricity to all Jawa-

Bali, total = 3.200 MW

Page 5: Pa It On

stockpile

Loading coal

unloading

Tutupan

Stockpile 750,000 mT

Paiton 7&8Coal yard

silo

mill

Boilerfurnace

Paiton PLTUBHP-Kalimantan island

Fuel / Coal Supply ConditionFuel / Coal Supply Condition

Mine

Kelanis

KalimantanPulat Laut

IBTTruck transport 40-80 ton capacity

Ship 47.000 mTon Capacity

Tongkang 8.000 mTon Capacity

Ocean

Kalimantan Island - Adaro Coal

Page 6: Pa It On

Coal Electricity

Water

Basic Operation of Coal Fire Power Plant

Page 7: Pa It On

Coal Fire Power Plant Phase I Unit 7&8 Specification

Steam Generator System (1 per Unit)

Type Balanced Draft, Pulverized Coal-FiredEnvironment OutdoorDrum Operating Pressure 190 bar; (2,750 psig)Superheated Steam Flow 2,290 tph; (5,064 klbs/hr)Superheated Steam Pressure 180 bar; (2,620 psig)Superheated Steam Temp/Reheat 540C/540C; (1005 /1005F)Feedwater Inlet Temp 281C; (538F)Coal Storage Silos 6 Each (600 ton capacity each)Coal Silo Capacity 8 hours at MCRCoal Mills / Feeders 5 Primary and 1 spareCoal Mill Capacity 77 tonnes/hour per Mill normal rateCoal Burn Rate 330 tph @ Boiler MCR (715 GMW)Ignition Fuel No. 2 Fuel OilAir Preheaters 1 Primary and 2 SecondaryForced Draft Fans 2 x 50% Axial TypeInduced Draft Fans 2 x 50% Axial TypePrimary Air Fans 2 x 50% Centrifugal TypeBurner System 24 Low NOx Burners; Tilting Tangential FiringBoiler Efficiency 86.15 %Bottom Ash Silo Storage Capacity 36 hours at MCR

Page 8: Pa It On

Coal Fire Power Plant Phase I Unit 7&8 Specification (Cont.)

Land Occupied : 84 hectaresPower Plant Capacity : 2 X 615 MWCoal Consumption Per Year : 4.3 million tones 2 unitsCombustion Coal : Using Drum Type

Steam GeneratorsOperation : 24 hours per day

with up to 40 days scheduled outage

each year Operational Contract : 40 years

Page 9: Pa It On

Boiler Components

ECONOMIZERSTEAM DRUMDOWNCOMERBOILER WATER CIRCULATING PUMP ( BWCP )LOWER WATER WALL INLET DRUMFURNACE WALL TUBERAISER TUBESUPERHEATER TUBEDESUPERHEATERREHEATERFORCED DRAFT (FD) FANINDUCED DRAFT (ID) FANAIR HEATERSPRIMARY AIR (PA) FANSEAL AIR BOOSTER FANSAIR FILTERSSCANNER AIR BOOSTER FANFLAME FRONT CONTROLFLAME FRONT CONTROL NOZZLE TIPSOIL GUNPULVERIZERWINDBOX

FEEDERHEA IGNITORCCOFASOFATILT DRIVE MAIN WINDBOXTILT DRIVE SOFA WINDBOXYAW ADJUSTMENTAIR FLOW CONTROLFUEL AIR DAMPERSAUXILIARY AIR DAMPERSTILT CONTROLFLAME SCANNERSOOT BLOWERSAFETY VALVEELECTROMATIC RELIEF VALVE ( ERV )PYIRITE COLLECTION HOPPERSUBMERGED SCRAPER CHAIN CONVEYORCLINKER GRINDERSCREW CONVEYORBELT CONVEYORASH DISPOSAL SILOFURNACE SAFEGUARD SUPERVISORY SYSTEM ( FSSS )

Page 10: Pa It On

Turbine Generator TransformerCondenser

Intake Canal

Discharge Canal

Water Treatment

Plant

Coal Stockpile Ash Disposal Area

Steam Generators

Electrostatic Precipitators

Absorber

Seawater Scrubber

Chimney

Storage Silos

Steam

Ste

am

Bottom Ash

Fly Ash

To S

eaw

ate

r S

crub

ber

Make-up Water

Coolin

g W

ate

r

From Condenser

To Discharge Canal

FD FanAir Blower

ID Fan

Pump

Pump

Pump

To Distribution

RO Pre-Treatment Filters

Service Water

Flow DiagramCoal Fire Power Plant Phase I Unit 7&8

Page 11: Pa It On

HP HeatersHP Heaters

DeaeratorDeaerator

LP HeatersLP HeatersCondensate Condensate

Polisher PlantPolisher Plant

Condensate Condensate Extraction pumpExtraction pump

CondenserCondenser

LP TurbineLP TurbineIP TurbineIP TurbineHP TurbineHP Turbine

BoilerBoiler

BlowdownBlowdown

Steam DrumSteam Drum

Condensate TankCondensate Tank

Make up treatment systemMake up treatment system

WATER & AIR CYCLE

SWRO ~~ Demin Water

Page 12: Pa It On

Coal Fire Power Plant Paiton Unit 7 & 8 Flow DiagramCoal Fire Power Plant Paiton Unit 7 & 8 Flow Diagram

TurbineTurbine

GeneratorGenerator

TransformerTransformer

CondenserCondenser

Intake Intake CanalCanal

DischargDischarge Canale Canal

Coal StockpileCoal Stockpile

BoilerBoiler

ESESPP

AbsorberAbsorber ChimneyChimney

Bottom AshBottom Ash

Make-up Make-up WaterWater

To PLN Distribution Jawa-Bali systemTo PLN Distribution Jawa-Bali system

Fly AshFly Ash

Page 13: Pa It On

Coal Handling ProcessCoal Handling Process

Dock Mobile Hopper

Dust Suppression

Dust Suppression

Dust CollectorDust Collector

Stacker ReclaimerDust Suppression

Transfer House

Transfer House

Boiler Coal Silo (5 off)

Crusher

Stacker water spray

Stacker water spray

Page 14: Pa It On

Coal Mills (PULVELIZER) and FEEDER

Pulverizer: Grind the coal to a fine powder before transferring to the boiler (Furnace).

Feeder: Regulation the flow of coal to the Pulverizer

Page 15: Pa It On

ResinResin

Ferric ChlorideFerric Chloride

Sea Water Intake Canal Sea Water Intake Canal Mixing TankMixing Tank

Infilter DAFInfilter DAFPolishing FilterPolishing Filter

Cartridge FilterCartridge FilterSW Reverse OsmosisSW Reverse Osmosis

Reject to Discharge CanalReject to Discharge CanalPotable Water Storage TankPotable Water Storage Tank

Service & Potable Water UseService & Potable Water Use

Chemical Make-upChemical Make-up

Demin Plant Make-upDemin Plant Make-up

Cartridge FilterCartridge Filter

Demin Reverse OsmosisDemin Reverse Osmosis

Reject to filtered Reject to filtered water tankwater tank

Permeate Storage TankPermeate Storage Tank Mixed Bed PolishersMixed Bed Polishers Condensate Storage TankCondensate Storage Tank

Make-up Make-up water to Boilerwater to Boiler

PRE-TREATMENTPRE-TREATMENT

Diagram of Water Treatment Plant

Page 16: Pa It On

Diagram of Waste Water Treatment Installation

Inlet

Equalization basin

pH Adjustment

Aeration tank

Caustic Soda Ferric Sulfate

Air Blower

Flocculation Tank

Liquid Polymer

Sulfide

Lamella Clarifier/Thickener

Sludge

Sludge Pump

Sulfuric Acid

To Ash Disposal Area

Sludge Filtrate Return

Air Blower

Effluent waste

water to the

Discharge Canal

pH Trim

Sulfide Reaction tank

Sludge Holding Tank

Belt Press

Slu

dg

e C

ake

Gravity Filter

Polymer

pump

Page 17: Pa It On

Ash Management

Coal Consumption : 4.3 Million ton/yearAsh Production : 180 ton/day

: 68,000 ton/yearAsh Disposal Area

Total Area : 27,810 m2

Total Area future : 86,333 m2

(for 30 years power plant life time)Height : 20 mAsh Disposal Area Design : According to the regulation of

Chief of BAPEDAL decision No : 04/BAPEDAL/09/1995

Page 18: Pa It On

Ash Management System

Ash Management System consist of:Bottom Ash Handling SystemFly Ash Handling SystemAsh Disposal SystemAsh Disposal Area

This system complete with hopper, conveyor, crusher, stacker and other heavy equipment

Page 19: Pa It On

Ash Disposal Area

According to Chief of BAPEDAL decision No : 04/BAPEDAL/09/1995 Ash Disposal area for B3 waste (ash from coal fire power plant is a B3 waste) need to have :

Basic Layer System which is consist of clay, HDPE, Geonet, Geotextile Filter, clay layer leach collecting and covering material with the size of 20-30% Closing Layer System consist of clay, HDPE, Geonet, Geotextile Filter, material layer with the size of 20-30% covering a plant.Well for leaching collectionWell to monitored the ground water

Page 20: Pa It On

Declivity of the ash pile is plan for 45 0. Rain water in ash disposal area will be collect in the ash disposal run of pond then transfer and process in the waste water treatment plant.

To decrease the air pollution because of the ash particle at the ash disposal area, besides solid the ash, ash disposal surface has to be wet by water spray. Other alternative is by covering with plastic (dry system).

Ash Disposal Area (Cont.)

Page 21: Pa It On

Ash Collection and Disposal SystemAsh Collection and Disposal System

Steam Generator U8Steam Generator U8

Electrostatic Precipitator U8Electrostatic Precipitator U8

ChimneyChimney

WaterWater

SS Chain ConveyorSS Chain Conveyor

U7U7

Common Bottom Ash Common Bottom Ash Storage SiloStorage Silo

207 m3207 m3

Fly Ash Fly Ash Storage Storage

SilosSilos1020 m3 each1020 m3 each

Pneumatic Ash Pneumatic Ash Conveying SystemConveying System

Crossover Crossover TieTie

U7U7

WaterWaterWaterWater

Tubular ConveyorTubular ConveyorAsh Ash

Disposal Disposal AreaArea

120 t/hr120 t/hr

Fly AshFly Ash

ConditionerConditioner

Page 22: Pa It On

SUB BASESUB BASE

1000 mm CLAY LINER1000 mm CLAY LINER

GEONETGEONETHDPE LAYERHDPE LAYER

300 mm CLAY LINER300 mm CLAY LINERGEOTEXTILEGEOTEXTILE300 mm SAND300 mm SANDGEOTEXTILEGEOTEXTILE

300 mm GENERAL FILL MATERIAL300 mm GENERAL FILL MATERIAL

150 mm GENERAL FILL MATERIAL150 mm GENERAL FILL MATERIAL

600 mm CLAY LINER600 mm CLAY LINER

HDPE LAYERHDPE LAYERGEONETGEONET

GEOTEXTILEGEOTEXTILE600 mm GENERAL FILL MATERIAL600 mm GENERAL FILL MATERIAL

VEGETATIONVEGETATION

PAITON UNIT 7 & 8 ASH DISPOSAL

A S HA S H

LO

WE

R L

INE

R

SY

ST

EM

CA

PP

ING

INE

R

SY

ST

EM

Page 23: Pa It On

Mission & Vision

EMOMI provides the highest qualityoperations and maintenance servicesin the independent power industry

(IPP).We continuously improve the quality of

everything we do, completely andcost-effectively satisfy all of ourcustomers, and provide fulfilling careeropportunities for our employees

Page 24: Pa It On

Thank You - Terima kasih

Now we are going for Plant Tour