0 ISSUE DATE: DRAWING LIST Drawing List 0 -15 Drawing List Revisions Page Drawing Category Content of Drawing Sleeve Detail Site Information Site Location 1 7 6 5 4 3 2 1 8 9 13 14 A3 Sheet Size A3 A3 A3 A3 A A3 L1 Detail Design P1 A A3 A3 A A A A A A Detail Design Detail Design Detail Design Detail Design Detail Design Detail Design Detail Design Remarks Drawing No. Site Location 2 Site Photo A Detail Design A Detail Design A Detail Design A3 A3 A3 L2 C1 Site Location Construction Top View Front & Side View Earthing Layout Tower Foundation 1 C2 C3 C4 C5 C6 C7 Top View Front & Side View Preview P2 10 11 12 C8 C9 C10 Tower Foundation 2 Tower Foundation 3 Tower Foundation 4 A3 A Detail Design A3 A Detail Design A3 A Detail Design Equipment Layout C11 15 A3 A Detail Design 25.09.2015
16
Embed
P-Front & Side View · 2019-09-18 · 0 ISSUE DATE: DRAWING LIST Drawing List 0-15 Drawing List Page Drawing Category Content of Drawing Revisions Sleeve Detail Site Information Site
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
0
ISSUE DATE:
DRAWING LIST
Drawing List
0 -15
Drawing List
RevisionsPageDrawing Category
Content of Drawing
Sleeve Detail
Site Information
Site Location 1
7
6
5
4
3
2
1
8
9
13
14
A3
Sheet Size
A3
A3
A3
A3
A A3
L1
Detail Design
P1
A
A3
A3
A
A
A
A
A
A
Detail Design
Detail Design
Detail Design
Detail Design
Detail Design
Detail Design
Detail Design
RemarksDrawing No.
Site Location 2
Site Photo
ADetail Design
ADetail Design
ADetail Design
A3
A3
A3
L2
C1
Site Location
Construction
Top View
Front & Side View
Earthing Layout
Tower Foundation 1
C2
C3
C4
C5
C6
C7
Top View
Front & Side View
Preview
P2
10
11
12
C8
C9
C10
Tower Foundation 2
Tower Foundation 3
Tower Foundation 4
A3A
Detail Design
A3A
Detail Design
A3A
Detail Design
Equipment LayoutC11
15
A3A
Detail Design
25.09.2015
L1
Site Location
Site Location 1
1 -15
DA DEWET DA DEWET DA DEWET
DA DEWET
DA DEWET
SIGNNAME:
MTN RADIO ENGINEER
SHEETSITE NO.PROJECT
DRAWING No. :
REV
BY DATEDESCRIPTIONREV
0 Original D.de Wet
SITE NAME:
T-NUMBER:
LAND ID:
WBS NO:
RFQ NO:
LATITUDE LONGITUDE ASL
PROJECT NO:
ADDERSS
SURVEY DATE:
ENGINEER:
SITE SURVEYOR:
SIGNNAME:
ZTE APPROVAL
SIGNNAME:
MTN PLANNER
CHECKED BYDRAWN BY
DATE DATE
REVISIONS
TITLE:
MTNX100195 A
Commencement of work subject to above approval
NAME: NAME:
ECSA NO.:
25.09.2015
D.de Wet
25.09.2015
05.09.2015
N/A
N/A
Marius Nortje
Luiperdsberg
Swellendam
34.13157 S 20.30522 E 375m
LUIPERDSBERG
N/A
N/A
X100195
Cape Town
L2
Site Location
Site Location 2
2 -15
DISTANCES
D to E +/- 90m
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
8
AutoCAD SHX Text
7
AutoCAD SHX Text
6
AutoCAD SHX Text
5
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
H
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
Notes: 1. If New Power Supply Required For The Site, the information of Power Source Location,Distance to Site, Route Type,etc,Must Be Shonw On The Drawing. 2. If New Access Road required, The Width,Distance of The Access Road Must be Indicated on the Drawing.