Top Banner
Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC code: 772840155709 Costco Code: 345690 Guide de l’utilisateur Solarium Castel 3,05 m x 3,66 m (10 pi x 12 pi) Code Sojag : E999-4155709 Code CUP : 772840155709 Code Costco : 345690 © Sojag inc. 2014
56

Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

Oct 10, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

Owner’s ManualCastel Solarium3.05 m x 3.66 m (10 x 12 ft.)

Sojag code: E999-4155709

UPC code: 772840155709

Costco Code: 345690

Guide de l’utilisateurSolarium Castel

3,05 m x 3,66 m (10 pi x 12 pi)

Code Sojag : E999-4155709

Code CUP : 772840155709

Code Costco : 345690

© Sojag inc. 2014

Page 2: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

2© Sojag inc. 2014

TABLE OF CONTENTS TABLE DES MATIÈRES Safety Information ...............................................2

Warranty ..............................................................3 What is Covered...........................................3 What is Not Covered ....................................3

Operation.............................................................3

Maintenance ........................................................4

Care and Cleaning ..............................................5

Pre-assembly ......................................................5 Planning Assembly........................................5 Tools Required ..............................................5 Hardware Included ........................................6 Package Contents................................... 7-10

Assembly ......................................................11-55

SAFETY INFORMATION RÈGLES DE SÉCURITÉ

Règles de sécurité...............................................2

Garantie...............................................................3 Ce qui est couvert ........................................3 Ce qui n’est pas couvert...............................3

Fonctionnement...................................................3

Entretien ..............................................................4

Soins et nettoyage...............................................5

Préassemblage ...................................................5........................5

Outils requis ..................................................5 Trousse de quincaillerie incluse ....................6 Liste des pièces ...................................... 7-10

Assemblage..................................................11-55

It is very important to read and follow the safety precautions before assembly and during the use of the product.

1. Keep all children and pets away from assembly area.

2. When assembling and using this product, basic safety precautions must always be followed to reduce risks of personal injuries and damages to the product and its surroundings.

3. Ensure that all the parts are in the boxes before starting the assembly. It is recommended to wear protective gloves since some of the parts have sharp edges.

4. This solarium will take at least 8 hours to put up. You must schedule enough time to complete the assembly. You cannot leave the solarium unattended if it is not fully assembled, even if bolted to the ground. A minimum of 3 people is required for a safe assembly of the solarium.

5. Begin the assembly and install the solarium more than 6 feet away from any obstructions including, but not limited to, a fence, overhanging branches, a laundry line or electrical wires.

6. Always install the solarium on a leveled platform. The solarium must be anchored to either wood or concrete using the appropriate

7. Check all screws for tightness before and during the use of the solarium. Tighten the screws at least twice a year.

8. Your solarium has been created for all four seasons. However, you must remove any snow accumulation on the roof.

9. Do not place any type of heat source under the solarium or

or a space heater.

10. Do not install the solarium in a space where there is the possibility of high winds.

Il est très important de lire et de suivre les règles de sécurité avant de procéder à l’assemblage et durant l’utilisation du solarium.

1. Garder les enfants et les animaux loin de la zone d’assemblage.

2. Pendant l’assemblage et l’utilisation de ce produit, les règles de sécurité de base doivent toujours être suivies dans le but de réduire les risques de blessures et les dommages causés sur le produit et son environnement.

l’assemblage. Certaines pièces peuvent avoir des côtés coupants, il est recommandé de porter des gants de protection.

4. Ce solarium prendra au moins huit heures à assembler. Il est important

pas laisser ce solarium sans surveillance si l’assemblage n’est pas complètement terminé, même si ce dernier est vissé au sol. Un minimum de trois personnes est requis pour effectuer l’assemblage du solarium.

5. Débuter l’assemblage et installer le solarium à plus de six pieds de toutes obstructions, incluant, mais ne se limitant pas à une clôture,

à un endroit protégé du vent.

6. Toujours installer la structure sur un sol nivelé. Le solarium doit être ancré à un plancher de bois ou de béton en utilisant les vis appropriées pour

resserrer au minimum 2 fois par année.

l’extérieur durant toute l’année. Cependant, toute accumulation de neige doit être retirée du toit du solarium.

9. Ne placer aucune source de chaleur sous le solarium ou à moins de pieds incluant, sans toutefois s’y limiter, un BBQ ou un

chauffage d’appoint.

10. Ne pas installer le solarium dans un endroit où il y a possibilité de vent important.

Page 3: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

3© Sojag inc. 2014

WHAT IS COVEREDThis unit is guaranteed against defective materials for one year from the date of purchase and based on normal residential use of the product. This limited warranty is applicable on parts only, labour is not included. The warranty is not transferable. The

for damages due to hail. Shipping fees for replacement parts are

WHAT IS NOT COVEREDDamages due to vandalism, abuse or wrong use of the product are not covered by the warranty. Damages caused by severe weather conditions such as thunderstorms, wind or snow

discolouration of the structure or the fabric are not covered by the warranty.

If any instructions in the OPERATION or SAFETY INFORMATION sections are not followed, the warranty will be voided. Any

1. The solarium is a four-season solarium, meaning that it may be left up year-round. However, any accumulation of snow must be removed from the roof of the solarium.

2. The solarium must be anchored using the appropriate screws

3. Roof panels must be installed with the UV protected side facing the sun.

4. This solarium should not be used as a storage shelter during the winter.

5. Check all screws for tightness before and during usage of the solarium. Tighten the screws at least twice a year.

6. Do not hang any items to the structure.

7. The application of silicone is not recommended. This would prevent the water to evacuate by the holes provided for this purpose.

CE QUI EST COUVERTCet abri est garanti pendant un an, à partir de la date d’achat, contre les défauts de fabrication basés sur un usage normal et résidentiel. Cette garantie limitée est applicable sur les pièces seulement, la main-d’œuvre est en sus. Cette garantie est non transférable. Les panneaux de polycarbonate ont une garantie de

des pièces de remplacement sont gratuits la première année suivant la date d’achat.

CE QUI N’EST PAS COUVERTLes dommages causés par le vandalisme, les abus ou le mauvais usage de ce produit ne sont pas couverts par la garantie.

que les orages et les tempêtes de vent ou de neige ne sont pas

tissu ne sont pas couverts par la garantie.

Si l’une des instructions de la section FONCTIONNEMENT ou RÈGLES DE SÉCURITÉ n’est pas respectée, la garantie sera alors

la garantie.

être laissé à l’extérieur durant toute l’année. Cependant, toute accumulation de neige doit être retirée du toit du solarium.

2. Le solarium doit être ancré au sol en utilisant les vis appropriées

3. Les panneaux de toit doivent être installés en plaçant le côté

que ce côté soit placé face au soleil.

4. Le solarium ne doit pas être utilisé comme abri d’entreposage durant la période hivernale.

solarium et les resserrer au minimum 2 fois par année.

6. Ne rien suspendre à la structure.

7. L’application de silicone est déconseillée. Celui-ci empêcherait l’eau de s’évacuer par les trous prévus à cet effet.

WARRANTY GARANTIE

OPERATION FONCTIONNEMENT

Page 4: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

4© Sojag inc. 2014

If this solarium needs repairs:

1. In case of a defective part or if a problem occurs while using this product, please contact SOJAG Customer Service at 1-866-901-1649.

2. To order replacement parts, use the model number and the part numbers on the parts list.

1. For cleaning: use a domestic soap or a soft detergent and wash with warm water using a sponge or fabric cloth. Rinse with clean water

Si ce solarium a besoin de réparations :

1. Pour une pièce défectueuse, ou si un problème survient pendant l’utilisation de ce produit, nous vous prions de contacter le service à la clientèle de SOJAG au 1-866-901-1649.

remplacer, référez-vous au numéro de modèle de l’abri ainsi qu’aux lettres qui sont indiquées sur la liste de pièces.

1. Pour le nettoyage : utiliser un savon domestique ou un détergent

l’eau tiède. Rincer à l’eau claire.

MAINTENANCE ENTRETIEN

CARE AND CLEANING SOINS ET NETTOYAGE

Page 5: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

5© Sojag inc. 2014

TOOLS REQUIRED OUTILS REQUIS

SAFETY GOGGLES SAFETY HAT LEVEL LUNETTES DE SÉCURITÉ CASQUE DE SÉCURITÉ NIVEAU

GLOVES STEPLADDER PHILLIPS SCREWDRIVER GANTS ESCABEAU TOURNEVIS ÉTOILE

IMPORTANT: IMPORTANT :

PLANNING ASSEMBLY1. It is the consumer’s responsibility to comply with building rules, regulations/zoning restrictions orders or any other regional restrictions and obtain the required permits before purchasing this product and installing it.

2. Make sure that every part is in the box before beginning installation.

3. Some parts may have sharp edges; it is recommended to wear gloves, protection glasses and closed shoes.

4. This solarium will take at least 8 hours to put up. You must schedule enough time to complete the assembly.

5. You cannot leave the solarium unattended if it is not fully assembled, even if bolted to the ground.

6. A minimum of 3 people is required for a safe assembly of the solarium.

7. Follow each instruction carefully to ensure the strength of the solarium.

8. To avoid damages to the solarium and its parts, use the proper tools. Do not use the shelter as a support. The use of a ladder is recommended.

9. Keep the instruction manual and the parts list in case of future needs or references.

10. Do not assemble the solarium in days of wind or rain.

PLANIFICATION DE L’ASSEMBLAGE1. Il est de la responsabilité du consommateur de se conformer aux règles de bâtiment, aux règlements/ limitation de zonage, aux ordonnances ou toutes autres restrictions régionales et d’obtenir les permis requis avant l’achat de ce produit et d’en faire son installation.

débuter l’assemblage.

3. Certaines pièces peuvent avoir des côtés coupants. Il est recommandé de porter des gants et des lunettes de protection et des souliers fermés.

4. Ce solarium prendra au moins huit heures à assembler. Vous

5. On ne doit pas laisser ce solarium sans surveillance si l’assemblage n’est pas complètement terminé, même si ce dernier est vissé au sol.

6. Un minimum de trois personnes est requis pour effectuer l’assemblage de ce solarium.

7. Suivre toutes les instructions pour s’assurer de la solidité du solarium.

8. Pour éviter les dommages au solarium et ses composantes, utilisez les outils appropriés. Ne pas utiliser la structure comme support. L’utilisation d’un escabeau est recommandée.

9. Garder le manuel d’instructions et la liste de pièces en cas de besoins futurs.

10. Ne pas assembler par journée de vent ou de pluie.

PRE-ASSEMBLY PRÉASSEMBLAGE

Page 6: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

6© Sojag inc. 2014

HARDWARE KIT TROUSSE DE QUINCAILLERIENOTE: NOTE :

T1 X24 V1 X16 A2 X179

C2 X16 D2 X25 E2 X32 F2 X64

Item Description Qty

T1 Screw M6X16 (D12X19) 24

V1 Spacer 16

A2 Screw M6X16 179

B2 Screw M6X20 16

C2 Screw M6X28 16

D2 Screw M6X35 25

E2 Screw M5X12 32

F2 Screw St4.8x16 64

H2 Nut M6 17

K2 Union Bar 4

K3 Iron Angle 8

K4 Union Bar 4

G2 Allen Key 1

Pièce Description Qté

T1 Vis M6X16 (D12X19) 24

V1 Entretoise 16

A2 Vis M6X16 179

B2 Vis M6X20 16

C2 Vis M6X28 16

D2 Vis M6X35 25

E2 Vis M5X12 32

F2 Vis St4.8x16 64

H2 Écrou M6 17

K2 Barre d’union 4

K3 Fer-angle 8

K4 Barre d’union 4

G2 Clé hexagonale 1

B2 X16

H2 X17

G2 X1

K2 X4

K3 X8

K4 X4

Page 7: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

7© Sojag inc. 2014

PARTS LIST

Item Description Qty

A Column 4

B Long Ogee 2

C Long Ogee 2

D Short Ogee 2

E Short Ogee 2

C1 Middle Roof Bar 6

D1 Corner Roof Bar 4

F Roof Side Structure (left) 4

G Roof Side Structure (right) 4

H Roof Side Structure (middle) 2

I Long Upper Door Track (left) 2

J Long Upper Door Track (right) 2

K Short Upper Door Track (left) 2

L Short Upper Door Track (right) 2

Pièce Description Qté

A Colonne 4

B Moulure longue 2

C Moulure longue 2

D Moulure courte 2

E Moulure courte 2

C1 Barre de toit de centre 6

D1 Barre de toit de coin 4

F Barre de contour de toit (gauche) 4

G Barre de contour de toit (droite) 4

H Barre de contour de toit (centre) 2

I Rail de haut de porte long (gauche) 2

J Rail de haut de porte long (droit) 2

K Rail de haut de porte court (gauche) 2

L Rail de haut de porte court (droit) 2

NOTE:Parts not shown to actual size and not to scale.

D1 X4

C1 X6

A X4

B X2

C X2

D X2

E X2

F X4

G X4

H X2

I X2

J X2

K X2

L X2

Page 8: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

8© Sojag inc. 2014

Item Description Qty

A1 Inside Roof Connector 1

B1 Outside Roof Connector 1

N1 Roof Finishing Bar (left) 4

O1 Roof Finishing Bar (right) 4

P1 Roof Finishing Bar (middle) 2

K1 Roof Support Bar (middle) 2

L1 Roof Support Bar (left) 4

M1 Roof Support Bar (right) 4

S Long Bottom Door Track (right) 2

T Long Bottom Door Track (left) 2

U Short Bottom Door Track (right) 2

V Short Bottom Door Track (left) 2

W Rod 1

X Rod 5

Y Rod 6

Z Rod 4

Pièce Description Qté

A1 Connecteur de toit intérieur 1

B1 Connecteur de toit extérieur 1

N1 Barre de finition de toit (gauche) 4

O1 Barre de finition de toit (droite) 4

P1 Barre de finition de toit (centre) 2

K1 Barre d’insertion de toit (centre) 2

L1 Barre d’insertion de toit (gauche) 4

M1 Barre d’insertion de toit (droite) 4

S Rail de bas de porte long (droit) 2

T Rail de bas de porte long (gauche) 2

U Rail de bas de porte court (droit) 2

V Rail de bas de porte court (gauche) 2

W Baguette 1

X Baguette 5

Y Baguette 6

Z Baguette 4

N1 X4

S X2

T X2

U X2

V X2

A1 X1 B1 X1

W X1

X X5

Y X6

Z X4

K1 X2

L1 X4 M1 X4

O1 X4

P1 X2

Page 9: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

9© Sojag inc. 2014

PARTS LIST (CONTINUED) LISTE DE PIÈCES (SUITE)NOTE: NOTE :

Item Description Qty

I2 Lock Pin 1

J2 Inside Fabric Roof 2

Q1 Base 4

R1 Corner Cover 4

S1 Joint Cover 4

U1 Door Handle 16

W1 Corner Finishing End 4

X1 Finishing End 6

Y1 Iron Angle 6

Z1 Wheels 12

Pièce Description Qté

I2 Loquet 1

J2 Toit en tissus amovible 2

Q1 Base 4

R1 Cache-coin 4

S1 Cache-joint 4

U1 Poignée de porte 16

W1 Embout de finition de coin 4

X1 Embout de finition 6

Y1 Fer angle 6

Z1 Roulette 12

J2 X2

I2 X1

Z1 X12

Q1 X4 R1 X4 S1 X4

U1 X16 W1 X4

X1 X6Y1 X6

Page 10: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

10© Sojag inc. 2014

Item Description Qty

M Cornel Panel (left) 4

N Corner Panel (right) 4

O Big Door Panel (left) 2

P Big Door Panel (right) 2

Q Small Door Panel (left) 2

R Small Door Panel (right) 2

E1 Right Roof Panel (upside) 4

F1 Left Roof Panel (upside) 4

G1 Right Roof Panel (downside) 4

H1 Left Roof Panel (downside) 4

I1 Middle Roof Panel (downside) 2

J1 Middle Roof Panel (upside) 2

Pièce Description Qté

M Panneau de coin (gauche) 4

N Panneau de coin (droit) 4

O Grand panneau de porte (gauche) 2

P Grand panneau de porte (droit) 2

Q Petit panneau de porte (gauche) 2

R Petit panneau de porte (droit) 2

E1 Panneau de toit de droite (haut) 4

F1 Panneau de toit de gauche (haut) 4

G1 Panneau de toit de droite (bas) 4

H1 Panneau de toit de gauche (bas) 4

I1 Panneau de toit du centre (bas) 2

J1 Panneau de toit du centre (haut) 2

G1 X4

E1 X4

F1 X4

H1 X4 I1 X2

J1 X2

M NX4 X4 O QP RX2 X2X2 X2

Page 11: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

11

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

Step 11.1 Install the column (A) on the base (Q1)

using the screws (A2).

Repeat for all remaining columns (A).

Étape 11.1 Installer une colonne (A) sur une base (Q1) en

utilisant les vis (A2).

Répéter pour les colonnes (A) restantes.

A

Q1

Q1

A

A2

X4

Q1 X4A X4

A2 X8

Page 12: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

12

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

Step 22.1 Slide half of a union bar (K4) into a short ogee (E)

and attach using the screws (A2 and T1)

as illustrated.

2.2 Slide the second half of the union bar (K4) into

a short ogee (D) and attach using the screws

(A2 and T1) as illustrated.

2.3 Repeat this process for all remaining ogees

(D and E) and (B and C) as illustrated.

Étape 22.1 Insérer la barre d’union (K4) à mi-chemin dans la moulure

courte (E) et attacher en utilisant les vis (A2 et T1)

tel qu’illustré.

2.2 Insérer l’autre moitié de barre d’union (K4) dans la moulure

courte (D) et attacher en utilisant les vis (A2 et T1)

tel qu’illustré.

2.3 Répéter ce procéder pour les moulures restantes

(D et E) et (B et C).

A2 X12

B X2

C X2

D X2

E X2

K4 X4

T1 X16

Page 13: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

13© Sojag inc. 2014

K4

K4

E

C

E

C

E

C

D

B

D

B

D

B

A2A2

T1

X4

Page 14: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

14

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

IMPORTANT:Always install the shelter on a level platform, wood or concrete.

IMPORTANT :Toujours installer la structure sur une surface de niveau.

Step 33.1 Install the short ogees (B and C) between two

columns (A) using the screws (T1) on the outside

of the ogee and the screws (B2) on the inside

of the ogee.

Repeat with the long ogees (D and E).

Étape 33.1 Installer les moulures courtes (B et C) entre deux

colonnes (A) en utilisant les vis (T1) à l’avant des

moulures ainsi que les vis (B2) à l’arrière des moulures.

Répéter avec les moulures longues (D et E).

CAUTION:Three people are required for this step.

AVERTISSEMENT :Trois personnes sont requises pour cette étape.

X8

X2

T1 X8

A

B2

B2

T1

T1D

E

E

D

A

B2

B

B

B

C

C

C

A

T1

B2 X16

Page 15: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

15

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

D

S1

B

C

Step 44.1 Install the joint cover plates (S1) using the screws

(F2) on the joint between the short ogees (B and C)

and the long ogees (D and E).

4.2 Install the corner cover (R1) using the screws (F2)

on each corner of the structure.

Étape 44.1 Attacher un cache-joint (S1) en utilisant les vis (F2) sur

tous les joints unissant les moulures courtes (B et C) et

sur tous les joints unissant les moulures longues (D et E).

4.2 Attacher le cache-coin (R1) en utilisant les vis (F2) sur

chacun des coins de la structure.

X4

S1

F2

F2

X4

R1

F2

E

D

ES1

R1

R1

BS1

S1

R1

R1

C

F2 X24S1 X4

R1 X4

Page 16: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

16

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

Step 55.1 Fix the roof side structure (F, G and H) on the

long ogees (B and C) using the screws (F2).

5.2 Fix the roof side structure (G and F) on the short

ogees (D and E) using the screws (F2).

Étape 55.1 Attacher les barres de contour de toit (F, G et H) sur les

moulures (B et C) en utilisant les vis (F2).

5.2 Attacher les barres de contour de toit (F et G) sur les

moulures (D et E) en utilisant les vis (F2).

F2 X40

F X4 G X4

H X2

Page 17: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

17© Sojag inc. 2014

X2

F

F2

G

F

G

G

F

H

X4

DB

C

E

D

EB

C

Page 18: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

18

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

Étape 66.1 Insérer deux écrous (H2) à l’intérieur de chaque rail

de bas de porte (S, T, U et V).

6.2 Insérer la barre d’union (K2) à mi-chemin dans le rail

de bas de porte court (V) et attacher à l’aide des vis (A2).

6.3 Insérer l’autre moitié de la barre d’union (K2) à mi-chemin

dans le rail de bas de porte court (U) et attacher à l’aide

des vis (A2).

6.4 Répéter ces étapes pour les rails de bas de porte

restants (V et U) et (T et S) tel qu’illustré.

Step 66.1 Insert two nuts (H2) into each track found of the

bottom door tracks (S, T, U and V).

6.2 Insert a union bar (K2) half way into the short

bottom door track (V) and attach using the

screws (A2) as illustrated.

6.3 Insert the second half of the union bar (K2) into

the short bottom door track (U) and attach using

the screws (A2) as illustrated.

6.4 Repeat these steps for all remaining door

tracks (V and U) and T and S) as illustrated.

A2 X8

S X2

T X2

U X2

V X2

H2 X16K2 X4

Page 19: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

19© Sojag inc. 2014

V

V

V

T

T

T

U

U

U

S

S

S

H2

A2

H2H2

X4

A2

X4

Page 20: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

20

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

A2 X8

Étape 77.1 Attacher les rails de bas de porte longs (S et T)

et les rails de bas de porte courts (U et V) aux

colonnes (A) en utilisant les vis (A2).

Step 77.1 Attach the long bottom door tracks (S and T) and

the short bottom door tracks (U and V) to the

columns (A) using the screws (A2).

Page 21: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

21© Sojag inc. 2014

A

A

A

A

A

A2

X4

SU

V

U

VS

T

T

Page 22: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

22

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

Étape 88.1 Attacher un fer angle (K3) au dessus de chaque

panneau (M et N) en utilisant les vis (A2) tel qu’illustré.

8.2 De l’extérieur du solarium, attacher les panneaux de

coin (M et N) aux rails de bas de porte (S, T, U et V) en

utilisant deux vis (C2). Attacher le côté des panneaux en

coin (M et N) aux colonnes (A) en utilisant deux vis (D2).

8.3 Terminer l’installation des panneaux de coin (M et N) à

partir de l’intérieur du gazebo en attachant le fer angle (K3)

aux moulures en utilisant une vis (A2).

Répéter ces étapes pour les panneaux

en coin (M et N) restants.

NOTE :Lorsque vous positionnez le panneau, assurez-vous de mettre le fer

angle qui se trouve sur le dessus du panneau derrière la moulure

avant de le visser.

Step 88.1 Attach an iron angle (K3) on top of each

panel (M and N) using the screws (A2) as illustrated.

8.2 From the outside of the solarium, attach the

corner panels (M and N) to the bottom door tracks

(S, T, U and V) using two screws (C2). Attach the

side of the corner panels (M & N) to the columns (A)

using two screws (D2).

8.3 Finish the installation of the corner panels

(M and N) from the inside of the solarium by

attaching the iron angle (K3) to the ogee using

one screw (A2).

Repeat for all remaining corner panels (M and N).

NOTE:When positionning your panel in place, ensure to put the iron

angle found on top of the panel behind the ogee prior to screw.

M X4 N X4

C2 D2

A2

X16 X16

X24K3 X8

Page 23: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

23© Sojag inc. 2014

X8

X8

A2

A2

K3

M/N

M/N

C2

D2

A2

C2

M

M

M NN

N

NM

Page 24: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

24

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

Étape 99.1 Installer les poignées (U1) sur chaque panneau de porte

(O, P, Q et R) en utilisant les entretoises (V1) et les

vis (E2) tel qu’illustré.

Step 99.1 Install the door handles (U1) on each door

panels (O, P, Q and R) using the spacers (V1)

and the screws (E2) as illustrated.

O X2

Q X2P X2 R X2

U1 X16

V1 X16

E2 X32

Page 25: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

25© Sojag inc. 2014

X8

X8

O & P Q & R

E2

E2

U1

U1

V1

Page 26: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

26

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

Étape 1010.1 Insérer le grand panneau de porte (O) à l’intérieur du

long rail de haut de porte (J). Utiliser le rail se trouvant

les plus près du côté qui sera attaché à la moulure.

10.2 Insérer le grand panneau de porte (P) à l’intérieur

du long rail de haut de porte (I). Utiliser le rail se

trouvant les plus près du côté qui sera attaché à

la moulure.

Répéter pour les grands panneaux de porte

(O et P) restants.

NOTE :S’assurer d’avoir placé les poignées de porte aux bons endroits. Insérer

les grands panneaux de porte (O et P) en suivant les illustrations.

Step 1010.1 Insert the big door panel (O) into the long upper

door track (J). Use the track closest to the side

that will be attached to the ogee.

10.2 Insert the big door panel (P) into the long upper

door track (I). Use the track closest to the side

that will be attached to the ogee.

Repeat for all remaining big door panels

(O and P).

NOTE:To ensure you have the door handle at the right place, insert the

big door panels (O and P) following the illustrations.

I X2

J X2

Page 27: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

27© Sojag inc. 2014

X2

X2

Door handlePoignée de porte

Door handlePoignée de porte

O O

J

J

I

I

P

P

Page 28: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

28

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

A2 X8

Étape 1111.1 De l’intérieur du solarium, en utilisant les pièces (P et I)

préalablement assemblées, insérer le grand panneau de

porte (P) à l’intérieur du rail du bas de porte long (S) qui

se trouve du côté de 12 pi et attacher le rail rail du haut

de porte long (I) à la moulure en utilisant les vis (A2).

11.2 Utiliser les pièces (O et J), préalablement assemblées,

sur le deuxième côté de 12 pi du solarium. Insérer le bas

du panneau de porte (O) à l’intérieur du rail de bas de

porte long (T) et attacher le rail du haut de porte long (J)

à la moulure en utilisant les vis (A2).

MISE EN GARDE :Pour cette étape, n’installer qu’un seul grand panneau de porte (O)

et qu’un seul grand panneau de porte (P) et garder les deux autres

grands panneaux de porte (O et P) pour l’étape 17.

Step 1111.1 From the inside of the solarium, using the

pre-assembled parts (P and I), insert the bottom

of the big door panel (P) into the track on the

long bottom door track (S) found on the 12 ft.

side then attach the long upper door track (I)

to the ogee using the screws (A2).

11.2 On the second 12 ft. side of the solarium, using

the pre-assembled parts (O and J), insert the

bottom of the big door panel (O) into the track

on the long bottom door track (T) then attach

the long upper door track (J) to the ogee using

the screws (A2).

CAUTION:Install only one big door panel (O) and one big door panel (P) on

this step and save the remaining big door panels (O & P) for

step 17.

Page 29: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

29© Sojag inc. 2014

X2

X2

S

S

A2

A2

I

J

O

P

Page 30: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

30

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

Étape 1212.1 Insérer une baguette (X) dans une baguette (Y) en les

attachant avec deux vis (A2).

Répéter cinq fois.

12.2 Insérer une baguette (W) dans une baguette (Y) en les

attachant avec deux vis (A2).

Step 1212.1 Insert the rod (X) into the rod (Y) and secure

with two screws (A2).

Repeat 5 times.

12.2 Insert the rod (W) into the rod (Y) and secure

with two screws (A2).

X X5

Y X6

W X1

A2 X12

Page 31: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

31© Sojag inc. 2014

W

W

Y

Y

Y

Y

X

X

A2

A2

A2

X5

X1

X6

Page 32: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

32

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

Étape 1313.1 Insérer les baguettes (W, X et Y), préalablement

assemblées, dans les panneaux de tissu de toit

intérieur (J2) en se référant à l’illustration.

13.2 Insérer la baguette (Z) à l’extrémité du tissu d’intérieur

de toit (J2) tel qu’illustré.

13.3 Installer le loquet (I2) sur la baguette (W) en utilisant

l’écrou (H2) et la vis (D3).

Step 1313.1 Insert the pre-assembled rods (W, X, Y) into the

inside fabric roof (J2) following the illustration.

13.2 Insert the rod (Z) into the extremities of the

inside fabric roof (J2) as illustrated.

13.3 Install the lock pin (I2) on the rod (W) using the

screw (D3) and nut (H2).

NOTE :Les baguettes (Z) ne requièrent aucune vis pour cette étape.

NOTE:The Rods (Z) do not require any screws for this step.

I2 X1J2 X2

Z X4

D2 X1

H2 X1

Page 33: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

33© Sojag inc. 2014

J2

W

ZY

Y

Y

Y

Y

YZ

Z

W

Z

XX

X

X

X

J2

J2

I2 D3

H2

X8

Page 34: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

34

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

Étape 1414.1 Installer les roues (Z1) à chaque extrémité des

baguettes (W, X et Y) en utilisant les vis (A2).

Step 1414.1 Install the wheels (Z1) at each extremity

of the rods (W, X and Y) using a screw (A2).

NOTE :Ne pas installer de roues sur la baguette (Z).

NOTE:Do not install wheels on the rod (Z).

A2 X12 Z1 X12

Page 35: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

35© Sojag inc. 2014

A2

Z1Z1Z1

Z1

Z1Z1

Z1

Z1Z1

Z1

Z1Z1

Z1

X12

W, X & Y

YY

Y

YY

Y

W

XX

X

X

X

Page 36: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

36

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

Étape 1515.1 Installer le tissu amovible d’intérieur de toit,

préalablement assemblé (étapes 12 à 14) sur la

structure en glissant les roues dans l’ouverture des

rails de haut de porte longs (I et J) qui se situe le

plus à l’intérieur de l’abri, tel qu’illustré. S’assurer de

commencer l’insertion avec les baguettes (Z) pour

le premier panneau et terminer l’insertion avec les

baguettes (Z) pour le second panneau.

Step 1515.1 Install the pre-assembled (steps 12 to 14)

removable inside fabric roof to the structure by

sliding the wheels into the tracks found on the

long upper door tracks (I and J) as illustrated.

Ensure to start the insertion with rods (Z) for the

first panel and finish the insertion with rods (Z)

for the second panel.

Z

I

J

Z

Z

Z

I & J

Page 37: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

37

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

Étape 1616.1 Insérer le petit panneau de porte (Q) dans le rail de haut

de porte court (L). Utiliser le rail le plus près du côté qui

sera rattaché à la moulure.

16.2 Insérer le petit panneau de porte (R) dans le rail de haut

de porte court (K). Utiliser le rail le plus près du côté qui

sera rattaché à la moulure.

Répéter pour les petits panneaux de porte

restants (Q et R).

Step 1616.1 Insert the small door panel (Q) into the short

upper door track (L). Use the track closest to

the side that will be attached to the ogee.

16.2 Insert the small door panel (R) into the short

upper door track (K). Use the track closest to

the side that will be attached to the ogee.

Repeat for all remaining small door

panels (Q and R).

Q

R

K

L

X2

Q

L

X2 R

K

K X2 L X2

Page 38: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

38

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

Étape 1717.1 À partir de l’intérieur du côté de 12 pieds du solarium,

utiliser les parties (P et I) préalablement assemblées.

Insérer le bas du grand panneau de porte (P) dans le rail

de bas de porte long (S) et attacher le rail de haut de

porte long (I) à la moulure en utilisant les vis (A2).

17.2 Sur le deuxième côté de 12 pieds du solarium, utiliser

les parties (O et J) préalablement assemblées. Insérer

le bas du grand panneau de porte (O) dans le rail

de bas de porte long (T) et attacher le rail de haut de

porte long (J) à la moulure en utilisant les vis (A2).

17.3 Sur le côté de 10 pieds, utiliser les parties (R et K)

préalablement assemblées. Insérer le bas du petit

panneau de porte (R) dans le rail de bas de porte

court (U) et attacher le rail de haut de porte court (K) à

la moulure en utilisant les vis (A2). Répéter pour le

deuxième côté de 10 pieds de la structure.

17.4 Sur le côté de 10 pieds, utiliser les parties (Q et L)

préalablement assemblées. Insérer le bas du petit

panneau de porte (Q) dans le rail de bas de porte

court (V) et attacher le rail de haut de porte court (L) à

la moulure en utilisant les vis (A2). Répéter pour le

deuxième côté de 10 pieds de la structure.

Step 1717.1 From the inside of the solarium on the 12 ft. side,

using the pre-assembled parts (P and I), insert

the bottom of the big door panel (P) into the rail

on the long bottom door track (S) then attach the

long upper door track (I) to the ogee using the

screws (A2).

17.2 On the second 12 ft. side of the solarium, using

the pre-assembled parts (O and J), insert the

bottom of the big door panel (O) into the rail

on the long bottom door track (T) then attach

the long upper door track (J) to the ogee using

the screws (A2).

17.3 On the 10 ft. side, using the pre-assembled

parts (R and K), insert the bottom of the small

door panel (R) into the rail on the short bottom

door track (U) found on the 10 ft. side then attach

the short upper door track (K) to the ogee using

the screws (A2). Repeat for the second 10 ft.

side of the structure.

17.4 On the 10 ft. side, using the pre-assembled parts

(Q and L), insert the bottom of the small door

panel (Q) into the rail on the short bottom door

track (V) then attach the short upper door track

(L) to the ogee using the screws (A2). Repeat for

the second 10 ft. side of the structure.

A2 X24

Page 39: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

39© Sojag inc. 2014

X6

X6

L

A2

T

SV

U

A2

OP

QR

OP

R

Q

Page 40: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

40

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

Étape 1818.1 Attacher la baguette (Z) aux moulures courtes en

utilisant les vis (D2).

Répéter pour les baguettes (Z) restantes.

Step 1818.1 Attach the rod (Z) to the short ogees using the

screws (D2).

Repeat for all remaining rods (Z).

Z

Z D2

D2D2

D2

X2

D2

D2Z

Z

D2 X8

Page 41: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

41

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

Étape 1919.1 Installer les barres de toit de coin (D1) au connecteur

de toit intérieur (A1) en utilisant les vis (A2).

Répéter cette étape pour les barres de toit de

coin (D1) restantes.

Step 1919.1 Install the corner roof bars (D1) to the inside roof

connector (A1) using the screws (A2).

Repeat this step for all remaining corner roof

bars (D1).

X4A2

A2

A1

A1

D1

D1

D1

D1

D1

D1 X4

A1 X1

A2 X8

Page 42: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

42

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

A2 X4

Étape 2020.1 Placer la structure du toit sur le dessus des moulures.

20.2 Visser les barres de coin de toit (D1) aux colonnes (A) en

utilisant les vis (A2).

Step 2020.1 Place the roof structure on top of the ogees.

20.2 Screw the corner roof bars (D1) to the columns

(A) using the screw (A2).

Page 43: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

43© Sojag inc. 2014

X4

D1

A2

Page 44: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

44

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

C1

C1

X6

Étape 2121.1 Attacher un fer angle (Y1) sur chaque barre de toit (C1)

en utilisant une vis (A2) tel qu’illustré..

21.2 Installer les barres de toit du centre (C1) au connecteur

de toit intérieur (A1) en utilisant les vis (A2).

21.3 Visser le fer angle sur la barre de toit du centre (C1)

aux moulures (B, C, D et E) en utilisant une vis (A2).

Répéter pour toutes les barres de toit du

centre (C1) restantes.

Step 2121.1 Attach an iron angle on each roof bar (C1)

using a screw (A2) as illustrated.

21.2 Install the middle roof bar (C1) to the inside

roof connector (A1) using a screw (A2).

21.3 Screw the iron angle on the middle roof bar (C1)

to the ogees (B, C, D or E) using a screws (A2).

Repeat for all remaining middle roof bars (C1).

A2 X30

Y1 X6

X6

C1

Y1

A2

Page 45: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

45© Sojag inc. 2014

X6

C1

C1

C1C1

C1

A2

A2

C1

C1

C1

X6

Page 46: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

46

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

Étape 2222.1 Installer le connecteur de toit extérieur (B1) sur le

connecteur de toit intérieur (A1) en utilisant les vis (A2).

Step 2222.1 Install the outside roof connector (B1) on the

inside roof connector (A1) using the screws (A2).

A2 X3

B1 X1

Page 47: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

47© Sojag inc. 2014

A1A2

B1

B1

Page 48: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

48

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

E1 X4

F1 X4

J1 X2

CAUTION:One side of the roof panels is UV protected. Ensure that the UV

protected side is facing up. It is a very important procedure;

if not followed as described, your roof will not be covered by

the warranty.

NOTE:The roof panels are covered with a plastic film identifying which

side has a UV protector. Once the plastic film is removed it

is impossible to know which side has the UV protector. We

recommend removing the film one at a time just prior to

installing the roof panel.

MISE EN GARDE :Un des côtés du panneau de toit a une protection UV. S’assurer

d’exposer le côté protégé contre les rayons UV du soleil vers

l’extérieur de l’abri. Cette étape est très importante, si elle n’est

pas respectée telle que décrite, le toit ne sera pas couvert par

la garantie.

NOTE :Les panneaux de toit sont recouverts d’une pellicule de plastique

identifiant le côté ayant une protection UV. Une fois que cette

pellicule est enlevée, il est impossible d’identifier quel côté est

protégé contre les rayons UV du soleil. Il est recommandé de

retirer les pellicules de plastique une à la fois, avant l’installation

de chacun des panneaux.

Étape 2323.1 Installer les panneaux de toit gauche (F1) et les panneaux

de toit droit (E1) tel qu’illustré en les glissant dans les

rails des barres de toit (C1 et D1).

23.2 Insérer les panneaux de toit du centre (J1) à partir du

bout de le la barre de toit du centre (C1) au milieu du côté

de 12 pieds du solarium.

23.3 Enligner la base du panneau de toit du centre (J1) avec

la base du panneau de toit de gauche (F1) et la base du

panneau de toit droit (E1). Cela peut demander que les

panneaux de toit du centre (J1) ne soient pas poussés

complètement au fond des rails.

Répéter cette étape tout le tour de l’abri.

Step 2323.1 Install the left roof panel (F1) and the right roof

panel (E1) according to the picture, by sliding

into the tracks of roof bars (C1 and D1).

23.2 Insert middle roof panel (J1) from the end of the

middle roof bars (C1) in the middle of the 12 ft.

side of the shelter.

23.3 Align the base of middle roof panel (J1) with

bases of the left roof panel (F1) and the right

roof panel (E1). This may require that middle roof

panel (J1) not be completely pushed to the back

of the tracks.

Repeat this step all around the unit.

Page 49: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

49© Sojag inc. 2014

THIS SIDE UP

CE CÔTÉ VERS LE HAUT

E1, F1 & J1

C1 & D1

J1

F1

F1E1

E1

C1D1

Page 50: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

50

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

Step 2424.1 Install the roof support bars (L1, K1 and M1)

according to the picture. Ensure they are

completely inserted into the tracks.

24.2 Align the middle roof support bars (K1) with roof

support bars (L1 and M1).

CAUTION:Ensure the roof panels are inserted into the track of

the roof support bars (L1, K1 & M1).

MISE EN GARDE :S’assurer que les panneaux de toit soient insérés dans les rails

des barres d’insertion de toit (L1, K1 et M1).

Étape 2424.1 Installer les barres de support de toit (L1, K1

et M1) en se référant à l’illustration. S’assurer

qu’elles soient complètement insérées dans

les rails.

24.2 Enligner les barres d’insertion de toit (K1) avec

les barres d’insertion de toit (L1 et M1).

K1 X2

L1 X4 M1 X4

Page 51: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

51© Sojag inc. 2014

L1, K1 & M1

C1 & D1

M1 L1M1K1L1

Page 52: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

52

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

CAUTION:One side of the roof panels is UV protected. Ensure that the UV

protected side is facing up. It is a very important procedure;

if not followed as described, your roof will not be covered by

the warranty.

NOTE:The roof panels are covered with a plastic film identifying which

side has a UV protector. Once the plastic film is removed it

is impossible to know which side has the UV protector. We

recommend removing the film one at a time just prior to

installing the roof panel.

MISE EN GARDE :Un des côtés du panneau de toit a une protection UV. S’assurer

d’exposer le côté protégé contre les rayons UV du soleil vers

l’extérieur de l’abri. Cette étape est très importante, si elle n’est

pas respectée telle que décrite, le toit ne sera pas couvert par

la garantie.

NOTE :Les panneaux de toit sont recouverts d’une pellicule de plastique

identifiant le côté ayant une protection UV. Une fois que cette

pellicule est enlevée, il est impossible d’identifier quel côté est

protégé contre les rayons UV du soleil. Il est recommandé de

retirer les pellicules de plastique une à la fois, avant l’installation

de chacun des panneaux.

Étape 2525.1 Installer le panneau de toit de gauche (H1) et le panneau

de toit de droite (G1) en se référant à l’illustration en les

glissant les barres de toit (C1 et D1).

Répéter cette étape quatre fois.

25.2 Insérer les panneaux de toit du centre (I1) à partir du

bout de la barre de toit du centre (C1) au milieu du côté

de 12 pieds du solarium.

Répéter cette étape tout le tour de l’abri.

Step 2525.1 Install the left roof panel (H1) and the right roof

panel (G1) according to the picture, by sliding

into the tracks of roof bars (C1 and D1).

Repeat this step 4 times.

25.2 Insert middle roof panel (I1) from the end of the

middle roof bars (C1) in the middle of the 12 ft.

side of the shelter.

Repeat this step all around the unit.

G1 X4

H1 X4 I1 X2

Page 53: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

53© Sojag inc. 2014

THIS SIDE UP

CE CÔTÉ VERS LE HAUT

H1, G1 & I1

C1 & D1

H1

H1

I1

G1

G1

Page 54: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

54

Parts required for this step / Pièces requises pour cette étape :

ASSEMBLY ASSEMBLAGE

© Sojag inc. 2014

NOTE :Pour cette étape, trois personnes sont requises.

NOTE:3 people are required for this step.

Étape 2626.1 Attacher le côté gauche de la barre de finition de toit

(N1) avec une vis (A2) dans le coin gauche du côté

de 12 pieds du solarium. Cette vis (A2) sera défaite

et insérée de nouveau à la fin de cette étape dans le

but d’accrocher un embout de finition de coin (W1).

26.2 Placer une barre de finition de toit de centre (P1) à

droite de la barre de finition de toit gauche (N1) et

enligner les trous les uns par-dessus les autres.

Placer un embout de finition (X1) par-dessus les

trous et les attacher avec une vis (A2).

26.3 Répéter cette étape avec une barre de finition de

toit droite (O1) en l’attachant sur la barre de finition

de toit du centre (P1) avec un embout de finition (X1)

et une vis (A2).

26.4 Dans le but de faire la transition du côté de 12 pieds

au côté de 10 pieds, enligner le trou restant de la

barre de finition de toit (O1) avec celui de la barre

de finition de toit gauche (N1) sur le côté de 10 pieds

au coin du solarium. Attacher les deux barres au coin

avec un embout de finition de coin (W1) en y insérant

une vis (A2).

26.5 Attacher une barre de finition de toit droite (O1) à la

barre de finition de toit gauche (N1) sur le côté de

10 pieds avec un embout de finition de coin (W1)

et une vis (A2).

26.6 Répéter ces étapes jusqu’à ce que vous ayez fait le

tour du solarium et que vous arriviez au dernier coin

où vous avez commencé l’installation de la première

barre de finition de toit.

26.7 Défaire la vis (A2) et enligner les trous de la première

et de la dernière barre de finition de toit qui ont été

installées. Attacher les deux barres au coin avec un

embout de finition de coin (W1) en y insérant la

vis (A2) que vous avez défaite.

Step 2626.1 Secure the left side of a left roof finishing bar (N1)

with a screw (A2) in the left corner of the 12 feet

side of the unit. This screw (A2) will be undone

and re-inserted at the end of this step.

26.2 Place a middle roof finishing bar (P1) next to

the left roof finishing bar (N1) and align the

pre-drilled holes in each bar one on top of the

other. Place finishing end (X1) over the aligned

holes and secure with screw (A2).

26.3 Repeat this step with the right roof finishing

bar (O1) by securing it to the middle roof finishing

bar (P1) with a finishing end (X1) and a screw (A2).

26.4 In order to transition from the 12 feet side of

the unit to the 10 feet side, align the remaining

pre-drilled hole of the right roof finishing bar (O1)

with that of a left roof finishing bar (N1) on the

10 feet in the corner of the unit. Secure both bars

in the corner with a corner finishing end (W1) by

inserting a screw (A2).

26.5 Secure a right roof finishing bar (O1) to left roof

finishing bar (N1) on the 10 feet side with a

corner finishing end (W1) and a screw (A2).

26.6 Repeat these steps working your way around the

entire unit until coming to the last corner where

the installation of the roof finishing bar began.

26.7 Undo the first screw (A2) and align the pre-drilled

holes of the first and last roof finishing bar which

were installed. Secure both bars in the corner

with a corner finishing end (W1) by inserting

a screw (A2).

A2 X10

W1 X4

X1 X6N1 X4

O1 X4

P1 X2

Page 55: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

55© Sojag inc. 2014

A2

W1

O1

N1

A2

C1

X1

X4 X6

N1

P1

O1N1

W1

O1

W1

X1X1

X1

W1

Start Here

Commencer ici

Page 56: Owner’s Manual Guide de l’utilisateurus.bacchigazebo.com/DATA/PRODUITPARENT/1126~v...Owner’s Manual Castel Solarium 3.05 m x 3.66 m (10 x 12 ft.) Sojag code: E999-4155709 UPC

Printed in China / Imprimé en Chine

ww

w.s

oja

g.c

a