Top Banner
The collective centre of the Belgian technology industry
25

Owi project

Apr 16, 2017

Download

Technology

BruWind
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Owi project

The collective centre of the Belgian technology industry

Page 2: Owi project

27/06/2011© sirris 2010 | www.sirris.be | [email protected] | 2

Driving industry by technology

• Mission?

To help companies implement technological

innovations

• Why?

Strengthen the competitive position over the long-term

• For whom?

The Belgian technology industry

Page 3: Owi project

27/06/2011© sirris 2010 | www.sirris.be | [email protected] | 3

Our centre

Federation

for the technology industry

Collective centre

of the technology industry

• Nonprofit organisation

• Industry owned

“Increase the competitiveness of

companies of the Agoria sectors through

technological innovations”

Mission

Page 4: Owi project

27/06/2011© sirris 2010 | www.sirris.be | [email protected] | 4

Our technological sectors

Aerospace Automotive Construction products

Contracting & Maintenance Electrical engineering

Industrial automation Mechatronical engineering

Information and communication technologies (ICT)

Metals & materials Metal processing Mounting & cranes

Plastics & composites Security & defence

Page 5: Owi project

27/06/2011© sirris 2009 | www.sirris.be | [email protected] | 5

Local presence, near the companies

Leuven

Mechatronics

Technology Coaching

Hasselt

Materials Engineering

Production Technology

Charleroi

Rapid Manufacturing

Brussels

Software Engineering & ICT

Technology Coaching

Ghent

Materials Engineering

Liège

Rapid Manufacturing

Materials Engineering

> 120 experts in 6 sites in the 3 regions

Page 6: Owi project

the collective centre of the Belgian technological industry

Offshore Wind Infrastructure (OWI)

project

27/06/2011

Page 7: Owi project

27-6-2011© Sirris | www.sirris.be | [email protected] | 7

Generaties

www.generaties.net

• Mission: seizing the opportunities concerning renewable energy

in Flanders

• Wind energy, photovoltaïc and thermal solar energy, smart grids,

bioenergy

• Partnerships with:

• Agoria Agoria Renewable Energy Club (AREC)

• Ghent Bio-energy Valley (GBEV)

• Steering Group consisting of: Agoria Vlaanderen, ODE Vlaanderen,

the research community, member companies

• Coordination: 3E

Page 8: Owi project

27-6-2011© Sirris | www.sirris.be | [email protected] | 8

Generaties: 3 subprojects

• Large project “Generaties” approved by the Flemish Government,

for a total value of 23,5 mio €

TOWARDS WORLD LEADERSHIP IN RENEWABLE ENGERGY

TECHNOLOGY AND ELECTRICAL INFRASTRUCTURE

• Subprojects:

• Intelligent networks (smart grids)

• Infrastructure for PV (photovoltaïcs)

• Offshore wind energy research infrastructure (4.8 mio €)

Page 9: Owi project

Project charter: problems

• Flemish companies miss access to test infrastructure and

datasets to support and accelerate their innovation process

• Offshore wind energy needs an increase in efficiency & uptime

• Wind resource mapping, modeling siting, performance monitoring

• KT weather forecasts grid balancing, O&M

• Endurance testing of components robust turbines, risk mgt

• CMS O&M, risk mgt

• O&M management tool increase uptime, reduction of O&M costs

• Larger turbines (multi-megawatt) innovation

• Not enough clustering of local players need of a ecosystem

• Wind energy is not enough covered by the Belgian academia

27-6-2011© Sirris | www.sirris.be | [email protected] | 9

Page 10: Owi project

Project charter: project objectives

• Partners: 3E, CG Power (Pauwels Trafo), Hansen Transmissions,

DEME (GeoSea), Sirris, Agoria Vlaanderen (AREC), VUB

• Start-up of Offshore Wind Energy test Infrastructure

(OWI)

• LIDAR Local measurement of wind speeds in

order to build up wind/meteo datasets & models

• Access to wind turbine(s) – test capacity

• Large climate chamber (& corrosion chamber

to test big components

• Performance & Condition Monitoring Systems + SHM

• Management tool for O&M

27-6-2011© Sirris | www.sirris.be | [email protected] | 10

Page 11: Owi project

Project charter: scope

• Specify, purchase and make test infrastructure operational

• Grant access to test infrastructure for Flemish (& EU) companies

• (offshore) wind energy

• spillovers

• Start-up of innovation projects for offshore wind energy

• Establish a user group (> 20 companies)

• Engineering companies, component suppliers, C&M !!!

• Set-up and deliver support with proposals O&O projects, FP7,SET,…

• Put wind energy on the academic map – project partner VUB

• Thesis topics

• Research, for example SBO

• Participation TP Wind, EERA JP Wind, academic networking

27-6-2011© Sirris | www.sirris.be | [email protected] | 11

Page 12: Owi project

R&D

INFRASTRUCTURE

(Hardware)

SOFTWARE

(Simulation)

RESEARCH

DATA-POOL

Page 13: Owi project

Project overview

27-6-2011© Sirris | www.sirris.be | [email protected] | 13

Test-lab infrastucture for

accelerated lifetime testing

of WT components

2

Systeem & component

condition monitoring

systemen (CMS)

1 43

O&M

software

tool

= 1 deelproject

LIDAR

Page 14: Owi project

Project overview: Sub-project

• (1) Large climate chamber

• Real life component testing infrastructure

• Focus: accelerated lifetime testing

• Unique infrastructure in EU !!!

• Up to 150 ton

• -60°C

• 10 x 7 x 7 meter

• Short term, opening summer 2012

• Implementation in testfacility

• Harbour of Antwerp

• (2) Corrosion chamber / simulation

• Feasability study accelerated lifetime testing

• (investment in testing infrastructure on long term)

27-6-2011© Sirris | www.sirris.be | [email protected] | 14

Test-lab infrastucture for

accelerated lifetime testing

of WT components

2

Page 15: Owi project

Test facility: Large climate chamer

27-6-2011© Sirris | www.sirris.be | [email protected] | 15

Page 16: Owi project

Test facility: Large climate chamer

27-6-2011© Sirris | www.sirris.be | [email protected] | 16

Page 17: Owi project

Project overview: Sub-project

CMS-SHM:

(Condition & Structural Health Monitoring)

• Invest in tools for measurements (backbone)

• Use these tools in a real life offshore wind turbine

• Goal:

• Generate relevant offshore datasets by

measurements in real life

• Use these datasets for R&D in the whole

Belgian wind energy value chain

27-6-2011© Sirris | www.sirris.be | [email protected] | 17

3

Systeem & component

condition monitoring

systemen (CMS)

Page 18: Owi project

Project overview: Sub-project

Testcapacity

• Grand access to:

• Offshore wind turbine structures

(foundation, tower,…)

• Wind turbine (components)

• Goal:

• Generate relevant offshore datasets by

measurements in real life

• Use these datasets for R&D in the whole

belgian windenergy value chain

• Partnership with offshore windpark &

turbine manufacturer (OEM)

27-6-2011© Sirris | www.sirris.be | [email protected] | 18

3

Systeem & component

condition monitoring

systemen (CMS)

Page 19: Owi project

Project overview: Sub-project

O&M- software tool

• Buy or make a software tool

• Generate O&M-strategies by using datasets in tool:

• Performance data

• Weather & wind data (LIDAR)

• CMS

• SHM

• Measurement campaigns

27-6-2011© Sirris | www.sirris.be | [email protected] | 19

4

O&M

software

tool

Page 20: Owi project

Project overview: Sub-project

LIDAR

• Stationary & floating LIDAR

• Coordination by 3E & GeoSea

• Generate data:

• Weather data & wind data (LIDAR)

27-6-2011© Sirris | www.sirris.be | [email protected] | 20

1

LIDAR

Page 21: Owi project

In the pipeline: 1e

R&D project – knowledge acquisition

27-6-2011© Sirris | www.sirris.be | [email protected] | 21

“Test & monitoring campaign at sea – part 1”

Systeem & component

condition monitoring

systemen (CMS)

1 43

O&M

software

tool

LIDAR

Page 22: Owi project

Structural Health Monitoring

1. SUPPORT STRUCTURE AND TOWER

(In Field measurements)

-Dynamic Monitoring

-Accelerometers

-Load Monitoring

- Strain gauge sensors

- Wind and wave measurements

-Corrosion Monitoring

-Corrosion Sensors and test coupons

2. BLADES (Laboratory Measurements on scaled blades)

-Structural Health Monitoring

-Accelerometers and optical fibers

Performance Monitoring-Power Curve Monitoring

- SCADA data

In the pipeline: 1e

R&D project – knowledge acquisition

(part 1)

27-6-2011© Sirris | www.sirris.be | [email protected] | 22

Page 23: Owi project

Condition Monitoring

1. DRIVETRAIN COMPONANTS

(In Field measurements)

-Dynamic Monitoring

-Accelerometers

-Load Monitoring

- Strain gauge sensors

- Wind and wave measurements

- …

Performance Monitoring- Power Curve Monitoring

-SCADA data

In the pipeline: 1e

R&D project – knowledge acquisition

(part 2)

27-6-2011© Sirris | www.sirris.be | [email protected] | 23

Longer term – partnership OEM

Page 24: Owi project

In the pipeline: 1e

R&D project – knowledge acquisition

(part 1 & 2)

27-6-2011© Sirris | www.sirris.be | [email protected] | 24

Page 25: Owi project

• Generated datasets could be use as:

• An input for R&D projects

• An input for O&M

• An input in the design proces of Belgian component suppliers

• Tower & foundation structures

• Drivetrain components

• Electrical components

• Simulation and MBS – (i.e. dynamic modeling drivetrain components

27-6-2011© Sirris | www.sirris.be | [email protected] | 25

In the pipeline: 1e

R&D project – knowledge acquisition

(part 1 & 2)