Overview of the Installation Flow of Builders’ lift
Planning/Coordination :
Design, Application, Efficiency and Logistic
Safety
Moving Forward
Contents
LECA | CIC Vol 4 Seminar | Safety : Planning & Coordination | 2017
Overview of the Installation Flow
LECA | CIC Vol 4 Seminar | Safety : Planning & Coordination | 2017
Design and Application
Planning/Coordination
LECA | CIC Vol 4 Seminar | Safety : Planning & Coordination | 2017
The use of Builders’ Lifts, if properly planned, designed and
used, can provide a convenient and safe means of vertical
transportation for site personnel and materials
Your Project Design & Application
LECA | CIC Vol 4 Seminar | Safety : Planning & Coordination | 2017
Sole application/
In combination
with passenger hoist
Capacity & Size
Site Progress
vs
Time of availability
Stops arrangement
(considering 11m
interval requirement)
Appropriate assignment
of lift (location
designation)
1. Package assignment (Exclusive or Hybrid)
2. Capacity and Size
3. Phasing deployment (i.e. stops arrangement per phase)
4. Builders’ Lifts allocation and designation
5. Time of availability
Efficiency and Logistic
Planning/Coordination
LECA | CIC Vol 4 Seminar | Safety : Planning & Coordination | 2017
Your Project Efficiency & Logistic
LECA | CIC Vol 4 Seminar | Safety : Planning & Coordination | 2017
Transit storage arrangement
(i.e. initial set-up and stage
installation phase)
Clear & safe access
for delivery and
dismantling
Well organized
service timing
Sound structural provision
for hoisting, cathead
installation and crash
deck erection
Clear and tidy working area in
front of respective lift lobby
during installation phase
1. Site Storage and house keeping
2. Structural design interface
3. Clear and Safe Access
4. Sufficient and tidy working space
5. Well coordinated downtime arrangement
Risk Assessment Competency and Supervision Work briefing prior to work commencement Permit-to-work LALG checking and examination Shaft opening protection
Recommended Tools/Device
Safety
LECA | CIC Vol 4 Seminar | Safety : Planning & Coordination | 2017
Safety NO GO LIST (Zero Tolerance)
We do not tolerate any violation concerning the use of …
Fall Protection
Safe Hoistway Access Process
LOTO (Log-Out/Tag-Out)
Jumper
Appropriate hoisting/rigging equipment and methods
Safety certified sub-contractor companies, and individually trained and
qualified sub-contractor employees
LECA | CIC Vol 4 Seminar | Safety : Planning & Coordination | 2017
Builder’s Lift
“The NEXT”
Safer and Efficient
Moving Forward
LECA | CIC Vol 4 Seminar | Safety : Planning & Coordination | 2017
The NEXT Step by Step to the Top
The next generation of Builders’ Lifts.
Self-climbing vertical transportation
during the construction phase
Independent from construction work
The extension process only takes a
maximum of 24 hours, excl. 3rd party
acceptance tests
Water-proofed
crash-deck
Lifting platform
Machine platform
Lift car
LECA | CIC Vol 4 Seminar | Safety : Planning & Coordination | 2017
The NEXT The Machine Platform
The machine platform contains all the
machine room equipment allowing to run
the elevator:
Builders’ Lift machine with control &
converter
Guided within the permanent guide rails
Equipped with separate safety gears
Fitted with retractable supporting beams
to secure towards the shaft structure
LECA | CIC Vol 4 Seminar | Safety : Planning & Coordination | 2017
The NEXT The Lifting Platform
The optional lifting platform extends the
Builders’ Lift to a self-climbing system:
Independent hoisting crane to hoist the
machine platform
Climbs itself up using a dedicated
suspension point provided at the crash-
deck or slip form
Fitted with retractable supporting
beams to secure towards the shaft
structure
LECA | CIC Vol 4 Seminar | Safety : Planning & Coordination | 2017
Moving Forward
LECA | CIC Vol 4 Seminar | Safety : Planning & Coordination | 2017
Thank you for your attention