Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

Jul 17, 2019

Download

Documents

duongduong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a
Page 2: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

32

Overview of Remedial Design Process

Definition of RDVarious leads may undertake RDKey components of RD

Page 3: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

33

Scoping

RD begins with project planning

Scoping the RD involves several planning activities

»Establish the TRT

»Coordinate activities with the state

»Collect predesign information

»Prepare the project management plan

»Identify constraints on the project

Page 4: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

34

Tasking the Designer

Determination of the lead

RPM’s role

»Fund-lead

»Enforcement-lead

»USACE-lead

»State-lead

»Federal facility-lead

Using standard tasks

Page 5: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

35

Predesign Submittals and Treatability Studies

Standard submittals before field work begins

»SMP

»HASP

»ERP

»FSP

»QAPP

Treatability studies maybe performed if necessary

Page 6: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

36

Design Submittals:Preliminary Design Phase

Design is 30 percent complete

Components of the preliminary design» Design criteria report» Basis of design report» Preliminary drawings and specifications» Results of value engineering screening» Preliminary RA schedule» Preliminary RA and O&M cost estimates

Review of preliminary design submittals

Page 7: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

37

Design Submittals:Intermediate Design Phase

Design is 60 percent completed

Optional phase

Includes revision of deliverables

Focus of review

» ROD requirements

» Biddability, constructability,operability

» Pollution controls

» Construction practices

» Accuracy of calculation

Page 8: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

38

Value Engineering

A specialized cost-control technique

VE screening identifies potentially high-cost design

VE study performed concurrent with design elements

Page 9: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

39

Prefinal and Final Design

Incorporates final comments into the design submittal

Final design must be certified by a licensed professional engineer

Components of the prefinal and final designs

Page 10: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

40

Post-design Activities

RA solicitation

Fund-lead requirements

»Obtain SSC

»Secure access to the site

»Develop an RA assignment for Fund-lead RAs

PRP-lead requirements

Federal facility-lead requirements

Page 11: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

41

The RA Process

RPM’s role

RA planning activities

Procurement of RA contractor

Preconstruction activities and RA submittals

Construction

Completion activities

Page 12: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

42

Key Personnel in the RA

RPM

TRT

Oversight contractor

RA contractor

Resident engineer orconstruction manager

Construction contractor’ssupervisor

Page 13: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

43

RA Implementation:Routine Activities

Health and safety issues must be monitored

Inspection and testing in accordance with the QA plan

RA schedule used to monitor progress

Progress is documented in various logs and reports

» On-site

» Progress reports

» Daily field logs

Page 14: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

44

RA Implementation: Near Completion Activities

Prefinal construction conference held as each OU nears completion

Prefinal inspection performed to identify deficiencies

Final inspection ensures work is complete

Settlement agreement reviewed at PRP-lead sites

Page 15: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

45

Value Engineering During Construction

VE is required by contracts

RPM reviews the VE change proposal

Page 16: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

46

RA Implementation:Demobilization

Demobilization tasks:

»Removal of material

»Cleanup of debris

»Disconnection of utilities

»Completion of restoration or replacement

»Transfer of equipment and property

»Transfer of documents

Page 17: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

47

RA Implementation:Remedial Action Report

Prepared by the remedial action contractor 60 days after the final inspection

Reviewed by the RPM

Project completion report completed for PRP-lead sites

Page 18: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

48

Overview of O&M and Post Construction Activities

O&M begins when remedy is operational and functional

Site closeout documents cleanup milestones

Five-year reviews conducted at certain remedies to ensure protectiveness

Page 19: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

49

Operation and Maintenance

O&M activities include maintenance of treatment systems and final covers, monitoring of groundwater, and implementation of ICs

O&M activities are initiated after determination that the remedy is operational and functional (O&F)

O&M is funded, implemented and sustained by states or PRPs

» LTRA for groundwater and surface water restoration

RPM responsibilities include oversight, optimization, and documentation of O&M activities

Page 20: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

50

Major Milestones in the Closeout of NPL Sites Under CERCLA

Remedial action completion

Construction completion

Site completion

Site deletion

Page 21: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

51

RA Completion for an OU

Occurs when the designated EPA regional official approves the Interim or Final RA report

Will require a separate RA completion for each phase if the OU is implemented in phases

Will vary for different remedies

» Excavation and off-site disposal

» On-site treatment of wastes (other than groundwater or surface water restoration)

» Containment

» Groundwater and surface water restoration involving active treatment

» Groundwater and surface water restoration involving MNA

Page 22: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

52

Construction Completion

Means that all physical construction (under removal or remedial authority) is complete at the entire site

Has no legal or financial significance

Is achieved when the designated regional official signs the PCOR or FCOR and EPA HQs concurs

Applies only to sites on the final NPL

Page 23: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

53

Site Completion

Signifies the end of all response actions at NPL sites

Must meet specific criteria

Requires an FCOR for documentation

Enables site to be eligible for site deletion

Page 24: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

54

Site Deletion

NCP requirements dictate the deletion process

NPL deletion criteria in § 300.425(e)

Sites in O&M may be deleted

NPL deletion through RCRA deferrals

The deletion process

Page 25: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

55

Partial Deletion

Partial Deletion Rule and NCP requirements dictate the process

Partial deletion process is similar to full deletion, except for:

»Mapping requirements

»Documentation requirements

Page 26: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

56

Five-Year Reviews

Statutory requirement for five-year review

Purpose of five-year review

Five-year review process

Site deletion is independent and unaffected by the five-year review requirement

Page 27: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

57

Records Management

Promotes efficiency in compiling and retrieving Superfund information

Ensures that document storage space is adequate and secure

Promotes compliance with relevant laws and regulations

Page 28: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

58

Roles and Responsibilities in Records Management

Role of HQ: Overall program goal setting and oversight

Role of regional records manager: Day-to-day management of the system

Role of RPM: Provision of latest site-specific documentation

Role of records center staff: Day-to-day support of the system

Page 29: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

59

Types of Records and Files to be Maintained

Site files

AR

Litigation support documentation

Cost documentation

Documentation of damage to natural resources

Page 30: Overview of Remedial Design Process - US EPA · 51 RA Completion for an OU Occurs when the designated EPA regional official approves the Interim or Final RA report Will require a

60

In Review

Remedial actions at NPL sites are designed to provide permanent solutions from the release of hazardous substances

CERCLA establishes goals and management principles for remedial actions

Remedial actions generally involve six major phases

The RPM is responsible for directing and coordinating the remedial process