Top Banner
Overview of Proposed Marin County Parks Budgets for FY 2015-16 March 19, 2015
61

Overview of Proposed Marin County Parks Budgets for FY 2015-16

Nov 18, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Overview of Proposed Marin County Parks Budgets for FY 2015-16

Overview of

Proposed

Marin County Parks

Budgets

for FY 2015-16

March 19, 2015

Page 2: Overview of Proposed Marin County Parks Budgets for FY 2015-16

• Marin County Parks staff develops separate budgets

for

o Measure A

o Marin County Open Space District

o Parks, including Landscape Services and County Integrated

Pest Management Program (All funded by County General

Fund)

o 7 County Service Areas

o 1 Lighting and Landscaping District

B U D G E T D E V E L O P M E N T P R O C E S S

2.

Page 3: Overview of Proposed Marin County Parks Budgets for FY 2015-16

• 2 general types of expenditures

o Fixed Expenditures (salaries for full time,

non-term positions, benefits, supplies,

equipment, utilities, etc.)

o Functional Area Expenditures

• Project expenditures (A one time,

limited duration expenditure; could

be for project planning, design,

permitting, environmental review

and/or construction)

• Staff expenditures - Measure A only.

(Salaries, benefits, etc. for term

positions that are associated with

functional areas identified in

Measure A )

B U D G E T D E V E L O P M E N T P R O C E S S

3.

Page 4: Overview of Proposed Marin County Parks Budgets for FY 2015-16

• Sources of Proposed Projects and

Service Enhancements

o Parks and Open Space Strategic Plan

o Other plans such as Road and Trail

Management Plan, Vegetation and

Biodiversity Management Plan, other

approved and current park master plans

o Public input

o Staff knowledge of issues and needs

• Selection and Prioritization of

Proposed Projects and Service

Enhancements

o Proposed expenditures undergo a

rigorous review

o Collaborative process involving all

managers and multiple meetings

B U D G E T D E V E L O P M E N T P R O C E S S

4.

Page 5: Overview of Proposed Marin County Parks Budgets for FY 2015-16

• Selection Criteria for Proposed

Projects and Service Enhancements

o Detailed Project Description (why,

what, how much, how many, etc.)

o Project/Service Category • Road and Trail Management

• Vegetation Management (includes fire fuel reduction)

• Wildlife Management

• Wetland Protection and Restoration

• Real Property Acquisition and Administration

• Visitor Services and Community Engagement

• Slope and Drainage Management

• Park, Landscape or CSA Facility and

Infrastructure Management

• Open Space Facility and Infrastructure Management

B U D G E T D E V E L O P M E N T P R O C E S S

5.

Page 6: Overview of Proposed Marin County Parks Budgets for FY 2015-16

• Selection Criteria for Proposed

Projects and Other Expenditures

(cont.)

o Duration of Expenditure

• One time (could be multi-year)

• Annual or ongoing

o Selection Criteria (weighted)

• Priority in current, approved plan

• Engages volunteers

• Removes, reduces threat to health,

safety

• Legal mandate

• Grant or other outside funding

• Board priority

• Project is already underway

B U D G E T D E V E L O P M E N T P R O C E S S

6.

Page 7: Overview of Proposed Marin County Parks Budgets for FY 2015-16

o Selection Criteria (continued)

• Generates revenues or leads to

savings, efficiency

• Removes or reduces threat to natural

or cultural resources

• Engages underserved communities

(Measure A only)

• Contributes to community health

and wellness (Measure A only)

• Contributes to increasing visitor

diversity (Measure A only)

B U D G E T D E V E L O P M E N T P R O C E S S

7.

Page 8: Overview of Proposed Marin County Parks Budgets for FY 2015-16

• Measure A budget complements budgets for Parks,

Open Space, Landscape Services, Integrated Pest

Management, and CSAs

• Department’s approach to Measure A funding

o All functional area expenditures

o Measure A has its own budget, to facilitate tracking of

expenditures and reporting to the Community Oversight

Committee and the public.

o Measure A funding is for projects and service enhancements

beyond the capacity of existing staff and financial

resources. However, certain work can be justifiably funded

by either Measure A or a different budget.

B U D G E T D E V E L O P M E N T P R O C E S S

8.

Page 9: Overview of Proposed Marin County Parks Budgets for FY 2015-16

• Department’s approach to Measure A funding (cont.)

o New staff positions funded by Measure A are fixed term

positions, as the tax will expire in 7 years.

o In general, few projects requested by CSAs are funded,

except for urgent, minor repairs that cannot be funded by

the CSA’s own budget. Replacement or major renovation of

CSA capital facilitieswill have to be funded by a substantial

match from CSA budgets or other sources.

o Leveraging Measure A funds with grants is a high priority,

especially for capital projects.

o In FY 2015-16, majority of Measure A funds used to renovate,

maintain, and replace deteriorating infrastructure and

facilities in parks. Open Space budget is funding the majority

of vegetation management and road and trail

management projects in FY 2015-16.

B U D G E T D E V E L O P M E N T P R O C E S S

9.

Page 10: Overview of Proposed Marin County Parks Budgets for FY 2015-16

FY 2015-16

Measure A Budget 10.

Page 11: Overview of Proposed Marin County Parks Budgets for FY 2015-16

• Parks and Open Space Program ($9.6

million)

o Protect Natural Resources, Maintain

Existing Parks and Open Space

Preserves, Provide Visitor Services ($8.2

million)

o Preserve New Natural Lands ($1.4 million)

• City, Town and Special District

Program ($2.1 million)

o All funds disbursed in fiscal year pursuant

to agreement with each entity

M E A S U R E A : S U M M A R Y O F P R O P O S E D F Y 2 0 1 5 - 1 6

B U D G E T

11.

Page 12: Overview of Proposed Marin County Parks Budgets for FY 2015-16

• Farmland Preservation Program ($1.6

million)

o Expenditures authorized by Board of

Supervisors on case by case basis per

agreement with grantee.

o Funds not used in one fiscal year carry

over to the next

M E A S U R E A : S U M M A R Y O F P R O P O S E D F Y 2 0 1 5 - 1 6

B U D G E T

12.

Page 13: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

13.

Functional Area Expenditures - Projects

VEGETATION MANAGEMENT: $318,000

Location Project or Purpose Notes

Open Space

and Parks – System Wide

flashy fuel reduction

in preserves and parks, broom removal

Work performed by Conservation

Corps North Bay at trail heads and street ends as well as broom removal from edges of Ladybug Trail, King Mountain Loop Trail, others.

Open Space –

System wide Early Detection,

Rapid response Program

To control or eradicate pioneer

populations of invasive plants to prevent their spread

Page 14: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

14.

Functional Area Expenditures - Projects

ROAD AND TRAIL MANAGEMENT: $340,000

Location Project or Purpose Notes

Loma Alta Preserve

Reroute of “The Plunge”

Construction, road decommissioning, weed eradication and revegetation

RTMP Regions 1, 2

Implementation of projects emerging from trail

designation process

Projects are currently undetermined

Open Space – System Wide

illegal trail eradication

Affects only unauthorized trails not included in the November 2011 Road

and Trail Assessment. Does not affect social trails as defined in the RTMP

Alto Bowl / Horse Hill

Preserve

Construct new, multi-use trail to

bypass existing “Gas Line” trail

Planning and permitting only. Construction planned for FY 2016-17

Page 15: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

15.

Functional Area Expenditures - Projects

ROAD AND TRAIL MANAGEMENT (cont.)

Location Project or Purpose Notes

Open Space – System Wide

2 half time Maintenance

Equipment Operators for 6 months

Will perform routine, seasonal, road and trail maintenance work,

including gates and other infrastructure

Functional Area Expenditures - Projects

WETLAND PROTECTION AND RESTORATION: $350,000

Location Project or Purpose Notes

McInnis Park marsh restoration Environmental review and permitting for plans developed in FY 14-15

Page 16: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

16.

Functional Area Expenditures - Projects

OPEN SPACE FACILITY AND INFRASTRUCTURE MANAGEMENT:

$80,000

Location Project or Purpose Notes

Open Space – System - Wide

Inclusive Access Plan

Document production, environmental review

Open Space –Multiple

Dog Waste Pickup Contracted service

Page 17: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

17.

Functional Area Expenditures - Projects

VISITOR SERVICES AND COMMUNITY ENGAGEMENT: $599,600

Location Project or Purpose Notes

Not applicable Annual Report and Measure A audit

Parks – Multiple On-call Sheriff’s Deputies

For holiday crowds in parks and for enforcement on Mill Valley – Sausalito

Multi-Use Path

Not applicable Parks Volunteer Program supplies

Parks and Open Space – System-Wide

Marin County Parks Interpretive Plan

Implementation of one or more projects, programs or initiatives associated with the interpretive plan.

Page 18: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

18.

Functional Area Expenditures - Projects

VISITOR SERVICES AND COMMUNITY ENGAGEMENT (cont.)

Location Project or Purpose Notes

Not applicable Road and Trail Management Plan:

Continued implementation of designation process: meeting costs, geotechnical assessments of proposals

Parks and Open Space – System-Wide

Sign Plan Continued fabrication and installation of new sign system in parks and preserves.

Not applicable Community Grant Program

Grants to external partner organizations to overcome barriers to participation in department’s programs and visitation to its lands

Not applicable Roving Ranger Program

Cost sharing for a “Roving Ranger” Program as an outreach tool, in partnership with the Tamalpais Lands Collaborative.

Page 19: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

19.

Functional Area Expenditures - Projects

PARK, LANDSCAPE AND CSA FACILITY INFRASTRUCTURE AND

MANAGEMENT: $4,779,825

Location Project or Purpose Notes

McNears Beach

Pier repairs Repairs include foundation, deck, and railing. This expenditure will take the project through completion.

McNears Beach

Master plan implementation

Design and engineering for a priority project emerging from the master plan

John F. McInnis Master plan implementation

Construct dog park, renovate play fields, and construct accessibility improvements

Paradise Beach

Pier repairs Repairs to railing, kick curb and decking

Page 20: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

20.

Functional Area Expenditures - Projects

PARK, LANDSCAPE AND CSA FACILITY INFRASTRUCTURE AND

MANAGEMENT (cont.)

Location Project or Purpose Notes

Paradise Beach

New playground Design for new playground

Paradise Beach

Pier repair Engineering, plans, specifications, environmental review , permitting, and

bid documents

Stafford Lake Refuse transfer station relocation

Relocation necessary to implement master pan

Page 21: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

21.

Functional Area Expenditures - Projects

PARK, LANDSCAPE AND CSA FACILITY INFRASTRUCTURE AND

MANAGEMENT (cont.)

Location Project or Purpose Notes

Stafford Lake Master plan

implementation Design for new playground

Stafford Lake Master plan implementation

Design for one project emerging from Stafford Lake Master Plan

Stafford Lake Erosion control Planning, design, permitting, and

construction to alleviate head cutting. Not related to the bike park.

Page 22: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

22.

Functional Area Expenditures - Projects

PARK, LANDSCAPE AND CSA FACILITY INFRASTRUCTURE AND

MANAGEMENT (cont.)

Location Project or Purpose Notes

Buck’s Landing Temporary improvements to

open new county park to public use

Expenditure dependent on donation of property to county. First addition to

county park system in over 30 years

Pueblo Park

(CSA 18) Tennis court

resurfacing Matching contribution from CSA 18

Rocky Graham Park (Marin City CSD)

Park maintenance Part time seasonal assistant to maintain new park

Page 23: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

23.

Functional Area Expenditures - Projects

PARK, LANDSCAPE AND CSA FACILITY INFRASTRUCTURE AND

MANAGEMENT (cont.)

Location Project or Purpose Notes

Parks – Multiple Water

Conservation and Management Initiative

Improvements to irrigation and other

water distribution infrastructure Civic Center Lagoon, McNears Beach, Stafford Lake, Paradise Beach, and John F. McInnis

Parks - Multiple Turf Renovation Initiative

Renovation of ball fields and lawns at McNears Beach, Stafford Lake, Paradise Beach, John F. McInnis, and Village Green

Parks – Multiple Tree pruning and hazard tree removal

McNears Beach, Stafford Lake, Paradise Beach, Civic Center, John F. McInnis, Miller Point, Village Green,

Black Point, Tam Valley, Forest Knolls, Bel Marin Keys, Agate Beach

Page 24: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

24.

Functional Area Expenditures - Projects

PARK, LANDSCAPE AND CSA FACILITY INFRASTRUCTURE AND

MANAGEMENT (cont.)

Location Project or Purpose Notes

Parks – Multiple Site Furnishing

Improvement Initiative

Replacement of worn out park

benches, barbecues, picnic tables, water fountains, waste containers, etc.

Parks – Multiple Building and Bathroom Repair Initiative

Repairs to occur at McNears Beach, Stafford Lake, Paradise Beach, and Civic Center Lagoon Parks

Parks - Multiple Fence Repair Initiative

Repair, replace, or construct new fence for safety, to protect natural resorces and to delineate pathways at McNears Beach, Stafford Lake, White House Pool, Agate Beach and Village

Green Park

Page 25: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

25.

Functional Area Expenditures - Projects

PARK, LANDSCAPE AND CSA FACILITY INFRASTRUCTURE AND

MANAGEMENT (cont.)

Location Project or Purpose Notes

Parks – Multiple Paving Repair Initiative

Work to be performed at McNears Beach, Paradise Beach, Civic Center

Lagoon, Point Reyes Playground, Forest Knolls

Parks - Multiple Sports court repairs Repair of sports courts at Bolinas and Forest Knolls Parks

Parks - Multiple Playground Surfacing Safety

Initiative

Replace deteriorated playground surfacing at Stafford lake Park, Forest

Knolls Park, and Point Reyes Playground

Page 26: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

26.

Functional Area Expenditures - Projects

PARK, LANDSCAPE AND CSA FACILITY INFRASTRUCTURE AND

MANAGEMENT (cont.)

Location Project or Purpose Notes

Parks - Multiple Parking Lot Restriping Initiative

Repaint curbs and striping at McNears Beach Park and Miller Point Boat

Launch

Parks - Multiple Fence Repair Initiative

Repair, replace, or construct new fence for safety, to protect natural resorces and to delineate pathways at

McNears Beach, Stafford Lake, White House Pool, Agate Beach and Village Green Park

Parks – Multiple 8 Seasonal Assistants to work in parks

Perform maintenance and visitor services

Page 27: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

27.

Functional Area Expenditures - Projects

PARK, LANDSCAPE AND CSA FACILITY INFRASTRUCTURE AND

MANAGEMENT (cont.)

Location Project or Purpose Notes

Mill Valley – Sausalito Multi-Use Path

Path rehabilitation Planning to rehabilitate substantial portion of path, with funding from Marin County DPW and Transportation

Authority of Marin .

Mill Valley – Sausalito Multi-Use Path

Safety improvements

Regulatory and directional signs, pathway markings and surface treatments.

Mill Valley – Sausalito Multi-Use Path

Bridge railing replacement

Replace deteriorated railings on 4 bridges to meet code requirements and eliminate hazards

Stafford Lake –

Novato Bike Path

Path paving and

restoration Continuation of multi-year project.

Design, engineering and construction related to retaining wall and paving failures.

Page 28: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

28.

Functional Area Expenditures - Projects

PARK, LANDSCAPE AND CSA FACILITY INFRASTRUCTURE AND

MANAGEMENT (cont.)

Location Project or Purpose Notes

Not applicable Replacement of Landscape Services operations building

Existing facility at Civic Center Lagoon Park is 45 years old and does not meet accessibility and other building code requirements. New facility would

include offices for resource management staff and a native plant nursery run by volunteers.

Not applicable On-call grant writer

Identify grant sources and support preparation of grant applications to leverage Measure A funds.

Page 29: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

29.

Functional Area Expenditures – Staff

VEGETATION MANAGEMENT

Position Notes

1 Vegetation and Fire Ecologist, fixed term (existing position)

Lead implementation of Vegetation and Biodiversity Management Plan (VBMP)

2.75 Resource Specialists, fixed term (existing positions)

Support implementation of VBMP RTMP projects; non-native, invasive weed control; Ring Mountain Habitat Restoration Project; Wildlife Picture

Index Project; Resource Management and Volunteer Program coordination; native plant nursery.

Page 30: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

30.

Functional Area Expenditures – Staff

WETLAND PROTECTION AND RESTORATION

Position Notes

0.5 Open Space Planner, fixed term (existing position)

Bolinas Lagoon Ecosystem Restoration Project Coordinator

Page 31: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

31.

Functional Area Expenditures – Staff

ROAD AND TRAIL MANAGEMENT

Position Notes

1 Maintenance Equipment Operator, fixed term. (existing position)

Implements project emerging from Road and Trail Management Plan

Page 32: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

32.

Functional Area Expenditures – Staff

VISITOR SERVICES AND COMMUNITY ENGAGEMENT

Position Notes

4 Open Space Rangers, fixed term

(existing positions)

Increases ranger presence in open

space preserves for visitor assistance, environmental education and code enforcement.

1 Park Ranger, fixed term (existing

position)

Enables department to base a ranger

in west Marin to cover Agate Beach, Upton Beach, Chicken Ranch Beach, Stinson Beach Village Green, Bolinas Park, White House Pool, Vedanta Trail.

1 Volunteer Coordinator, fixed term (existing position)

Assigned to parks to enable increased community participation in volunteer opportunities.

Page 33: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

33.

Functional Area Expenditures – Staff

VISITOR SERVICES AND COMMUNITY ENGAGEMENT

Position Notes

1 Media Specialist, fixed term (existing position)

Supports communications functions related to print, social media, the department’s website, document accessibility, and online services.

Page 34: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

34.

Functional Area Expenditures – Staff

PARK, LANDSCAPE AND CSA FACILITY AND INFRASTRUCTURE

MANAGEMENT

Position Notes

2 Landscape Architects, fixed term (existing positions)

Enables implementation of master planning and park renovation projects funded by Measure A.

1 Water and Irrigation Management

Specialist, fixed term (existing position)

1 Integrated Pest Management Specialist, fixed term (existing position)

Supports County’s Integrated Pest Management Program

Page 35: Overview of Proposed Marin County Parks Budgets for FY 2015-16

M E A S U R E A : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S -

P A R K S A N D O P E N S P A C E P R O G R A M

35.

Functional Area Expenditures – Staff

ADMINISTRATION

Position Notes

1 Senior Secretary, fixed term (existing position)

1 Administrative Services Technician, fixed term (existing position)

Page 36: Overview of Proposed Marin County Parks Budgets for FY 2015-16

FY 2015-16

Open Space District Budget 36.

Page 37: Overview of Proposed Marin County Parks Budgets for FY 2015-16

• Estimated revenues: $6,465,184

• Use of reserves $2,105,238

• Total expenditures: $8,570,422

• Fixed expenditures: $5,272,349

• Functional area expenditures: $1,888,073

• Vehicle Replacement Fund: $860,000

• Self-Insurance Fund: $500,000

• Trails Legacy Fund $50,000

• Total expenditures: $8,570,422

O P E N S P A C E D I S T R I C T : P R O P O S E D F Y 2 0 1 5 - 1 6

E X P E N D I T U R E S

37.

Page 38: Overview of Proposed Marin County Parks Budgets for FY 2015-16

• Use of Unallocated Reserves

o Starting FY 2015-16 with $4.9 million unallocated

reserves

o $2.1 million used to balance budget, leaving $2.8

million

• $1.36 million set aside for vehicle replacement

and insurance purposes

• $640K used for high priority land stewardship

expenditures

o Staff capacity exists to perform the additional work

O P E N S P A C E D I S T R I C T : P R O P O S E D F Y 2 0 1 5 - 1 6

E X P E N D I T U R E S

38.

Page 39: Overview of Proposed Marin County Parks Budgets for FY 2015-16

• Vehicle Replacement Fund

o 49: Total number of vehicles in the OSD fleet

o 0: Vehicles purchased in the 4-year period 2010

through 2013, despite new staff.

o 67,064: Average mileage of the 32 vehicles in

service that were purchased between 1990 and

2009

o 30: Percentage of vehicles purchased between

1990 and 2009 that are still in service have mileage

in excess of 100,000

o 65: Percentage of the fleet that is 6 years old or

older

O P E N S P A C E D I S T R I C T : P R O P O S E D F Y 2 0 1 5 - 1 6

E X P E N D I T U R E S

39.

Page 40: Overview of Proposed Marin County Parks Budgets for FY 2015-16

• Vehicle Replacement Fund

o Replacements to existing fleet will be paid from this

fund

o Vehicles added to the fleet will continue to be

budget line items. When it is time to replace them,

funding will come from the Vehicle Replacement

Fund

O P E N S P A C E D I S T R I C T : P R O P O S E D F Y 2 0 1 5 - 1 6

E X P E N D I T U R E S

40.

Page 41: Overview of Proposed Marin County Parks Budgets for FY 2015-16

• Self-Insurance Fund

o County’s self-insurance and OSD’s special liability

insurance takes effect at $1,000,000

o Balance since 2008 has been $500,000

o Additional allocation of $500,000 necessary to fully

fund the fund

O P E N S P A C E D I S T R I C T : P R O P O S E D F Y 2 0 1 5 - 1 6

E X P E N D I T U R E S

41.

Page 42: Overview of Proposed Marin County Parks Budgets for FY 2015-16

• Trail Legacy Fund

o Annual set aside established in 2007 to be used to

purchase trail easements and fund trail

improvements.

o OSD contributions matched dollar for dollar by

county

O P E N S P A C E D I S T R I C T : P R O P O S E D F Y 2 0 1 5 - 1 6

E X P E N D I T U R E S

42.

Page 43: Overview of Proposed Marin County Parks Budgets for FY 2015-16

O P E N S P A C E D I S T R I C T : P R O P O S E D F Y 2 0 1 5 - 1 6

E X P E N D I T U R E S

43.

Functional Area Expenditures

VEGETATION MANAGEMENT: $686,677

Location Project or Purpose Notes

Blithedale Summit

Fuelbreak maintenance

Multiple Establishment of long-term

vegetation monitoring plots

Start of system to monitor different vegetation types

Multiple Research grants $10K to facilitate research in preserves. Could be used for purposes other than vegetation

management

Not applicable Grasslands mapping To refine existing vegetation mapping

data

Page 44: Overview of Proposed Marin County Parks Budgets for FY 2015-16

O P E N S P A C E D I S T R I C T : P R O P O S E D F Y 2 0 1 5 - 1 6

E X P E N D I T U R E S

44.

Functional Area Expenditures

VEGETATION MANAGEMENT (cont.)

Location Project or Purpose Notes

Gary

Giacomini

Fire fuel reduction Continuation of broom reduction in

wildland-urban interface

Not applicable Vegetation and Biodiversity Management Plan

Prepare response to comments, finalize EIR, and document production

Camino Alto Phase V fuel reduction

Lucas Valley 680 Trail mitigation Fulfillment of permit and mitigation

requirements related to control and eradication of invasive weeds

Page 45: Overview of Proposed Marin County Parks Budgets for FY 2015-16

O P E N S P A C E D I S T R I C T : P R O P O S E D F Y 2 0 1 5 - 1 6

E X P E N D I T U R E S

45.

Functional Area Expenditures

VEGETATION MANAGEMENT (cont.)

Location Project or Purpose Notes

Multiple Annual barbed goatgrass control

Multi-year expenditure to control invasive that is a threat to local agriculture

Multiple Wide area fuelbreak maintenance

Follow-up maintenance (hand pulling) at Camino Alto and Blithedale Summit

Not applicable Fire history

reconstruction

Data gathering and database

establishment to create comprehensive fire history of preserves and track future occurrences

Multiple Hazard tree removal Due to sudden oak death

Page 46: Overview of Proposed Marin County Parks Budgets for FY 2015-16

O P E N S P A C E D I S T R I C T : P R O P O S E D F Y 2 0 1 5 - 1 6

E X P E N D I T U R E S

46.

Functional Area Expenditures

VEGETATION MANAGEMENT (cont.)

Location Project or Purpose Notes

Bolinas Lagoon Kent Island Habitat Restoration Project

For expenditures not covered by grant including pump replacement, PVC pipe.

Multiple Grazing monitoring Monitor grasslands pre and post 2015 grazing season to determine carrying capacity for 2016

Multiple Grazing

management Costs for seasonal assistant to run

goats, sheep and cattle at Mt. Burdell and Roy’s Redwoods, livestock rental, and supplemental feed

Not applicable Native plant nursery Establish new nursery to replace existing at Lucas Valley Yard as

source of plants for revegetation

Page 47: Overview of Proposed Marin County Parks Budgets for FY 2015-16

O P E N S P A C E D I S T R I C T : P R O P O S E D F Y 2 0 1 5 - 1 6

E X P E N D I T U R E S

47.

Functional Area Expenditures

VEGETATION MANAGEMENT (cont.)

Location Project or Purpose Notes

Multiple Spring and winter weed removal

Removal of high priority species, based on VBMP

Multiple Invasive species

control planning Software and data sharing expenses

for multi-agency weed mapping, prioritization, and control effort

Page 48: Overview of Proposed Marin County Parks Budgets for FY 2015-16

O P E N S P A C E D I S T R I C T : P R O P O S E D F Y 2 0 1 5 - 1 6

E X P E N D I T U R E S

48.

Functional Area Expenditures

ROAD AND TRAIL MANAGEMENT: $527,996

Location Project or Purpose Notes

Gary Giacomini

Manzanita Fire Rd. maintenance

Improvements to reduce erosion

Gary Giacomini

Fire road maintenance

Sediment removal at culverts, maintenance of Conifer, E. Sylvestris, Buckeye and hunt Camp Fire Roads

San Pedro Mountain /

Heron Hill

Entry improvements

Terra Linda / Sleepy Hollow

Irving Fire Road, Fox Lane Trail maintenance

Infrastructure repair, maintenance, replacement

Page 49: Overview of Proposed Marin County Parks Budgets for FY 2015-16

O P E N S P A C E D I S T R I C T : P R O P O S E D F Y 2 0 1 5 - 1 6

E X P E N D I T U R E S

49.

Functional Area Expenditures

ROAD AND TRAIL MANAGEMENT (cont.)

Location Project or Purpose Notes

Blithedale Summit

Glen Fire Road improvements

Blithedale Summit

Piedmont Trail improvements

Includes new wooden bridge

King Mountain Citron Fire Road improvements

Cascade Canyon

Toyon and Creekside Fire Road Improvements

Implementation of plans developed in previous fiscal year

Page 50: Overview of Proposed Marin County Parks Budgets for FY 2015-16

O P E N S P A C E D I S T R I C T : P R O P O S E D F Y 2 0 1 5 - 1 6

E X P E N D I T U R E S

50.

Functional Area Expenditures

ROAD AND TRAIL MANAGEMENT (cont.)

Location Project or Purpose Notes

Not applicable Equipment rental fees

For road and trail maintenance and improvement projects

Multiple Fire road maintenance

Grading at multiple locations to be determined in spring 2016

Not applicable Monitoring of open source road and trail maps

Multiple Fire road maintenance – vehicle access

Pruning at road edges to maintain access

Page 51: Overview of Proposed Marin County Parks Budgets for FY 2015-16

O P E N S P A C E D I S T R I C T : P R O P O S E D F Y 2 0 1 5 - 1 6

E X P E N D I T U R E S

51.

Functional Area Expenditures

ROAD AND TRAIL MANAGEMENT (cont.)

Location Project or Purpose Notes

Loma Alta Smith Ridge and Gunshot Fire Road

Improvements

Implementation of plans developed in previous fiscal year

Multiple French Ranch and Dickson Ridge Fire Road improvements

Implementation of plans developed in previous fiscal year

Not applicable Geotechnical serves On-call contract for unplanned events and damage

Indian Tree Deer Camp and Deer Camp Cutoff

Trail Improvements

Implementation of plans developed in previous fiscal year

Page 52: Overview of Proposed Marin County Parks Budgets for FY 2015-16

O P E N S P A C E D I S T R I C T : P R O P O S E D F Y 2 0 1 5 - 1 6

E X P E N D I T U R E S

52.

Functional Area Expenditures

ROAD AND TRAIL MANAGEMENT (cont.)

Location Project or Purpose Notes

Mt. Burdell Fire Road Assessments

Assess Creekside, Deer Camp, and Cobblestone Fire Roads, identify and prioritize improvement projects for

next fiscal year

Multiple Routine trail maintenance

Page 53: Overview of Proposed Marin County Parks Budgets for FY 2015-16

O P E N S P A C E D I S T R I C T : P R O P O S E D F Y 2 0 1 5 - 1 6

E X P E N D I T U R E S

53.

Functional Area Expenditures

WILDLIFE MANAGEMENT: $118,300

Location Project or Purpose Notes

Cascade Canyon

Fish Surveys In San Anselmo Creek

Mt. Burdell Biotic assessments Includes badger and mesocarnivore studies to address data gaps

Multiple Wildlife Picture Index Continuation and expansion of pilot project

Multiple Annual owl, rail, and songbird monitoring

Page 54: Overview of Proposed Marin County Parks Budgets for FY 2015-16

O P E N S P A C E D I S T R I C T : P R O P O S E D F Y 2 0 1 5 - 1 6

E X P E N D I T U R E S

54.

Functional Area Expenditures

SLOPE AND DRAINAGE MANAGEMENT: $129,600

Location Project or Purpose Notes

Bolinas Lagoon Tide gauge Annual cost for maintenance of gauge and data collection.

Bald Hill Sky Ranch restoration

Erosion control, entry barrier improvements, vegetation

management

Multiple Infrastructure maintenance

As needed for slope repair, erosion control, storm damage repair, including dump fees.

Multiple Erosion repair services and

supplies

Page 55: Overview of Proposed Marin County Parks Budgets for FY 2015-16

O P E N S P A C E D I S T R I C T : P R O P O S E D F Y 2 0 1 5 - 1 6

E X P E N D I T U R E S

55.

Functional Area Expenditures

VISITOR SERVICES AND COMMUNITY ENGAGEMENT: $325,500

Location Project or Purpose Notes

Bolinas Lagoon Annual State of the Lagoon Conference

For displays and other conference costs

Not applicable Equipment for new vehicles

Not applicable Replacement of 5 all-terrain vehicles

Not applicable Volunteer program supplies, equipment, and seasonal

support

Page 56: Overview of Proposed Marin County Parks Budgets for FY 2015-16

O P E N S P A C E D I S T R I C T : P R O P O S E D F Y 2 0 1 5 - 1 6

E X P E N D I T U R E S

56.

Functional Area Expenditures

VISITOR SERVICES AND COMMUNITY ENGAGEMENT (cont.)

Location Project or Purpose Notes

Not applicable Communications expenditures

Design and production services, supplies, and maps

Not applicable Interpretive plan implementation

For educational materials and other communications/outreach in support of Interpretive Plan

Multiple On-Call Sheriff’s Deputy

For coverage in preserves when regular Sheriff’s Deputy is not on duty

Page 57: Overview of Proposed Marin County Parks Budgets for FY 2015-16

O P E N S P A C E D I S T R I C T : P R O P O S E D F Y 2 0 1 5 - 1 6

E X P E N D I T U R E S

57.

Functional Area Expenditures

REAL PROPERTY ADMINISTRATION: $100,000

Location Project or Purpose Notes

Multiple Encroachment resolution Initiative

To fund expenses associated with resolution of encroachments, including surveys, title searches, and appraisals

Page 58: Overview of Proposed Marin County Parks Budgets for FY 2015-16

FY 2015-16

Parks Budget, including Landscape services

58.

Page 59: Overview of Proposed Marin County Parks Budgets for FY 2015-16

• Parks budget follows a process prescribed by the

County Administrator (CAO) for most county

departments, as the Parks and Landscape Services

divisions are funded by the county General Fund.

• Baseline budget is established and changes can be

made only with approval of CAO through “budget

change proposals” (BCPs) and “unforeseen budget

requests”

• Marin County Parks has much more control over the

Open Space and Measure A budgets, and follows a

“zero based budgeting” approach.

P A R K S : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S

59.

Page 60: Overview of Proposed Marin County Parks Budgets for FY 2015-16

• Baseline budget $5,630,170

• Expenditure reduction ($0)

• Approved budget increase $194,805

• Total expenditures $5,824,975

• Anticipated revenues $2,075,587

• Net county cost $3,749,388

• Total expenditures $5,824,975

* Best available information

P A R K S : P R O P O S E D F Y 2 0 1 5 - 1 6 E X P E N D I T U R E S *

60.

Page 61: Overview of Proposed Marin County Parks Budgets for FY 2015-16

Overview of

Proposed

Marin County Parks

Budgets

for FY 2015-16

May 19, 2015