Overview of 1366-2001 Overview of 1366-2001 Full Use Guide on Electric Power Full Use Guide on Electric Power
Distribution Reliability IndicesDistribution Reliability Indices
Panel Session – How to Define Major EventsJuly 22, 2002
Presented by Cheryl A. Warren
7/22/2002
2
Foundations of the DefinitionFoundations of the Definition
• Purpose is to partition the data into normal and abnormal days.
• Rigorously analyze and report on abnormal events above and beyond the normal process.
• Use normal events for trending, internal goal setting, and Commission mandated targets.
7/22/2002
3
Foundations of the DefinitionFoundations of the Definition
• Definition must be understandable by all and easy to apply.Executives and Commissioners must be able to
understand and feel comfortable with the approach.
• Definition must be specific and calculated using the same process for all utilities.
• Must be fair to all utilities.Large and small, urban and rural….
7/22/2002
4
Foundations of the DefinitionFoundations of the Definition
• Definition must be extensible.The approach must address varying levels
of data collection.Some utilities have little reliability data. Others
have been collecting it with flawed system. Others have very sophisticated systems that track interruptions to the customer level.
7/22/2002
5
Process To DateProcess To Date
• Members agreed that the current definition should be reevaluated.
• A subgroup was formed to further analyze approaches. Jim Bouford , Rich Christie, Dan Kowaleski, John
McDaniel, Dave Schepers, Cheri Warren, Charlie Williams & Joe Viglietta
• Members discussed the options and performed analysis using real data.
• This panel session will share some of the background behind the current thinking.
7/22/2002
6
SummarySummary
• The assembled panel will describe the proposed methodology, why one is needed, and potential benefits of the proposed
approach.
7/22/2002
7
PresentersPresenters
• Rich Christie University of Washington
• Charlie Williams Florida Power Corp A Progress Energy Company
• Dan Kowalewski Exelon – ComEd
• Dave Schepers Ameren Energy
• Jim Bouford National Grid
Major Reliability EventsMajor Reliability EventsSelf - Defining?Self - Defining?
Charlie Williams, P.E.Florida Power
Senior Member IEEE
7/22/2002
9
Major Event DefinitionsMajor Event Definitions
• P1366 (old)- 10% of customers in a 24 hour period
Average Worst Outage Day (all months) = 1927/15/00 = 2.2 times greater than annual average worst day
7/22/2002
15
Suncoast Daily Regional SAIDI
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
01/0
1/93
05/0
1/93
09/0
1/93
01/0
1/94
05/0
1/94
09/0
1/94
01/0
1/95
05/0
1/95
09/0
1/95
01/0
1/96
05/0
1/96
09/0
1/96
01/0
1/97
05/0
1/97
09/0
1/97
01/0
1/98
05/0
1/98
09/0
1/98
01/0
1/99
05/0
1/99
09/0
1/99
01/0
1/00
05/0
1/00
09/0
1/00
01/0
1/01
05/0
1/01
09/0
1/01
Date
SA
IDI
Suncoast StormSAIDI = 7.1
7/22/2002
16
Self Defining?Self Defining?
• Outage and Reliability statistics clearly show this event as an “outlier”
• Customer Expectations ???????
7/22/2002
17
New Major Event DefinitionNew Major Event Definition
• Statistical process to establish “normal” reliability parameters for daily outage statistics based on historical data
• Establish limits for major events
• Review these limits annually
7/22/2002
18
Statistical Analysis of Reliability Data
7/22/2002
19
Severe vs Non-Severe WeatherSuncoast Region
0
10,000,000
20,000,000
30,000,000
40,000,000
50,000,000
60,000,000
70,000,000
80,000,000
90,000,000
100,000,000
0 100 200 300 400 500 600 700 800 900 1000
# Daily Outages
Dai
ly C
MI
NON-SEVERE
Severe
Suncoast Storm 7/15/2000
3/13/93
3/14/93
9/17/2000
4/25/91
Comparison of Event Definition vs. Statistical Definition
7/22/2002
20
ConclusionConclusion
• Statistical Definition is definitive and non-ambiguous
• Leaves little room for debate on major events.
• Only excludes events that are of significant impact to the system.
IEEE IEEE Power Engineering Society Power Engineering Society
Summer MeetingSummer Meeting
Reliability Surveying Criteria
David J. Schepers, IEEE MemberManager, Distribution Operating
Ameren - St. Louis, MO
7/22/2002
22
Why New Survey Criteria?Why New Survey Criteria?
• Desire to BenchmarkUtility CompaniesRegulators
• Performance-Based Rates
• Continuous Improvement - Determine what makes a Difference
• Need for comparative statistics
7/22/2002
23
Problems with Current SurveysProblems with Current Surveys
• No Company Identification
• Issues of Data Accuracy What’s Included/Excluded Storms
• Diverse Companies Geography Data Collection Capabilities SCADA/DA Implementation AMR Outage Reporting
• Lack of Common Reporting Standards
7/22/2002
24
Major Event Definition ProblemMajor Event Definition Problem
• Storm-excluded indices are most valuable for benchmarking
• Current published IEEE definition vagueApplied by 50% of respondents using 10%
customers out, some >24 hours in a region (what’s a region?)
• Need a definition that puts everyone on a common standard
• IEEE Working Group on System Designs new definition - Major Events
7/22/2002
25
The OMS And ConnectivityThe OMS And Connectivity
• Automated vs. Manual OMS• Extent Of Connectivity
Customer to transformerTransformer to protective deviceProtective device to upstream protective deviceProtective device to substation breakerBreaker to bus
• How many customers are really out?
7/22/2002
26
AMR Outage ReportingAMR Outage Reporting
• Accurate maintenance outage records
• Supplement phone calls for more accurate outage recordsNumber of customers affectedOutage start time
7/22/2002
27
Outage DefinitionOutage Definition
• Sustained vs. momentaryTime definition (IEEE 1366: >5 minutes)Human intervention
• ExclusionsMaintenance outagesPublic-caused outagesDifferent definitions by cause by utility
7/22/2002
28
DA/ScadaDA/Scada
• Affects CAIDI/SAIDI
• Opportunity to change sustained interruptions into momentary (SAIFI/MAIFI)
• Knowing the extent of implementation allows for better comparison
New Questions In EEI SurveyNew Questions In EEI Survey
• Do you have an automated OMS with Full Connectivity?
• Percentage of Customers with AMR Outage Reporting• Percentage of Customers served by SCADA
Substations• Percentage of Customers on Distribution Circuits with
Automated Switching• Urban/Suburban/Rural Geography• Does your OMS have Partial Restoration Capability?• Will your utility identify itself for others willing to do
likewise?
7/22/2002
31
What to Report to EEIWhat to Report to EEI
• Standard IEEE Indices SAIFI, CAIDI, SAIDI, MAIFI
• Percentage of Interruptions and Hours by Cause, by System Location
• Actual & Normalized for Major Events
• Percentage of Customers with 0, 1, 2, 3, 4, 5 or more Normalized Interruptions (CEMI)
7/22/2002
32
Data and Indices DefinitionsData and Indices Definitions
• Use IEEE 1366 Definitions for Standard Indices
• Sustained Interruptions >5 minutes
• No outage types excluded other than Customer Outage caused by Customer Equipment
7/22/2002
33
SummarySummary
• Need exists for benchmarking for utilities and regulators alike
• Current surveys do not allow for accurate comparisons
• More segmentation is needed and possible
• EEI Reliability Survey is moving in this direction today
The Need to Segment The Need to Segment (Exclude) Abnormal Events (Exclude) Abnormal Events
from the Calculation of from the Calculation of Reliability IndicesReliability Indices
Presented by Jim Bouford National Grid
7/22/2002
35
I. Reasons for Measuring ReliabilityI. Reasons for Measuring Reliability
• Identification of Problems
• Allocation of Resources
• Accepted Measure of Customer Service
• Performance Based Ratemaking
• Comparison with Other Utilities
7/22/2002
36
II. Requirements of MeasurementsII. Requirements of Measurements