UN-HABITAT

Urban Mobility Unit

Urban Basic Services Branch

RAHAB MUNDARA

3rd August 2012

1

GEF- East Africa

“PROMOTING

SUSTAINABLE

TRANSPORT

SOLUTIONS FOR EAST

AFRICAN CITIES”

OVERVIEW

Page 2: Overview gefnairobicomponent rahabmundara_unhabitat

2

Background Cities are expanding at unprecedented rates and facing: • Sustained population growth • Rapid motorization rates • Rapidly worsening traffic congestion • Decreasing accessibility and increasing health problems • By 2030, the population living in urban areas in East Africa will increase from 7.5% of

the average annual population (1950 to 2000) to 22.6% (2000 – 2030).

East-African countries developing and implementing urban transport

policies for creating socially‐equitable and environmentally‐sound

urban transport systems.

Page 3: Overview gefnairobicomponent rahabmundara_unhabitat

In the three capital cities of Ethiopia, Uganda, and Kenya:

Strategic Response

Upgrade transit systems

Implement improved non-motorized transport

infrastructure

Apply travel demand management

Other supporting policies

Intermediate Aim:

Reduce growth in private motorised

vehicles

Project Aim:

Reduce traffic congestion &

pollution

Project aims

Page 4: Overview gefnairobicomponent rahabmundara_unhabitat

4

Implementation arrangements

1. Network plan and policy

2. Sustainable Transport Corridor

3. Clean fuel and technology

4. Regional capacity building

Addis Ababa

Nairobi

Kampala

Implementing agency

Executing agency Partners

Page 5: Overview gefnairobicomponent rahabmundara_unhabitat

5

1. Network Plan and Policy,

$793,960

2. Sustainable Transport Corridor,

$1,372,087

3. Clean Fuel and

Tech, $213,004

4. Regional capacity building, $350,950

5. Project Management, $120,000

Budget and co-financing

Total amount: $2’850,000

US $ %

Cost to the GEF Trust Fund

3,000,000 42.6

Full Size Project 2,850,000 40.5

Project Preparation Grant

150,000 2.1

Co-financing

Cash

UN-Habitat 185,000 2.6

UNEP 40,000 0.6

World Bank Kampala 3,200,000 45.5

Sub-total 3,425,000 48.7

In-kind

UN Habitat 450,000 6.4

UNEP 30,000 0.4

TRL 40,000 0.6

GIZ 95,000 1.3

Sub-total 615,000 8.7

Total 7,040,000 100.0

Page 6: Overview gefnairobicomponent rahabmundara_unhabitat

German International Cooperation Agency (GIZ) Implementing partners • FABIO First African Bicycle Information Organisation

• Makerere University – Kampala

Addis Ababa Transport Bureau (focal point for government in Ethiopia) Kenyan Urban Roads Authority (focal point for government in Kenya) Ministry of Works and Transport, Uganda (focal point for government in Uganda)

Project partners

• Kenyan Ministry of Transport

• Nairobi Metropolitan Authority

• Nairobi City Council

• Kenya Railways

• Kenya Prime Minister’s Office

• Kenya Bus Service

• KIPPRA

• Kampala Capital City Authority

• Ugandan Ministry of Finance

• Uganda National Police

• Ethiopian Ministry of Transport

• Addis Ababa Transport Authority

• Anbessa City Bus Service Enterprise

• Addis Ababa Municipality

• UNECA

• Planning & Economic Development (GEF Focal Point)

World Bank Funding partners • African Development Bank (AfDB)

• French Development Agency

• JICA

• EU

• Ethio-French Cooperation

6

Page 7: Overview gefnairobicomponent rahabmundara_unhabitat
Page 8: Overview gefnairobicomponent rahabmundara_unhabitat
Page 9: Overview gefnairobicomponent rahabmundara_unhabitat

Demand

Studies

Operational Plan

Reorganization

Infrastructure

Design

Equipment

Definitions

BRT Planning Process: Project Steps

Business Plan

Operation

Infrastructure

Plan

B

I

D

D

I

N

G

P

R

O

C

E

S

S

This is an iterative process. The operational plan

gets developed, then it is checked by the business

plan and infrastructure. Issues and problems will

arise and they will be taken back to the operational

plan to modify.

Page 10: Overview gefnairobicomponent rahabmundara_unhabitat

Operational Plan Answers the following questions based on calibrated demand model

• How many passengers?

• What are the trunk routes?

• What are the feeder routes?

• How many buses and what capacity?

• At what frequency?

• Where are the stations, terminals, and depots?

• Estimated costs

• Estimated revenues

• What existing transit routes need to be removed or restructured?

Page 11: Overview gefnairobicomponent rahabmundara_unhabitat

Infrastructure Plan • Detailed engineering and design, geometric

• Implementation Plan (traffic management and mitigation, etc.)

• Environmental and Social Impact Assessments

• Construction contracts awarded and supervised

Page 12: Overview gefnairobicomponent rahabmundara_unhabitat

Business Plan: Goals (1) • Maximize the quality of the service over the long term

• Minimize the cost of the service over the long term

• Maximize the level of private sector investment over the long term

• Maximize the public benefit from the public investment

The BRTS give priority to public transportation over private and

must serve to offer an opportunity to the traditional transporters

to modernize their industry as well as to improve the working

conditions of the drivers.

•Making investment environment attractive for private investment

• Determining for the government the fees to pay the private sector

• Creating a financially viable system with no subsidy

Page 13: Overview gefnairobicomponent rahabmundara_unhabitat

Other Components to BRT Planning

• Institutional Structure

• Industry Reform and Engagement

• Marketing and Communications

• Economic Development Plan

Page 14: Overview gefnairobicomponent rahabmundara_unhabitat

Aim of the Matatu Industry Transition • Creation of internationally competitive and

profitable companies composed of impacted former matatu operators

• Created in time to operate the service • Performance based contracting • Adverse impacts to taxi operators • minimized • Violence is mitigated

Page 15: Overview gefnairobicomponent rahabmundara_unhabitat

Project Components

15

expected accomplishments

Comprehensive concepts and strategies adopted guiding the development of sustainable metropolitan transport

networks

MRT/BRT agency established; System designs approved, Investors’ document and financial model approved;

Construction contracts initiated and implemented; Start of operations on Corridor 1 Quality transformation of

existing transport industry achieved; Improvement and construction of NMT facilities initiated; Parking

management strategy and TDM measures adopted

Strategies and Measures adopted for implementing clean vehicle and fuel technologies

Regional Network established for effective knowledge exchange and communication; Capacity improved on

designing, financing, implementing and evaluating sustainable urban transport models.

project components

1. Technical assistance and institutional support for the development of a comprehensive

sustainable metropolitan transport system in Addis Ababa, Kampala and Nairobi MRT

2. Planning and detailed design for implementation of a demonstration sustainable transport corridor in Addis Ababa, Kampala and Nairobi, featuring BRT, NMT and TDM measures

3. Feasibility of application of clean vehicles and fuel technology initiatives in Addis Ababa,

Kampala and Nairobi

4. Regional capacity building, awareness raising and networking

Page 16: Overview gefnairobicomponent rahabmundara_unhabitat

ELEMENTS OF PLANNING IN NAIROBI

APR – AUG 2011 - STAKEHOLDER CONSULTATIVE WORKSHOPS/MEETINGS ON WORK PLAN

CONCENSUS ON WORK PLAN AND INSTITUTIONAL ANCHORING

DISCUSSIONS WITH DEVELOPMENT PARTNERS ON FINANCING AND PARTNERING OPPORTUNITIES

AUG 2011- LAUNCH OF THE MRTS FS REPORT

SEPT 2011 – VALUE ENGINEERING EXERCISE

Page 17: Overview gefnairobicomponent rahabmundara_unhabitat

MRTS Phasing Plan 2011-2030

Page 18: Overview gefnairobicomponent rahabmundara_unhabitat

Corridor selection process

• JICA

-Ngong Road (LRT?)

-Master plan for Nairobi City

• World Bank

- Juja Road (BRT)

- Uhuru Highway (BRT)

- Mombasa Rd (BRT)

• ADB/MOT

-Thika Road (MRT)

- Ngong Rd OR Jogoo Rd (BRT)

• EU – Willing to support

• AfD – Waiting for specific request by GOK. Willing to support BRT studies

Page 19: Overview gefnairobicomponent rahabmundara_unhabitat

Institutional issues PMU set up at KURA

COORDINATION ROLE

An intermediate arrangement which should be supported to enable mutation into the

proposed Authorities in the policy document.