UN-HABITAT Urban Mobility Unit Urban Basic Services Branch RAHAB MUNDARA 3 rd August 2012 1 GEF- East Africa “PROMOTING SUSTAINABLE TRANSPORT SOLUTIONS FOR EAST AFRICAN CITIES” OVERVIEW
May 19, 2015
UN-HABITAT
Urban Mobility Unit
Urban Basic Services Branch
RAHAB MUNDARA
3rd August 2012
1
GEF- East Africa
“PROMOTING
SUSTAINABLE
TRANSPORT
SOLUTIONS FOR EAST
AFRICAN CITIES”
OVERVIEW
2
Background Cities are expanding at unprecedented rates and facing: • Sustained population growth • Rapid motorization rates • Rapidly worsening traffic congestion • Decreasing accessibility and increasing health problems • By 2030, the population living in urban areas in East Africa will increase from 7.5% of
the average annual population (1950 to 2000) to 22.6% (2000 – 2030).
East-African countries developing and implementing urban transport
policies for creating socially‐equitable and environmentally‐sound
urban transport systems.
In the three capital cities of Ethiopia, Uganda, and Kenya:
Strategic Response
Upgrade transit systems
Implement improved non-motorized transport
infrastructure
Apply travel demand management
Other supporting policies
Intermediate Aim:
Reduce growth in private motorised
vehicles
Project Aim:
Reduce traffic congestion &
pollution
Project aims
4
Implementation arrangements
1. Network plan and policy
2. Sustainable Transport Corridor
3. Clean fuel and technology
4. Regional capacity building
Addis Ababa
Nairobi
Kampala
Implementing agency
Executing agency Partners
5
1. Network Plan and Policy,
$793,960
2. Sustainable Transport Corridor,
$1,372,087
3. Clean Fuel and
Tech, $213,004
4. Regional capacity building, $350,950
5. Project Management, $120,000
Budget and co-financing
Total amount: $2’850,000
US $ %
Cost to the GEF Trust Fund
3,000,000 42.6
Full Size Project 2,850,000 40.5
Project Preparation Grant
150,000 2.1
Co-financing
Cash
UN-Habitat 185,000 2.6
UNEP 40,000 0.6
World Bank Kampala 3,200,000 45.5
Sub-total 3,425,000 48.7
In-kind
UN Habitat 450,000 6.4
UNEP 30,000 0.4
TRL 40,000 0.6
GIZ 95,000 1.3
Sub-total 615,000 8.7
Total 7,040,000 100.0
German International Cooperation Agency (GIZ) Implementing partners • FABIO First African Bicycle Information Organisation
• Makerere University – Kampala
Addis Ababa Transport Bureau (focal point for government in Ethiopia) Kenyan Urban Roads Authority (focal point for government in Kenya) Ministry of Works and Transport, Uganda (focal point for government in Uganda)
Project partners
• Kenyan Ministry of Transport
• Nairobi Metropolitan Authority
• Nairobi City Council
• Kenya Railways
• Kenya Prime Minister’s Office
• Kenya Bus Service
• KIPPRA
• Kampala Capital City Authority
• Ugandan Ministry of Finance
• Uganda National Police
• Ethiopian Ministry of Transport
• Addis Ababa Transport Authority
• Anbessa City Bus Service Enterprise
• Addis Ababa Municipality
• UNECA
• Planning & Economic Development (GEF Focal Point)
World Bank Funding partners • African Development Bank (AfDB)
• French Development Agency
• JICA
• EU
• Ethio-French Cooperation
6
Demand
Studies
Operational Plan
Reorganization
Infrastructure
Design
Equipment
Definitions
BRT Planning Process: Project Steps
Business Plan
Operation
Infrastructure
Plan
B
I
D
D
I
N
G
P
R
O
C
E
S
S
This is an iterative process. The operational plan
gets developed, then it is checked by the business
plan and infrastructure. Issues and problems will
arise and they will be taken back to the operational
plan to modify.
Operational Plan Answers the following questions based on calibrated demand model
• How many passengers?
• What are the trunk routes?
• What are the feeder routes?
• How many buses and what capacity?
• At what frequency?
• Where are the stations, terminals, and depots?
• Estimated costs
• Estimated revenues
• What existing transit routes need to be removed or restructured?
Infrastructure Plan • Detailed engineering and design, geometric
• Implementation Plan (traffic management and mitigation, etc.)
• Environmental and Social Impact Assessments
• Construction contracts awarded and supervised
Business Plan: Goals (1) • Maximize the quality of the service over the long term
• Minimize the cost of the service over the long term
• Maximize the level of private sector investment over the long term
• Maximize the public benefit from the public investment
The BRTS give priority to public transportation over private and
must serve to offer an opportunity to the traditional transporters
to modernize their industry as well as to improve the working
conditions of the drivers.
•Making investment environment attractive for private investment
• Determining for the government the fees to pay the private sector
• Creating a financially viable system with no subsidy
Other Components to BRT Planning
• Institutional Structure
• Industry Reform and Engagement
• Marketing and Communications
• Economic Development Plan
Aim of the Matatu Industry Transition • Creation of internationally competitive and
profitable companies composed of impacted former matatu operators
• Created in time to operate the service • Performance based contracting • Adverse impacts to taxi operators • minimized • Violence is mitigated
Project Components
15
expected accomplishments
Comprehensive concepts and strategies adopted guiding the development of sustainable metropolitan transport
networks
MRT/BRT agency established; System designs approved, Investors’ document and financial model approved;
Construction contracts initiated and implemented; Start of operations on Corridor 1 Quality transformation of
existing transport industry achieved; Improvement and construction of NMT facilities initiated; Parking
management strategy and TDM measures adopted
Strategies and Measures adopted for implementing clean vehicle and fuel technologies
Regional Network established for effective knowledge exchange and communication; Capacity improved on
designing, financing, implementing and evaluating sustainable urban transport models.
project components
1. Technical assistance and institutional support for the development of a comprehensive
sustainable metropolitan transport system in Addis Ababa, Kampala and Nairobi MRT
2. Planning and detailed design for implementation of a demonstration sustainable transport corridor in Addis Ababa, Kampala and Nairobi, featuring BRT, NMT and TDM measures
3. Feasibility of application of clean vehicles and fuel technology initiatives in Addis Ababa,
Kampala and Nairobi
4. Regional capacity building, awareness raising and networking
ELEMENTS OF PLANNING IN NAIROBI
APR – AUG 2011 - STAKEHOLDER CONSULTATIVE WORKSHOPS/MEETINGS ON WORK PLAN
CONCENSUS ON WORK PLAN AND INSTITUTIONAL ANCHORING
DISCUSSIONS WITH DEVELOPMENT PARTNERS ON FINANCING AND PARTNERING OPPORTUNITIES
AUG 2011- LAUNCH OF THE MRTS FS REPORT
SEPT 2011 – VALUE ENGINEERING EXERCISE
MRTS Phasing Plan 2011-2030
Corridor selection process
• JICA
-Ngong Road (LRT?)
-Master plan for Nairobi City
• World Bank
- Juja Road (BRT)
- Uhuru Highway (BRT)
- Mombasa Rd (BRT)
• ADB/MOT
-Thika Road (MRT)
- Ngong Rd OR Jogoo Rd (BRT)
• EU – Willing to support
• AfD – Waiting for specific request by GOK. Willing to support BRT studies
Institutional issues PMU set up at KURA
COORDINATION ROLE
An intermediate arrangement which should be supported to enable mutation into the
proposed Authorities in the policy document.
Thank You