OVERHEAD CONSTRUCTION MANUAL 11/22/33kV CONSTRUCTION CONCRETE POLE Go to SECTION INDEX Back to MAIN INDEX
OVERHEAD CONSTRUCTION MANUAL
11/22/33kV CONSTRUCTION CONCRETE POLE Go to SECTION INDEX Back to MAIN INDEX
DESCRIPTION PAGE DESCRIPTION PAGE
INDEX
C
04.09.07
T.Borg18 1645 1
HARD COPYUNCONTROLLED
C. Noel
C.Avenell
Sh 1
CONSTRUCTION CONSTRUCTION
B 18.01.0811/22/33KV CONSTRUCTION CONCRETE POLE
Urban transformer flat strain single crossarm
Urban transformer flat strain single crossarm
Urban transformer flat strain single crossarm
22C/DS
33C/DS
11C/DT
11/22/33kV RURAL CONCRETE POLE
TOP CONSTRUCTION
1468/1
1468/2
1468/3
1467/1
1467/2
1467/3
1467/4
1493/1
1493/2
1493/3
1493/4
1494/1
1494/2
1494/3
1494/4
1495/1
1495/2
1495/3
1495/4
11C/FPB
22C/FPB
33C/FPB
11C/DS
22C/DT
33C/DT
11C/DS
22C/DS
33C/DS
11C/DT
22C/DT
33C/DT
Rural flat pin intermediate with crossarm
Rural flat pin intermediate with crossarm
Rural flat pin intermediate with crossarm
mounting bracket - material
mounting bracket - material
mounting bracket
Rural delta strain single crossarm - material
Rural delta strain single crossarm - material
Rural delta strain single crossarm - material
Rural delta strain single crossarm
Rural delta termination single crossarm - material
Rural delta termination single crossarm - material
Rural delta termination single crossarm - material
Rural delta termination single crossarm
Rural delta strain double crossarm - material
Rural delta strain double crossarm - material
Rural delta strain double crossarm - material
Rural delta strain double crossarm
Rural delta termination double crossarm - material
Rural delta termination double crossarm - material
Rural delta termination double crossarm - material
Rural delta termination double crossarm
1637/1
1637/2
1637/3
1471/1
1471/2
1471/3
1510/1
1510/2
1510/3
1509/1
1509/2
1509/3
11/22/33kV URBAN CONCRETE POLE
TOP CONSTRUCTION - TRANSFORMERS
11C/FPB
22C/FPB
33C/FPB
11C/FSB
22C/FSB
33C/FSB
11C/FTB
22C/FTB
33C/FTB
pole tops
Construction Code Guide - Rural concrete
Construction Code Guide - Normal bridging
Urban transformer flat pin intermediate to
Urban transformer flat pin intermediate to
Urban transformer flat pin intermediate to
mounting bracket - material
mounting bracket - material
mounting bracket
to mounting bracket - material
to mounting bracket - material
to mounting bracket
Urban transformer flat termination single
Urban transformer flat termination single
Urban transformer flat termination single
crossarm to mounting bracket - material
crossarm to mounting bracket - material
crossarm to mounting bracket
C 08.04.13
concrete pole tops
Construction Code Guide - Urban Transformer
1637/5Construction Code Guide - OHEW
1637/6
Concrete pole tops
Construction Code Guide - Double circuit
1637/7Construction Code Guide - Single circuit
urban & rural concrete pole tops
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
FILE: 5Page
CONSTRUCTION DESCRIPTION DWG CONSTRUCTION DESCRIPTION DWG
Ergon Energy Corporation Ltd ABN 50 087 646 062 FILE: 5 18 1645 2
OVERHEAD DISTRIBUTION 11/22/33kV CONSTRUCTION CONCRETE POLE INDEX
APPROVED
DATE
PASSED
DRAWN L. Burton Index
18.01.08
Sh 2
J. Brooks
A. Croft
A ORIGINAL ISSUE
11/22/33kV CONCRETE POLE NORMAL BRIDGING 11C/NBIT 11kV Normal bridging intermediate/termination 1675 22C/NBIT 22kV Normal bridging intermediate/termination 1675 33C/NBIT 33kV Normal bridging intermediate/termination 1675 11C/NBTT 11kV Normal Bridging termination/termination 1668 22C/NBTT 22kV Normal Bridging termination/termination 1668 33C/NBTT 33kV Normal Bridging termination/termination 1668 11C/NBST 11kV Normal Bridging strain/termination 1669 22C/NBST 22kV Normal Bridging strain/termination 1669 33C/NBST 33kV Normal Bridging strain/termination 1669
DESCRIPTION PAGE DESCRIPTION PAGE
INDEX10/4/13
T.Borg18 1645 2
C. Noel
C.Avenell
Sh 3
CONSTRUCTION CONSTRUCTION
11/22/33KV CONSTRUCTION CONCRETE POLE
1829
1830
1830
11/22/33kV CONCRETE POLE OHEW CONSTRUCTION
OHEWCI
OHEWCT
OHEWCS
11/22/33kV OHEW intermediate
11/22/33kV OHEW termination / strain
11/22/33kV OHEW termination / strain
11/C/HPI 1747/1
1747/2
22/C/HPI
33/C/HPI
11/C/HPA
22/C/HPA
33/C/HPA
/ angle with OHEW - material
Single circuit horizontal post vertical intermediate
1534/1
/ angle with OHEW
Single circuit horizontal post vertical intermediate
11/C/VS15
22/C/VS15
33/C/VS15
OHEW - material
Single circuit vertical strain 15°, 45° & 75° with
1534/2
OHEW
Single circuit vertical strain 15°, 45° & 75° with
11/C/VS45
22/C/VS45
33/C/VS45
11/C/VS75
22/C/VS75
33/C/VS75
11/C/VT 1567/1
1567/222/C/VT
33/C/VT
Single circuit vertical termination with OHEW - Material
Single circuit vertical termination with OHEW
POLE TOP CONSTRUCTION
11/22/33kV DOUBLE CIRCUIT CONCRETE
D11C/VI
D22C/VI
D33C/VI
1555/1
1555/2
1555/3
D11C/HPI
D22C/HPI
D33C/HPI
1486/1
1486/2
D11C/HPA
D22C/HPA
D33C/HPA
D11C/VS
D22C/VS
D33C/VS
1558/1
1558/2
1558/3
1566/1
1566/2
1566/3
1566/4
D11C/VS/D
D22C/VS/D
D33C/VS/D
D11C/VT
D22C/VT
D33C/VT
1557/1
1557/2
1557/3
1565/1
1565/2
1565/3
1565/4
D11C/VT/D
D22C/VT/D
D33C/VT/D
Double Circuit Vertical Horizontal Post
Double Circuit Vertical Horizontal Post POLE TOP CONSTRUCTION
11/22/33kV SINGLE CIRCUIT CONCRETE Intermediate / Angle with OHEW - material
Intermediate / Angle with OHEW
Double Circuit Vertical Intermediate with OHEW - material
Double Circuit Vertical Intermediate with OHEW - material
Double Circuit Vertical Intermediate with OHEW
Double circuit single x-arm vertical strain with OHEW - material
Double circuit single x-arm vertical strain with OHEW - material
Double circuit single x-arm vertical strain with OHEW
Double circuit double x-arm vertical strain with OHEW - material
Double circuit double x-arm vertical strain with OHEW - material
Double circuit double x-arm vertical strain with OHEW - material
Double circuit double x-arm vertical strain with OHEW
Double circuit single x-arm vertical term with OHEW - material
Double circuit single x-arm vertical term with OHEW - material
Double circuit single x-arm vertical term with OHEW
Double circuit double x-arm vertical term with OHEW - material
Double circuit double x-arm vertical term with OHEW - material
Double circuit double x-arm vertical term with OHEW - material
Double circuit double x-arm vertical term with OHEW
B 22.5.14
B
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
FILE: 5Page
CONSTRUCTION CODE GUIDE
163718 1637 1
11/22/33kV CONSTRUCTION CONCRETE POLE 21.08.07HARD COPY
UNCONTROLLED
B 21.01.08
C
EXAMPLE:-
CONSTRUCTIONS
VOLTAGE
No. OF PHASES
3 = Three No. OF CROSSARMS
D = Double arm
(Omit if single arm)
DISC INSUL.TYPE
B = Ball & Socket
S = Synthetic
LOCATION
CONDUCTOR CODE
constructions)
(Omit for Intermediate
Adetail drawings in this manual.
appears on relevant construction
Code shown within dashed box
U = Urban
LIB
MOO
MAR
PLU
= Libra 7/3.0 AAC
= Mars 7/3.75 AAC
= Moon 7/4.75 AAC
= Pluto 19/3.75 AAC
11 = 11kV
22 = 22kV
33 = 33kV
= No conductor fittings000
UPGRADE
INSULATION
P = Pollution
Construction)
(Omit for Std
POLE TYPE
C = Concrete Pole
FPB = Flat Pin Intermediate to Mounting Bracket
FSB = Flat Strain to Mounting Bracket
FTB = Flat Termination to Mounting Bracket
30 = 2400x100x100 - 11kV Intermediate
31 = 2400x100x100 - 11kV Strain/Term
35 = 2700x100x100 - 22/33kV Intermediate
36 = 2700x100x100 - 22/33kV Strain/Term
CROSSARM SIZE COMPOSITE FIBRE
11C/FPB 16/3/30 - /B/MOO/ U/ -
STRENGTH
24 = 24kN (Limit State)
16 = 16kN (Limit State)
2400x100x100 - 11kV composite intermediate, ball and socket, moon 7/4.75AAC, urban.
11C/FPB 16/3/30/B/MOO/U = 11kV concrete pole, flat pin intermediate to mounting bracket, 16kN (Limit State), three phase,
1
C 18.3.13URBAN TRANSFORMER CONCRETE POLE TOPS
C. Noel
L. Burton
C. Avenell
URBAN TRANSFORMER CONCRETE POLE TOP - CONSTRUCTION CODE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
163718 1637 2
18.01.08
L. Burton
CONSTRUCTION CODE GUIDE
11/22/33kV CONSTRUCTION CONCRETE POLE
CONSTRUCTIONS
VOLTAGE
No. OF PHASES
No. OF CROSSARMS
D = Double arm
(Omit if single arm)
DISC INSUL.TYPE
B = Ball & Socket
S = Synthetic
LOCATION
CONDUCTOR CODE
constructions)
(Omit for Intermediate
Adetail drawings in this manual.
appears on relevant construction
Code shown within dashed box
11 = 11kV
22 = 22kV
33 = 33kV
UPGRADE
INSULATION
P = Pollution
Construction)
(Omit for Std
R = Rural
SUL
APP
BAN
LIB
PLU
HEL
IOD
AC = 3/2.75 SCAC
= Apple 6/1/3.0 ACSR
= Sultana 4/3/3.0 ACSR
= Banana 6/1/3.75 ACSR
= Libra 7/3.0 AAC
= Pluto 19/3.75 AAC
= Helium 7/3.75 AAAC
= Iodine 7/4.75 AAAC
FLU = Fluorine 7/3.0 AAAC
NEO = Neon 19/3.75 AAAC
= No conductor fittings000
EXAMPLE:-
CROSSARM SIZE - COMPOSITE FIBRE
CROSSARM SIZE - WOOD
3 = 2400x150x100 11kV
4 = 2400x175x125 11kVDS = Delta Strain
3 = Three
1 = Single
17 = 3300x100x125 22/33kV
13 = 3000x100x100 11kV
14 = 3000x100x125 11kV
16 = 3300x100x100 22/33kV
7 = 2700x150x100 22/33kV
8 = 2700x175x125 22/33kV
DT = Delta Termination
to Mounting BracketFPB = Flat Pin Intermediate
1 = 2400x100x100 11kV
2 = 2400x125x100 11kV
5 = 2700x100x100 22/33kV
6 = 2700x100x125 22/33kV
55 = 3300x100x100 - 22/33kV Composite
50 = 3000x100x100 - 11kV Composite
STRENGTH
11C/FPB 16/3/50 - / - /MOO/R/-
POLE TYPE
C = Concrete Pole
RURAL CONCRETE POLE TOP - CONSTRUCTION CODE
RURAL CONCRETE POLE TOPS
16 = 16kN (Limit State)
24 = 24kN (Limit State)
32 = 32kN (Limit State)
40 = 40kN (Limit State)
3000x100x100 - 11kV composite intermediate crossarm, Moon 7/4.75 AAC, rural.
11C/FPB/16/3/50/MOO/R = 11kV, Concrete Pole, Flat Pin Intermediate with Mounting Bracket, 16kN, three phase,
2
HARD COPYUNCONTROLLED
B 11.7.08
D
C 11.1.10
40 = 2400x125x125 - 11kV Composite
45 = 2700x125x125 - 22/33kV Composite
D 16.04.13C. Avenell
C. NoelA ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
L. Burton
HARD COPYUNCONTROLLED
CONSTRUCTION CODE GUIDE
11/22/33kV CONSTRUCTION CONCRETE POLE
18 1637 51637 5
C. Avenell
C. Noel
detail drawings in this manual.
appears on relevant construction
Code shown within dashed box
OHEW = Overhead Earth Wire
TYPE
EARTH CONDUCTORS
1 = Single
AC = 3/2.75 SCAC
CONDUCTOR
GZ2 = 7/3.25 SC/GZ
AC2 = 7/3.25 SC/AC
GZ1 = 7/2.75 SC/GZ
SUL = 4/3/3.00 ACSR
EXAMPLE:-
OVERHEAD EARTH WIRE CONCRETE POLE TOP - CONSTRUCTION CODE
OHEW/C 16 S 1 AC
RATING
10 = 10 kN
16 = 16 kN
24 = 24 kN
32 = 32 kN
40 = 40 kN
CONSTRUCTION
I = Intermediate
T = Termination
S = Strain
POLE TYPE
C = Concrete Pole
OHEW/C16S1AC = Overhead Earth Wire, Concrete Pole, 16kN, Strain, single conductor, 3/2.75 SCAC.
OVERHEAD EARTH WIRE
5/3/13
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
163718 1637 6
11/22/33kV CONSTRUCTION CONCRETE POLE 18/3/13HARD COPY
UNCONTROLLED
EXAMPLE:-
CONSTRUCTIONS
VOLTAGE
No. OF PHASES
3 = Three
DISC INSUL.TYPE
B = Ball & Socket
S = Synthetic
LOCATION
CONDUCTOR CODE
constructions)
(Omit for Intermediate
Adetail drawings in this manual.
appears on relevant construction
Code shown within dashed box
U = Urban
LIBPLU
= Libra 7/3.0 AAC= Pluto 19/3.75 AAC
11 = 11kV
22 = 22kV
33 = 33kV
= No conductor fittings000
UPGRADE
INSULATION
P = Pollution
Construction)
(Omit for Std
POLE TYPE
C = Concrete Pole
STRENGTH
6
C. Noel
L. Burton
C. Avenell
CONSTRUCTION CODE GUIDE - SINGLE CIRCUIT
URBAN & RURAL CONCRETE POLE TOPS
11C/VT 16/3 B/LIB/U/ -
R = Rural
40 = 40kN (Limit State)
32 = 32kN (Limit State)
24 = 24kN (Limit State)
16 = 16kN (Limit State)
VT = Vertical Termination
VS15 = Vertical Strain 15°
VS45 = Vertical Strain 45°
VS75 = Vertical Strain 75°
HPI = Horizontal Post Intermediate
HPA = Horizontal Post Angle
SUL = Sultana 4/3/3.0 ACSR= Apple 6/1/3.00 ACSR= Banana 6/1/3.75 ACSR
APPBAN
FLUHELIODAC = 3/2.75 SCAC
= Iodine 7/4.75 AAAC= Helium 7/3.75 AAAC= Flurine 7/3.0 AAAC
SINGLE CIRCUIT URBAN & RURAL CONCRETE POLE TOP - CONSTRUCTION CODE
11C/VT16/3B/LIB/U = 11kV concrete pole, vertical termination, 16kN pole, 3 phase, ball & socket insulators, libra 7/3.0 AAC conductor, urban location.
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
L. Burton
HARD COPYUNCONTROLLED C. Avenell
C. Noel
CONSTRUCTION CODE GUIDE
18 1637 71637 7
EXAMPLE:-
CONSTRUCTIONS
VOLTAGE
1 = 2400x100x100 11kV
2 = 2400x100x125 11kV
No. OF CROSSARMS
D = Double arm
(Omit if single arm)
DISC INSUL.TYPE
B = Ball & Socket
S = Synthetic
LOCATION
CONDUCTOR CODE
constructions)
(Omit for Intermediate
detail drawings in this manual.
appears on relevant construction
Code shown within dashed box
U = Urban
R = Rural
APP
LIB
PLU
IOD
= Libra 7/3.0 AAC
= Pluto 19/3.75 AAC
= Iodine 7/4.75 AAAC
FLU = Fluorine 7/3.0 AAAC
NEO = Neon 19/3.75 AAAC
11 = 11kV
22 = 22kV
33 = 33kV
= No conductor fittings000
UPGRADE
INSULATION
P = Pollution
Construction)
(Omit for Std
CROSSARM SIZE - WOOD
CROSSARM SIZE - COMPOSITE FIBRE
13 = 2400x100x100 22/33kV
14 = 2400x100x125 22/33kV
VI = Vertical Intermediate
HPA = Horizontal post angle
HPI = Horizontal post intermediate
CIRCUITS
= Apple 6/1/3.00 ACSR
3 = 2400x150x100 11/22/33kV
4 = 2400x175x125 11/22/33kV
27 = 2400x125x125 11/22/33kV (S/T)
29 = 2400x100x100 22/33kV (VI)
20 = 2400x100x100 11kV (VI)
VS = Vertical Strain
VT = Vertical Termination
DOUBLE CIRCUIT POLE TOPS
D = Double circuit
(Omit if horizontal post construction)
8/3/13
POLE TYPE
C = Concrete Pole
11/22/33kV CONSTRUCTION CONCRETE POLE
DOUBLE CIRCUIT CONCRETE POLE TOP - CONSTRUCTION CODE
B 16.12.13
B
Ball & Socket Insulators, Mars Conductor, Rural
D11C/VS16/3B/MAR/R = Double circuit, 11kV, Concrete Pole, Vertical Strain, 16kN pole, 2400x150x100 11kV Crossarm,
D 11 C/VS 16/3D/B/MAR /R / P
STRENGTH
40 = 40kN (limit state)
32 = 32kN (limit state)
24 = 24kN (limit state)
16 = 16kN (limit state)
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
118 1509 1
1509L. Burton
22.8.0711/22/33kV CONSTRUCTION CONCRETE POLE
QTY
MATERIAL
11kV 22/33kVDESCRIPTIONASSY
2011-2
74-4 3 3Eyebolt M20 to predrilled 100 x-arm
2021-2
1
1
1 1Crossarm support bracket urban strain / term to single 2400x100 crossarm and concrete pole
2022-2 Crossarm support bracket urban strain / term to single 2700x100 crossarm and concrete pole
URBAN TRANSFORMER FLAT TERMINATION SINGLE
CROSSARM TO MOUNTING BRACKET - MATERIAL
Crossarm composite fibre urban 2400x100x100 strain/term suit mounting bracket 11kV
Crossarm composite fibre urban 2700x100x100 strain/term suit mounting bracket 22/33kV 2011-10
DESCRIPTION
CONCRETE POLES & FOUNDATION (Not included in Construction Material)
Refer CONSTRUCTION PRACTICES Dwg no. 1635 for Concrete Transformer Pole
HARD COPYUNCONTROLLED
B 31.3.11
B
C. Avenell
C. Noel
�
�
�
���
�
�
A ORIGINAL ISSUE
���
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
OVERHEAD DISTRIBUTION
FILE: 5
��������
L. Burton 150918 1509 3
3
F
F
F
F
F
00
500
300
500
750Working Steps
200Stay Position
11/22/33kV CONSTRUCTION CONCRETE POLE22.8.07
Construction Type
11C/FTB
22C/FTB
33C/FTB
F
Assy Selection
44-5 or 6 or
45-1, 2, or 3
or 157-2
2400 X-ARM 11kV
2700 X-ARM 22/33kV
100
850 Stay Position
12.5
SETTING
DEPTH
POLE
LENGTH
CONDUCTOR
HEIGHT
10.802.10
F
F
F
100
SINGLE CROSSARM TO MOUNTING BRACKET
URBAN TRANSFORMER FLAT TERMINATION
100
Assy Selection
2011-2 or 10
HARD COPYUNCONTROLLED
B 31.3.11
B
Assy Selection
2021-2 or
2022-2 and
2035-14 or 16
Assy 74-4
C. Avenell
C. Noel
�
�
�
���
�
�
A ORIGINAL ISSUE
���
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
OVERHEAD DISTRIBUTION
FILE: 5
��������
...\51814682.dgn 3/04/2008 2:09:03 PM
���������� �
��B� 1/2 �DISC
����
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
���
�
�
�
�1
�
�
�
�
18 1467 11467
�
L. Burton
19.12.07
MATERIAL
11/22/33kV CONSTRUCTION CONCRETE POLE
QTY
MATERIAL
11kV 22/33kVDESCRIPTIONASSY
Refer sheet 4
2049-2 Gain base bracket to concrete / steel pole
2026-1
2026-3
Brace double to predrilled x-arm (175)
2014-4
30-1
30-2
83-1
83-2
2014-14
Crossarm predrilled 2400x150x100 strain/term 11kV
Crossarm predrilled 2400x175x125 strain/term 11kV
Crossarm predrilled 2700x150x100 strain term 22/33kV
Crossarm predrilled 2700x175x125 strain term 22/33kV
74-5
74-6
Eyebolt M20 to predrilled 125/150 x-arm
Eyebolt M20 to predrilled 175/200 x-arm
Crossarm composite fibre 2700x125x125 strain/term 22/33kV
1 1
1 1
1
1
4 4
1 1
Crossarm predrilled single (100) 11/22/33kV to concrete / steel pole
Crossarm predrilled single (125) 11/22/33kV to concrete / steel pole
2028-12
2028-16
2038-1 Step bolt to concrete pole
RURAL DELTA STRAIN SINGLE CROSSARM HARD COPYUNCONTROLLED
B 04.01.10
B
Crossarm composite fibre 2400x125x125 strain/term 11kV
Brace double to predrilled x-arm (150)2028-14
Brace double to predrilled x-arm (100/125)
�
�
�
���
�
�
A ORIGINAL ISSUE
���
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
OVERHEAD DISTRIBUTION
FILE: 5
��������
�
�
�
�
���������� �
��B� 1/2 �DISC
������
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
�
�
�
�
�
18 1467 21467
�
2L. Burton
4.12.07
MATERIAL
11/22/33kV CONSTRUCTION CONCRETE POLE
Bolt and Nut M20 x 350
ASSY DESCRIPTION32kN
QTY
Bolt and Nut M20 x 400
2037-4
2037-5
Eyebolt M20 to concrete / steel pole (300)
Eyebolt M20 to concrete / steel pole (350)
2035-10
2035-12
Bolt and Nut M16 x 350
Bolt and Nut M16 x 400
2036-14
2036-16
41-1
11kVDESCRIPTION
MATERIAL - INSULATOR PINS
41-2
41-3
41-4
Pin insulator 11kV to 100 predrilled crossarm
Pin insulator 11kV to 125/150 predrilled crossarm
Pin insulator 22/33kV to 100 predrilled crossarm
Pin insulator 22/33kV to 125/150 predrilled crossarm
QTY
60-12
2
2
33kV
Pollution
2Stud insulator M24 to 100/125/150 predrilled crossarm
22/33kV or
22kV Pollution
11kV
Pollution
41-8
41-9
Pin insulator 11kV pollution to 100 predrilled crossarm
Pin insulator 11kV pollution to 125/150 predrilled crossarm2
MATERIAL - BOLTS & EYEBOLTS TO CONCRETE POLE
16kN
2
Bolt and Nut M20 x 325 22035-9
1
24kN 40kN
2
2
1
2
2
1
2
2
1
ASSY
RURAL DELTA STRAIN SINGLE CROSSARMHARD COPYUNCONTROLLED
2035-17
2035-18
ASSY DESCRIPTION
Bolt and Nut M20 x 550
Bolt and Nut M20 x 600
150 X-ARM 175 X-ARM125 X-ARM
1
1
MATERIAL - BOLTS TO X-ARM & CONCRETE POLE
1
1 1
1
1 1
1
2035-16 Bolt and Nut M20 x 500
32kN16kN 24kN 40kN 32kN16kN 24kN 40kN32kN16kN 24kN 40kN
1 1
1
B 2.2.10
B
���
�
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062Dwg Sh
OVERHEAD DISTRIBUTION
FILE: 5
...\51814673.dgn 3/04/2008 2:13:47 PM
���
��
�
����
�
��������������
��B� 1/2 �DISC
���������
�������������
��������������������
L. Burton 1467
12.514.015.5
1.852.002.152.30
17.0 2.45
POLE
STEPS
SETTING
DEPTH
POLE
LENGTH
10.85
13.55
18 1467 44
CONDUCTOR
HEIGHT
8.159.50 8
5
111417
4.12.0711/22/33kV CONSTRUCTION CONCRETE POLE
11.0
14.90 2018.5 2.60
12.20
����
�
�
�
�
�
�
��
�
�
�
�
�
�
�
���
���
��B� 1/2 �DISC
�
�
�
�
�
�
�
��
Construction Type
F
F
Load
F
F
F
F
F
F
F
F
11C/DS
22C/DS
33C/DS
F
Supply
Non Tension Connector
Refer Assembly 90
F
Assy Selection
2037-4 or 5
F
F
150175
F
F
2700 X-ARM 22/33kV
2400 X-ARM 11kV
00100175250
475
1000
405
650
1200
1650
2100
1655
Stay Position
Stay Position
Stay Position
Working Steps
Stay Position1300
Assy 2038-1
Conc.
Pole
Assy Selection
173-1 or 7
Assy Selection
44-6 or
157-2 or
45-2 or 3
Assy Selection
46-1, 2 or 3 or
213-7
Assy Selection
41-1, 2, 3, 4, 8 or 9 or
60-12
Assy Selection
74-5 or 6
Assy Selection
2049-2 and
2035-9, 10 or 12
Assy Selection
2026-1 or 3 and
2035-16, 17, 18 or 19
RURAL DELTA STRAIN SINGLE CROSSARM HARD COPYUNCONTROLLED
B 11.1.10
B
125
Assy Selection
30-1 or 2 or
83-1 or 2 or
2014-4 or 14
Assy Selection
2028-12, 14 or 16 and
2036-14 or 16
100
F
F
125
(Composite only)
���
�
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062Dwg Sh
OVERHEAD DISTRIBUTION
FILE: 5
���������� �
��B� 1/2 �DISC
����
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
���
�
�
�
�1
�
�
�
�
L.Burton
19.12.07
18 1493 11493
�
11/22/33kV CONSTRUCTION CONCRETE POLE
MATERIAL
�
�
�
�
QTY
MATERIAL
11kV 22/33kVDESCRIPTIONASSY
Refer sheet 4
2026-1
2026-3
Brace double to predrilled x-arm (150)
Brace double to predrilled x-arm (175)
30-1
30-2
83-1
83-2
Crossarm predrilled 2400x150x100 strain/term 11kV
Crossarm predrilled 2400x175x125 strain/term 11kV
Crossarm predrilled 2700x150x100 strain term 22/33kV
Crossarm predrilled 2700x175x125 strain term 22/33kV
74-5
74-6
Eyebolt M20 to predrilled 125/150 x-arm
Eyebolt M20 to predrilled 175/200 x-arm
1 1
1
1
2 2
1 1
Crossarm predrilled single (100) 11/22/33kV to concrete / steel pole
Crossarm predrilled single (125) 11/22/33kV to concrete / steel pole
2028-14
2028-16
2038-1 Step bolt to concrete pole
RURAL DELTA TERMINATION SINGLE CROSSARMHARD COPYUNCONTROLLED
B 11.1.09
B
2014-4 Crossarm composite fibre 2400x125x125 strain/term 11kV
Crossarm composite fibre 2700x125x125 strain/term 22/33kV2014-14
2028-12 Brace double to predrilled x-arm (100/125)
�
�
�
���
�
�
A ORIGINAL ISSUE
���
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
OVERHEAD DISTRIBUTION
FILE: 5
��������
���������� �
��B� 1/2 �DISC
����
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
���
�
�
�
�
�
�
�
�
L.Burton
5.12.07
18 1493 21493
�
MATERIAL
2
11/22/33kV CONSTRUCTION CONCRETE POLE
ASSY DESCRIPTION32kN
QTY
2037-4
2037-5
Eyebolt M20 to concrete / steel pole (300)
Eyebolt M20 to concrete / steel pole (350)
Bolt and Nut M16 x 350
Bolt and Nut M16 x 400
2036-14
2036-16
MATERIAL - BOLTS & EYEBOLTS TO CONCRETE POLE
16kN
1
1
24kN 40kN
1
1
1
1
1
1
RURAL DELTA TERMINATION SINGLE CROSSARMHARD COPYUNCONTROLLED
B 2.2.10
B
2035-17
2035-18
ASSY DESCRIPTION
Bolt and Nut M20 x 550
Bolt and Nut M20 x 600
150 X-ARM 175 X-ARM125 X-ARM
1
1
MATERIAL - BOLTS TO X-ARM & CONCRETE POLE
1
1 1
1
1 1
1
2035-16 Bolt and Nut M20 x 500
32kN16kN 24kN 40kN 32kN16kN 24kN 40kN32kN16kN 24kN 40kN
1 1
1
���
�
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062Dwg Sh
OVERHEAD DISTRIBUTION
FILE: 5
...\51814933.dgn 7/08/2008 11:14:36 AM
���
�
��
�
�
��
��
��
�
���
��
�
�
�
�
�
�
��
�
����
���
�
�
��B� 1/2 �DISC��
��
�
�
�
�
�
��
�
���
�������������
��������������������
L. Burton 149318 1493 4
4
11/22/33kV CONSTRUCTION CONCRETE POLE 5.12.07
�����������
�
�����������
�
�
��B� 1/2 �DISC
��������
�
Construction Type
F
F
Load
F
F
F
F
11C/DT
22C/DT
33C/DT
F
Supply
F
Assy Selection
2037-4 or 5
F
F
150175 F
2700 X-ARM 22/33kV
2400 X-ARM 11kV
00100175250
475
1000
405
650
1200
1650
2100
1655
Stay Position
Stay Position
Stay Position
Working Steps
Stay Position1300
Assy 2038-1
Assy Selection
44-6 or
157-2 or
45-2 or 3
Assy Selection
74-5 or 6
Assy Selection
2026-1 or 3 and
2035-16, 17, 18 or 19Conc.
Pole
12.514.015.5
1.852.002.152.30
17.0 2.45
POLE
STEPS
SETTING
DEPTH
POLE
LENGTH
10.85
13.55
CONDUCTOR
HEIGHT
8.159.50 8
5
111417
11.0
14.90 2018.5 2.60
12.20
RURAL DELTA TERMINATION SINGLE CROSSARMHARD COPYUNCONTROLLED
B 11.1.10
B
125
Assy Selection
2028-12, 14 or 16
2036-14 or 16
Assy Selection
30-1 or 2 or
83-1 or 2 or
2014-4 or 14
100
F
F
125
(Composite only)
���
�
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062Dwg Sh
OVERHEAD DISTRIBUTION
FILE: 5
���������� �
��B� 1/2 �DISC
����
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
���
�
�
�
�1
��
18 1494 11494
�
L. Burton
10.01.08
MATERIAL
11/22/33kV CONSTRUCTION CONCRETE POLE
QTY
11kV 22/33kVDESCRIPTIONASSY
Refer sheet 4
2026-9
Brace double to predrilled x-arm (150)
30-1
83-1
83-2
Crossarm predrilled 2400x150x100 strain/term 11kV
Crossarm predrilled 2700x150x100 strain term 22/33kV
Crossarm predrilled 2700x175x125 strain term 22/33kV
1 1
2
2
2 2
Crossarm predrilled double (100) 11/22/33kV to concrete / steel pole
2028-14
2028-12 Brace double to predrilled x-arm (100/125)
2038-1
4 474-5 Eyebolt M20 to predrilled 125/150 x-arm
Step bolt to concrete pole
2049-2 1 1Gain base bracket to concrete / steel pole
ASSY DESCRIPTION 32kN
QTY
2037-4
2037-5
Eyebolt M20 to concrete / steel pole (300)
Eyebolt M20 to concrete / steel pole (350)
Bolt and Nut M16 x 350
Bolt and Nut M16 x 400
2036-14
2036-16
MATERIAL - BOLTS & EYEBOLTS TO CONCRETE POLE
16kN
2
1
24kN 40kN
2
1
2
1
2
Bolt and Nut M16 x 4502036-18 1
Bolt and Nut M20 x 3252035-9
Bolt and Nut M20 x 350
Bolt and Nut M20 x 400
2035-10
2035-12
2
2
2 2
RURAL DELTA STRAIN DOUBLE CROSSARM HARD COPYUNCONTROLLED
B 15.5.08
C
MATERIAL
2014-4 Crossarm composite fibre 2400x125x125 strain/term 11kV
2014-14 Crossarm composite fibre 2700x125x125 strain/term 22/33kV
��
C 18.8.10
Crossarm predrilled double (125) 11/22/33kV to concrete / steel pole2026-11
Crossarm predrilled 2400x175x125 strain/term 11kV30-2
74-6
2028-16 Brace double to predrilled x-arm (175)
Eyebolt M20 to predrilled 175 x-arm
�
�
�
���
�
�
A ORIGINAL ISSUE
���
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
OVERHEAD DISTRIBUTION
FILE: 5
��������
���������� �
��B� 1/2 �DISC
�����
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
�
�
�
�
�
18 1494 21494
�
2L. Burton
MATERIAL
11/22/33kV CONSTRUCTION CONCRETE POLE
2035-19
2035-20
2035-22
ASSY DESCRIPTION
Bolt and Nut M20 x 650
Bolt and Nut M20 x 700
Bolt and Nut M20 x 750
MATERIAL - BOLTS TO X-ARM & CONCRETE POLE
2035-18 Bolt and Nut M20 x 600
32kN16kN 24kN 40kN 32kN16kN 24kN 40kN
35-4
35-5
35-6
35-7
Bolt combiner double crossarm (650)
Bolt combiner double crossarm (700)
Bolt combiner double crossarm (750)
Bolt combiner double crossarm (600) 2
2
2 2
2
2
2 2
1
1
1 1
1
1
1 1
ASSY
41-1
11kVDESCRIPTION
MATERIAL - INSULATOR PINS
41-3
Pin insulator 11kV to 100 predrilled crossarm
Pin insulator 22/33kV to 100 predrilled crossarm
QTY
60-12
2
2
33kV
Pollution
2Stud insulator M24 to 100/125/150 predrilled crossarm
22/33kV or
22kV Pollution
11kV
Pollution
41-8 Pin insulator 11kV pollution to 100 predrilled crossarm2
10.01.08RURAL DELTA STRAIN DOUBLE CROSSARMHARD COPY
UNCONTROLLED
B
B
41-2
41-9
41-4
Pin insulator 11kV to 125/150 predrilled crossarm
Pin insulator 11kV pollution to 125/150 predrilled crossarm
Pin insulator 22/33kV to 125/150 predrilled crossarm
32kN16kN 24kN 40kN
2
2
2 2
1
1
1 1
35-8 Bolt combiner double crossarm (800)
18.8.10
2035-24 Bolt and Nut M20 x 800
125 x 125 Crossarm 150 x 100 Crossarm 175 x 125 Crossarm
���
�
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062Dwg Sh
OVERHEAD DISTRIBUTION
FILE: 5
...\51814943.dgn 3/04/2008 2:19:03 PM
���
��
�
����
�
��������������
��B� 1/2 �DISC
���������
�������������
��������������������
L. Burton 149418 1494 4
4
10.01.0811/22/33kV CONSTRUCTION CONCRETE POLE
��B� 1/2 �DISC
�������������
����
�
�
�
�
�
�
��
�
�
�
�
�
�
�
���
���
�
�
�
�
�
�
�
��
Construction Type
F
F
Load
F
F
F
11C/DS
22C/DS
33C/DS
F
Supply
F
Assy Selection
2037-4 or 5
F
F175
125150
2700 X-ARM 22/33kV
2400 X-ARM 11kV
00100175250
475
1000
405
650
1200
1650
2100
1655
Stay Position
Stay Position
Stay Position
Working Steps
Stay Position1300
Assy 2038-1
Conc.
Pole
12.514.015.5
1.852.002.152.30
17.0 2.45
POLE
STEPS
SETTING
DEPTH
POLE
LENGTH
10.85
13.55
CONDUCTOR
HEIGHT
8.159.50 8
5
111417
11.0
14.90 2018.5 2.60
12.20
F
F175
125150
F
F
Assy Selection
35-4, 5, 6, 7 or 8
F
Assy Selection
2049-2 and
2035-8, 10 or 12
F
F
Assy Selection
46-1, 2 or 3 or
213-7
Assy Selection
41-1, 3 or 8 or
60-12
RURAL DELTA STRAIN DOUBLE CROSSARM HARD COPYUNCONTROLLED
Assy Selection
173-1 or 7
F
Assy Selection
44-6 or
157-2 or
45-2 or 3F
B 11.7.08
C
C 11.1.10
100
F
F
125
Assy Selection
2028-12 or 14 and
2036-14, 16 or 18
(Composite only)
(Composite only)
Assy Selection
30-1 or 2 or
83-1 or 2 or
2014-4 or 14
Assy Selection
2026-9 or 11 and
2035-18, 19, 20, 22 or 24
Assy Selection
74-5 or 6
Refer Assy 30 & 83
for drilling detail
���
�
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062Dwg Sh
OVERHEAD DISTRIBUTION
FILE: 5
����������
��B� 1/2 �DISC
����
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
���
�
�
�
�1
�
�
�
�
L.Burton 18 1495 11495
�
11.12.0711/22/33kV CONSTRUCTION CONCRETE POLE
MATERIAL
RURAL DELTA TERMINATION DOUBLE CROSSARM HARD COPYUNCONTROLLED
B 11.7.08
C
QTY
MATERIAL
11kV 22/33kVDESCRIPTIONASSY
Refer sheet 4
2026-9
Brace double to predrilled x-arm (150)
30-1
83-1
83-2
Crossarm predrilled 2400x150x100 strain/term 11kV
Crossarm predrilled 2700x150x100 strain term 22/33kV
Crossarm predrilled 2700x175x125 strain term 22/33kV
1 1
2
2
2 2
Crossarm predrilled double (100) 11/22/33kV to concrete / steel pole
2028-14
30-2 Crossarm predrilled 2400x175x125 strain/term 11kV
2028-12 Brace double to predrilled x-arm (100/125)
2038-1
2 274-5 Eyebolt M20 to predrilled 125/150 x-arm
Step bolt to concrete pole
2014-4 Crossarm composite fibre 2400x125x125 strain/term 11kV
2014-14 Crossarm composite fibre 2700x125x125 strain/term 22/33kV
��
C 18.8.10
Crossarm predrilled double (125) 11/22/33kV to concrete / steel pole2026-11
74-6 Eyebolt M20 to predrilled 175 x-arm
2028-16 Brace double to predrilled x-arm (175)
�
�
�
���
�
�
A ORIGINAL ISSUE
���
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
OVERHEAD DISTRIBUTION
FILE: 5
��������
����������
��B� 1/2 �DISC
����
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
���
�
�
�
�
�
�
�
�
L.Burton 18 1495 21495
�
12.12.0711/22/33kV CONSTRUCTION CONCRETE POLE
MATERIAL
2
ASSY DESCRIPTION32kN
QTY
2037-4
2037-5
Eyebolt M20 to concrete / steel pole (300)
Eyebolt M20 to concrete / steel pole (350)
2035-19
2035-20
2035-22
Bolt and Nut M16 x 350
Bolt and Nut M16 x 400
2036-14
2036-16
ASSY DESCRIPTION
Bolt and Nut M20 x 650
Bolt and Nut M20 x 700
Bolt and Nut M20 x 750
MATERIAL - BOLTS & EYEBOLTS TO CONCRETE POLE
MATERIAL - BOLTS TO X-ARM & CONCRETE POLE
16kN
1
1
24kN 40kN
1
1
1
1
1
2035-18 Bolt and Nut M20 x 600
32kN16kN 24kN 40kN 32kN16kN 24kN 40kN
Bolt and Nut M16 x 4502036-18 1
35-4
35-5
35-6
35-7
Bolt combiner double crossarm (650)
Bolt combiner double crossarm (700)
Bolt combiner double crossarm (750)
Bolt combiner double crossarm (600) 2
2
2 2
2
2
2 2
1
1
1 1
1
1
1 1
RURAL DELTA TERMINATION DOUBLE CROSSARM HARD COPYUNCONTROLLED
B 18.8.10
B
32kN16kN 24kN 40kN
2
2
2 2
1
1
1 1
35-8 Bolt combiner double crossarm (800)
2035-24 Bolt and Nut M20 x 800
125 x 125 Crossarm 150 x 100 Crossarm 175 x 125 Crossarm
���
�
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062Dwg Sh
OVERHEAD DISTRIBUTION
FILE: 5
...\51814953.dgn 7/08/2008 11:20:05 AM
���
�
��
�
�
��
��
��
�
���
��
�
�
�
�
�
�
��
�
����
���
�
�
��B� 1/2 �DISC��
��
�
�
�
�
�
��
�
���
�������������
��������������������
L. Burton 149518 1495 4
4
12.12.0711/22/33kV CONSTRUCTION CONCRETE POLE
���������
��B� 1/2 �DISC
����
�����������
�
�����������
�
�
��B� 1/2 �DISC
��������
�
Construction Type
F
F
Load
F
F
F
F
11C/DT
22C/DT
33C/DT
F
Supply
F
Assy Selection
2037-4 or 5
F
F175
125150
2700 X-ARM 22/33kV
2400 X-ARM 11kV
00100175250
475
1000
405
650
1200
1650
2100
1655
Stay Position
Stay Position
Stay Position
Working Steps
Stay Position1300
Assy 2038-1
Assy Selection
44-6 or
157-2 or
45-2 or 3
Conc.
Pole
12.514.015.5
1.852.002.152.30
17.0 2.45
POLE
STEPS
SETTING
DEPTH
POLE
LENGTH
10.85
13.55
CONDUCTOR
HEIGHT
8.159.50 8
5
111417
11.0
14.90 2018.5 2.60
12.20
F
F175
125150
F
F
Assy Selection
35-4, 5, 6, 7 or 8
RURAL DELTA TERMINATION DOUBLE CROSSARM HARD COPYUNCONTROLLED
B 11.7.08
C
C 11.1.10
�
100
F
F
125
(Composite only)
(Composite only)
Assy Selection
2026-9 or 11 and
2035-18, 19, 20, 22 or 24
Assy Selection
2028-12, 14 or 16 and
2036-14, 16 or 18
Assy Selection
30-1 or 2 or
83-1 or 2 or
2014-4 or 14
Assy Selection
74-5 or 6
���
�
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062Dwg Sh
OVERHEAD DISTRIBUTION
FILE: 5
...\51816691.dgn 7/08/2008 11:23:36 AM
FF
Construction Type
HARD COPYUNCONTROLLED
C. Noel
C. Avenell
L. Burton
3/12/12
18 1829 11829
DESCRIPTIONASSY
1
178-3
178-5
178-7
178-9
178-11
QTY
Ty guard preformed 4/3/3.00 ACSR sultana
1
MATERIAL - OHEW TERMINATION / STRAIN
OHEW INTERMEDIATE
OHEW INTERMEDIATE
178-3, 5, 7, 9 or 11
Assy Selection
Ty guard preformed 3/2.75 SC/AC
Ty guard preformed 7/3.25 SC/GZ
Ty guard preformed 7/3.25 SC/AC
Ty guard preformed 7/2.75 SC/GZ
2047-1
2047-1 or 3
Assy Selection
TO CONCRETE POLE
11/22/33kV CONSTRUCTION CONCRETE POLE
2047-3
OHEW intermediate to concrete pole (10/16kN)
OHEW intermediate to concrete pole (24/32/40kN)
00100
300
Pole
Conc.
Pole
Conc.
OHEWCI
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
F
F
F
Construction Type
C. Noel
C. Avenell
L. Burton
5/12/12
18 1830 1
OHEW STRAINOHEW TERMINATION
1830
DESCRIPTIONASSY
1
178-13
178-15
178-17
178-19
178-22
QTY
Term Strain
2
Deadend preformed 3/2.75 SC/AC
Deadend preformed 7/3.25 SC/GZ
Deadend preformed 7/3.25 SC/AC
Deadend preformed 7/2.75 SC/GZ
Deadend preformed 4/3/3.00 ACSR sultana
21
MATERIAL - OHEW TERMINATION / STRAIN
OHEW TERMINATION / STRAIN
178-13, 15, 17, 19 or 22
Assy Selection 178-13, 15, 17, 19 or 22
Assy Selection
HARD COPYUNCONTROLLED
TO CONCRETE POLE
Pole
Conc.
Pole
Conc.
Pole
Conc.
Pole
Conc.
2047-12
2047-10 OHEW termination to conc pole (10/16/24kN)
OHEW termination to conc pole (32/40kN)
2047-10 or 12
Assy Selection
2047-10 or 12
Assy Selection
00100
300
00100
300200
prevent loosening of the nut.
shall be burred to effectively
immediately behind the nut
against the pole. The thread
vertical plane and pulled tight
1. The eye of all eyebolts to be in the
NOTE:
OHEWCT
OHEWCS
11/22/33kV CONSTRUCTION CONCRETE POLE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
HARD COPYUNCONTROLLED
174718 1747 1
1
MATERIAL - INSULATORS
ASSY DESCRIPTIONQTY
173-1
NOTES:
22/33kV insulators shown
11kV 22/33kV
173-7
3
Insulator post clamp tie horizontal 22/33kV 3
1.
2.
3.
4.
11/22/33kV CONCRETE POLE CONSTRUCTION
ASSY DESCRIPTION24kN
QTY
Bolt and nut M20 x 350
16kN
Construction Practices
For concrete pole attachments and foundations refer to
Designer to calculate maximum deviation angle
MATERIAL - BOLTS TO CONCRETE POLE
2035-10
QTYDESCRIPTIONASSY
2049-2
2038-1
11/22/33kV
MATERIAL - BRACKETS & POLE STEPS
3Gain base bracket to concrete pole
Step bolt to concrete pole
conductor per span. Refer assy 96 for details
known bad vibration areas fit 2 dampers per
Fit 1 damper per conductor per span, except in
Vibration dampers fitted to Rural Constructions.
15.9.10
4Bolt and nut M20 x 400
6
2035-12
11.11.10
Refer sh 2
18.3.13
5.
Bolt and nut M20 x 4502035-14 4
32kN 40kN
2
2
6
173-3
173-9
3Insulator post clamp top horizontal 11kV
Insulator post clamp top horizontal 22/33kV 3
or
or
Insulator post tie top horizontal 11kV
B
C
CL. Burton
C. Avenell
C. Noel
Dwg No. 1749-1 to 12 for pole details.
Refer Manufacturing Detail Concrete Pole Folder
WITH OHEW - MATERIAL
INTERMEDIATE / ANGLE HORIZONTAL POST
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
F
F
F
F
f f
L. Burton 174718 1747 2
2
11/22/33kV CONCRETE POLE CONSTRUCTION26.8.10HARD COPY
UNCONTROLLED
B 12.11.10
C
C
F
STEPS
POLE
HEIGHT
CONDUCTOR
DEPTH
SETTING
LENGTH
POLE
15.5 2.3017.0 2.45
1400
1705
2000
2305
2600
2905
3300
1850
2400
2850
Working Steps
Working Steps
3750Working Steps
Working Steps
Construction Type
Assy 2038-1
14.0 2.15 9.25
11.45
11
00100200300400
Stay500
173-3 or 9 (Angle)
or
173-1 or 7 (Intermediate)
Assy Selection
C. Avenell
C. Noel
18.3.13
outside angle
Conductor position
inside angle
Conductor position
LVABC Earth Ferrule
LVABC4600
4800
11C/HPI
22C/HPI
33C/HPI
11C/HPA
22C/HPA
33C/HPA
2035-10, 12 or 14
2049-2 and
Assy Selection
allowed for.
strain / term OHEW
Both Intermediate &
Dwg. No. 1829 & 1830
Construction Concrete Pole
For OHEW refer 11/22/33kV
10.10 1417
WITH OHEW - CONSTRUCTION
INTERMEDIATE / ANGLE HORIZONTAL POST
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
L.Burton
22.7.10B 12.11.10
C
C 18.3.13
DESCRIPTIONASSY
MATERIAL
2037-62037-5
DESCRIPTIONASSY
MATERIAL - INSULATORS
Eyebolt M20 to concrete pole (400)
Eyebolt M20 to concrete pole (350)
157-2 Insulator disc (B&S) termination (triple) with aluminium thimble
2049-2 3
173-7 Insulator post tie top (22/33kV)
11kV
11kV 22/33kV
22/33kV
3
6
2038-1 Step bolt to concrete pole Refer sheet 2
11kV 22/33kV
Refer sheet 2
QTYQTY
11kV 22/33kV
QTYQTY
Insulator disc (B&S) termination (double) with aluminium thimble44-6
45-2
45-3
Insulator synthetic 22kV - termination with aluminium thimble
Insulator synthetic 33kV - termination with aluminium thimble or
6
6
or
6
3
6
or
6
6
or
6
Gain base bracket to concrete pole
ASSY DESCRIPTION
24kN
QTY
2Bolt and nut M20 x 350
MATERIAL - BOLTS / EYEBOLTS TO CONCRETE POLE
Bolt and nut M20 x 400 4
6
40kN
NOTES:
3.
4.
22/33kV insulators shown
5.
4
2035-10
2035-12
Structure 15 & 45 Structure 75
Structure 15 & 45
Structure 15 & 45 Structure 75
16kN
4
2
32kN
6
2037-4 Eyebolt M20 to concrete pole (300) 4
Bolt and nut M20 x 325 22035-9
1.
11/22/33kV CONCRETE POLE CONSTRUCTION
MATERIAL
1153418 1534 1
C. Noel
C. Avenell
24kN16kN 40kN
QTY Structure 75
32kN
Bolt and nut M20 x 4502035-14 4
2
2
4
2037-7 Eyebolt M20 to concrete pole (450) 2
6
4
2
6
4
2
details.
conductor per span. Refer assy 96 for
bad vibration areas fit 2 dampers per
conductor per span, except in known
Constructions. Fit one damper per
Vibration dampers fitted to Rural
Practices
foundations refer to Construction
For concrete pole attachments and
insulator in line with bisect
When standing pole locate bridging
Dwg No. 1588-1 to 36
Concrete Pole Folder
Refer Manufacturing Detail
173-1 3
VERTICAL STRAIN WITH OHEW 15°, 45° & 75°
Insulator post tie top (11kV)
2.
effectively prevent loosening of the nut.
behind the nut shall be burred to
the pole. The thread immediately
vertical plane and pulled tight against
The eye of all eyebolts to be in the
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
F
F
F
F
F
F
F
F
F
F
F
F
F
F
L. Burton
HARD COPYUNCONTROLLED
B 12.11.10
C
C
Pole
Conc.
00
22002275
33003375
11001175
STEPS
POLE
HEIGHT
CONDUCTOR
DEPTH
SETTING
LENGTH
POLE
15.5 2.30 9.82517.0 2.45 11.175
2650
100175
300
Working Steps
1300
1750
3100
3550
4000
4450
1215
Construction Type
45-2 or 3
44-6 or
157-2 or
Assy Selection
Assy 2038-1
990
1295
2090
2395
3190
3495
0°
0°
Refer note 4 sheet 1.
Refer note 4 sheet 1.
45°
75°
15°
15°
15°
Stay position
Stay position
1680
2700Stay position
Structure VSO15
Structure VSO45
(Bridging insulators not required)
Structure VSO75
Bisect stay position
Stay position
Stay positions
positions
Stay
11/22/33kV CONCRETE POLE CONSTRUCTION
CONSTRUCTION
18 1534 2
20.8.10
1534 2
0°
15° 15°
15°
15°
8.475 914.0 2.15
C. Avenell
C. Noel
18.3.13
11C/VS15
22C/VS15
33C/VS15
11C/VS45
22C/VS45
33C/VS45
11C/VS75
22C/VS75
33C/VS75
450 Bisect stay position
Assy 173-1 or 7
5375
5500
LVABC
LVABC Earth Ferrule
LVABC5300
Refer Assy 90
Non Tension Connector
Bisect stay position
Stay position2850
2750
2035-9, 10, 12 or 14
2049-2 and
Assy Selection
2037-4, 5, 6 or 7
Assy Selection
Dwg. No. 1829 & 1830
Construction Concrete Pole
For OHEW refer 11/22/33kV
VERTICAL STRAIN WITH OHEW 15°, 45° & 75°
690
740
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
1L.Burton 18 1567 11567
11/22/33kV CONCRETE POLE CONSTRUCTION
MATERIAL
18/3/13VERTICAL TERMINATION WITH OHEW
C. Noel
C. Avenell
1.
NOTES:
22/33kV insulators shown
DESCRIPTIONASSY
2037-4
2037-5
2037-6
ASSY
MATERIAL - INSULATORS
2
Eyebolt M20 to concrete pole (300)
Eyebolt M20 to concrete pole (350)
Eyebolt M20 to concrete pole (400)
157-2 Insulator disc (B&S) termination (triple) with aluminium thimble
16kN
11kV 22/33kV
2038-1 Step bolt to concrete pole Refer sheet 2
QTY
QTY
details.
conductor per span. Refer assy 96 for
bad vibration areas fit 2 dampers per
conductor per span, except in known
Constructions. Fit one damper per
Vibration dampers fitted to Rural
Practices
foundations refer to Construction
For concrete pole attachments and
MATERIAL - HV CONSTRUCTION
3Insulator synthetic 33kV - termination with aluminium thimble45-3
DESCRIPTION
Dwg No 1857-1 to 12
Concrete Pole Folder
Refer manufacturing detail
24kN
2
32kN 40kN
45-2 Insulator synthetic 22kV - termination with cast iron thimble
44-63
Insulator disc (B&S) termination (double) with aluminium thimble
1
1 3
2037-7 Eyebolt M20 to concrete pole (450)
2
1
HARD COPYUNCONTROLLED
2.
loosening of the nut.
shall be burred to effectively prevent
thread immediately behind the nut
against the crossarm/pole. The
vertical plane and pulled tight
The eye of all eyebolts to be in the
3.
4.
5.
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
F
F
F
F
L. Burton 156718 1567 2
2
Pole
Conc.
00
2200
3300
1100
STEPS
POLE
HEIGHT
CONDUCTOR
DEPTH
SETTING
LENGTH
POLE
14.015.5
2.152.30
8.4759.825
17.0 2.45 11.175
2650
100
300
Working Steps
1300
500
Stay position
Stay position
2800Stay position
Stay position
1750
3100
3550
4000
4450 F
91215
11/22/33kV CONCRETE POLE CONSTRUCTION
Construction Type
VERTICAL TERMINATION WITH OHEW
11C/VT
22C/VT
33C/VT
C. Avenell
C. Noel
1318/3/
CONSTRUCTION
750
3750
5500
LVABC
LVABC5375
5300
157-2
44-6 or
45-2 or 3 or
Assy Selection
Assy 2038-1
2037-4, 5, 6 or 7
Assy Selection
Dwg. No. 1830
Construction Concrete Pole
For OHEW refer 11/22/33kV
LVABC Earth Ferrule
HARD COPYUNCONTROLLED
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
L. Burton 155518 1555 1
1
11/22/33kV CONCRETE POLE CONSTRUCTION
WITH OHEW - MATERIAL
ASSY
MATERIAL
169-2
2026-1
41-3
41-4
2038-1 Step bolt to concrete pole
60-12
2026-3
41-1
41-2
Pin insulator 11kV to 100 predrilled x-arm
Pin insulator 11kV to 125/150 predrilled x-arm
Pin insulator 22/33kV to 125/150 predrilled crossarm
3 3 3
3 3 3
3
3 3
11kVPollution
33kV Pollution
33kV or 22kV
6
3
3
3
6
DESCRIPTION
QTY
Crossarm predrilled single (100) 11/22/33 to concrete pole
Crossarm predrilled single (125) 11/22/33 to concrete pole
Brace double to predrilled x-arm (100/125)
Crossarm fibreglass 2400x100x100 intermediate 11kV
Crossarm predrilled 2400x100x100 intermediate 11kV31-1
31-2 Crossarm predrilled 2400x100x125 intermediate 11kV
Crossarm predrilled 2400x100x100 intermediate 22/33kV
Crossarm predrilled 2400x100x125 intermediate 22/33kV
6Pin insulator 22/33kV to 100 predrilled crossarm
Refer manufacturing dwg 1605
Stud insulator M24 to 100/125/150 predrilled crossarm
Pollution11kV
22kV
6
3
3
242-1
242-2
242-8 Crossarm Composite Fibre 2400x100x100 intermediate 22/33kV
2028-12
C. Avenell
C. Noel
7/3/13DOUBLE CIRCUIT - VERTICAL INTERMEDIATE
6
3
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
L. Burton 155518 1555 2
2
11/22/33kV CONCRETE POLE CONSTRUCTION
NOTES:
1.
2.
3.
4.
5.
6.
MATERIAL - INSULATORS
6
Insulator post 33kV46-3
213-7
46-1
46-2
Insulator pin 11kV
Insulator pin 22kV
11kV
6
6
6
Pollution
33kV
Pollution
22kV or 11kV
Pollution
33kV or 22kVASSY DESCRIPTION
QTY
WITH OHEW MATERIAL
22/33kV insulators shown.
ASSY DESCRIPTION
MATERIAL - BOLTS TO CONCRETE POLE
16kN 24kN 32kN 40kN
2Bolt and Nut M16 x 350
1Bolt and Nut M16 x 400 1
Bolt and Nut M16 x 450
1
QTY
ASSY DESCRIPTION
Bolt and Nut M20 x 500 3
Bolt and Nut M20 x 550 1
Bolt and Nut M20 x 600
1
2
MATERIAL - BOLTS TO X-ARM AND CONCRETE POLE
QTY 100 X-ARM
2
3
for the entire length that may come into contact with the wood.
All metalwork that passes through or into wood shall be greased
2 dampers per conductor per span. Refer assy 96 for details.
per conductor per span, except in known bad vibration areas fit
Vibration dampers fitted to Rural Constructions. Fit one damper
Construction Practices.
For concrete pole attachments and foundations refer to
2
2 3
Painted side of wood crossarm is to be the top surface when fitted.
Insulator post clamp top vertical 22/33kV M24 Stud
16kN 24kN 32kN 40kN
2036-14
2036-16
2036-18
2035-16
2035-17
2035-18
Dwg. No. 1605-1 to 12.
Manufacturing Detail Concrete Pole Folder
For pole manufacturing details refer
7/3/13DOUBLE CIRCUIT - VERTICAL INTERMEDIATE
C. Avenell
C. Noel
HARD COPYUNCONTROLLED
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
L. Burton 155518 1555 3
3
Lo
ad
12
5
F
F
F
10
0
F
F
F
F
00
2500
3700
4900
3500
4700
5900
5450
4250
3050
Pole
Co
nc
Work
ing S
teps
F
Construction Type
11/22/33kV CONCRETE POLE CONSTRUCTION
10
0
2038-1
Assy S
ele
cti
on
F
10
0
30
0
W ITH OHEW
2100
1200
1650
Work
ing S
teps
Ste
ps
Wo
rkin
g
Ste
ps
Wo
rkin
g
F
4100
Sta
y
5100
Sta
y
20
0
3155
4355
5555
Supply
Supply
Lo
ad
D11C/VI
D22C/VI
D33C/VI
C. Avenell
C. Noel
7/3/13
40
0
or
60
-12
41-1
, 2, 3, 4,
Assy S
ele
cti
on
21
3-7
46-1
, 2 o
r 3 o
r
Assy S
ele
cti
on
242-1
, 2 o
r 8
169-2
or
31-1
or
2 o
r
Assy
Sele
cti
on
24
00
X-A
rm
20
35
-16
, 1
7 o
r 1
8
20
26
-1 o
r 3
an
d
Assy
Sele
cti
on
20
36
-14
, 1
6 o
r 1
8
2028-1
2 a
nd
Assy S
ele
cti
on
6900
7100
LV
AB
C
LV
AB
C E
art
h F
err
ule
DOUBLE CIRCUIT - VERTICAL INTERMEDIATE
all
ow
ed f
or.
str
ain
/ t
erm
OH
EW
Both
Inte
rmedia
te &
Dw
g.
No
. 1
82
9 &
18
30
Co
nstr
ucti
on
Co
ncre
te P
ole
For
OH
EW
refe
r 11/2
2/3
3kV
50
0S
tay
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
L. Burton 148618 1486 1
1
QTYASSY
MATERIAL
MATERIAL - INSULATORS
ASSY DESCRIPTION
173-1
DESCRIPTION
173-3
173-7
173-9
Insulator post tie top 22/33kV
Insulator post tie top 11kV
Insulator post clamp top horizontal 11kV
Insulator post clamp top horizontal 22/33kV
11/22/33kV CONCRETE POLE CONSTRUCTION
2038-1 Step bolt to concrete pole
3Double gain base bracket to concrete pole
Bolt and Nut M20 x 450
Bolt and Nut M20 x 500
Bolt and Nut M20 x 400
ASSY DESCRIPTION24kN 32kN 40kN
MATERIAL - BOLT TO CONC. POLE
4
4 4
2
Bolt and Nut M20 x 350
16kN
2
4
QTY
2
2
4.
3.
2.22/33kV insulators shown.
1.
NOTES:
refer to Construction Practices.
For concrete pole attachments and foundations
conductor per span. Refer assy 96 for details.
in known bad vibration areas fit 2 dampers per
Fit one damper per conductor per span, except
Vibration dampers fitted to Rural Constructions.
HORIZONTAL POST WITH OHEW - MATERIAL
2049-10
Note 4
2035-10
2035-12
2035-14
2035-16
C. Noel
C. Avenell
8/3/13
Folder Dwg. No. 1603-1 to 12.
Manufacturing Detail Concrete Pole
For pole manufacturing details refer
DOUBLE CIRCUIT VERTICAL INTERMEDIATE / ANGLEHARD COPYUNCONTROLLED
B 16.12.13
B
6
11kV
6
11/22/33kV Pollution
22/33kV or
3
3
11kV
3
3
11/22/33kV Pollution
22/33kV or
QTY - INTERMEDIATE QTY - ANGLE
conductor clamp)
(comes with standard
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
L. Burton 148618 1486 2
2
11/22/33kV CONCRETE POLE CONSTRUCTION
HORIZONTAL POST W ITH OHEW
8/3/13
C. Avenell
C. Noel
1750
2950
4150
1350
2200
2650
3400
3850
4600
5050
F
pole
Co
nc
Wo
rkin
g s
tep
s
Wo
rkin
g s
tep
s
Wo
rkin
g s
tep
s
Wo
rkin
g s
tep
s
Construction Type
F
4700
Sta
y
2055
3255
4455
D11C/HPI
D22C/HPI
D33C/HPI
D11C/HPA
D22C/HPA
D33C/HPA
all
ow
ed f
or.
str
ain
/ t
erm
OH
EW
Both
Inte
rmedia
te &
Dw
g.
No
. 1
82
9 &
18
30
Co
nstr
ucti
on
Co
ncre
te P
ole
For
OH
EW
refe
r 11/2
2/3
3kV
00
10
02
00
30
04
00
Sta
y5
00
6150
6350
LV
AB
C
LV
AB
C E
art
h F
err
ule
20
35
-10
, 1
2,
14
or
16
2049-1
0 a
nd
Assy
Sele
cti
on
Assy 2
038-1
outs
ide a
ngle
Conducto
r posit
ion
f
insid
e a
ngle
Conducto
r posit
ion
f
F
173-3
or
9 (
Angle
)
or
17
3-1
or
7 (
Inte
rmed
iate
)
Assy S
ele
cti
on
DOUBLE CIRCUIT VERTICAL INTERMEDIATE / ANGLEHARD COPYUNCONTROLLED
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
L. Burton 155818 1558 1 1
11/22/33kV CONCRETE POLE CONSTRUCTION
NOTES:
1.
contact with the wood.
entire length that may come into
into wood shall be greased for the
All metalwork that passes through or
the top surface when fitted.
Painted side of crossarm is to be
for details.
conductor per span. Refer assy 96
bad vibration areas fit 2 dampers per
conductor per span, except in known
Constructions. Fit one damper per
Vibration dampers fitted to Rural
22/33kV insulators shown.
Practices.
foundations refer to Construction
For concrete pole attachments and
DOUBLE CIRCUIT - VERTICAL STRAIN
SINGLE CROSSARM WITH OHEW - MATERIAL
DESCRIPTIONASSY
MATERIAL
2026-3
Brace double to predrilled crossarm (150)
Brace double to predrilled crossarm (175)
2038-1 Step bolt to concrete pole
3
3
3
2026-1
Crossarm predrilled single (125) 11/22/33kV to conc pole
Crossarm predrilled single (100) 11/22/33kV to conc pole
74-5
74-6 Eyebolt M20 to predrilled 175/200 x-arm
Eyebolt M20 to predrilled 125/150 x-arm12
30-1
30-2
Crossarm predrilled 2400x150x100 strain/term 11/22/33kV
Crossarm predrilled 2400x175x125 strain/term 11/22/33kV
QTY
2014-4 Crossarm composite fibre 2400x125x125 strain/term 11/22/33kV
2028-12
2028-14
2028-16
Brace double to predrilled crossarm (100/125)
C. Avenell
C. Noel
7/3/13
ASSY DESCRIPTION
Bolt and Nut M20 x 600
Bolt and Nut M20 x 650
Bolt and Nut M20 x 500
3
3
MATERIAL - BOLT / COMBINER TO CROSSARM & CONC. POLE
Bolt and Nut M20 x 550
1
2 2
1 2
1
1
2
1
2
2
1
QTY 125 X-ARM QTY 150 X-ARM QTY 175 X-ARM
2
11
2
1
2
3
ASSY DESCRIPTION
MATERIAL - BOLTS TO CONCRETE POLE
16kN 24kN 32kN 40kN
1Bolt and Nut M16 x 300
Bolt and Nut M16 x 450
QTY
2
2036-12
2036-18
Bolt and Nut M16 x 400 122036-16
2Bolt and Nut M16 x 350 12036-14
2
1
16kN 24kN 32kN 40kN16kN 24kN 32kN 40kN16kN 24kN 32kN 40kN
2035-16
2035-17
2035-18
2035-19
Note 6
Folder Dwg. No. 1602-1 to 12.
Manufacturing Detail Concrete Pole
For pole manufacturing details refer
3.
4.
5.
6.
7.
2.
loosening of the the nut.
be burred to effectively prevent
immediately behind the nut shall
against the pole. The thread
vertical plane and pulled tight
The eye of all eyebolts to be in the
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
155818 1558 2 2
11/22/33kV CONCRETE POLE CONSTRUCTION
DOUBLE CIRCUIT - VERTICAL STRAIN
SINGLE CROSSARM WITH OHEW - MATERIAL
QTY
ASSY
44-5
44-6
11kV
Insulator disc (B&S) Termination (single) with aluminium thimble
Insulator disc (B&S) Termination (double) with aluminium thimble
MATERIAL - INSULATORS
DESCRIPTION
157-2 Insulator disc (B&S) Termination (triple) with aluminium thimble
45-1
45-2
45-3
Insulator synthetic 11kV - Termination with aluminium thimble
Insulator synthetic 22kV - Termination with aluminium thimble
Insulator synthetic 33kV - Termination with aluminium thimble
Pollution
or 11kV
22kV
12
12
or12
or
12
12
or
12
12
or
12
46-1
46-2
46-3
Insulator pin 11kV
Insulator pin 22kV
Insulator pin 33kV
6
6
6
DESCRIPTION
MATERIAL
ASSY
40-2
40-3
40-4
Pin insulator 11kV to 125/150 undrilled crossarm
Pin insulator 22/33kV to 100 undrilled crossarm
Pin insulator 22/33kV to 125/150 undrilled crossarm
41-2
6
QTY
Wood X-Arm Composite X-Arm
41-9 Pin insulator 11kV (pollution) to 125/150 predrilled crossarm 6
Pin insulator 11kV to 125/150 predrilled crossarm
Stud insulator M20 to 100/125/150 undrilled crossarm60-2
60-10 Stud insulator M20 to 100/125/150 predrilled crossarm
6173-7 Insulator post M20 tie top 22/33kV
Pollution
33kV
C. Noel
C. Avenell
L. Burton
7/3/13
40-1 Pin insulator 11kV to 100 undrilled crossarm
Pollution
22kV33kV
6
12
or
12
HARD COPYUNCONTROLLED
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
L. Burton 155818 1558 3
3
Lo
ad
12
5
F
F
F
17
5
F
F
F
2000
4400
3000
4200
5400
F
F
15
0
10
0
2550
3750
4950
Pole
Co
nc
Wo
rkin
g s
tep
s11/22/33kV CONCRETE POLE CONSTRUCTION
F
F
45-1
, 2 o
r 3
157-2
or
44-5
or
6 o
r
Assy S
ele
cti
on
ste
ps
Wo
rkin
g
ste
ps
Wo
rkin
g
F
1650
1200
Wo
rkin
g s
tep
s
3400
Sta
y
F
4600
Sta
yConstruction Type
5055
3855
2655
2200
Sta
y
3200
Supply
Supply Lo
ad
DOUBLE CIRCUIT - VERTICAL STRAIN
SINGLE CROSSARM W ITH OHEW
all
ow
ed f
or.
str
ain
/ t
erm
OH
EW
Both
Inte
rmedia
te &
00
10
02
00
30
04
00
Sta
y5
00
17
3-7
46-1
, 2 o
r 3 o
r
Assy S
ele
cti
on
2014-4
30-1
or
2 o
r
Assy S
ele
cti
on
2400 C
rossarm
20
36
-12
, 1
4,
16
or
18
20
28
-12
, 1
4 o
r 1
6 a
nd
Assy
Sele
cti
on
Assy 2
038-1
D11C/VS
D22C/VS
D33C/VS
LV
AB
C E
art
h F
err
ule
6500
6600
LV
AB
C
6400
LV
AB
C
Dw
g.
No
. 1
82
9 &
18
30
Co
nstr
ucti
on
Co
ncre
te P
ole
For
OH
EW
refe
r 11/2
2/3
3kV
74
-5 o
r 6
Assy S
ele
cti
on
7/3/13
C. Avenell
C. Noel
com
posit
e o
nly
12
5 c
rossarm
is
60
-2
40
-1,2
,3,4
or
60
-10
or
41
-2,
or
9 o
r
Assy S
ele
cti
on
20
35
-16
, 1
7,
18
, 1
9
20
26
-1 o
r 3
an
d
Assy
Sele
cti
on
125 (
Com
posit
e)
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
L. Burton 156618 1566 1 1
11/22/33kV CONCRETE POLE CONSTRUCTION
QTYDESCRIPTIONASSY
MATERIAL
Brace double to predrilled crossarm (150)
Brace double to predrilled crossarm (175)
2038-1 Step bolt to concrete pole
3
6
2026-9
Crossarm predrilled double (125) 11/22/33kV to conc pole
Crossarm predrilled double (100) 11/22/33kV to conc pole
74-5
74-612
30-1
6
30-2
DOUBLE CROSSARM WITH OHEW - MATERIAL
DOUBLE CIRCUIT - VERTICAL STRAIN8/3/13
C. Noel
C. Avenell
2014-4 Crossarm Composite fibre 2400x125x125 strain/term
Eyebolt M20 to predrilled 125/150 x-arm
Eyebolt M20 to predrilled 175 x-arm
2028-12
2028-14
2028-16
2026-11
Note 6
Brace double to predrilled crossarm (100/125)
Crossarm predrilled 2400x150x100 strain/term
Crossarm predrilled 2400x175x100 strain/term
NOTES:
1.
contact with the wood.
entire length that may come into
into wood shall be greased for the
All metalwork that passes through or
the top surface when fitted.
Painted side of crossarm is to be
for details.
conductor per span. Refer assy 96
bad vibration areas fit 2 dampers per
conductor per span, except in known
Constructions. Fit one damper per
Vibration dampers fitted to Rural
22/33kV insulators shown.
Practices.
foundations refer to Construction
For concrete pole attachments and
Folder Dwg. No. 1602-1 to 12.
Manufacturing Detail Concrete Pole
For pole manufacturing details refer
2.
3.
4.
5.
6.
7.
loosening of the nut.
be burred to effectively prevent
immediately behind the nut shall
against the pole. The thread
vertical plane and pulled tight
The eye of all eyebolts to be in the
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
156618 1566 2 2
11/22/33kV CONCRETE POLE CONSTRUCTION
DOUBLE CROSSARM WITH OHEW - MATERIAL
DOUBLE CIRCUIT - VERTICAL STRAIN
L. Burton
8/3/13
C. Noel
C. Avenell
ASSY DESCRIPTION
MATERIAL - BOLT / COMBINER TO CROSSARM & CONC. POLE
QTY 125 X-ARM QTY 150 X-ARM QTY 175 X-ARM
35-4
35-5
35-6
35-7
35-8
2
6
2
4 2
6 6
6
4
2
6
66
2
4
4
Bolt Combiner Double X-Arm (600)
Bolt Combiner Double X-Arm (650)
Bolt Combiner Double X-Arm (700)
Bolt Combiner Double X-Arm (750)
Bolt Combiner Double X-Arm (800)
35-10 Bolt Combiner Double X-Arm (900)
4
ASSY DESCRIPTION
MATERIAL - BOLTS TO CONCRETE POLE
16kN 24kN 32kN 40kN
1Bolt and Nut M16 x 300
Bolt and Nut M16 x 450
QTY
2
2036-12
2036-18
Bolt and Nut M16 x 400 122036-16
2Bolt and Nut M16 x 350 12036-14
2
1
16kN 24kN 32kN 40kN16kN 24kN 32kN 40kN16kN 24kN 32kN 40kN
Bolt and Nut M20 x 600
Bolt and Nut M20 x 650
Bolt and Nut M20 x 700
1
2 1
2
3 3
3
1
2
3
3
2035-18
2035-19
2035-20
Bolt and Nut M20 x 750
Bolt and Nut M20 x 900
2035-22
2035-26
Bolt and Nut M20 x 8002035-24
1
2 1
2
3 3
HARD COPYUNCONTROLLED
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
156618 1566 3 3
11/22/33kV CONCRETE POLE CONSTRUCTION
QTY
ASSY
44-5
44-6
11kV
Insulator disc (B&S) Termination (single) with aluminium thimble
Insulator disc (B&S) Termination (double) with aluminium thimble
MATERIAL - INSULATORS
DESCRIPTION
157-2 Insulator disc (B&S) Termination (triple) with aluminium thimble
45-1
45-2
45-3
Insulator synthetic 11kV - Termination with aluminium thimble
Insulator synthetic 22kV - Termination with aluminium thimble
Insulator synthetic 33kV - Termination with aluminium thimble
Pollution
or 11kV
22kV
12
12
or12
or
12
12
or
12
12
or
12
46-1
46-2
46-3
Insulator pin 11kV
Insulator pin 22kV
Insulator pin 33kV
6
6
6
DOUBLE CROSSARM WITH OHEW - MATERIAL
DOUBLE CIRCUIT - VERTICAL STRAIN
L. Burton
8/3/13
C. Noel
C. Avenell
DESCRIPTION
MATERIAL
ASSY
40-1 Pin insulator 11kV to 100 undrilled crossarm
40-2
40-3
40-4
Pin insulator 11kV to 125/150 undrilled crossarm
Pin insulator 22/33kV to 100 undrilled crossarm
Pin insulator 22/33kV to 125/150 undrilled crossarm
41-2
6
QTY
Wood X-Arm Composite X-Arm
41-9 Pin insulator 11kV (pollution) to 125/150 predrilled crossarm 6
Pin insulator 11kV to 125/150 predrilled crossarm
Stud insulator M20 to 100/125/150 undrilled crossarm60-2
60-10 Stud insulator M20 to 100/125/150 predrilled crossarm
6173-7 Insulator post M20 tie top 22/33kV
Pollution
33kV
Pollution
22kV33kV
6
12
12
or
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
156618 1566 4
4
F
F
F
F
2000
3200
4400
3000
4200
F
F
2550
3750
4950
Pole
Co
nc
11/22/33kV CONCRETE POLE CONSTRUCTION
45-1
, 2 o
r 3
157-2
or
44-5
or
6 o
r
Assy S
ele
cti
on
ste
ps
Wo
rkin
g
ste
ps
Wo
rkin
g
1650
3400
Sta
y
F
Supply
Lo
ad
F
F
15
0
12
5
F
F
4600
Sta
y
F
17
5
12
5
10
0
2655
3855
5055
Construction Type
2200
Sta
y
Supply
Lo
ad
DOUBLE CROSSARM W ITH OHEW
DOUBLE CIRCUIT - VERTICAL STRAIN
C. Noel
C. Avenell
L. Burton
2014-4
30-1
, 2 o
r
Assy S
ele
cti
on
20
35
-18
, 1
9,
20
, 2
2,
24
or
26
20
26
-9 o
r 1
1 a
nd
Assy
Sele
cti
on
20
36
-12
, 1
4,
16
or
18
20
28
-12
, 1
4,
16
an
d
Assy
Sele
cti
on
74
-5 o
r 6
Assy S
ele
cti
on
2400 X
-Arm
17
3-7
46-1
, 2 o
r 3 o
r
Assy S
ele
cti
on
1200
Wo
rkin
g s
tep
s
00
10
02
00
30
04
00
Sta
y5
00
Dw
g.
No
. 1
82
9 &
18
30
Co
nstr
ucti
on
Co
ncre
te P
ole
For
OH
EW
refe
r 11/2
2/3
3kV
all
ow
ed f
or.
str
ain
/ t
erm
OH
EW
Both
Inte
rmedia
te &
5400
Wo
rkin
g s
tep
s
F
Assy 2
038-1
LV
AB
C E
art
h F
err
ule
6500
6600
LV
AB
C
6400
LV
AB
C
com
posit
e o
nly
12
5 c
rossarm
is
35
-4,
5,
6,
7,
8 o
r 1
0
Assy S
ele
cti
on
8/3/13
D11C/VS
D22C/VS
D33C/VS
60
-10
41
-2,
or
9 o
r
60-2
or
40
-1,
2,
3 o
r 4
or
Assy S
ele
cti
on
HARD COPYUNCONTROLLED
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
L. Burton 155718 1557 1
1
11/22/33kV CONCRETE POLE CONSTRUCTION
SINGLE CROSSARM WITH OHEW - MATERIAL
DESCRIPTIONASSY
MATERIAL
2026-3
Brace double to predrilled crossarm (150)
Brace double to predrilled crossarm (175)
2038-1 Step bolt to concrete pole
3
3
3
2026-1
Crossarm predrilled single (125) 11/22/33kV to conc pole
Crossarm predrilled single (100) 11/22/33kV to conc pole
74-5
74-6 Eyebolt M20 to predrilled 175/200 x-arm
Eyebolt M20 to predrilled 125/150 x-arm6
30-1
30-2
Crossarm predrilled 2400x150x100 strain/term 11/22/33kV
Crossarm predrilled 2400x175x125 strain/term 11/22/33kV
QTY
NOTES:
1.
contact with the wood.
entire length that may come into
into wood shall be greased for the
All metalwork that passes through or
the top surface when fitted.
Painted side of crossarm is to be
for details.
conductor per span. Refer assy 96
bad vibration areas fit 2 dampers per
conductor per span, except in known
Constructions. Fit one damper per
Vibration dampers fitted to Rural
22/33kV insulators shown.
Practices.
foundations refer to Construction
For concrete pole attachments and
C. Avenell
C. Noel
2014-4 Crossarm composite fibre 2400x125x125 strain/term 11/22/33kV
2028-12
2028-14
2028-16
Brace double to predrilled crossarm (100/125)
DOUBLE CIRCUIT - VERTICAL TERMINATION
Note 6
7/3/13
Folder Dwg. No. 1602-1 to 12.
Manufacturing Detail Concrete Pole
For pole manufacturing details refer
2.
3.
4.
5.
6.
7.
loosening of the nut.
be burred to effectively prevent
immediately behind the nut shall
against the pole. The thread
vertical plane and pulled tight
The eye of all eyebolts to be in the
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
L. Burton 155718 1557 2
2
11/22/33kV CONCRETE POLE CONSTRUCTION
QTY
ASSY
44-5
44-6
11kV
Insulator disc (B&S) Termination (single) with aluminium thimble
Insulator disc (B&S) Termination (double) with aluminium thimble
MATERIAL - INSULATORS
DESCRIPTION
157-2 Insulator disc (B&S) Termination (triple) with aluminium thimble
45-1
45-2
45-3
Insulator synthetic 11kV - Termination with aluminium thimble
Insulator synthetic 22kV - Termination with aluminium thimble
Insulator synthetic 33kV - Termination with aluminium thimble
Pollution
22/33kV
Pollution
or 11kV
22kV
33kV
6
6
or6
or
6
6
or
6
6
or
6
SINGLE CROSSARM WITH OHEW - MATERIAL
ASSY DESCRIPTION
Bolt and Nut M20 x 600
Bolt and Nut M20 x 650
Bolt and Nut M20 x 500
3
3
MATERIAL - BOLT / COMBINER TO CROSSARM & CONC. POLE
Bolt and Nut M20 x 550
1
2 2
1 2
1
1
2
1
2
2
1
QTY 125 X-ARM QTY 150 X-ARM QTY 175 X-ARM
2
11
2
1
2
3
C. Avenell
C. Noel
7/3/13
ASSY DESCRIPTION
MATERIAL - BOLTS TO CONCRETE POLE
16kN 24kN 32kN 40kN
1Bolt and Nut M16 x 300
Bolt and Nut M16 x 450
QTY
2
2036-12
2036-18
Bolt and Nut M16 x 400 122036-16
2Bolt and Nut M16 x 350 12036-14
2
1
16kN 24kN 32kN 40kN16kN 24kN 32kN 40kN16kN 24kN 32kN 40kN
2035-16
2035-17
2035-18
2035-19
DOUBLE CIRCUIT - VERTICAL TERMINATIONHARD COPYUNCONTROLLED
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
L. Burton 155718 1557 3
3
Supply
12
5
F
F
17
5
F
F
F
2000
3200
4400
3000
4200
5400
F
15
0
10
0
3750
4950
Wo
rkin
g s
tep
s
F
Wo
rkin
g s
tep
s
Wo
rkin
g s
tep
s
12
5
11/22/33kV CONCRETE POLE CONSTRUCTION
2038-1
Assy
Sele
cti
on
F
2550
00
10
0
1650
1200
Wo
rkin
g s
tep
s
Sta
y3400
45-1
, 2 o
r 3
15
7-2
or
44
-5 o
r 6
or
Assy
Sele
cti
on
F
4600
Sta
y
Pole
Co
nc.
F
2655
3855
5055
Construction Type
SINGLE CROSSARM W ITH OHEW - MATERIAL
2200
Sta
y
Supply
7/3/13
C. Noel
C. Avenell
DOUBLE CIRCUIT - VERTICAL TERMINATION
20
03
00
40
0S
tay
50
0
74-5
or
6
Assy
Sele
cti
on
20
14
-4
30-1
or
2 o
r
Assy S
ele
cti
on
2400 C
rossarm
20
36
-12
, 1
4,
16
or
18
20
28
-12
, 1
4 o
r 1
6 a
nd
Assy
Sele
cti
on
6500
6600
LV
AB
C
LV
AB
C E
art
h F
err
ule
co
mp
osit
e o
nly
125 c
rossarm
is
D11C/VT
D22C/VT
D33C/VT6400
LV
AB
C
all
ow
ed f
or.
str
ain
/ t
erm
OH
EW
Both
Inte
rmedia
te &
Dw
g.
No
. 1
82
9 &
18
30
Co
nstr
ucti
on
Co
ncre
te P
ole
For
OH
EW
refe
r 11/2
2/3
3kV
20
35
-16
, 1
7,
18
, 1
9
20
26
-1 o
r 3
an
d
Assy
Sele
cti
on
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
L. Burton 156518 1565 1 1
11/22/33kV CONCRETE POLE CONSTRUCTION
DOUBLE CROSSARM WITH OHEW - MATERIAL
DOUBLE CIRCUIT - VERTICAL TERMINATION
NOTES:
1.
contact with the wood.
entire length that may come into
into wood shall be greased for the
All metalwork that passes through or
the top surface when fitted.
Painted side of crossarm is to be
for details.
conductor per span. Refer assy 96
bad vibration areas fit 2 dampers per
conductor per span, except in known
Constructions. Fit one damper per
Vibration dampers fitted to Rural
22/33kV insulators shown.
Practices.
foundations refer to Construction
For concrete pole attachments and
DESCRIPTIONASSY
MATERIAL
Brace double to predrilled crossarm (150)
Brace double to predrilled crossarm (175)
2038-1 Step bolt to concrete pole
6
3
Refer Manufacturing Dwg
6
2026-9
Crossarm predrilled single (125) 11/22/33kV to conc pole
Crossarm predrilled single (100) 11/22/33kV to conc pole
74-5
74-6 Eyebolt M20 to predrilled 175/200 x-arm
Eyebolt M20 to predrilled 125/150 x-arm6
30-1
30-2
Crossarm predrilled 2400x150x100 strain/term 11/22/33kV
Crossarm predrilled 2400x175x125 strain/term 11/22/33kV
QTY
2014-4 Crossarm composite fibre 2400x125x125 strain/term 11/22/33kV
2028-12
2028-14
2028-16
Brace double to predrilled crossarm (100/125)
C. Avenell
C. Noel
8/3/13
2026-11
Folder Dwg. No. 1602-1 to 12.
Manufacturing Detail Concrete Pole
For pole manufacturing details refer
2.
3.
4.
5.
6.
7.
loosening of the nut.
be burred to effectively prevent
immediately behind the nut shall
against the pole. The thread
vertical plane and pulled tight
The eye of all eyebolts to be in the
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
L. Burton 156518 1565 2 2
11/22/33kV CONCRETE POLE CONSTRUCTION
ASSY DESCRIPTION
MATERIAL - BOLT / COMBINER TO CROSSARM & CONC. POLE
QTY 125 X-ARM QTY 150 X-ARM QTY 175 X-ARM
35-4
35-5
35-6
35-7
35-8
2
6
2
4 2
6 6
6
4
2
6
66
2
4
4
Bolt Combiner Double X-Arm (600)
Bolt Combiner Double X-Arm (650)
Bolt Combiner Double X-Arm (700)
Bolt Combiner Double X-Arm (750)
Bolt Combiner Double X-Arm (800)
35-10 Bolt Combiner Double X-Arm (900)
4
DOUBLE CROSSARM WITH OHEW - MATERIAL
ASSY DESCRIPTION
MATERIAL - BOLTS TO CONCRETE POLE
16kN 24kN 32kN 40kN
1Bolt and Nut M16 x 300
Bolt and Nut M16 x 450
QTY
2
2036-12
2036-18
Bolt and Nut M16 x 400 122036-16
2Bolt and Nut M16 x 350 12036-14
2
1
16kN 24kN 32kN 40kN16kN 24kN 32kN 40kN16kN 24kN 32kN 40kN
Bolt and Nut M20 x 600
Bolt and Nut M20 x 650
Bolt and Nut M20 x 700
1
2 1
2
3 3
3
1
2
3
3
2035-18
2035-19
2035-20
Bolt and Nut M20 x 750
Bolt and Nut M20 x 900
2035-22
2035-26
Bolt and Nut M20 x 8002035-24
1
2 1
2
3 3
DOUBLE CIRCUIT - VERTICAL TERMINATION
C. Avenell
C. Noel
8/3/13HARD COPYUNCONTROLLED
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
L. Burton 156518 1565 3 3
11/22/33kV CONCRETE POLE CONSTRUCTION
QTY
ASSY
44-5
44-6
11kV
Insulator disc (B&S) Termination (single) with aluminium thimble
Insulator disc (B&S) Termination (double) with aluminium thimble
MATERIAL - INSULATORS
DESCRIPTION
157-2 Insulator disc (B&S) Termination (triple) with aluminium thimble
45-1
45-2
45-3
Insulator synthetic 11kV - Termination with aluminium thimble
Insulator synthetic 22kV - Termination with aluminium thimble
Insulator synthetic 33kV - Termination with aluminium thimble
Pollution
22/33kV
Pollution
or 11kV
22kV
33kV
6
6
or6
or
6
6
or
6
6
or
6
DOUBLE CROSSARM WITH OHEW - MATERIAL
C. Noel
C. Avenell
8/3/13DOUBLE CIRCUIT - VERTICAL TERMINATION
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
L. Burton 156518 1565 4
4
11/22/33kV CONCRETE POLE CONSTRUCTION
2000
3200
4400
3000
3750
4950
Wo
rkin
g s
tep
s
Wo
rkin
g s
tep
s
2550
Pole
Co
nc
1650
Sta
y3400
F
F
15
0
12
5
F
F
F
45-1
, 2 o
r 3
157-2
or
44-5
or
6 o
r
Assy S
ele
cti
on
F
F F
F
4600
Sta
y
2655
3855
5055
17
5
Construction Type
2200
Sta
y
4200
Ref.
No
te 7
Sh
. 1
2400 X
-Arm
Supply
Supply
DOUBLE CROSSARM W ITH OHEW
C. Noel
C. Avenell
DOUBLE CIRCUIT - VERTICAL TERMINATION8/3/13
D11C/VT
D22C/VT
D33C/VT1200
Wo
rkin
g s
tep
s
00
10
02
00
30
04
00
Sta
y5
00
Dw
g.
No
. 1
82
9 &
18
30
Co
nstr
ucti
on
Co
ncre
te P
ole
Fo
r O
HE
W r
efe
r 1
1/2
2/3
3k
V
all
ow
ed f
or.
str
ain
/ t
erm
OH
EW
Both
Inte
rmedia
te &
12
5
F
F10
0
5400
Wo
rkin
g s
tep
s
LV
AB
C E
art
h F
err
ule
6500
6600
LV
AB
C
6400
LV
AB
C
74
-5 o
r 6
Assy S
ele
cti
on
2014-4
30-1
or
2 o
r
Assy S
ele
cti
on
20
36
-12
, 1
4,
16
or
18
20
28
-12
, 1
4 o
r 1
6 a
nd
Assy
Sele
cti
on
Assy 2
038-1
35
-4,
5,
6,
7,
8 o
r 1
0
Assy S
ele
cti
on
co
mp
osit
e o
nly
125 c
rossarm
is
20
35
-18
, 1
9,
20
, 2
2,
24
or
26
20
26
-9 o
r 1
1 a
nd
Assy
Sele
cti
on
HARD COPYUNCONTROLLED
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5