CCTR-AllRev: 0124-01-08D E S C R I P T I O
NUOMManhour/UomA-1EngineeringD-14Detail EngineeringG-140Detail
EngineeringCCTR-14000Detail EngineeringSub
CCTR-140000000Tesingnos23.0000Sub CCTR-140000001Detail Drawings Eqv
A-3 Sizenos10.0000A-2ConstructionD-21CivilG-211Earth
WorkCCTR-21110Clearing / Grubbing / Stripping / Top Soil RemovalSub
CCTR-211100002Grading / grubs / shrubs / stumps / hedges / bush
(upto 15 cm depth) without compaction & haulagem20.0200Sub
CCTR-211100004Stripping / Top soil removal upto 30 cm depth without
compaction and haulagem20.0300Sub CCTR-211100006Stripping / Top
soil removal from 30 to 50 cm depth without compaction and
haulagem20.0300Sub CCTR-211100008Sub-Grade Preparation (300mm
thick)m20.0300CCTR-21120General Open Section Excavation by Machine
(without dewatering /shoring)Sub CCTR-211200001Open section
Excavation in Medium soil (upto 2m depth) & haul upto stockpile
area. (Within 1 km)m30.0200Sub CCTR-211200002Open section
Excavation in Medium soil (2 to 4 m depth) & haul upto stock
pile (Within 1 km)m30.0200Sub CCTR-211200003Open section Excavation
in Hard soil (upto 2 m depth) & haul upto stockpile area.
(Within 1 km)m30.0300Sub CCTR-211200004Open section Excavation in
Hard soil (2 to 4 m depth) & haul upto stockpile area (Within 1
km)m30.0300Sub CCTR-211200005Open section Excavation (Restricted
space) in rock with blasting & haul upto stockpile area (Within
1 km)m31.0000Sub CCTR-211200006Open section Excavation (Free space)
in rock with blasting & haul upto stockpile area (Within 1
km)m31.0000Sub CCTR-211200011Dredging & haul upto stockpile
area (Within 1 km)m30.5000CCTR-21122Structural / Fixed Section
Excavation by Machine (Without Dewatering / Shoring/Dressing)Sub
CCTR-211220001Fixed section Excavation by machine in Medium soil
(upto 2 m depth) & haul upto stockpilem30.8000Sub
CCTR-211220002Fixed section Excavation by machine in Medium soil (2
to 4 m depth) & haul upto stockpilem30.8000Sub
CCTR-211220003Fixed section Excavation by machine in Medium soil
(below 4m depth) & haul upto stockpilem31.0000Sub
CCTR-211220007Fixed section Excavation in Hard soil (upto 2 m
depth) & haul upto stockpilem32.0000Sub CCTR-211220008Fixed
section Excavation by machine in Hard (2 to 4 m depth) & haul
upto stockpilem32.0000Sub CCTR-211220009Fixed section excavation by
machine in Hard soil (below 4 m) & haul upto stock
aream32.0000CCTR-21124Structural / Fixed Section Excavation by Hand
(Without Dewatering / Shoring)Sub CCTR-211240001Fixed section
Excavation by hand in Medium soil (upto 2 m) & haul upto
stockpilem34.0000Sub CCTR-211240002Fixed section Excavation by hand
in Medium soil (from 2 to 4 m) & haul upto stockpilem35.0000Sub
CCTR-211240003Fixed section Excavation by hand in Medium soil
(below 4 m) & haul upto stockpilem36.0000Sub
CCTR-211240007Fixed section Excavation by hand in Hard soil (upto 2
m) & haul upto stockpilem310.0000Sub CCTR-211240008Fixed
section Excavation by hand in Hard soil (from 2 to 4 m) & haul
upto stockpilem312.0000Sub CCTR-211240009Fixed section Excavation
by hand in Hard soil (below 4 m) & haul upto
stockpilem315.0000CCTR-21130Back Filling General / Open section
with compactionSub CCTR-211300001General / Open section backfilling
with excavated material (Hauled from
stockpile)m30.1500328122.9670.820361809.714821751749.9919258706262.498788880626.249878888113.124939444Sub
CCTR-211300002General / Open section backfilling with borrow (sand,
clay) materialm30.1500Sub CCTR-211300003General / Open section
backfilling with borrow (granular) materialm30.1500CCTR-21131Back
Filling Structural / Fixed Section with CompactionSub
CCTR-211310010Structural Fixed section back filling and compaction
with Excavated material (Hauled from stock pile)m32.8000Sub
CCTR-211310020Structural Fixed section back filling and compaction
with Barrow material (Sand, clay)m32.8000Sub
CCTR-211310030Structural Fixed section back filling and compaction
with Barrow material (Granular)m32.8000CCTR-21132Formation of
Embankment (with compaction )Sub CCTR-211320010Formation of
compacted Embankment with Excavated material (Hauled form
Stockpile)m30.1500328122.9670.820361809.714821751749.9919258706262.498788880626.249878888113.124939444Sub
CCTR-211320020Formation of compacted Embankment with Barrow
material (sand,clay)m30.1500Sub CCTR-211320030Formation of
compacted Embankment with Barrow material (Gravel,
moorum))m30.2000CCTR-21135Fill without compactionSub
CCTR-211350001General fill by machine without compactionm30.0300Sub
CCTR-211350002General fill by hand without compactionm31.2000Sub
CCTR-211350003General fill by machine / hand without
compactionm30.4000CCTR-21140DisposalSub CCTR-211400001Disposal of
surplus soil / debris upto 5 Kmm30.0100Sub CCTR-211400002Disposal
of surplus soil / debris 5 to 10 Kmm30.0100Sub
CCTR-211400030Disposal of Surplus soil / debris 10 to 20
Kmm30.0100Sub CCTR-211400040Disposal of surplus soil / debris 20 to
30 Kmm30.0100Sub CCTR-211400050Disposal of surplus soil / debris 30
to 40 Kmm30.0100Sub CCTR-211400060Disposal of surplus soil / debris
more than 40 Kmm30.0100CCTR-21145CompactionSub
CCTR-211450001Compaction of earth in Fixed section (150 mm
depth)m30.2500Sub CCTR-211450002Compaction of earth in Open section
(150 mm depth)m30.1000Sub CCTR-211450003Vibroflotation / Deep
Vibrationm1.2000CCTR-21155Shoring (Erection & Stripping)Sub
CCTR-211550001Erection of Shoring for excavation Depth 2 ~ 4
metersm22.5000Sub CCTR-211550002Erection of shoring for excavation
Above 4 meters depthm24.0000CCTR-21160Termite Proofing /
TreatmentSub CCTR-211600001Termite
Treatmentm20.0200CCTR-21170DewateringSub CCTR-211700010Extra over
for excavation with dewatering (for soil below existing water
level)m32.5000CCTR-21180Boring / DrillingSub CCTR-211800010Boring
for pump installation Dia 4" to 6" depth up to 15 mm0.2000Sub
CCTR-211800020Boring for Piles dia 300 mm to 600 mm depth up to 12
mm0.2500Sub CCTR-211800030Boring for Piles dia 600 mm to 1000 mm
depth up to 12 mm0.3000Sub CCTR-211800040Boring for Piles dia 1000
mm to 1500 mm depth up to 12 mm0.3500Sub CCTR-211800050Extra over
for Boring of pile dia 300 mm to 600 mm depth greater than 12
mm0.3000Sub CCTR-211800060Extra over for Boring of pile dia 600 mm
to 1000 mm depth greater than 12 mm0.3500Sub CCTR-211800070Extra
over for Boring of pile dia 1500 mm to 1500 mm depth greater than
12 mm0.4000G-212ConcreteCCTR-21210Cement Concrete Production and
Supply at LocationSub CCTR-212100001Conc. Production by Batch
Plant, Cylinder Strength C15 (1:3:6) , OPm31.5000Sub
CCTR-212100002Conc. Production by Batch Plant, Cylinder Strength
C20 (1:2:4) , OPm31.5000Sub CCTR-212100003Conc. Production by Batch
Plant, Cylinder Strength C40 (1:1:2) , OPm31.5000Sub
CCTR-212100004Conc. Production by Batch Plant, Cylinder Strength
C15 (1:3:6) , SRm31.5000Sub CCTR-212100005Conc. Production by Batch
Plant, Cylinder Strength C20 (1:2:4) , SRm31.5000Sub
CCTR-212100006Conc. Production by Batch Plant, Cylinder Strength
C40 (1:1:2) , SRm31.5000Sub CCTR-212100007Conc. Production by Mixer
Machine, Cylinder Strength C17 (1:2.5:5) , OPm35.0000Sub
CCTR-212100008Conc. Production by Mixer Machine, Cylinder Strength
C20 (1:2:4) , OPm35.0000Sub CCTR-212100009Conc. Production by Mixer
Machine, Cylinder Strength C40 (1:1:2) , OPm35.0000Sub
CCTR-212100010Conc. Production by Mixer Machine, Cylinder Strength
C17 (1:2.5:5) ,SRm35.0000Sub CCTR-212100011Conc. Production by
Mixer Machine, Cylinder Strength C20 (1:2:4) , SRm35.0000Sub
CCTR-212100012Conc. Production by Mixer Machine, Cylinder Strength
C40 (1:1:2) , SRm35.0000Sub CCTR-212100025Conc. Production by Batch
Plant, Cylinder Strength C10 (1:4:8) , OPm31.5000Sub
CCTR-212100026Conc. Production by Batch Plant, Cylinder Strength
C10 (1:4:8) , SRm31.5000Sub CCTR-212100027Conc. Production by Mixer
Machine, Cylinder Strength C10 (1:4:8) , OPm35.0000Sub
CCTR-212100028Conc. Production by Mixer Machine, Cylinder Strength
C10 (1:4:8) , SRm35.0000Sub CCTR-212100033Conc. Production by Batch
Plant,Cylinder Strength C30 (1:1.5:3) , OPm31.5000Sub
CCTR-212100034Conc. Production by Batch Plant, Cylinder Strength
C30 (1:1.5:3) , SRm31.5000Sub CCTR-212100035Conc. Production by
Mixer Machine, Cylinder Strength C30 (1:1.5:3) , OPm35.0000Sub
CCTR-212100036Conc. Production by Mixer Machine, Cylinder Strength
C30 (1:1.5:3) , SRm35.0000Sub CCTR-212100037Conc. Production by
Batch Plant, Cylinder Strength C25 (1:1.75:3.5), OPm31.5000Sub
CCTR-212100038Conc. Production by Batch Plant, Cylinder Strength
C25 (1:1.75:3.5), SRm31.5000Sub CCTR-212100039Conc. Production by
Mixer Machine, Cylinder Strength C25 (1:1.75:3.5), OPm35.0000Sub
CCTR-212100040Conc. Production by Mixer Machine, Cylinder Strength
C25 (1:1.75:3.5), SRm35.0000Sub CCTR-212100041Conc. Production by
Batch Plant, Cylinder Strength C35 (1:1.25:2.5), OPm31.5000Sub
CCTR-212100042Conc. Production by Batch Plant, Cylinder Strength
C35 (1:1.25:2.5), SRm31.5000Sub CCTR-212100043Conc. Production by
Mixer Machine, Cylinder Strength C35 (1:1.25:2.5), OPm35.0000Sub
CCTR-212100044Conc. Production by Mixer Machine, Cylinder Strength
C35 (1:1.25:2.5), SRm35.0000Sub CCTR-212100500Extra-over for
Red-oxide (5 Kg/m3) added Concretem30.0100Sub
CCTR-212100510Extra-over for Micro Silica in Concretem30.0100Sub
CCTR-212100520Conc. Production by Batch Plant, Cylinder Strength C7
(1:6:12), OPm31.5000Sub CCTR-212100530Conc. Production by Batch
Plant, Cylinder Strength C17 (1:2.5:5), OPm31.5000Sub
CCTR-212100540Conc. Production by Mixer Machine, Cylinder Strength
C7 (1:6:12), OPm35.0000Sub CCTR-212100550Conc. Production by Mixer
Machine, Cylinder Strength C15 (1:3:6), OPm35.0000Sub
CCTR-212100560Conc. Production by Batch Plant, Cylinder Strength C7
(1:6:12), SRm31.5000Sub CCTR-212100570Conc. Production by Batch
Plant, Cylinder Strength C17 (1:2.5:5), SRm31.5000Sub
CCTR-212100580Conc. Production by Mixer Machine, Cylinder Strength
C7 (1:6:12), SRm35.0000Sub CCTR-212100590Conc. Production by Mixer
Machine,Cylinder Strength C15 (1:3:6), SRm35.0000Sub
CCTR-212100600Haulage only of concrete 1 to 5 km away from batching
locationm30.0100CCTR-21215Supply of Ready Mix ConcreteSub
CCTR-212150005Supply & Haul Ready Mix Concrete C-10
(OP)m30.0020Sub CCTR-212150010Supply & Haul Ready Mix Concrete
C-10 (SR)m30.0020Sub CCTR-212150015Supply & Haul Ready Mix
Concrete C-15 (OP)m30.0020Sub CCTR-212150020Supply & Haul Ready
Mix Concrete C-15 (SR)m30.0020Sub CCTR-212150025Supply & Haul
Ready Mix Concrete C-20 (OP)m30.0020Sub CCTR-212150030Supply &
Haul Ready Mix Concrete C-20 (SR)m30.0020Sub CCTR-212150035Supply
& Haul Ready Mix Concrete C-25 (OP)m30.0020Sub
CCTR-212150040Supply & Haul Ready Mix Concrete C-25
(SR)m30.0020Sub CCTR-212150045Supply & Haul Ready Mix Concrete
C-30 (OP)m30.0020Sub CCTR-212150050Supply & Haul Ready Mix
Concrete C-30 (SR)m30.0020Sub CCTR-212150055Supply & Haul Ready
Mix Concrete C-35 (OP)m30.0020Sub CCTR-212150060Supply & Haul
Ready Mix Concrete C-35 (SR)m30.0020Sub CCTR-212150065Supply &
Haul Ready Mix Concrete C-40 (OP)m30.0020Sub CCTR-212150070Supply
& Haul Ready Mix Concrete C-40 (SR)m30.0020Sub
CCTR-212150100Extra Over for Microsilicam30.0020Sub
CCTR-212150105Extra Over for Red Colouring Concretem30.0020Sub
CCTR-212150110Supply & Haul Ready Mix Fireproof Concrete (with
aditive) rating 1 Hourm30.0500Sub CCTR-212150115Supply & Haul
Ready Mix Fireproof Concrete (with aditive) rating 2
Hourm30.0500CCTR-21220Concrete Placing in Sub-StructureSub
CCTR-212200001Concrete Placing in Substructure by Concrete Pump /
Cranem36.0000Sub CCTR-212200002Concrete Placing in substructure by
wheel barrowsm310.0000Sub CCTR-212200003Concrete Placing in
substructure by chutem38.0000CCTR-21230Concrete Placing in Super
StructureSub CCTR-212300001Concrete placing in superstructure by
Concrete Pumpm310.0000Sub CCTR-212300002Concrete placing in
superstructure by cranem312.0000Sub CCTR-212300003Concrete Placing
in superstructure by Winch / Hoist / Wheel
barrowm316.0000CCTR-21235Fire ProofingSub CCTR-212350001Placing of
fire proof concrete (50 mm thk) by mortar panm20.1000Sub
CCTR-212350003Supply & Placing Ready Mix fireproof concrete (1
hour rating) with guniting (complete job with reinforcement) by
supplierm20.1000Sub CCTR-212350004Placing of fire proof concrete by
spray application (Guniting without forms) on structure (50 mm
thk)m20.1000Sub CCTR-212350005Placing of fire proof concrete on
Equipments (50 mm thk) by mortar panm23.5000Sub
CCTR-212350008Placing of fire proof concrete on structure (50 mm
thk), by Cranem23.6000Sub CCTR-212350010Placing of fire proof
concrete on Equipments (50 mm thk), by Cranem22.8500Sub
CCTR-212350110Supply and placing of Ready mix fireproof concrete (2
hour rating) with guniting (complete job with reinforcement) by
supplierm20.0800CCTR-21250Concrete Placing for Pre-Cast ElementsSub
CCTR-212500030Concrete Placing for Precast panels / louvers /
covers / windo sill (Excl. Formwork)m315.0000CCTR-21255Erection of
Pre-cast ElementsSub CCTR-212550001Erection of Pre-cast pannels /
louvers / covers / window sillm325.0000Sub CCTR-212550002Erection
of Pre-cast Girdersm325.0000CCTR-21260Concrete Placing with
Slipforms (including slipforms)Sub CCTR-212600010Concrete placing
for silos with slipforming (incl running slipforms)m320.0000Sub
CCTR-212600020Concrete placing for chimneys with slipforming (incl
running slipforms)m340.0000CCTR-21270GroutingSub
CCTR-212700001Place Ready mix non shrink Epoxy Grout (incl.
Formwork)m3350.0000Sub CCTR-212700002Place Ready mix non shrink
Cementious Grout (incl. Formwork)m3300.0000Sub CCTR-212700003Place
Non Ready mix Non-shrink (with aditive) Cement sand (PCC) Grout
(incl. Formwork)m3300.0000Sub CCTR-212700040Place PCC Grout without
aditive (incl. Formwork)m3100.0000CCTR-21280Concrete Placing for
PilesSub CCTR-212800010Concrete placing for pile by chute /
pumpm38.0000Sub CCTR-212800020Concrete placing for pile by Sub
contractorm30.2500G-213Form Work / ShutteringCCTR-21310Form Work
Sub-StructureSub CCTR-213100001Erection & stripping of metal
formwork for Substructurem26.5000Sub CCTR-213100002Erection &
stripping of Plywood formwork for
Substructurem25.0000CCTR-21320Form Work Super-StructureSub
CCTR-213200001Erection & stripping of Metal formwork for
Super-structurem210.0000Sub CCTR-213200002Erection & stripping
of Plywood formwork for Super- structurem28.0000Sub
CCTR-213200003Extra over for fair face formed surface (metal plate)
for Super-structurem20.5000Sub CCTR-213200004Extra over for fair
face formed surface (Ply wood) for
Super-structurem22.0000CCTR-21330Form Work Repair and
MaintenanceSub CCTR-213300010Form Work Repair and
Maintenancem21.6000CCTR-21340Form Work for Pre-Cast ElementsSub
CCTR-213400010Formwork for Pre-cast
Elementsm26.0000G-214RebarCCTR-21410Steel RebarSub
CCTR-214100025Cut, bend, shift, hoist & fix (BS -4449) Deformed
Steel Gr-250ton90.0000Sub CCTR-214100026Cut, bend, shift, hoist
& fix (BS -4449) Ribbed Tor Steel Gr-250ton90.0000Sub
CCTR-214100027Cut, bend, shift, hoist & fix (BS -4449) Plain
Steel Gr-250ton90.0000Sub CCTR-214100028Cut, bend, shift, hoist
& fix (BS -4449) Epoxy Coated Deformed Steel
Gr-250ton90.0000Sub CCTR-214100032Cut, bend, shift, hoist & fix
(BS -4449) Deformed Steel Gr-460ton90.0000Sub CCTR-214100033Cut,
bend, shift, hoist & fix (BS -4449) Ribbed Tor Steel
Gr-460ton90.0000Sub CCTR-214100034Cut, bend, shift, hoist & fix
(BS -4449) Epoxy Coated Deformed Steel Gr-460ton90.0000Sub
CCTR-214100037Cut, bend, shift, hoist & fix (ASTM A-615/ AASHTO
M-31) Deformed Steel Gr-40ton90.0000Sub CCTR-214100038Cut, bend,
shift, hoist & fix (ASTM A-82/ AASHTO M-32) Ribbed Tor Steel
Gr-40ton90.0000Sub CCTR-214100039Cut, bend, shift, hoist & fix
(ASTM A-615/ AASHTO M-31) Plain Steel Gr-40ton90.0000Sub
CCTR-214100040Cut, bend, shift, hoist & fix (ASTM A-615/ AASHTO
M-31) Epoxy Coated Deformed Steel Gr-40ton90.0000Sub
CCTR-214100044Cut, bend, shift, hoist & fix (ASTM A-615/ AASHTO
M-31) Deformed Steel Gr-60ton90.0000Sub CCTR-214100045Cut, bend,
shift, hoist & fix (ASTM A-82/ AASHTO M-32) Ribbed Tor Steel
Gr-60ton90.0000Sub CCTR-214100046Cut, bend, shift, hoist & fix
(ASTM A-615/ AASHTO M-31) Epoxy Coated Deformed Steel
Gr-60ton90.0000Sub CCTR-214100049Fix Only Pre-Fabricated &
Bended non epoxy coatedton50.0000Sub CCTR-214100050Fix Only
Pre-Fabricated & Bended Rebar epoxy coatedton50.0000Sub
CCTR-214100052Cut, bend (by machine) and Bind (at Yard) for
Pilington40.0000Sub CCTR-214100053Posttensioning of
steelton3.5000Sub CCTR-214100540Cut, bend, hoist & fix by sub
contractor non coated rebarton2.7000Sub CCTR-214100550Cut, bend,
hoist & fix by sub contractor epoxy coated
rebarton2.7000CCTR-21420Welded Wire FabricSub CCTR-214200004Laying
/ Fixing of M.S welded wire fabricton40.0000Sub
CCTR-214200005Laying / Fixing of Galvanized welded wire
fabricton40.0000Sub CCTR-214200006Laying / Fixing of Epoxy Coated
welded wire fabricton40.0000G-215Masonry Brick, Block and
PlasteringCCTR-21510Masonry (Brick) WorkSub CCTR-215100001Brick
masonry (Excluding wall ties) in sub - structurem320.0000Sub
CCTR-215100002Brick masonry upto 5 m (Excluding wall ties) in super
structurem323.5000Sub CCTR-215100004Brick masonry from 5 m to 10 m
(Excluding wall ties) in super structurem324.2500Sub
CCTR-215100006Brick masonry above 10 m (Excluding wall ties) in
super structurem325.0000Sub CCTR-215100007Brick masonry above 10 m
(with wall ties) in super structurem326.0000Sub CCTR-215100070Brick
Masonry facing tile for wallm27.0000Sub CCTR-215100080Glass Block
Workm20.2400Sub CCTR-215100090Installation of wall ties / dowels /
anchorage / reinforcement incl. cut, bend &
fixton90.0000CCTR-21520Masonry (Block) WorkSub CCTR-215200001Block
masonry (Excluding wall ties) in sub structurem314.0000Sub
CCTR-215200003Block masonry (Excluding wall ties) upto 5 m in super
structurem320.0000Sub CCTR-215200004Block masonry (Excluding wall
ties) 5 m to 10 m in super structurem320.0000Sub
CCTR-215200006Block masonry (Excluding wall ties) above 10 m in
super structurem320.0000Sub CCTR-215200070Preparation of Masonry
Hollow Blocksm38.0000Sub CCTR-215200080Preparation of Masonry Solid
Blocksm38.0000Sub CCTR-215200090Filling cavity of Hollow
Blocksm316.0000CCTR-21525Plaster / Pointing WorkSub
CCTR-215250001Plaster / Pointing for Height upto 5.0 metres
(Excluding metal Lath) in wallsm22.0000Sub CCTR-215250002For Height
upto 5.0 metres (with metal Lath) in wallsm22.2500Sub
CCTR-215250003Plaster / Pointing for Height between 5.0 m to 10 m
(Excluding metal lath) in wallsm22.2500Sub CCTR-215250005Plaster /
Pointing for Height above 10 m (Excluding metal Lath) in
wallsm22.5000Sub CCTR-215250007Plaster / Pointing for Ceiling at
any heightm22.2500Sub CCTR-215250080Installation of metal lath /
beeds on masonarym1.0000CCTR-21540Stone Pitching / Rip Rap /
GabionSub CCTR-215400010Stone Pitching / Rip Rap / Gabion 6" deep
(Grouted)m320.00001SupervisorSub CCTR-215400020Stone Pitching / Rip
Rap / Gabion 6" deep (Non grouted)m315.00002ForemanG-216Flooring
& Tiling4MasonCCTR-21610Flooring4LabourerSub
CCTR-216100001Place concrete P.C.C / R.C.C for floor 2"thk
(Excluding Joint Sealant)m36.00004Semi SkilledSub
CCTR-216100002Place concrete P.C.C / R.C.C for floor 4" to 6" thk
(Excluding Joint Sealant)m35.00004Skilled LabourSub
CCTR-216100007Application of Hardening / Anti dust / Anti skid /
Epoxy treatment (2 coats) incl surface preparationm20.60003Stone
CutterSub CCTR-216100008Place cement topping / levelling mortar /
screeding (30mm / 50mm)m36.0000Sub CCTR-216100009Prepare &
Place Terrazo (cast - in - place) with Grinding &
Polishingm25.0000Sub CCTR-216100010Lay Brick-on-edge paving with
sand groutingm22.5000Sub CCTR-216100012Lay Brick Ballast 3"
thkm20.4200Sub CCTR-216100013Installation of Raised / Floating
floor with pivotm20.1800CCTR-21620Tiling / SkirtingSub
CCTR-216200001Installation of PVC / VCT tiles for
flooringm21.2500Sub CCTR-216200002Installation of AR/Anti acid
tiles for flooringm24.5000Sub CCTR-216200003Installation of Marble
/ Granite tiles for flooring with polishing.m26.5000Sub
CCTR-216200004Installation of Ceramic for flooringm24.5000Sub
CCTR-216200006Installation of Terrazo tiles (pre-cast) for flooring
with polishingm23.0000Sub CCTR-216200008Installation of Tuff/Inter
locking tilesm21.5000Sub CCTR-216200010Installation of PVC tiles /
strip for dado / skirtingm21.5000Sub CCTR-216200011Installation of
Terrazo tiles for dado / skirtingm23.5000Sub
CCTR-216200012Installation of Ceramic tiles for dado /
skirtingm25.0000Sub CCTR-216200013Installation of Marble tiles for
dado / skirtingm27.0000Sub CCTR-216200014Installation of Vinyl
tiles for dado / skirtingm21.5000Sub CCTR-216200150Installation of
AR / Anti Acid tiles for dado /
skirtingm25.0000G-217RoadsCCTR-21710Granular Base / Sub Base for
RoadSub CCTR-217100010Fill and compaction for Base of
Roadm30.2000328122.9670.820361809.714821751749.9919258706349.998385174134.999838517417.4999192587Sub
CCTR-217100020Fill and compaction for Sub Base of Roadm30.2000Sub
CCTR-217100030Fill and compaction for Water Bound Maccadom of
Roadm30.2000CCTR-21740Production of Asphalt Concrete and Supply at
LocationSub CCTR-217400001Production of Binder course by Asphalt
Batch plantm31.5000Sub CCTR-217400002Haulage of Asphalt mix up to 2
Km away / Kmm30.0250Sub CCTR-217400003Haulage of Asphalt mix above
2 Km to 5 Km away / Kmm30.2500Sub CCTR-217400004Haulage of Asphalt
mix above 5 Km to 10 Km away / Kmm30.2500Sub CCTR-217400005Haulage
of Asphalt mix above 10 Km to 30 Km away / Kmm30.2500Sub
CCTR-217400006Production of Wear course by Asphalt Batch
plantm31.5000Sub CCTR-217400011Production of Binder Course by mixer
/ Burnerm34.2500Sub CCTR-217400012Production of Wear Course by
mixer / Burnerm34.2500Sub CCTR-217400013Supply, Lay & compact
Ready Mix A.B.C from subcontractor at Locationm30.5000Sub
CCTR-217400014Production of Asphalt Mastic by Batch Plant and
supply at locationm30.3000Sub CCTR-217400015Production of Asphalt
mastic by Mixer / Burnerm34.2500Sub CCTR-217400016Supply, Lay &
compact Ready Mix A.W.C from subcontractor at
Locationm30.5000CCTR-21745Placing and compaction of Asphaltic
Concrete / masticSub CCTR-217450001Placing Binder course by paver
incl. compaction, in unconfined aream32.0000Sub
CCTR-217450002Placing Binder Course by paver incl. compaction, in
confined
aream33.0000328122.9670.166712561.6329909355.65212318521066.9563695555106.695636955553.3478184778Sub
CCTR-217450003Placing Wear course by paver incl. compaction, in
unconfined aream32.0000Sub CCTR-217450004Placing Wear Course by
paver incl. compaction, in confined aream33.0000Sub
CCTR-217450007Placing Asphalt mix by Cart / Wheel barrow incl.
compactionm39.0000CCTR-21746Placing & compaction of DST /
TSTSub CCTR-217460008Placing of T.S.T. incl. Primer, tack coat and
compactionm20.5000Sub CCTR-217460010Placing D.S.T. incl . Primer ,
Tack coat and compactionm20.4000CCTR-21748Asphalt Tack / Prime
CoatSub CCTR-217480006Primer Coat Applicationm20.0200Sub
CCTR-217480009Tack Coat Applicationm20.0200Sub CCTR-217480030Supply
& Application of Tack Coat By Sub-Contractorm20.0300Sub
CCTR-217480040Supply & Application of Asphalt Prime Coat By
Sub-Contractorm20.0300CCTR-21750Road Curb / MarkingSub
CCTR-217500002Installation of kurb stone with lean haunch,
groutm0.9000Sub CCTR-217500005Markings on main/internal straight
road. (lines)m20.1000Sub CCTR-217500006Markings on main/internal
curved road
(lines)m20.100032810.3830.00003769.869106.734682899210.67346828991.0673468290.5336734145Sub
CCTR-217500007Markings on main/internal straight road. (Arrow /
letters)m20.1000Sub CCTR-217500008Markings on main/internal curved
road. (Arrow / letters)m20.1000CCTR-21751Road Guard RailSub
CCTR-217510120Installation of W-Beam Guard Rail with
postsm2.00002000020000200004000059.701492537329.8507462687500CCTR-21752Road
Signs/reflectors67000Sub CCTR-217520090install cat eyes /
reflectors on roadnos0.1200Sub CCTR-217520100Install mile / km
stone excl. other civil worksnos5.0000Sub CCTR-217520110Install
traffic sign board with pole, excl. other civil
worksnos4.00006700CCTR-21753Road Curb SupplySub
CCTR-217530001Supply of ready made kurb stonem31.2500CCTR-21754Road
Curb InstallationSub CCTR-217540002Installation of Kurb stone with
lean haunch, groutm0.9000G-218Other Civil WorksCCTR-21805Roofing/
Cladding/ Siding/ Decking/ Partition wall/ False ceilingSub
CCTR-218050010Roofing with metal sandwich pannel incl. flashing /
ridge and sealant.m21.5000Sub CCTR-218050020Roofing with G.I /
Asbestos sheet incl. ridge & accessoriesm20.5000Sub
CCTR-218050030Wall cladding / siding with metal sandwich pannel
incl. fixing prefab. flashing and sealantm22.5000Sub
CCTR-218050040Roof decking with galvanized corrugated steel
sheetsm20.9000Sub CCTR-218050050Wall cladding / siding with
aluminium corrugated sheetm21.0000Sub CCTR-218050060Wall cladding /
siding with galvanized corrugated sheetm21.0000Sub
CCTR-218050070Install partition wall with metal studs.m21.2500Sub
CCTR-218050080Erection of shear / connector boltsnos0.1000Sub
CCTR-218050090Installation of false ceiling with aluminium supports
& mineral fiber tilesm20.1000Sub CCTR-218050100Installation of
false ceiling with Dumpa brand (perforated metal) tilesm20.1000Sub
CCTR-218050110Installation of false ceiling with aluminium supports
& gypsum board tilesm20.1000Sub CCTR-218050120Installation of
false ceiling with aluminium supports & polystyrene board
tilesm20.1000Sub CCTR-218050130Installation of false ceiling with
aluminium supports & acoustic board
tilesm20.1000CCTR-21810Doors, Windows, Cabinets, Hand RailSub
CCTR-218100001Installation of wooden door framem0.5000Sub
CCTR-218100002Installation of wooden / Ply wood door panels
excluding iron mongriesm21.1000Sub CCTR-218100004Installation of
fly/insect proof door (metal / wood)m21.0000Sub
CCTR-218100005Installation of metal hollow frame incl. PCC grouting
between wall & framem1.0000Sub CCTR-218100006Installation of
metal door (single skin) excluding iron mongrym21.5000Sub
CCTR-218100007Installation of metal door (double skin) excluding
iron mongrym21.5000Sub CCTR-218100008Install metal folding
(scissors type ) Door / gate.m24.5000Sub CCTR-218100009Install fire
resistant door excluding iron mongriesm24.5000Sub
CCTR-218100010Installation of Blast proof door excluding iron
mongriesm25.0000Sub CCTR-218100012Installation of metal gate/access
door (3000x5000) excluding iron mongriesm23.6000Sub
CCTR-218100014Installation of rolling shutter incl. frame and
accessoriesm28.0000Sub CCTR-218100015Installation of Al. door
(swing/sliding) incl. frame.m21.2000Sub CCTR-218100017Installation
of steel window / ventilator excluding iron mongriesm24.0000Sub
CCTR-218100021Installation of steel grill for doors / windows /
ventilatorsm21.2500Sub CCTR-218100026Install wooden window /
ventilator excluding iron mongriesm24.0000Sub CCTR-218100027Install
Aluminium window / ventilatorsm21.5000Sub CCTR-218100030Install
window blinds (vertical / horizontal)m20.2500Sub
CCTR-218100031Fixing clear / float / tinted/
wire/sheet/plain/patterned/reflective glassm21.6000Sub
CCTR-218100032Fixing plastic / polycarbonate sheetm21.6000Sub
CCTR-218100330Wall Cabinetm21.5000Sub CCTR-218100340Base
Cabinetm21.0000CCTR-21815Non Structural steel (Chequired plate/C.I.
Cover/Grating/Hand Rail, Guard Rail etc.)Sub
CCTR-218150001Fabrication of chequered plate (52
Kg/M2)ton80.0000Sub CCTR-218150003Erection of Chequired plate (52
Kg/ m2)ton55.0000Sub CCTR-218150004Erection of C.I. cover / grating
with frame incl. groutington50.0000Sub CCTR-218150050Installation
of wooden hand rails (banister) with blusterm5.0000Sub
CCTR-218150060Installation of Aluminium hand rails (banister)
balusterm2.5000Sub CCTR-218150070fabrication and erection of M.S. /
G.I Hand rail (banister) with blusterm3.5000Sub
CCTR-218150080Erection of Guard rail with chainm0.7000Sub
CCTR-218150090Erection of M.S rails for transformer / crane with
expansion bolt & anchor (65 kg/m)m2.0000Sub
CCTR-218150100Fabrication of stop barrier size (150 mm x
8M)nos15.0000Sub CCTR-218150110Erection of stop barrier (150 mm x
8M)nos7.5000CCTR-21820Plumbing and SanitationSub
CCTR-218200001Fixing of wash basin (without faucet)nos5.0000Sub
CCTR-218200002Fixing of waste pipe / wash basin
pedestalnos1.5000Sub CCTR-218200003Fixing of bath room mirror (18"
X 24")nos1.5000Sub CCTR-218200004Fixing of soap dish / dispenser /
tooth brush holdernos1.0000Sub CCTR-218200005Fixing of towel
railnos1.0000Sub CCTR-218200006Fixing of toilet paper holder /
dispensernos1.0000Sub CCTR-218200007Fixing of W.C. (European type)
with flush cistern / tanknos6.0000Sub CCTR-218200008Fixing of W.C.
(Indian type) without flush tanknos6.0000Sub CCTR-218200009Fixing
of Urinalnos6.0000Sub CCTR-218200010Fixing of Faucetsnos1.5000Sub
CCTR-218200011Fixing of Shower / Telephone or Muslim
Showernos1.5000Sub CCTR-218200012Fixing of water heater
(Geyser)nos8.0000Sub CCTR-218200013Fixing of Fiberglass tank (500 G
~ 2000 G)nos8.0000Sub CCTR-218200014Fixing of bathroom
shelfnos1.5000Sub CCTR-218200015Fixing of bathroom Tub, complete
with supportsnos10.0000Sub CCTR-218200016Fixing of hand
dryernos2.0000Sub CCTR-218200017Fixing of accessory
traynos1.0000Sub CCTR-218200018Fixing of waste
receptaclenos1.0000Sub CCTR-218200019Fixing of Kitchen
Sinknos8.0000Sub CCTR-218200020Fixing of Emergency Eye wash /
Showernos8.0000Sub CCTR-218200021Fixing of Water filters (
Cartridge style, dirt & dust type)nos3.0000Sub
CCTR-218200022Cast Iron gate valves dia 1"nos0.2000Sub
CCTR-218200023Cast Iron gate valves dia 1-1/2"nos0.2500Sub
CCTR-218200024Cast Iron gate valves dia 2"nos0.2500Sub
CCTR-218200025Check valves dia 1"nos0.2000Sub CCTR-218200026Check
valves dia 2"nos0.2000Sub CCTR-218200027Floor trap, gully 3" to 6"
P, S or Q typenos1.2500Sub CCTR-218200028Mixer tap for wash
basinsnos1.0000Sub CCTR-218200029Shower complete
setnos1.500040200Sub CCTR-218200030Gas Cock (brass) 3/ 4 "
dianos0.2500Sub CCTR-218200031Floor drain 3" to 6"
dianos1.0000CCTR-21825Hard ware / Iron Mongries / ProtectionSub
CCTR-218250002Fixing of Antipanic / escape devicenos2.0000Sub
CCTR-218250004Fixing of Door closer / Springnos1.5000Sub
CCTR-218250006Fixing of door /Windows handelsnos0.5000Sub
CCTR-218250009Fixing of Straggle (One piece overlaping)m0.3300Sub
CCTR-218250011fixing of Door mortise lockset / rim locknos1.0000Sub
CCTR-218250022Misc. Doors / windows hard ware and
accessoriesnos1.0000CCTR-21830Piping (Under Ground or Above
Ground)Sub CCTR-218300001Laying, Jointing & hydrotest of RCC
pipes dia 150mm excl. excavation, backfilling &
Haunchingm1.5000Sub CCTR-218300002Laying, Jointing &
hydrotesting of RCC pipes dia 200mm excl. excavation, backfilling
and haunchingm1.5000Sub CCTR-218300003Laying, Jointing &
hydrotesting of RCC pipes dia 250mm excl. excavation, backfilling
and haunchingm2.5000Sub CCTR-218300004Laying, jointing &
hydrotesting of RCC pipes dia 300mm excel. excavation, backfilling
and haunchingm2.5000Sub CCTR-218300005Laying. jointing &
hydrotesting of RCC pipes dia 400mm excl.excavation, backfilling
& haunchingm2.5000Sub CCTR-218300006Laying, jointing &
hydrotesting of RCC pipes dia 450mm excl. excavation, backfilling
& haunchingm2.5000Sub CCTR-218300007Laying, jointing &
hydrotesting of RCC pipes dia 500mm excl. excavation, backfilling
& haunchingm2.5000Sub CCTR-218300008Laying, jointing &
hydrotesting of RCC pipe dia 600mm excl. excavation. backfilling
& haunchingm2.5000Sub CCTR-218300009Laying, jointing &
hydrotesting of RCC pipes dia 750mm excl. excavation, backfilling
& haunchingm3.0000Sub CCTR-218300010Laying, jointing &
hydrotesting of RCC pipes dia 900mm excl. excavation, backfilling
& haunchingm3.5000Sub CCTR-218300011Laying, jointing, &
hydrotesting of RCC pipes dia 1000mm excl. excavation, backfilling
& haunchingm4.0000Sub CCTR-218300012Laying, jointing &
hydrotesting of RCC pipes dia 1200mm excl. excavation, backfilling
& haunchingm4.5000Sub CCTR-218300013Laying & Jointing of
PVC dia 19 mm pipes excl. excavation, casing or concretem0.5000Sub
CCTR-218300014Laying & Jointing of PVC dia 25 mm pipes excl.
excavation, casing or concretem0.5000Sub CCTR-218300015Laying &
Jointing of PVC dia 37 mm pipes excl. excavation, casing or
concretem0.1800Sub CCTR-218300016Laying & Jointing of PVC dia
50 mm pipes excl. excavation, casing or concretem0.5000Sub
CCTR-218300017Laying & Jointing of PVC dia 75 mm pipes excl.
excavation, casing or concretem1.0000Sub CCTR-218300018Laying &
Jointing of PVC dia 100 mm pipes excl. excavation, casing or
concretem1.0000Sub CCTR-218300019Laying & Jointing of PVC dia
150 mm pipes excl. excavation, casing or concretem0.6000Sub
CCTR-218300020Laying & Jointing of PVC dia 200 mm pipes excl.
excavation, casing or concretem1.0000Sub CCTR-218300021Laying &
Jointing of PVC dia 250 mm pipes excl. excavation, casing or
concretem1.0000Sub CCTR-218300022Laying & Jointing of PVC dia
300 mm pipes excl. excavation, casing or concretem1.0000Sub
CCTR-218300047Laying of G.I pipes dia 12mm excl. excavation,
backfillingm0.5000Sub CCTR-218300048Laying of G.I pipes dia 19mm
excl. excavation, backfillingm0.5000Sub CCTR-218300049Laying of G.I
pipes dia 25mm excl. excavation, backfillingm0.5500Sub
CCTR-218300050Laying of G.I pipes dia 38mm excl. excavation,
backfillingm0.7500Sub CCTR-218300051Laying of G.I pipes dia 50mm
excl. excavation, backfillingm0.8500Sub CCTR-218300052Laying of G.I
pipes dia 75mm excl. excavation, backfillingm1.0000Sub
CCTR-218300053Laying of G.I pipes dia 100mm excl. excavation,
backfillingm1.2500Sub CCTR-218300054Laying of G.I pipes dia 150mm
excl. excavation, backfillingm1.7500Sub CCTR-218300091Laying of
cast iron pipe dia 100mm excl. excavation, backfillingm1.5000Sub
CCTR-218300092Laying of cast iron pipe dia 150mm excl. excavation,
backfillingm1.5000Sub CCTR-218300093Laying of cast iron pipe dia
200mm excl. excavation, backfillingm2.0000Sub CCTR-218300094Laying
of cast iron pipe dia 250mm excl. excavation, backfillingm2.5000Sub
CCTR-218300095Laying of cast iron pipe dia 300mm excl. excavation,
backfillingm3.0000CCTR-21840Water Proofing / Roof TreatmentSub
CCTR-218400001Bitumen coating (Single coat)m20.3000Sub
CCTR-218400002Laying craft paper single layerm20.7000Sub
CCTR-218400004Laying polyethylene sheet one layerm20.0500Sub
CCTR-218400005Water proofing (product item) single coatm20.4000Sub
CCTR-218400007Lay Geotextile fabric / polypropylene (single
layer)m20.1300Sub CCTR-218400010Water proofing of foundation with
Synthaprufe (Under ground)m20.6000Sub CCTR-218400011Water proofing
of foundation with epoxy (Above ground)m20.6000Sub
CCTR-218400012Water proofing of foundation with Asphalt Bitumen
Emulsionm21.2000Sub CCTR-218400013Waterproofing protection Hard
Boardm20.2500Sub CCTR-218400080Fabricate and install metal (copper
/ G.I) water stopperm1.5000Sub CCTR-218400090Installation of EPDM /
LDPE (self adhesive / non adhesive) single layerm23.0000Sub
CCTR-218400100Bitumen coating with polyethylene sheet sand and tuff
tile (grouted)m23.0000Sub CCTR-218400110Foam concrete incl.
batching with mixer machine & haul / transport, place and
finishm310.0000Sub CCTR-218400120Lay sand cushionm31.4000Sub
CCTR-218400130Lay Thermopore sheetm20.1300Sub CCTR-218400140Cold
applied bitumen emulsion single coatm20.7500Sub
CCTR-218400150Install water stopper (PVC)m1.0000Sub
CCTR-218400160Application of rubber lining in pitsm20.2500Sub
CCTR-218400170Installation of bituminized felt single
layerm20.4000Sub CCTR-218400200Place screed on Roof (20 to 60 mm
thk)m310.0000Sub CCTR-218400210Spread pea gravel at top of
roofm34.0000Sub CCTR-218400220Installation of brick tiles on
roofm22.5000Sub CCTR-218400230Installation of Concrete Precast
tiles on roofm22.0000Sub CCTR-218400240Grouting of roof tiles
(concrete / clay)m20.6000Sub CCTR-218400250Install cant strip on
roof (treated timber / foamglass) 4"x4" or 1-1/2"x5"m0.2500Sub
CCTR-218400260Fixing of A.C / C.I / PVC Roof drain Pipe (4" to 6"
dia)m0.4500Sub CCTR-218400270Fixing of Cowelsnos0.0600Sub
CCTR-218400280Fixing of rain water down spout (4" to
6")nos2.0000Sub CCTR-218400290Fixing of Precast splash
blocknos0.6000Sub CCTR-218400300Fixing of Roof scupper (6" to 8"
dia)nos0.6000Sub CCTR-218400310Fabrication & erection of roof
gutter with MS/G.I sheet (6" to 8") incl. supports &
paintingm2.0000Sub CCTR-218400320Fabrication & erection G.I /
SS coping on parapet (8" or 10")m0.5000Sub CCTR-218400330Erection
of prefabricated G.I / SS coping on parapet (8" or 10"
wide)m0.3000Sub CCTR-218400340Install precast concrete coping 10"
widem0.5500Sub CCTR-218400350Installation of prefabricated metal
flashing / Ridgem0.2000Sub CCTR-218400360Fabrication & erection
of metal (MS/SS/G.I) flashingm0.5000Sub CCTR-218400370Supply and
fixing of catch basinnos3.0000CCTR-21850Surface Preparation and
Painting on Concrete / MasonrySub CCTR-218500001Primer & 2~3
coats upto 5.0 meter (Distemper)m21.2500Sub CCTR-218500002Primer
& 2~3 coats above 5.0 meter (Distemper)m21.5000Sub
CCTR-218500003Primer & 2~3 coats upto 5.0 meter ( White
wash)m20.3000Sub CCTR-218500004Primer & 2~3 coats above 5.0
meter (White wash)m20.4000Sub CCTR-218500005Primer & 2~3 coats
upto 5.0 meter (Emulsion)m22.5000Sub CCTR-218500006Primer & 2~3
coats above 5.0 meter (Emulsion)m22.7500Sub CCTR-218500007Primer
& 2~3 coats upto 5.0 meter (Alkyd Enamel)m22.5000Sub
CCTR-218500008Primer & 2~3 coats above 5.0 meter (Alkyd
Enamel)m22.7500Sub CCTR-218500009Primer & 2~3 coats upto 5.0
meter (weather shield)m21.5000Sub CCTR-218500010Primer & 2~3
coats above 5.0 meter (weather shield)m21.7500Sub
CCTR-218500011Sand blast on concrete surfacem21.8000Sub
CCTR-218500012Primer & finish coat of chemical resistant
paintm22.5000Sub CCTR-218500013Primer & finish coat of epoxy /
coaltar epoxy paintm23.0000Sub CCTR-218500014Primer & finish
coat of acid resistant paintm22.5000Sub CCTR-218500015Primer &
paint (fluorescent) on chimney / silom210.0000Sub
CCTR-218500016Primer & 2~3 coats at any height for
ceilingm22.5000Sub CCTR-218500170Installation of wall paper up to 5
m heightm20.5000Sub CCTR-218500180Acid resistant coating with woven
/ tissue Glass cloth single layerm20.8000CCTR-21852Surface
Preparation & Painting on metal / steel & woodSub
CCTR-218520001Surface preparation, Primer & two coats Enamel
Paint upto 10 m heightm22.5000Sub CCTR-218520002Surface
preparation, primer & two coats Enamel Paint 10 m to 20 m
heightm23.5000Sub CCTR-218520003Primer & two coats (upto10.0
meter)m21.0000Sub CCTR-218520005Only touch up to 20 meter
heightm20.8000Sub CCTR-218520006Wood polish on Wooden Doors /
Windows / Cabinets / Railingm20.0700Sub CCTR-218520007Fire Proof
paint on Doorsm24.0000Sub CCTR-218520008Painting and lettering on
Sign Boardm20.0300CCTR-21860FencingSub CCTR-218600001Installation
of Fence post G.I Pipe 1-1/2" dia, for fence 2.5m high, without
provision for barbed wire, excl. all other civil worksm1.6000Sub
CCTR-218600002Installation of Fence post G.I Pipe 1-1/2" dia, for
fence 2.5m high, with provision for barbed wire, excl. all other
civil worksm1.6000Sub CCTR-218600003Installation of Fence post
M.S/G.I Angle iron 60x60 mm, for fence 2.5 m high without provision
for barbed wire, excl. all other civil worksm1.6000Sub
CCTR-218600004Installation of Fence post M.S/G.I Angle iron 60x60
mm, for fence 2.5 m high above ground with provision for barbed
wire, excl. all other civil worksm1.6000Sub
CCTR-218600005Installation of Fence post R.C.C. precast for fence
2.5 m high, without provision of barbed wire, excl. all civil
worksm1.6000Sub CCTR-218600006Installation of Fence post R.C.C.
precast for fence 2.5 m high, with provision of barbed wire, excl.
all civil worksm1.6000Sub CCTR-218600007Installation of Fence with
(M.S post & intermediate profiles) for fence 2.5 m high, excl.
all civil worksm4.7000Sub CCTR-218600008Installation of puller wire
(single line) and accessories for fencem0.3000Sub
CCTR-218600009Installation of G.I chain link fence height 2.5
mm1.4000Sub CCTR-218600010Installation of PVC coated chain link
fence height 2.5 mm1.4000Sub CCTR-218600011Installation of vermin
mesh single layer height up to 1.00 mm0.8000Sub
CCTR-218600012Installation of Barbed wire single linem0.2500Sub
CCTR-218600014Erection of fence personal gate (single leaf) 1.2 m
wide with G.I pipe posts and chain link fence, excl. all other
civil worksnos1.5000Sub CCTR-218600015Erection of Fence vehicular
gate 4 m wide with G.I pipe posts and chain link fence, excl. all
other civil worksm2.5000Sub CCTR-218600016Erection of Fence
vehicular gate 8 m wide with G.I posts and chain link fence, excl.
all other civil worksm4.0000CCTR-21868Expansion Joint SealantSub
CCTR-218680010Install Foam Rod / Thixafoam / Beaker rod / Jumbolan
in expansion jointsm0.2000Sub CCTR-218680020Application of primer
for joint sealant on joint sidesm20.3000Sub
CCTR-218680030Application of joint sealantm3400.0000Sub
CCTR-218680040Fill Bituminous Mastic in Expansion
jointsm3500.0000Sub CCTR-218680050Sealing joints by installation
G.I flushing sheetm22.0000Sub CCTR-218680060Sealing joint by
installation Aluminium flushing sheetm22.0000Sub
CCTR-218680070Cutting grove in RCC / PCC 5 mm wide, 50 mm deep by
machine for Expansion jointsm1.1000Sub CCTR-218680080Installation
of Bitumious imprignated Fiber Boardm20.5000CCTR-21870Embedded
Items ( Anchor Bolts and Profiles)Sub CCTR-218700001Fabrication of
MS profile / plates for embedimentston175.0000Sub
CCTR-218700002Erection of MS profile / plates for
embedimentston125.0000Sub CCTR-218700003Fabrication of pipe sleeves
(dia 150 mm x Length 450mm)nos1.2500Sub CCTR-218700004Erection of
pipe sleeves (dia 150 mm x Length 450 mm)nos1.5000Sub
CCTR-218700005Erection of plates / halfenton275.0000Sub
CCTR-218700006Fab. & erection of MS / SS rod (rungs) for
ladders (1000mm)nos1.5000Sub CCTR-218700007Erection of Anchor
Boltston300.0000Sub CCTR-218700008Supply of Non-galvanized Anchor
boltston1.0000Sub CCTR-218700009Supply of Galvanized Anchor
Boltston1.0000Sub CCTR-218700011Fabricate & Install wooden
pocketsnos2.0000Sub CCTR-218700012Installation & removal of
pockets (Boxout)nos1.1500Sub CCTR-218700013Fabricate & Install
Steel Pockets with wire gauzenos1.2000Sub
CCTR-218700014Installation of Expansion boltsnos0.2000Sub
CCTR-218700015Erection of MS profile / plateskg0.1500Sub
CCTR-218700150Installation of Bolts with chemical
capsulesnos0.5000CCTR-21875Steel Piles Supply, Driving and
TestingSub CCTR-218750010Driving Steel Pile small Size without Load
Test & Mob/ Demob by Sub Contractorm0.5000Sub
CCTR-218750020Driving Steel Pile large size without Load Test &
Mob/Demob by Sub Contractorm0.6000Sub CCTR-218750030Pile Driving
Equipment - Mob/Demob to/from Sitem0.0200Sub CCTR-218750040Movement
of Piling Equipment - Between Pilesnos3.0000Sub CCTR-218750050Steel
Pile Load Testnos120.0000CCTR-21880DemolitionSub
CCTR-218800001Demolition of Reinforced Structures/ Walls (With
Equipment)m36.0000Sub CCTR-218800002Demolition of Pile Head (With
Chisel)m330.0000Sub CCTR-218800003Demolition of Plain Concrete
Structuresm38.0000Sub CCTR-218800004Demolition of Block/ Brick/
Stone Masonrym35.0000Sub CCTR-218800005Demolition of Road/
Bituminous Paving (10 Cm Thick)m20.2800Sub CCTR-218800006Demolition
of Fence Including Foundation (2 m to 3 m High)m0.5000Sub
CCTR-218800007Demolition of RCC Floor/ Slab on Grade (Upto 150 mm
Thick)m20.4500Sub CCTR-218800008Removal of False
Ceillingm20.2000Sub CCTR-218800009Demolition of R.C.C Pipes
(Including relevant works)m0.7000Sub CCTR-218800010Demolition of
Door/ Windowm20.5500Sub CCTR-218800011Demolition of Sanitary
Fixtures / Fittingsnos0.8000Sub CCTR-218800012Demolition of Roofing
(Built up)m20.3500Sub CCTR-218800013Demolition of R.C.C / Masonry
Buildings (Complete)m30.2000Sub CCTR-218800014Removal of Trees (Not
Exceeding 800 mm girth) by Toolsnos2.0000Sub CCTR-218800015Removal
of Trees (Between 800 mm to 1500 mm girth) by Toolsnos6.0000Sub
CCTR-218800016Demolition of Plasterm20.2500Sub
CCTR-218800019Demolition of Hand Rails (upto 1.25m high)m0.3000Sub
CCTR-218800020Removal of Raised
Floorm20.0000CCTR-21885Miscellaneous Civil worksSub
CCTR-218850005Fixing of wall / roof exhaust fannos2.5000Sub
CCTR-218850016Laying glass wool / polystyrene in masonry (
insulation )m20.1200Sub CCTR-218850041Restoration Work (Wooden
Barrier Wall)m3.5000Sub CCTR-218850047Supply and Fix Elastomeric
bearing padsm3600.0000Sub CCTR-218850470Load testing for
pilesnos80.0000Sub CCTR-218850480mobilization cost for
subcontractorLot0.0000Sub CCTR-218850490Material Supplynos1.0000Sub
CCTR-218850500Installationnos5.0000Sub CCTR-218850510Subcontracted
work---0.1000Sub CCTR-218850511Cable Trench Warning
Tapem0.1000CCTR-21886LandscapingSub CCTR-218860001Landscaping
(Scarifying, Dressing, Soiling, Seeding, Watering, Maintaining
until established)m20.6500Sub CCTR-218860002Spreading &
levelling of Gravel / chippings. (100mm thick
layer)m20.1000CCTR-21887Ducting and Expanded steel meshSub
CCTR-218870017Fabrication of G.I ducting ( 7kg / m2 ) including
supports, joints, fittingm24.7000Sub CCTR-218870018Erection of
prefabricated G.I ducting ( 7kg / m2 ) including supports, joints ,
fitting & Leak test. ( without insulation &
painting)m23.8500Sub CCTR-218870038Installation of Galvanized
expanded steel mesh.m20.1500CCTR-21888Concrete RepairsSub
CCTR-218880040Concrete Repairing with productm22.5000Sub
CCTR-218880046Mortar Finishing Worksm21.5000CCTR-21889Hydro
TestingSub CCTR-218890019Hydro Testing ( pit / ponds / reservoir /
sumps / basin )m32.5000CCTR-21890Complete Civil Works (Lump Sum)Sub
CCTR-218900010Construction of Complete Building (one Story) with
all Finishesm22.0000Sub CCTR-218900020Construction of Yard area
(incl. Foundations, trenches, Pits,Gravel,Fence)
Completem20.0000Sub CCTR-218900030Client
FacilitiesLot0.0000G-219Extra Work, Day Work, Idling and
SupplyCCTR-21910Extra Work CivilSub CCTR-219100000Extra Work
Civil-0.0000D-22MechanicalG-221Steel StructureCCTR-22110Fabrication
of Steel StructureSub CCTR-221101010Fabrication of Steel Profiles
(Plate Built-up) Extra Heavyton90.0000Sub CCTR-221101045Fabrication
of Steel Structure, Bolted, Extra Heavy (201 kg/m &
above)ton60.0000Sub CCTR-221101050Fabrication of Steel Structure,
Bolted, Heavy (121 to 200 kg/m)ton80.0000Sub
CCTR-221101060Fabrication of Steel Structure, Bolted, Medium (61 to
120 kg/m)ton110.0000Sub CCTR-221101065Fabrication of Steel
Structure, Bolted, Light ( 31 to 60 kg/m)ton140.0000Sub
CCTR-221101070Fabrication of Steel Structure, Bolted, Extra Light
(up to 30 kg/m)ton200.0000Sub CCTR-221101090Fabrication of Steel
Structure, Building (31 to 120 kg/m)ton125.0000Sub
CCTR-221101100Fabrication of Steel Structure, Pipe
Rackston100.0000Sub CCTR-221101110Fabrication of Platforms (up to
30 kg/m)ton180.0000Sub CCTR-221101120Fabrication of Railings (up to
30 kg/m)ton250.0000Sub CCTR-221101130Fabrication of Stairs/Ladders
(up to 15kg/m)ton250.0000Sub CCTR-221101140Fabrication of Gratings
( 47 kg/m2 )ton250.0000Sub CCTR-221101160Hot Dip Galvanizing (35
m2/ton)ton20.0000CCTR-22111Fabrication of Built up Steel
ProfilesSub CCTR-221110000Fabrication of Built up Steel
Profileston150.0000CCTR-22120Erection of Steel StructureSub
CCTR-221201045Erection of Steel Structure, Bolted, Extra Heavy (201
kg/m & above)ton30.0000Sub CCTR-221201050Erection of Steel
Structure, Bolted, Heavy (121 to 200 kg/m)ton40.0000Sub
CCTR-221201060Erection of Steel Structure, Bolted, Medium (61 to
120 kg/m)ton50.0000Sub CCTR-221201065Erection of Steel Structure,
Bolted, Light (31 to 60 kg/m)ton70.0000Sub CCTR-221201070Erection
of Steel Structure, Bolted, Extra Light (up to 30
kg/m)ton90.0000Sub CCTR-221201090Erection of Steel Structure,
Building (31 to 120 kg/m)ton60.0000Sub CCTR-221201100Erection of
Steel Structure, Pipe Rackston45.0000Sub CCTR-221201110Erection of
Platforms / Stairs (up to 30 kg/m)ton60.0000Sub
CCTR-221201120Erection of Railings (30 kg/m)ton120.0000Sub
CCTR-221201130Erection of Ladders, Safety Cage (15
kg/m)ton120.0000Sub CCTR-221201140Erection of Gratings (47
kg/m2)ton60.0000Sub CCTR-221201150Erection of Cladding, Roofing,
Decking (9 kg/m2)m24.0000Sub CCTR-221201170Grouting of Steel
Structure (Plain Cement Sand Grout)m3100.0000Sub
CCTR-221201180Grouting of Steel Structure (Non Shrink
Grout)m3100.0000Sub CCTR-221201190Dismantling of Steel
Structureton25.0000Sub CCTR-221201200Cutting Opening in Grating (
Cut Length)m3.0000CCTR-22121Erection of Pre Heater Steel
StructureSub CCTR-221210000Erection of Pre Heater Steel
Structureton70.0000CCTR-22130Fabrication of Pipe SupportsSub
CCTR-221301010Fabrication of Pipe Supports C.S Up to 5
Kgton240.0000Sub CCTR-221301020Fabrication of Pipe Supports C.S
>6 Kg Up to 10 Kgton200.0000Sub CCTR-221301030Fabrication of
Pipe Supports C.S > 10 Kg Up to 15 Kgton150.0000Sub
CCTR-221301040Fabrication of Pipe Supports C.S >15 Kg Up to 20
Kgton110.0000Sub CCTR-221301050Fabrication of Pipe Supports C.S
> 20 Kgton70.0000Sub CCTR-221301060Fabrication of Pipe Supports
S.S Up to 5 Kgton300.0000Sub CCTR-221301070Fabrication of Pipe
Supports S.S > 6 Kg Up to 10 Kgton250.0000Sub
CCTR-221301080Fabrication of Pipe Supports S.S > 10 Kg Up to 15
Kgton190.0000Sub CCTR-221301090Fabrication of Pipe Supports S.S
> 15 kg Up to 20 Kgton140.0000Sub CCTR-221301100Fabrication of
Pipe Supports S.S > 20 Kgton90.0000CCTR-22140Erection of Pipe
SupportsSub CCTR-221401010Erection of Pipe Supports C.S Up to 5
Kgton300.0000Sub CCTR-221401020Erection of Pipe Supports C.S > 6
Kg Up to 10 kgton250.0000Sub CCTR-221401030Erection of Pipe
Supports C.S > 10 kg Up to 15 Kgton200.0000Sub
CCTR-221401040Erection of Pipe Supports C.S > 15 kg Up to 20
Kgton170.0000Sub CCTR-221401050Erection of Pipe Supports C.S >
20 Kgton110.0000Sub CCTR-221401060Erection of Pipe Supports S.S Up
to 5 Kgton370.0000Sub CCTR-221401070Erection of Pipe Supports S.S
> 6 Kg Up to 10 Kgton300.0000Sub CCTR-221401080Erection of Pipe
Supports S.S > 10 Kg Up to 15 Kgton230.0000Sub
CCTR-221401090Erection of Pipe Supports S.S > 15 Kg Up to 20
Kgton170.0000Sub CCTR-221401100Erection of Pipe Supports S.S >
20 Kgton110.0000Sub CCTR-221401110Grouting of Pipe Supports (Plain
Cement Sand Grout)m3250.0000Sub CCTR-221401120Grouting of Pipe
Supports (Non Shrink Grout)m3250.0000Sub CCTR-221401130Dismantling
of Pipe Supportston80.0000G-222EquipmentCCTR-22210Stationary
EquipmentSub CCTR-222100001Installation of Equipment Stationary (Up
to 1.0 ton)ton80.0000Sub CCTR-222101005Installation of Equipment
Stationery ( >1.0 to 5 ton )ton60.0000Sub
CCTR-222101010Installation of Equipment Stationery (>5 to 20
ton)ton50.0000Sub CCTR-222101020Installation of Equipment
Stationary (>21 up to 50 ton)ton35.0000Sub
CCTR-222101030Installation of Equipment Stationary (>51 up to
100 ton)ton20.0000Sub CCTR-222101035Installation of Equipment
Stationery (>100 to 200 ton)ton16.0000Sub
CCTR-222101040Installation of Equipment Stationary (>200 to 300
ton)ton12.0000Sub CCTR-222101045Installation of Equipment
Stationary (>300 to 400 ton)ton10.0000Sub
CCTR-222101050Installation of Equipment Stationary (>400 to 500
ton)ton9.0000Sub CCTR-222101060Installation of Equipment Stationary
(>500 ton)ton8.0000Sub CCTR-222101070Installation of Equipment
Internalston70.0000Sub CCTR-222101100Filling of Pal
Ringston25.0000Sub CCTR-222101110Filling of Catalystston25.0000Sub
CCTR-222101120Erection of Internal Traysm210.0000Sub
CCTR-222101130Erection of Demister Padston70.0000Sub
CCTR-222101150Erection of small verticle equipmentton60.0000Sub
CCTR-222101200Erection of Siloston100.0000Sub
CCTR-222101210Erection of Skid Mounted Unitston40.0000Sub
CCTR-222101220Grouting of Stationary Equipment (Plain Cement Sand
Grout)m3300.0000Sub CCTR-222101230Grouting of Stationary Equipment
(Non Shrink Grout)m3300.0000Sub CCTR-222101240Dismantling of
Equipment Stationary Smallton15.0000Sub CCTR-222101250Dismantling
of Equipment Stationary Mediumton12.0000Sub
CCTR-222101260Dismantling of Equipment Stationary
Heavyton8.0000CCTR-22220Rotary EquipmentSub
CCTR-222201010Installation of Rotry Equip. Assemb. (up to 1
ton)ton120.0000Sub CCTR-222201020Installation of Rotry Equip.
Assemb. (>1 to 5 ton)ton90.0000Sub CCTR-222201030Installation of
Rotry equip. Assemb. (>5 to 10 ton)ton75.0000Sub
CCTR-222201040Installation of Rotry Equip. Assemb. (>10 to 50
ton)ton50.0000Sub CCTR-222201045Installation of Rotry. Assemb.
(>50 ton)ton40.0000Sub CCTR-222201050Installation of Rotry
Equip. Knock Down (up to 10 ton)ton120.0000Sub
CCTR-222201060Installation of Rotry Equip. Knock Down (>10 to 50
ton)ton90.0000Sub CCTR-222201070Installation of Rotry Equip. Knock
Down ( >50 to 100 ton)ton50.0000Sub CCTR-222201080Installation
of Rotry Equip. Knock Down (>100 ton)ton40.0000Sub
CCTR-222201120Installation of Gas Turbine Small Size (up to 15
ton)ton70.0000Sub CCTR-222201130Installation of Gas Turbine Medium
Size (16 to 50 ton)ton50.0000Sub CCTR-222201140Installation of Gas
Turbine Large Size (> 50 to 100 ton)ton35.0000Sub
CCTR-222201145Installation of Gas Turbine Large Size (>100
ton)ton25.0000Sub CCTR-222201150Installation of Gas Turbine Exhaust
Systemton80.0000Sub CCTR-222201160Installation of Gas Turbine
Accessorieston90.0000Sub CCTR-222201170Installation of Steam
Turbine Small Size ( up to 15 ton)ton90.0000Sub
CCTR-222201180Installation of Steam Turbine Medium Size (16 to 50
ton)ton60.0000Sub CCTR-222201190Installation of Steam Turbine Large
Size (>50 to 100 ton)ton40.0000Sub CCTR-222201195Installation of
Steam Turbine Large Size (>100 ton)ton40.0000Sub
CCTR-222201200Installation of Steam Turbine
Accessorieston90.0000Sub CCTR-222201210Installation of Power
Generators Small Size ( up to 15 ton)ton50.0000Sub
CCTR-222201220Installation of Power Generators Medium Size (16 to
50 ton)ton35.0000Sub CCTR-222201225Installation of Power Generators
Large Size (>50 to 100 ton)ton30.0000Sub
CCTR-222201230Installation of Power Generators Large Size (>100
ton)ton20.0000Sub CCTR-222201235Installation of Power Generators
Accessorieston80.0000Sub CCTR-222201260Grouting of Rotary Equipment
(Non Shrink Grout)m3250.0000Sub CCTR-222201270Grouting of Rotary
Equipment (Epoxy Grout)m3250.0000Sub CCTR-222201280Dismantling of
Rotary Equipment Smallton30.0000Sub CCTR-222201290Dismantling of
Rotary Equipment Largeton20.0000CCTR-22221Misc. Items/EquipmentSub
CCTR-222210001Expansion Joints in Ducts Fabric
Typejoints150.0000Sub CCTR-222210002Expansion Joint in Ducts
Mechanical Flanged Prefabricatedjoints80.0000CCTR-22225Fire
Fighting and Misc. Items/EquipmentSub CCTR-222251010Installation of
Fire Extingusher 2 kgnos4.0000Sub CCTR-222251020Installation of
Fire Extingusher 6 kgnos4.0000Sub CCTR-222251030Installation of
Fire Extingusher 12 kgnos3.0000Sub CCTR-222251040Installation of
Fire Extingusher 25 kgnos4.0000Sub CCTR-222251050Installation of
Double Piller Fire Hydrantnos15.0000Sub CCTR-222251060Installation
of Sprinklernos2.0000Sub CCTR-222251080Installation of Hose
Boxnos10.0000Sub CCTR-222251090Installation of Safety
Showernos30.0000Sub CCTR-222251100Installation of Eye
Washernos30.0000Sub CCTR-222251110Installation of Information/Risk
Warning Signsnos10.0000CCTR-22230Furnace, Heaters, BoilersSub
CCTR-222301010Erection of Boilers/HRSG (Modular Type)ton40.0000Sub
CCTR-222301020Erection of Boiler Structure and Casington65.0000Sub
CCTR-222301030Erection of Boilers Heating Surface
Moduleton22.0000Sub CCTR-222301040Erection of Boilers Drum Tubes
and Mounting with weldington120.0000Sub CCTR-222301050Erection of
Boilers Buckstayton60.0000Sub CCTR-222301070Erection of Boilers
Accessorieston125.0000Sub CCTR-222301080Erection of Furnaces
(Modular Type)ton22.0000Sub CCTR-222301090Erection of Furnaces
Structure and Casington55.0000Sub CCTR-222301100Erection of
Furnaces Coils and Tubeston75.0000Sub CCTR-222301110Erection of
Furnaces Accessories (Burner and Blowers)ton150.0000Sub
CCTR-222301120Refractory (Brick Lining)m320.0000Sub
CCTR-222301130Refractory (Castable)m380.0000Sub
CCTR-222301140Refractory (Gunitting)m360.0000Sub
CCTR-222301150Dismantling of Boiler/ Furnaceston30.0000Sub
CCTR-222301160NON DESTRUCTIVE TESTING OF
FURNACEnos0.8000CCTR-22240Heating, Ventilation & Air
ConditioningSub CCTR-222401010Installation of Ventilation / Heating
Systemton120.0000Sub CCTR-222401030Installation of A/C Units
(Windows Type)ton20.0000Sub CCTR-222401040Installation of A/C Units
(Split Type)ton60.0000Sub CCTR-222401050Fabrication of Ducts for
HVACton300.0000Sub CCTR-222401060Erection of Ducts for
HVACton120.0000Sub CCTR-222401070Dismantling of
HVACton40.0000CCTR-22250Stacks, Flares, Ducts, Chute, Bins,
HoppersSub CCTR-222501010Fabrication of Stack / Flareton120.0000Sub
CCTR-222501020Erection of Stack / Flareton60.0000Sub
CCTR-222501030Fabrication of Chutes, Bins, Hoppers, Cyclones &
Troughston150.0000Sub CCTR-222501040Erection of Chutes, Bins,
Hoppers, Cyclones & Troughston60.0000Sub
CCTR-222501050Fabrication of Ductston120.0000Sub
CCTR-222501060Erection of Ductston50.0000Sub
CCTR-222501070Dismantling of Stack/ Flare/
Ductston30.0000CCTR-22260Condensers / Heat Exchangers / Air
CoolersSub CCTR-222601010Erection of Surface Condenser up to 1.0
Tonton110.0000Sub CCTR-222601020Erection of Surface Condenser >
1.0 to 5 Tonton95.0000Sub CCTR-222601030Erection of Surface
Condenser > 5 Ton to 10 Tonton80.0000Sub CCTR-222601040Erection
of Surface Condenser > 10 Ton to 20 Tonton65.0000Sub
CCTR-222601050Erection of Surface Condenser > 20 Ton to 50
Tonton50.0000Sub CCTR-222601060Erection of Surface Condenser >
50 Ton to 100 Tonton40.0000Sub CCTR-222601070Erection of Surface
Condenser > 100 Tonton30.0000Sub CCTR-222601080Erection of
Surface Condenser Partial Assembledton50.0000Sub
CCTR-222601090Erection of Surface Condenser Knock Downton65.0000Sub
CCTR-222601100Erection of Heat Exchangers S/T up to 1.0
Tonton90.0000Sub CCTR-222601110Erection of Heat Exchangers S/T >
1.0 to 5 Tonton75.0000Sub CCTR-222601120Erection of Heat Exchangers
S/T > 5 to 10 Tonton65.0000Sub CCTR-222601130Erection of Heat
Exchangers S/T > 10 Ton to 20 Tonton55.0000Sub
CCTR-222601140Erection of Heat Exchangers S/T > 20 Ton to 50
Tonton45.0000Sub CCTR-222601150Erection of Heat Exchangers S/T
>50 Ton to 100 Tonton35.0000Sub CCTR-222601160Erection of Heat
Exchangers S/T > 100 Tonton25.0000Sub CCTR-222601170Erection of
Heat Exchangers Plate Type up to 1.0 Tonton180.0000Sub
CCTR-222601180Erection of Heat Exchangers Plate Type > 1.0 to 5
Tonton150.0000Sub CCTR-222601190Erection of Heat Exchangers Plate
Type >5 Ton to 10 Tonton120.0000Sub CCTR-222601200Erection of
Heat Exchangers Plate Type > 10 Ton to 20 Tonton100.0000Sub
CCTR-222601210Erection of Heat Exchangers Plate Type > 20 Ton to
50 Tonton80.0000Sub CCTR-222601220Erection of Heat Exchangers Plate
Type >50 Ton to 100 Tonton60.0000Sub CCTR-222601230Erection of
Heat Exchangers Plate Type > 100 Tonton50.0000Sub
CCTR-222601240Erection of Air Cooler up to 5 Tonton120.0000Sub
CCTR-222601250Erection of Air Cooler > 5 Ton to 10
Tonton100.0000Sub CCTR-222601260Erection of Air Cooler > 10 Ton
to 20 Tonton80.0000Sub CCTR-222601270Erection of Air Cooler > 20
Ton to 50 Tonton65.0000Sub CCTR-222601280Erection of Air Cooler
> 50 Tonton50.0000CCTR-22270Cooling TowersSub
CCTR-222701040Erection of Cooling Tower Drift Eliminators &
Supportston250.0000Sub CCTR-222701050Installation & Gluing of
Fill / Packton80.0000Sub CCTR-222701070Erection of Cooling Tower
Distribution Systemton180.0000Sub CCTR-222701080Dismantling of
Colling Towerton25.0000CCTR-22280Classified EquipmentSub
CCTR-222801010Fabrication of Crane Beams/Gantryton80.0000Sub
CCTR-222801020Erection of Crane Beams/Gantryton60.0000Sub
CCTR-222801030Erection of Overhead Craneston100.0000Sub
CCTR-222801040Erection of Weighing Equipment (Weigh
Bridge)ton60.0000Sub CCTR-222801050Fabrication and Erection of Fire
Fighting Network Ave. Dia 8"ton150.0000Sub
CCTR-222801060Fabrication and Erection of Steam Tracing
Lineston500.0000Sub CCTR-222801070Fabrication and Erection of
Jacketed Pipington400.0000Sub CCTR-222801160Installation of
Laboratory Equipmentton160.0000CCTR-22290Cement PlantSub
CCTR-222901010Erection of Chutes, Bins, Hoppers, Cyclones &
Troughston100.0000Sub CCTR-222901020Erection of Conveyors (Belt
Conveyors)ton150.0000Sub CCTR-222901030Erectation of Elevators
(Bucket Type)ton150.0000Sub CCTR-222901040Erection of
Liftston75.0000Sub CCTR-222901050Erection of
Crusherston30.0000200Sub CCTR-222901060Erection of Reclaimers and
Scrapperston90.0000Sub CCTR-222901070Erection of
Stackerston90.0000Sub CCTR-222901080Erection of Sampling
Stationton50.0000Sub CCTR-222901090Erection of Grinding
Millston50.0000Sub CCTR-222901100Erection of Raw Millston50.0000Sub
CCTR-222901110Erection of Rotary Kilnton90.0000Sub
CCTR-222901120Erection of Pre-Heaters (Without
Refractory)ton130.0000Sub CCTR-222901130Erection of Clinker Cooler
(Without Supporting Structure)ton140.0000Sub CCTR-222901140Erection
of Fin Fan Coolerton140.0000Sub CCTR-222901150Erection of
Electrostatic Precipitator (Without Insulation)ton150.0000Sub
CCTR-222901160Erection of Air Separatorston100.0000Sub
CCTR-222901170Erection of De-dusting Equipment /
Filterston140.0000Sub CCTR-222901180Erection of Siloston100.0000Sub
CCTR-222901190Loading of Grinding Madiaton25.0000Sub
CCTR-222901220Commissioningmhr1.0000CCTR-22291Erection of Equipment
KilnSub CCTR-222910000Erection of Equipment
Kilnton100.0000CCTR-22292Erection of Equipment Pre HeaterSub
CCTR-222920000Erection Of Equipment Pre
Heaterton130.0000G-223TanksCCTR-22310Fabrication of Tanks (CS)Sub
CCTR-223101010Fabrication of Floating Roof Tank (Capacity upto 800
m3)ton123.0000Sub CCTR-223101020Fabrication of Floating Roof Tank
(Capacity upto 1000 m3)ton101.0000Sub CCTR-223101030Fabrication of
Floating Roof Tank (Capacity upto 2000 m3)ton74.0000Sub
CCTR-223101040Fabrication of Floating Roof Tank (Capacity upto 3000
m3)ton62.0000Sub CCTR-223101050Fabrication of Floating Roof Tank
(Capacity upto 5000 m3)ton52.0000Sub CCTR-223101060Fabrication of
Floating Roof Tank (Capacity upto 7000 m3)ton46.0000Sub
CCTR-223101070Fabrication of Floating Roof Tank (Capacity upto
10000 m3)ton36.0000Sub CCTR-223101080Fabrication of Floating Roof
Tank (Capacity upto 20000 m3)ton31.0000Sub
CCTR-223101090Fabrication of Floating Roof Tank (Capacity upto
30000 m3)ton28.0000Sub CCTR-223101100Fabrication of Floating Roof
Tank (Capacity upto 50000 m3)ton25.0000Sub
CCTR-223101110Fabrication of Floating Roof Tank (Capacity upto
80000 m3)ton24.0000Sub CCTR-223101120Fabrication of Floating Roof
Tank (Capacity upto 100000 m3)ton23.0000Sub
CCTR-223101130Fabrication of Conical Roof Tank (Capacity upto 40
m3)ton153.0000Sub CCTR-223101140Fabrication of Conical Roof Tank
(Capacity 50 m3)ton128.0000Sub CCTR-223101150Fabrication of Conical
Roof Tank (Capacity 100 m3)ton117.0000Sub CCTR-223101160Fabrication
of Conical Roof Tank (Capacity 200 m3)ton109.0000Sub
CCTR-223101170Fabrication of Conical Roof Tank (Capacity 300
m3)ton101.0000Sub CCTR-223101180Fabrication of Conical Roof Tank
(Capacity 500 m3)ton79.0000Sub CCTR-223101190Fabrication of Conical
Roof Tank (Capacity 800 m3)ton74.0000Sub CCTR-223101200Fabrication
of Conical Roof Tank (Capacity 1000 m3)ton63.0000Sub
CCTR-223101210Fabrication of Conical Roof Tank (Capacity 2000
m3)ton54.0000Sub CCTR-223101220Fabrication of Conical Roof Tank
(Capacity 2000 m3)ton47.0000Sub CCTR-223101230Fabrication of
Conical Roof Tank (Capacity 5000 m3)ton40.0000Sub
CCTR-223101240Fabrication of Conical Roof Tank (Capacity 7000
m3)ton36.0000Sub CCTR-223101250Fabrication of Conical Roof Tank
(Capacity 10000 m3)ton31.0000Sub CCTR-223101260Fabrication of
Conical Roof Tank (Capacity 20000 m3)ton30.0000Sub
CCTR-223101270Fabrication of Conical Roof Tank (Capacity 30000
m3)ton26.0000Sub CCTR-223101280Fabrication of Conical Roof Tank
(Capacity 50000 m3)ton24.0000Sub CCTR-223101290Fabrication of Dom
Roof Tanks (Capacity upto 50 m3)ton128.0000Sub
CCTR-223101300Fabrication of Dom Roof Tanks (Capacity 100
m3)ton117.0000Sub CCTR-223101310Fabrication of Dom Roof Tanks
(Capacity 200 m3)ton109.0000Sub CCTR-223101320Fabrication of Dom
Roof Tanks (Capacity 300 m3)ton101.0000Sub
CCTR-223101330Fabrication of Dom Roof Tanks (Capacity 500
m3)ton79.0000Sub CCTR-223101340Fabrication of Dom Roof Tanks
(Capacity 800 m3)ton74.0000Sub CCTR-223101350Fabrication of Dom
Roof Tanks (Capacity 1000 m3)ton71.0000Sub
CCTR-223101360Fabrication of Dom Roof Tanks (Capacity 2000
m3)ton60.0000Sub CCTR-223101370Fabrication of Dom Roof Tanks
(Capacity 3000 m3)ton55.0000Sub CCTR-223101380Fabrication of Dom
Roof Tanks (Capacity 5000 m3)ton46.0000Sub
CCTR-223101390Fabrication of Dom Roof Tanks (Capacity 7000
m3)ton41.0000Sub CCTR-223101400Fabrication of Dom Roof Tanks
(Capacity 10000 m3)ton38.0000Sub CCTR-223101410Fabrication of Dom
Roof Tanks (Capacity 20000 m3)ton35.0000Sub
CCTR-223101420Fabrication of Dom Roof Tanks (Capacity 30000
m3)ton31.0000Sub CCTR-223101430Fabrication of Dom Roof Tanks
(Capacity 50000 m3)ton31.0000Sub CCTR-223101440Fabrication of
Sphere Tanks-Propane (Capacity upto 40 m3)ton219.0000Sub
CCTR-223101450Fabrication of Sphere Tanks-Propane (Capacity 50
m3)ton219.0000Sub CCTR-223101460Fabrication of Sphere Tanks-Propane
(Capacity 100 m3)ton204.0000Sub CCTR-223101470Fabrication of Sphere
Tanks-Propane (Capacity 200 m3)ton173.0000Sub
CCTR-223101480Fabrication of Sphere Tanks-Propane (Capacity 300
m3)ton160.0000Sub CCTR-223101490Fabrication of Sphere Tanks-Propane
(Capacity 500 m3)ton150.0000Sub CCTR-223101500Fabrication of Sphere
Tanks-Propane (Capacity 800 m3)ton144.0000Sub
CCTR-223101510Fabrication of Sphere Tanks-Propane (Capacity 1000
m3)ton109.0000Sub CCTR-223101520Fabrication of Sphere Tanks-Butane
(Capacity upto 100 m3)ton274.0000Sub CCTR-223101530Fabrication of
Sphere Tanks-Butane (Capacity 200 m3)ton246.0000Sub
CCTR-223101540Fabrication of Sphere Tanks-Butane (Capacity 300
m3)ton235.0000Sub CCTR-223101550Fabrication of Sphere Tanks-Butane
(Capacity 500 m3)ton219.0000Sub CCTR-223101560Fabrication of Sphere
Tanks-Butane (Capacity 800 m3)ton196.0000Sub
CCTR-223101570Fabrication of Sphere Tanks-Butane (Capacity 1000
m3)ton186.0000Sub CCTR-223101580Fabrication of Sphere Tanks-Butane
(Capacity 2000 m3)ton156.0000Sub CCTR-223101590Fabrication of
Sphere Tanks-Butane (Capacity 3000 m3)ton133.0000Sub
CCTR-223101600Fabrication of Sphere Tanks-Butane (Capacity 5000
m3)ton117.0000CCTR-22320Erection of Tanks (CS)Sub
CCTR-223201010Erection of Floating Roof Tanks (Capacity upto 800
m3)ton300.0000Sub CCTR-223201020Erection of Floating Roof Tanks
(Capacity 1000 m3)ton245.0000Sub CCTR-223201030Erection of Floating
Roof Tanks (Capacity 2000 m3)ton180.0000Sub CCTR-223201040Erection
of Floating Roof Tanks (Capacity 3000 m3)ton150.0000Sub
CCTR-223201050Erection of Floating Roof Tanks (Capacity 5000
m3)ton125.0000Sub CCTR-223201060Erection of Floating Roof Tanks
(Capacity 7000 m3)ton113.0000Sub CCTR-223201070Erection of Floating
Roof Tanks (Capacity 10000 m3)ton81.0000Sub CCTR-223201080Erection
of Floating Roof Tanks (Capacity 20000 m3)ton75.0000Sub
CCTR-223201090Erection of Floating Roof Tanks (Capacity 30000
m3)ton68.0000Sub CCTR-223201100Erection of Floating Roof Tanks
(Capacity 50000 m3)ton63.0000Sub CCTR-223201110Erection of Floating
Roof Tanks (Capacity 80000 m3)ton58.0000Sub CCTR-223201120Erection
of Floating Roof Tanks (Capacity 100000 m3)ton55.0000Sub
CCTR-223201130Erection of Conical Roof Tanks (Capacity upto 40
m3)ton300.0000Sub CCTR-223201140Erection of Conical Roof Tanks
(Capacity 50 m3)ton250.0000Sub CCTR-223201150Erection of Conical
Roof Tanks (Capacity 100 m3)ton230.0000Sub CCTR-223201160Erection
of Conical Roof Tanks (Capacity 200 m3)ton215.0000Sub
CCTR-223201170Erection of Conical Roof Tanks (Capacity 300
m3)ton200.0000Sub CCTR-223201180Erection of Conical Roof Tanks
(Capacity 500 m3)ton158.0000Sub CCTR-223201190Erection of Conical
Roof Tanks (Capacity 800 m3)ton145.0000Sub CCTR-223201200Erection
of Conical Roof Tanks (Capacity 1000 m3)ton125.0000Sub
CCTR-223201210Erection of Conical Roof Tanks (Capacity 2000
m3)ton108.0000Sub CCTR-223201220Erection of Conical Roof Tanks
(Capacity 3000 m3)ton93.0000Sub CCTR-223201230Erection of Conical
Roof Tanks (Capacity 5000 m3)ton76.0000Sub CCTR-223201240Erection
of Conical Roof Tanks (Capacity 7000 m3)ton70.0000Sub
CCTR-223201250Erection of Conical Roof Tanks (Capacity 10000
m3)ton60.0000Sub CCTR-223201260Erection of Conical Roof Tanks
(Capacity 20000 m3)ton58.0000Sub CCTR-223201270Erection of Conical
Roof Tanks (Capacity 30000 m3)ton53.0000Sub CCTR-223201280Erection
of Conical Roof Tanks (Capacity 50000 m3)ton48.0000Sub
CCTR-223201290Erection of Dome Roof Tanks (Capacity upto 50
m3)ton250.0000Sub CCTR-223201300Erection of Dome Roof Tanks
(Capacity 100 m3)ton230.0000Sub CCTR-223201310Erection of Dome Roof
Tanks (Capacity 200 m3)ton215.0000Sub CCTR-223201320Erection of
Dome Roof Tanks (Capacity 300 m3)ton200.0000Sub
CCTR-223201330Erection of Dome Roof Tanks (Capacity 500
m3)ton158.0000Sub CCTR-223201340Erection of Dome Roof Tanks
(Capacity 800 m3)ton145.0000Sub CCTR-223201350Erection of Dome Roof
Tanks (Capacity 1000 m3)ton140.0000Sub CCTR-223201360Erection of
Dome Roof Tanks (Capacity 2000 m3)ton118.0000Sub
CCTR-223201370Erection of Dome Roof Tanks (Capacity 3000
m3)ton108.0000Sub CCTR-223201380Erection of Dome Roof Tanks
(Capacity 5000 m3)ton90.0000Sub CCTR-223201390Erection of Dome Roof
Tanks (Capacity 7000 m3)ton83.0000Sub CCTR-223201400Erection of
Dome Roof Tanks (Capacity 10000 m3)ton75.0000Sub
CCTR-223201410Erection of Dome Roof Tanks (Capacity 20000
m3)ton68.0000Sub CCTR-223201420Erection of Dome Roof Tanks
(Capacity 30000 m3)ton63.0000Sub CCTR-223201430Erection of Dome
Roof Tanks (Capacity 50000 m3)ton60.0000Sub CCTR-223201440Erection
of Sphere Tanks-Propane (Capacity upto 40 m3)ton350.0000Sub
CCTR-223201450Erection of Sphere Tanks-Propane (Capacity 50
m3)ton350.0000Sub CCTR-223201460Erection of Sphere Tanks-Propane
(Capacity 100 m3)ton325.0000Sub CCTR-223201470Erection of Sphere
Tanks-Propane (Capacity 200 m3)ton275.0000Sub
CCTR-223201480Erection of Sphere Tanks-Propane (Capacity 300
m3)ton255.0000Sub CCTR-223201490Erection of Sphere Tanks-Propane
(Capacity 500 m3)ton240.0000Sub CCTR-223201500Erection of Sphere
Tanks-Propane (Capacity 800 m3)ton230.0000Sub
CCTR-223201510Erection of Sphere Tanks-Propane (Capacity 1000
m3)ton175.0000Sub CCTR-223201520Erection of Sphere Tanks-Butane
(Capacity upto 100 m3)ton350.0000Sub CCTR-223201530Erection of
Sphere Tanks-Butane (Capacity 200 m3)ton315.0000Sub
CCTR-223201540Erection of Sphere Tanks-Butane (Capacity 300
m3)ton300.0000Sub CCTR-223201550Erection of Sphere Tanks-Butane
(Capacity 500 m3)ton280.0000Sub CCTR-223201560Erection of Sphere
Tanks-Butane (Capacity 800 m3)ton250.0000Sub CCTR-223201570Erection
of Sphere Tanks-Butane (Capacity 1000 m3)ton238.0000Sub
CCTR-223201580Erection of Sphere Tanks-Butane (Capacity 2000
m3)ton200.0000Sub CCTR-223201590Erection of Sphere Tanks-Butane
(Capacity 3000 m3)ton170.0000Sub CCTR-223201600Erection of Sphere
Tanks-Butane (Capacity 5000
m3)ton150.0000G-224InsulationCCTR-22410Hot InsulationSub
CCTR-224100001Hot Insulation of Piping, Single Layerm23.6000Sub
CCTR-224100002Hot Insulation of Piping, Double Layerm25.6000Sub
CCTR-224100003Hot Insulation of Valves, Single Layerm24.2000Sub
CCTR-224101040Hot Insulation of Valve, Double Layerm26.7000Sub
CCTR-224101050Hot Insulation of Equipment, Single Layerm23.0000Sub
CCTR-22410144AHot Insulation of Equipment, Double
Layerm24.8000CCTR-22420Cold InsulationSub CCTR-224201010Cold
Insulation of pipe , Single layerm27.0000Sub CCTR-224201020Cold
Insulation of pipe , Double layerm211.2000Sub CCTR-224201030Cold
Insulation of Valves, Single Layerm28.4000Sub CCTR-224201040Cold
Insulation of Valves, Double Layerm213.4000Sub CCTR-224201050Cold
Insulation of Equipment, Single Layerm26.0000Sub CCTR-224201060Cold
Insulation of Equipment, Double Layerm29.6000CCTR-22430Insulation
Jacketing / CladdingSub CCTR-224301010Insulation Jacketing /
Cladding Work Of Pipingm23.6000Sub CCTR-224301020Insulation
Jacketing / Cladding Work of Pipe Fittings and Valvesm25.0000Sub
CCTR-224301030Insulation Jacketing / Cladding Work of
Equipmentm23.0000Sub CCTR-224301040Dismantling of Insulation/
Claddingm22.0000CCTR-22440Fire ProofingSub CCTR-224400010Placing of
fire proofing on equipment (50 mm thk) by cranem22.8500Sub
CCTR-224400020Placing of fire proofing on structure (50 mm thk) by
cranem23.6000Sub CCTR-224400030Grouting of Steel Structure (Plain
Cement Sand Grout)m3250.0000Sub CCTR-224400040Grouting of Steel
Structure (Non Shrink Grout)m3250.0000Sub CCTR-224400050Grouting of
Pipe Supports (Plain Cement Sand Grout)m3250.0000Sub
CCTR-224400060Grouting of Pipe Supports (Non Shrink
Grout)m3250.0000Sub CCTR-224400070Grouting of Equipment (Plain
Cement Sand Grout)m3225.0000Sub CCTR-224400080Grouting of Equipment
(Non Shrink Grout)m3225.0000Sub CCTR-224400090Grouting of Equipment
(Epoxy Grout)m3250.0000Sub CCTR-224400100Refractory (Brick Lining)
Exculding Enchoringm320.0000Sub CCTR-224400110Refractory ( Castable
) Exculding Enchoringm380.0000Sub CCTR-224400120Refractory
(Gunitting) Exculding Enchoringm360.0000Sub
CCTR-224400130Refractory (Performed/Block) Exculding
Enchoringm345.0000Sub CCTR-224400140Fire Proofing of Equipment (50
mm thk)m25.0000Sub CCTR-224400150Fire Proofing of Structure (50 mm
thk)m26.5000CCTR-22450DismantlingSub CCTR-224500010Dismantling of
Steel Structureton25.0000Sub CCTR-224500020Dismantling of Pipe
Supportston80.0000Sub CCTR-224500030Dismantling of Equipment
Stationary Smallton15.0000Sub CCTR-224500040Dismantling of
Equipment Stationary Mediumton12.0000Sub CCTR-224500050Dismantling
of Equipment Stationary Heavyton8.0000Sub CCTR-224500060Dismantling
of Rotary Equipment Smallton30.0000Sub CCTR-224500070Dismantling of
Rotary Equipment Largeton20.0000Sub CCTR-224500080Dismantling of
Boiler / Furnaceston30.0000Sub CCTR-224500090Dismantling of
HVACton40.0000Sub CCTR-224500100Dismantling of Stack/ Flare /
Ductston30.0000Sub CCTR-224500110Dismantling of Colling
Towerton25.0000Sub CCTR-224500120Dismantling of Insulation /
Claddingm22.0000Sub CCTR-224500130Dismantling of
Conveyorston25.0000Sub CCTR-224500140Dismantling of
Elevatorston25.0000Sub CCTR-224500150Dismantling of Piping Dia less
Than 2"ton100.0000Sub CCTR-224500160Dismantling of Piping Dia 2"
and aboveton30.0000Sub CCTR-224500170Dismantling of Misc.
Itemston100.0000G-225Surface
Preparation/Painting/Coating/LiningCCTR-22510Surface PreparationSub
CCTR-225101020Surface Preparation : Power Tool Cleaning at
Groundm20.6000Sub CCTR-225101040Surface Preparation : Near White
Metal Sa 2.5 at Groundm20.6000Sub CCTR-225101050Surface Preparation
: White Metal Sa 3.0 at Groundm20.8000Sub CCTR-225101070Surface
Preparation : Power Tool Cleaning at Fieldm20.8000Sub
CCTR-225101090Surface Preparation : Near White Metal Sa 2.5 at
Fieldm20.7000Sub CCTR-225101100Surface Preparation : White Metal Sa
3.0 at Fieldm21.0000CCTR-22520PaintingSub CCTR-225201110Painting :
Single Coat with Brush/Roller at Groundm20.2500Sub
CCTR-225201120Painting : Single Coat with Spray Gun at
Groundm20.1500Sub CCTR-225201150Painting : Single Coat with
Brush/Roller at Fieldm20.4000Sub CCTR-225201160Painting : Single
Coat with Spray Gun at Fieldm20.2000Sub CCTR-225201170Application
of Fusion Bonded Epoxy Coatingm20.4500CCTR-22530Coat/Wrap/Rubber
Lining/Cement Lining (Excluding Surface PreparationSub
CCTR-225301010Coat/Wrap Polyken Tape Inner and Outer Wrap
(Excluding Surface Preparation)m22.4000Sub CCTR-225301020Bitumen
Coat/Wrap (Excluding Surface Preparation)m23.0000Sub
CCTR-225301030Heat Shrink Coating (Excluding Surface
Preparation)m21.8000Sub CCTR-225301040Rubber Lining (Excluding
Surface Preparation)m23.0000Sub CCTR-225301050Cement Lining
(Excluding Surface Preparation)m24.0000Sub
CCTR-225301060Application of Phenolic internal Pipe
Coatingm20.4500G-226Cross Country PipelineCCTR-22605Pipeline Dia
04"Sub CCTR-226051240Dewateringm0.0750CCTR-22690Pipeline Dia 24"Sub
CCTR-226900010Stringing Pipeton3.0000Sub CCTR-226900050Lowering
inm0.1875Sub CCTR-226900070Anchor Flangesnos20.0000G-227Conveyors
& ElevatorsCCTR-22710Conveyors ErectionSub
CCTR-227101010Erection of Conveyors (Belt Conveyors)ton150.0000Sub
CCTR-227101020Erection of Conveyors (Chain Conveyors)ton150.0000Sub
CCTR-227101030Erection of Conveyors (Screw Conveyors)ton75.0000Sub
CCTR-227101050Erection of Conveyors (Air Slide
Conveyors)ton75.0000Sub CCTR-227101060Erection of Conveyors (Apron
Feeder)ton75.0000Sub CCTR-227101070Dismantling of
Conveyorston25.0000CCTR-22720Elevator ErectionSub
CCTR-227201010Erection of Elevators (Belt Elevators)ton75.0000Sub
CCTR-227201020Erection of Elevators (Bucket Elevators)ton75.0000Sub
CCTR-227201030Erection of Liftston75.0000Sub
CCTR-227201040Dismantling of
Elevatorston25.0000G-228Precommissioning &
CommissioningCCTR-22810PrecommissioningSub
CCTR-228100001Precommissioningmhr1.0000Sub CCTR-228100002Chemical
CleaniningLot0.0000CCTR-22820CommissioningSub
CCTR-228200001Commissioningmhr100.0000G-229Test &
CalibrationCCTR-22900Inspection/Testing/Flushing &
CalibrationSub CCTR-229001010Pressure Testing of Piping (Hydro
Testing)lbs0.0000Sub CCTR-229001020Pressure Testing of Equipment
(Hydro Testing)nos50.0000Sub CCTR-229001030Pressure Testing of
Equipment (Pneumatic Testing)nos40.0000Sub
CCTR-229001050Calibration of Tanksnos10.0000Sub CCTR-229001055Hydro
Testing of Tanksm30.2500Sub CCTR-229001060Pigging and Flushing
Pipelineton0.0000Sub CCTR-229001070Pigging and Flushing
Pipelinelbs0.0000Sub CCTR-229001080Purging and Blankinglbs0.0000Sub
CCTR-229001090Chemical Cleaning and Flushingm34.0000Sub
CCTR-229001100Flushing and Drying-0.0000Sub CCTR-229001110Post Weld
Heat Treatment (Stress Reliving) of Pipingnos30.0000Sub
CCTR-229001120Post Weld Heat Treatment (Stress Reliving) of
Tanksm24.0000Sub CCTR-229001130Holiday Detectionm20.2500Sub
CCTR-229001140Magnetic Particle Testnos0.0000Sub
CCTR-229001150Hardness Testm0.0000CCTR-22910Hydrotesting of
TanksSub CCTR-229100001Hydrotesting of Tanks More than 2500 cubic
meterm30.2500CCTR-22940Non Destructive Testing of TanksSub
CCTR-229400010NON DESTRUCTIVE TEST OF TANKSnos0.8000CCTR-22950Non
Destructive Testing of EquipmentSub CCTR-229500001Non Destructive
Testing of Equipmentm20.0000CCTR-22960Dye Penetrant Test of
TanksSub CCTR-229600001Dye Penetrant Test of
Tanksm20.0000D-23PipingG-231Piping Carbon
SteelCCTR-23110Fabrication and Erection of Piping Around
EquipmentSub CCTR-231100000Fabrication and Erection of Piping
Around Equipmentton0.0000Sub CCTR-231100001Erection of CS Piping
Dia less than 2" (To be Deleted)ton600.0000Sub
CCTR-231100002Equipment for Special Criteria CS Piping Dia less
than 2"ton0.0000Sub CCTR-231100003Dismantling of Piping Dia less
Than 2"ton100.0000Sub CCTR-231100110Fabrication and Erection of CS
piping Dia Less Than 2" (Avg. Dia 1-1/4" SWT) Around
Equipmentton1,100.0000Sub CCTR-231100210Fabrication and Erection of
CS piping Dia Less Than 2" (Avg. Dia 1-1/4" SWT) At
Rackton800.0000Sub CCTR-231100310Fabrication and Erection of CS
piping Dia Less Than 2" (Avg. Dia 1-1/4" SWT) At
Sleeperton700.0000Sub CCTR-231100410Fabrication and Erection of CS
piping Dia Less Than 2" (Avg. Dia 1-1/4" SWT) Under
Groundton850.0000Sub CCTR-231109999Special Criteria for Erection of
CS Fitting and Valvesnos0.0000CCTR-23120Fabrication of CS Piping
Dia 2" and Above.Sub CCTR-231200000Fabrication and Erection of
Piping At Rackton0.0000Sub CCTR-231200001Fabrication of C.S. Piping
Dia 2" and above.ton110.0000Sub CCTR-231200002Equipmen for Special
Criteria Fabrication of CS Piping Dia 2" and aboveton0.0000Sub
CCTR-231200010Fabrication of CS piping Dia 2"- 6" (Avg. Dia 4"
SWT)ton140.0000Sub CCTR-231200020Fabrication of CS piping Dia
8"-12" (Avg. Dia 10" SWT)ton110.0000Sub CCTR-231200030Fabrication
of CS piping Dia 14"-18" (Avg. Dia 16" SWT)ton80.0000Sub
CCTR-231200040Fabrication of CS piping Dia 20"-24" (Avg. Dia 22"
SWT)ton50.0000Sub CCTR-231200050Fabrication of CS piping Dia
26"-30" (Avg. Dia 28" SWT)ton40.0000Sub CCTR-231200060Fabrication
of CS piping Dia 32"-40" (Avg. Dia 36" SWT)ton36.0000Sub
CCTR-231200065Fabrication of CS piping Sch. 40 (Std.)inch
dia1.6000Sub CCTR-231200070Fabrication of CS piping Sch. 80inch
dia2.0000Sub CCTR-231200075Fabrication of CS piping Sch. 120inch
dia2.6000Sub CCTR-231200080Fabrication of CS piping Sch. 160inch
dia3.4000Sub CCTR-231200085Fabrication of CS piping Sch. XXSinch
dia4.4000Sub CCTR-231209999Special Criteria for Erection of CS
Fitting and Valvesnos0.0000CCTR-23130Erection of CS Piping Dia 2"
and Above.Sub CCTR-231300000Fabrication and Erection of Piping At
Sleeperton0.0000Sub CCTR-231300001Erection of CS. Piping Dia 2" and
above.ton117.0000Sub CCTR-231300002Equipment for Special Criteria
Erection of CS Piping Dia 2" and above.ton0.0000Sub
CCTR-231300003Tie-innsinch dia4.0000Sub CCTR-231300004Dismantling
of Piping Dia 2" and aboveton30.0000Sub CCTR-231300110Erection of
CS Piping Dia 2"- 6" (Avg. Dia 4" SWT) Around
Equipmentton280.0000Sub CCTR-231300120Erection of CS Piping Dia
8"-12" (Avg. Dia 10" SWT) Around Equipmentton220.0000Sub
CCTR-231300130Erection of CS Piping Dia 14"-18" (Avg. Dia 16" SWT)
Around Equipmentton160.0000Sub CCTR-231300140Erection of CS Piping
Dia 20"-24" (Avg. Dia 22" SWT) Around Equipmentton110.0000Sub
CCTR-231300150Erection of CS Piping Dia 26"-30" (Avg. Dia 28" SWT)
Around Equipmentton90.0000Sub CCTR-231300160Erection of CS Piping
Dia 32"-40" (Avg. Dia 36" SWT) Around Equipmentton80.0000Sub
CCTR-231300165Erection of CS Piping Sch.40 Around Equipmentinch
dia7.0000Sub CCTR-231300170Erection of CS Piping Sch.80 Around
Equipmentinch dia8.0000Sub CCTR-231300175Erection of CS Piping
Sch.120 Around Equipmentinch dia9.0000Sub CCTR-231300180Erection of
CS Piping Sch. 160 Around Equipmentinch dia10.0000Sub
CCTR-231300185Erection of CS Piping Sch. XXS Around Equipmentinch
dia12.0000Sub CCTR-231300210Erection of CS Piping Dia 2"- 6" (Avg.
Dia 4" SWT) At Rackton180.0000Sub CCTR-231300220Erection of CS
Piping Dia 8"-12" (Avg. Dia 10" SWT) At Rackton140.0000Sub
CCTR-231300230Erection of CS Piping Dia 14"-18" (Avg. Dia 16" SWT)
At Rackton100.0000Sub CCTR-231300240Erection of CS Piping Dia
20"-24" (Avg. Dia 22" SWT) At Rackton80.0000Sub
CCTR-231300250Erection of CS Piping Dia 26"-30" (Avg. Dia 28" SWT)
At Rackton70.0000Sub CCTR-231300260Erection of CS Piping Dia
32"-40" (Avg. Dia 36" SWT) At Rackton60.0000Sub
CCTR-231300265Erection of CS Piping Sch. 40 At Rackinch
dia5.6000Sub CCTR-231300270Erection of CS Piping Sch. 80 At
Rackinch dia6.4000Sub CCTR-231300275Erection of CS Piping Sch. 120
At Rackinch dia7.2000Sub CCTR-231300280Erection of CS Piping Sch.
160 At Rackinch dia8.0000Sub CCTR-231300285Erection of CS Piping
Sch. XXS At Rackinch dia9.6000Sub CCTR-231300310Erection of CS
Piping Dia 2"- 6" (Avg. Dia 4" SWT) At Sleeperton150.0000Sub
CCTR-231300320Erection of CS Piping Dia 8"-12" (Avg. Dia 10" SWT)
At Sleeperton120.0000Sub CCTR-231300330Erection of CS Piping Dia
14"-18" (Avg. Dia 16" SWT) At Sleeperton90.0000Sub
CCTR-231300340Erection of CS Piping Dia 20"-24" (Avg. Dia 22" SWT)
At Sleeperton70.0000Sub CCTR-231300350Erection of CS Piping Dia
26"-30" (Avg. Dia 28" SWT) At Sleeperton60.0000Sub
CCTR-231300360Erection of CS Piping Dia 32"-40" (Avg. Dia 36" SWT)
At Sleeperton50.0000Sub CCTR-231300365Erection of CS Piping Sch. 40
At Sleeperinch dia5.1000Sub CCTR-231300370Erection of CS Piping
Sch. 80 At Sleeperinch dia5.8000Sub CCTR-231300375Erection of CS
Piping Sch. 120 At Sleeperinch dia6.5000Sub CCTR-231300380Erection
of CS Piping Sch. 160 At Sleeperinch dia7.2000Sub
CCTR-231300385Erection of CS Piping Sch. XXS At Sleeperinch
dia8.6000Sub CCTR-231300410Erection of CS Piping Dia 2"- 6" (Avg.
Dia 4" SWT) Under Groundton225.0000Sub CCTR-231300420Erection of CS
Piping Dia 8"-12" (Avg. Dia 10" SWT) Under Groundton175.0000Sub
CCTR-231300430Erection of CS Piping Dia 14"-18" (Avg. Dia 16" SWT)
Under Groundton125.0000Sub CCTR-231300440Erection of CS Piping Dia
20"-24" (Avg. Dia 22" SWT) Under Groundton100.0000Sub
CCTR-231300450Erection of CS Piping Dia 26"-30" (Avg. Dia 28" SWT)
Under Groundton90.0000Sub CCTR-231300460Erection of CS Piping Dia
32"-40" (Avg. Dia 36" SWT) Under Groundton80.0000Sub
CCTR-231309999Special Criteria for Erection of CS Fitting and
Valvesnos0.0000CCTR-23140Fabrication and Erection of PipingSub
CCTR-231400000Fabrication and Erection of Piping Under
Groundton0.0000G-232Piping Alloy SteelCCTR-23210Fabrication and
Erection of AS Piping Dia Less than 2"Sub CCTR-232100000Fabrication
of Piping Dia 2" and Above.ton0.0000Sub CCTR-232100001Erection of
AS Piping Dia less than 2"ton1,000.0000Sub CCTR-232100002Equipment
for Special Criteria, AS Piping Dia less than 2"ton0.0000Sub
CCTR-232100110Fabrication and Erection of AS Piping Dia less Then
2" (Avg. Dia 1-1/4" SWT) Around Equipmentton1,800.0000Sub
CCTR-232100210Fabrication and Erection of AS Piping Dia less Then
2" (Avg. Dia 1-1/4" SWT) At Rackton1,300.0000Sub
CCTR-232100310Fabrication and Erection of AS Piping Dia less Then
2" (Avg. Dia 1-1/4" SWT) At Sleeperton1,100.0000Sub
CCTR-232100410Fabrication and Erection of AS Piping Dia less Then
2" (Avg. Dia 1-1/4" SWT) Under Groundton1,400.0000Sub
CCTR-232109999Special Criteria for Erection of AS Fittings and
Valvesnos0.0000CCTR-23220Fabrication of AS Piping Dia 2" and
above.Sub CCTR-232200000Special Criteria for A.S. Piping
Fabrication Greater than 2" Diaton0.0000Sub
CCTR-232200001Fabrication of A.S. Pipe greater than 2" Dia
Pipeton180.0000Sub CCTR-232200002Equipment for Special Criteria,
Fab. AS piping greater than 2" Diaton0.0000Sub
CCTR-232200010Fabrication of AS Piping Dia 2 "- 6" (Avg. Dia 4"
SWT)ton220.0000Sub CCTR-232200020Fabrication of AS Piping Dia
8"-12" (Avg. Dia 10" SWT)ton180.0000Sub CCTR-232200030Fabrication
of AS Piping Dia 14"-18" (Avg. Dia 16" SWT)ton130.0000Sub
CCTR-232200040Fabrication of AS Piping Dia 20"-24" (Avg. Dia 22"
SWT)ton80.0000Sub CCTR-232200050Fabrication of AS Piping Dia
26"-30" (Avg. Dia 28" SWT)ton70.0000Sub CCTR-232200060Fabrication
of AS Piping Dia 32"-40" (Avg. Dia 36" SWT)ton60.0000Sub
CCTR-232200065Fabrication of AS piping Sch. 40 (Std.)inch
dia3.2000Sub CCTR-232200070Fabrication of AS piping Sch. 80inch
dia4.0000Sub CCTR-232200075Fabrication of AS piping Sch. 120inch
dia5.2000Sub CCTR-232200080Fabrication of AS piping Sch. 160inch
dia6.8000Sub CCTR-232200085Fabrication of AS piping Sch. XXSinch
dia8.8000Sub CCTR-232209999Special Criteria for Erection of AS
Fitting and Valvesnos0.0000CCTR-23230Erection of AS Piping Dia 2"
and Above.Sub CCTR-232300000Special Criteria for Erection of A.S.
Pipe greater than 2" Diaton0.0000Sub CCTR-232300001Erection of A.S.
Pipe greater than 2" Diaton151.0000Sub CCTR-232300002Equipment for
Special Critera, Erect. AS piping greater than 2" Diaton0.0000Sub
CCTR-232300110Erection of AS Piping Dia 2"- 6" (Avg. Dia 4" SWT)
Around Equipmentton450.0000Sub CCTR-232300120Erection of AS Piping
Dia 8"-12" (Avg. Dia 10" SWT) Around Equipmentton350.0000Sub
CCTR-232300130Erection of AS Piping Dia 14"-18" (Avg. Dia 16" SWT)
Around Equipmentton260.0000Sub CCTR-232300140Erection of AS Piping
Dia 20"-24" (Avg. Dia 22" SWT) Around Equipmentton180.0000Sub
CCTR-232300150Erection of AS Piping Dia 26"-30" (Avg. Dia 28" SWT)
Around Equipmentton150.0000Sub CCTR-232300160Erection of AS Piping
Dia 32"-40" (Avg. Dia 36" SWT) Around Equipmentton130.0000Sub
CCTR-232300165Erection of AS Piping Sch. 40 Around Equipmentinch
dia8.8000Sub CCTR-232300170Erection of AS Piping Sch. 80 Around
Equipmentinch dia10.0000Sub CCTR-232300175Erection of AS Piping
Sch. 120 Around Equipmentinch dia11.5000Sub CCTR-232300180Erection
of AS Piping Sch. 160 Around Equipmentinch dia13.1000Sub
CCTR-232300185Erection of AS Piping Sch. XXS Around Equipmentinch
dia15.0000Sub CCTR-232300210Erection of AS Piping Dia 2"- 6" (Avg.
Dia 4" SWT) At Rackton290.0000Sub CCTR-232300220Erection of AS
Piping Dia 8"-12" (Avg. Dia 10" SWT) At Rackton225.0000Sub
CCTR-232300230Erection of AS Piping Dia 14"-18" (Avg. Dia 16" SWT)
At Rackton160.0000Sub CCTR-232300240Erection of AS Piping Dia
20"-24" (Avg. Dia 22" SWT) At Rackton130.0000Sub
CCTR-232300250Erection of AS Piping Dia 26"-30" (Avg. Dia 28" SWT)
At RackTton110.0000Sub CCTR-232300260Erection of AS Piping Dia
32"-40" (Avg. Dia 36" SWT) At Rackton100.0000Sub
CCTR-232300265Erection of AS Piping Sch. 40 At Rackinch
dia7.0000Sub CCTR-232300270Erection of AS Piping Sch. 80 At
Rackinch dia8.0000Sub CCTR-232300275Erection of AS Piping Sch. 120
At Rackinch dia9.2000Sub CCTR-232300280Erection of AS Piping Sch.
160 At Rackinch dia10.5000Sub CCTR-232300285Erection of AS Piping
Sch. XXS At Rackinch dia12.0000Sub CCTR-232300310Erection of AS
Piping Dia 2"- 6" (Avg. Dia 4" SWT) At Sleeperton240.0000Sub
CCTR-232300320Erection of AS Piping Dia 8"-12" (Avg. Dia 10" SWT)
At Sleeperton190.0000Sub CCTR-232300330Erection of AS Piping Dia
14"-18" (Avg. Dia 16" SWT) At Sleeperton150.0000Sub
CCTR-232300340Erection of AS Piping Dia 20"-24" (Avg. Dia 22" SWT)
At Sleeperton110.0000Sub CCTR-232300350Erection of AS Piping Dia
26"-30" (Avg. Dia 28" SWT) At Sleeperton100.0000Sub CCTR-232300