TITRE The Agency’s Work Programme Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig Director Volker Zuleger - Head of Market Monitoring dpt.
36

Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

Aug 03, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

TITRE

The Agency’s Work Programme Outline for 2015

Presentation for stakeholders, 4 June 2014

Alberto Pototschnig – Director

Volker Zuleger - Head of Market Monitoring dpt.

Page 2: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

Era

Annual Work Programme

Focus on activities and deliverables, most tables in annexes

Other changes

Key Performance Indicators More information on Agency-related issues

Single programming document

Agency’s strategic areas over the next few years

Multiannual outlook

Work Programme – New structure

Early implementation of COM’s new reporting structure for Agencies

2

Page 3: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

ACER – An Expanding Role

Third Energy Package

REMIT

TEN-E Regulation

ORIGINAL MANDATE

TWO NEW MAJOR PIECES OF LEGISLATIONconfirm ACER’s growing responsibilities

These are reflected in the Four Themes of the

2015 Work Programme

3

Page 4: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

• Network Codes (NCs)• IEM Implementation• NC Implement. Monitoring• Internal Market Monitoring

Themes of 2015 ACER WP

• Complete REMIT Implementation

• Wholesale Market Monitoring

• Gas TYNDP• Identification of PCIs for the

2nd EU list• Cross-Border Cost Allocation

• “Bridge” Implementation• Review of the Electricity and

Gas Target Models

Theme 1: (Post-) IEM Completion

Theme 3: The Infrastructure Challenge

Theme 2: Wholesale Energy Market Integrity and Transparency

Theme 4: Future Challenges, including RES Integration Challenge

4

Page 5: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

EU Council Conclusions – 4 February 2011

“The internal market should be completed by 2014 so as to allow gas and electricity to flow freely” (§4)

EU Council Conclusions – 22 May 2013

Priority to “speeding up the adoption and implementation of remaining network codes” (§1)

Theme 1 – (Post-) IEM Completion

5

Page 6: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

Framework Guidelines and Network CodesPlanned Activities in 2015 - Highlights

Theme 1 – (Post-) IEM Completion

.Scoping to prepare for possible FG on Harmonised Tariff Structures.Opinion and Recommendation on NC on operational procedures in emergency

Electricity

Gas

.Opinion and Recommendation NC Tariffs.CAM NC Amendment on Incremental Capacity.Probably no FG on Rules for Trading.Congestion report

Electricity and Gas

.NC Implementation Tools (CACM, CAM).Preparation for Monitoring NC Implementation

6

Page 7: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

Theme 1 – (Post-) IEM Completion

Framework Guidelines and Network Codes

State of Play

Electri-

cityGas

Framework areas prioritised by the European

Commission4 4

Framework Guidelines issued by ACER 4 4

Envisaged Network Codes 11 4

of which: Adopted 0 2

In Comitology 0 0

Recommended for Adoption by ACER/

With the European Commission7 1

Being Assessed by ACER/

revised by ENTSOs2 0

Being Developed by ENTSOs 0 1

Development not yet started 2 0

=12

7

Page 8: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

Integration of the Electricity Day-Ahead Market

TimelineAs of

Jan 2012

As of

Feb 2014

NWE(CWE + Nordic +

GB + PL)

2012 4 Feb 2014

SWE(ES + PT)

End 2012/H1

201313 May 2014

CEE(CZ + HU + SK)

End 2012/End

2013End of 2014^

Baltics End 2013 4 Feb 2014

CSE(IT + SI)

H1 2014 H2-2014

RO End of 2014 End of 2014

BG + GR End of 2014 2016

EI + NI 2016 2016

HR ? ?

SEE End of 2015 ?

^Subject to FBMC being

introduced8

Theme 1 – (Post-) IEM Completion

8

Page 9: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

Single EU DA Price Coupling

Electricity CACM Roadmaps: State of Play

Single EU ID Contin. Trading

• Significant delay due to PXs’ disagreement• EC took the process over at FF in Nov 2013• “Early-Start Agreement” signed in May

2014: 18-month timeline to “go-live”

Single EU LT Allocat. Platform

• “Wish list” agreed by NRAs early 2013• MoU between CASC and CAO (75% of the

EU borders with LT TRs)• Common auction rules expected in 2015

• CWE pilot project expected to start 2014H2• The CEE region to follow (ad-hoc solutions

may be required to address the loop flows phenomenon

Flow-Based Cap. Calc. Method

Theme 1 – (Post-) IEM Completion

• Important progress in Multi-Regional MC (NWE: 4 Feb 2013; SWE 13 May 2014)

• Extension to CSE expected by Dec 2014• “4 Markets” MC project expected in 2014

9

Page 10: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

Theme 1 – (Post-) IEM Completion

NC (early) Implementation Support.Coordination of the Electricity and Gas Regional Initiatives.Annual Regional Initiatives Status Review Report.Progress reports on Regional Initiatives Progress

Monitoring of IEM Developments.Annual Market Monitoring Report

» Retail prices in electricity and natural gas

» Wholesale market integration

» Consumer welfare benefits or losses as aresult of market integration (or lack of it)

» Access to networks

» Compliance with consumer rights10

Page 11: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

2011 2012 2013 2014 2015

FG/NC on Grid Connection

FG/NC on Capacity Allocation and Congestion Management (CACM)

FG/NC on Balancing

FG/NC on System Operation

NC

EV COMITOLOGY

FGNC

CC, DA, ID

Long-term

EV

EV

NC

NC

NC

Op. Security

Op. Plann./Sched.

LFC & Reserves

FG NC EV

ACER ENTSO-E EC – EP (without prejudice)

NC

NC EV

HVDC

DCC FG

RfG

NC EV

Network Code Development: Electricity

Balancing

NC

COMITOLOGY

COMITOLOGY

COMITOLOGY

COMITOLOGY

COMITOLOGY

COMITOLOGY

COMITOLOGY

COMITOLOGY

NC EV COMIT.Emergency proc.

EV

EV

EV EV

EV

ACER Recommendation

Theme 1 – (Post-) IEM Completion

11

Page 12: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

. Scoping for Framework Guidelines on rules regarding harmonised electricity transmission tariff structures

. Reasoned opinion and Recommendation on the Network Code on operational procedures in emergency

. Advice and support on Network Codes during the comitology process, as appropriate

Electricity

Activities/deliverables in AWP 2015

Theme 1 – (Post-) IEM Completion

12

Page 13: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

. Preparation for monitoring of the implementation of the adopted Network Codes

Opinion on ENTSO-E’s plan for the monitoring of the implementation of the adopted Network Codes

Establishing list of relevant information to be communicated by ENTSO-E to ACER for the purpose of monitoring activities pursuant to the adopted Network Codes

Electricity

Activities/deliverables in AWP 2015 (cont.)

Theme 1 – (Post-) IEM Completion

13

Page 14: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

. General activities related to the decision making process established pursuant to adopted Network Codes

Assistance in the decision making process for the development of proposals for terms and conditions or methodologies to be developed

Delivery of opinions on terms and conditions or methodologies developed and to be approved by relevant NRAs

Coordination and possible dispute resolution in the process of NRA approval of the terms and conditions or methodologies developed

Assistance in the functioning and the decision-making process of different committees established

Electricity

Activities/deliverables in AWP 2015 (cont.)

Theme 1 – (Post-) IEM Completion

14

Page 15: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

NC

2011 2012 2013 2014 2015

FG/NC on Capacity Allocation Mechanisms (CAM)FG

Commission Guidelines on Congestion Management Procedures

FG/NC on Gas Balancing in Transmission Systems

WS

CG

EV COMIT.

COMITOLOGY

NC

NC

EV

EV

COMITOLOGY

COMITOLOGY

FG NC EV COMIT.

FG

FG/NC on Interoperability and Data Exchange Rules

FG

NC

ACER Recommendation

Network Code Development: Gas

FG/NC on Harmonised Transmission Tariff Structures

ACER ENTSOG EC – EP (without prejudice)

Theme 1 – (Post-) IEM Completion

15

Page 16: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

. Possibly Framework Guidelines or appropriate legal tools to introduce rules for trading related to technical and operational provisions of network access services (and system balancing)

. Preparation for the Review of Transparency Rules and Scoping potential Framework Guidelines on Settlement Rules, Operational Procedures in an emergency

. Reasoned opinion and Recommendation on the Network Code on rules regarding harmonised transmission tariff structures

Gas

Activities/deliverables in AWP 2015

Theme 1 – (Post-) IEM Completion

16

Page 17: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

. Advice and support in comitology on the Network Code on harmonised transmission tariff structures and the amendment of the Network Code on capacity allocation mechanisms regarding incremental capacity

. Public consultation (article 7 Gas Regulation) on amendments of the Network Code on Capacity allocation mechanisms regarding incremental capacity and the preparation of reasoned proposals to the Commission

. 1st ACER report on Progress of capacity bundling at interconnection points according to the Network Code on Capacity allocation mechanisms due on 4 November 2015

Gas

Activities/deliverables in AWP 2015 (cont.)

Theme 1 – (Post-) IEM Completion

17

Page 18: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

. 2nd ACER report on monitoring of Congestion at interconnection points (incl. transparency platform data, conditions for firm day-ahead use-it-or-lose-it mechanisms and changes in bundled capacity at interconnection points)

. Preparation for and monitoring of the implementation of the adopted Network Codes (Implementation monitoring Report on congestion management procedures)

. Opinion(s), if sought by NRAs, on within day obligations and annual report on interim measures according to the Network Code on Balancing

Gas

Activities/deliverables in AWP 2015 (cont.)

Theme 1 – (Post-) IEM Completion

18

Page 19: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

MonitoringA new, sector-specific, comprehensive and effective monitoring framework for wholesale energy markets

Cooperation

Close cooperation and coordination between ACER (EU-wide monitoring) and NRAs (national monitoring, investigation and enforcement)

Integrity

Explicit prohibitions of abusive practices (market manipulation, attempted market manipulation and insider trading) in wholesale energy markets

TransparencyObligations for market participants to disclose inside information

Theme 2 - REMIT

19

Page 20: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

NRAs

- “shall monitor trading activity in wholesale energy products” in the EU

- “is best placed to carry out such monitoring as it has both a Union-wide view of electricity and gas markets, and the necessary expertise in the operation of electricity and gas markets and systems in the Union”

- “shall cooperate at regional level and with the Agency in carrying out the monitoring of wholesale energy markets”

- “may also monitor trading activity in wholesale energy products at national level”

INVESTIGATIONS

ENFORCEMENT

Theme 2 - REMIT

20

Page 21: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

Theme 2 - REMIT

Actively preparing for Market Monitoring

REMIT entered into force on 28 December 2011

Prohibitions of Market Abuse:- Market Manipulation- Attempted Market Manipulation- Insider Trading

Obligations:- to Publish Inside Information- to notify ACER of delays in the publication of Inside

Information- for Persons Professionally Arranging Transactions:

- to establish effective arrangements and procedures to identify breaches of Market Abuse prohibitions

- to notify NRAs of suspected breaches of Market Abuse prohibitions

These Prohibitions and Obligations already apply

21

Page 22: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

Wholesale Market Monitoring Approach

Data Acquisition

Trade DataFundamental Data

Initial assessment and analysisof “Anomalous

Events” to detect “Suspicious Events”

Notification of “Suspicious Events”

to NRA(s)

Coordination of NRAs (if needed)

Automatic Screeningto identify

“Anomalous Events”

Monitoring Methodology:“Anomalous

Events” definition

Theme 2 - REMIT

22

Page 23: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

.Completion of the Monitoring

Platform. Tier 1: Data Sourcing. Tier 2: Data Cleaning. Tier 3: Surveillance System. Tier 4: Data Exchange

Preparing to Go-live in Q1 2015.Activation of Systematic

Wholesale Market Monitoring. Timing dependent on Adoption

of Implementing Acts. Approach dependent on

available resources

Theme 2 - REMIT

23

Page 24: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

OperationalStage

REMIT Implementation and Operation

Implementation Stage

- Drafting of “Policy Documents”

- Deployment of IT Platforms and Tools

- Development of Procedures, Protocols and Manuals

- Collection of trade and fundamental data

- Automatic screening and initial assessment

- Data sharing with NRAs- Coordination of cross-

border investigations

TOTAL INVESTMENT NEEDED€ 4 million, of which:• € 1 million in 2012 √• € 3 million in 2013 √

ADDITIONAL STAFF• 5 in 2012 √• 10 in 2013 √• 0 in 2014 • ? in 2015 (+30 requested)

20162015201420132012

Theme 2 - REMIT

24

Page 25: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

. Operation, development, enhancements of the Centralised European register of energy market participants (CEREMP), of the Agency’s REMIT Information System (ARIS) for collection of trade, fundamental and other data and for the data sharing with NRAs

. Market monitoring of trading activity in wholesale energy markets to detect and prevent trading based on inside information and market manipulation, in cooperation with NRAs, and establishment, development and operation of the Agency’s market surveillance

Activities/deliverables in AWP 2015

Theme 2 - REMIT

25

Page 26: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

. Coordination of NRAs and other relevant authorities to promote best practices and consistency in the implementation of REMIT (including update of the Agency’s guidance on the application of REMIT definitions, and coordination of NRAs’ investigation activities on cross-border market abuse instances)

. Cooperation with NRAs, ESMA, other authorities, international organisations and third countries to ensure a coordinated approach in the enforcement of market abuse rules related to REMIT

. Annual report on the Agency’s activities under REMIT

Activities/deliverables in AWP 2015 (cont.)

Theme 2 - REMIT

26

Page 27: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

Theme 3 – The Infrastructure Challenge

ACER Priorities in 2015

.Opinion on the draft regional lists of proposed PCIs, in particular on the consistent application of the criteria and the cost-benefit analysis across regions

PCI Selection(2nd Union-wide List)

NRA Support.Guidance on Cross Border Cost

Allocation methodologies

PCI Implementation

Monitoring

.Annual consolidated report on progress in PCI implementation and (possibly) recommendations to overcome delays/difficulties

27

Page 28: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

. Annual monitoring report on the implementation and management of the inter-TSO compensation fund

. Opinions on ENTSO-E’s annual work programme; annual report; Summer and Winter supply outlooks; common network operation tools including a common incidents classification scale and research and development plan

. Opinion on the electricity national ten-year network development plans and (if appropriate) recommendations to amend it or amend the Community-wide network development plan

Activities/deliverables in AWP 2015

TSO-related tasks - Electricity

28

Page 29: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

. Opinion on ENTSO-E’s recommendations relating to the coordination of technical cooperation between Community and third-country transmission system operators

. Opinion on monitoring the implementation of the electricity Community–wide TYNDP and the progress as regards the implementation of projects to create new interconnector capacity

Activities/deliverables in AWP 2015 (cont.)

TSO-related tasks - Electricity

29

Page 30: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

. Opinions on ENTSOG’s TYNDP 2015-2024; annual work programme and ENTSOG’s annual report; common network operation tools including a common incidents classification scale and research plans; Summer and Winter supply outlooks

. Reviews and recommendations on national TYNDPs regarding their (in)consistency with the Community-wide TYNDP

Activities/deliverables in AWP 2015

TSO-related tasks - Gas

30

Page 31: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

. Opinions on ENTSOG’s recommendations relating to the coordination of technical cooperation between Community and third-country transmission system operators

. Report on monitoring the implementation of the Community-wide TYNDP and the progress as regards the implementation of projects to create new interconnector capacity

Activities/deliverables in AWP 2015 (cont.)

TSO-related tasks - Gas

31

Page 32: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

. Decision on operational security of cross-border interconnectors and on exemptions, when requested jointly by the concerned NRAs or when the concerned NRAs fail to take a decision

. Decisions on investment requests including on cross-border cost allocation

. Requests for updates and improvements of the (electricity or gas) methodology for cost-benefit analysis

. Opinions on preliminary decisions by NRAs on TSO certification when requested by the Commission

. Opinions and recommendations upon request by Member States, NRAs, the European Parliament, the Council and the European Commission

The Agency may be called to perform the following activities on request:

Activities subject to conditions

32

Page 33: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

Theme 4 – Future Challenges and RES

EU Council Conclusions – 22 May 2013

“the deployment of renewable energy sources will continue, while ensuring their cost reflectiveness [and] further market integration” (§6.a)

State of Play.Detailed Target Model for the Internal Electricity Market .Broader Target Model for the Internal Gas Market.These Target Models represent robust starting

points for any evolution to handle the increasing

penetration of RES-based electricity generation:

» Greater flexibility in electricity and gas markets required

» Resource adequacy concerns in electricity generation

33

Page 34: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

The 2025 Bridge

ElectricityWholesaleMarkets

RetailMarkets

GasWholesaleMarkets

Demand Side & DSOs

Infra-structure

Investment

1. Energy Sector Trends

2. Impact for Europe’s

Regulatory Framework

The 2025 Bridge analysis

3. Implications for Governance

Conclusions in September 2014

Theme 4 – Future Challenges and RES

34

Page 35: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

Next steps - Deadlines

Deadline for Stakeholders to submit comments on the 2015 Work Programme Outline18 Jun

30 Jun

The 2015 Work Programme is submitted by the Director to the BoR, the EP and the EC

1 Sep

The Board of Regulators approves the 2015 Work Programme

30 SepThe Administrative Board, after consulting the EC, adopts the 2015 Work Programme approved by the BoR, and transmits it to the EP, the Council and the EC

35

Page 36: Outline of the Agency’s Work Programme for 2014 · 2014-06-04 · Outline for 2015 Presentation for stakeholders, 4 June 2014 Alberto Pototschnig –Director Volker Zuleger - Head

Thank you for your

attention

Thank you for your attention!