Approval for Material Sample 1 OUTGOING Rev. Date Issued Title Attachment Status 14/02/28 14/03/10 Tung 14/03/03 Certificates for Pesticide Mr. Tung C 14/03/04 14/03/14 14/03/21 Tung 14/03/17 C 14/03/17 14/03/18 Tung 14/03/27 B 14/03/28 14/03/05 14/03/10 Tung 14/03/11 14/03/10 B Additional document Profile in English + 8 contracts Tung 14/05/02 14/05/08 14/05/07 Re-submit sample Tung A/B 14/03/07 Mrs. Lan 14/03/10 14/03/10 C 14/03/13 1 A3 paper Mrs. Lan 14/03/13 A 14/03/13 14/03/17 Hoang 14/03/19 B 14/03/19 14/04/15 14/04/18 Marubeni Itochu Steel Hoang 14/04/16 Marubeni Itochu Steel A 14/03/17 Hoang 14/03/24 Purlin C 14/03/24 14/04/07 14/04/10 Sample Hoang 14/04/21 Purlin_rev1 B 14/03/24 14/03/25 Hoang 14/03/24 Sample for Material Sticker A 14/03/24 14/03/24 14/03/25 Hoang Date Required Reply INCOMINGDate Issued Author/Copy Delivered to Date delivered BBVN-FIVE-S2-SC-AMASA- 0001-14 Anti Termite Treatment Product - LENFOS 50EC [Pesticide ( LENFOS leaflet, Certificate for Pesticide registration (official), Certificate of quality control for import pesticide (official), certificates of analysis (4 pages) Anti-Termite Product LENFOS - 50EC BBVN-FIVE-S2-SC- AMASA-0001-14/R1 Anti Termite Treatment: Termimesh Rev.1 Certificate of Quality, Certificate of Origin, Ocean Bill of Lading, Company Profile, Catalogue, Sample Anti Termite Treatment Termimesh Rev.1 BBVN-FIVE-S2-SC- AMASA-0001/R2 Anti Termite Treatment: Termimesh. Rev.2 Certificate of Analysis, Certificate of Quality Control for Import Pesticide, Certificate for Pesticide registration (official) Anti Termite Treatment: Termimesh. Rev.2 BBVN-FIVE-S2-SC- AMASA-0002-14 Geotextile ARITEX ART20 Specification of Non-Woven Geotextile, Result of Geotextile official, Sample Teinco Company Profile (in English) + 8 contracts as refe BBVN-FIVE-S2-SC- AMASA-0002-14/R2 Geotextile ARITEX ART20 BBVN-FIVE-S2-SC-AMASA- 0003-14 Concrete grade & Slump Concrete grade & Slump BBVN-FIVE-S2-SC- AMASA-0003-14/R1 Concrete grade & Slump (Rev.1) Concrete Grade & Slump Rev.1 BBVN-FIVE-S2-SC-AMASA- 0004 Steel (Kyoei Steel Vietnam Co., Ltd) Company profile, Brochure, Inspection certificate of raw material, Transportation capacity of company in Vietnamese Steel (Kyoei Steel Vietnam Co., LtdO BBVN-FIVE-S2-SC- AMASA-0004 (ADD) Letter of Guaranty for Transportation of Dbar to B.Braun Project; Letter of Guaranty for Quality of Billets Using for Production of Steel Dbar Supplied to B. Braun Project BBVN-FIVE-S2-SC-AMASA- 0005 Purlin Sample, Mill Test certificate, Inspection certificate, 1 A3 size BBVN-FIVE-S2-SC- AMASA-0005/R1 Purlin Rev1 (revised based on comments in AMASA-0005 dated 24-Mar-2014) BBVN-FIVE-S2-SC-AMASA- 0006 Sample for Material Sticker BBVN-FIVE-S2-SC-AMASA- 0007 Sand for Backfill
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Approval for Material Sample 1
OUTGOING Rev.Date Issued
Title AttachmentStatus
14/02/28 14/03/10 Tung
14/03/03Certificates for Pesticide
Mr. Tung C14/03/04
14/03/14 14/03/21 Tung
14/03/17 C14/03/17
14/03/18 Tung
14/03/27 B14/03/28
14/03/05 14/03/10 Tung14/03/11
14/03/10 B
Additional document Profile in English + 8 contractsTung
14/05/02 14/05/08 14/05/07
Re-submit sample
Tung A/B
14/03/07 Mrs. Lan14/03/10
14/03/10 C
14/03/131 A3 paper
Mrs. Lan
14/03/13 A14/03/13
14/03/17 Hoang
14/03/19 B14/03/19
14/04/15 14/04/18
Marubeni Itochu Steel
Hoang
14/04/16Marubeni Itochu Steel
A
14/03/17 Hoang
14/03/24Purlin
C14/03/24
Date Required Reply
INCOMINGDate Issued
Author/Copy Delivered to
Date delivered
BBVN-FIVE-S2-SC-AMASA-0001-14
Anti Termite Treatment Product - LENFOS 50EC [Pesticide (Hop Tri company)]LENFOS leaflet, Certificate for Pesticide registration (official), Certificate of quality control for import pesticide (official), certificates of analysis (4 pages)
Anti-Termite Product LENFOS - 50EC
BBVN-FIVE-S2-SC-AMASA-0001-14/R1
Anti Termite Treatment: Termimesh Rev.1 Certificate of Quality, Certificate of Origin, Ocean Bill of Lading, Company Profile, Catalogue, Sample
Anti Termite Treatment Termimesh Rev.1
BBVN-FIVE-S2-SC-AMASA-0001/R2
Anti Termite Treatment: Termimesh. Rev.2 Certificate of Analysis, Certificate of Quality Control for Import Pesticide, Certificate for Pesticide registration (official)
Anti Termite Treatment: Termimesh. Rev.2
BBVN-FIVE-S2-SC-AMASA-0002-14
Geotextile ARITEX ART20 Specification of Non-Woven Geotextile, Result of Geotextile official, Sample
Teinco Company Profile (in English) + 8 contracts as reference experience
BBVN-FIVE-S2-SC-AMASA-0002-14/R2
Geotextile ARITEX ART20
BBVN-FIVE-S2-SC-AMASA-0003-14
Concrete grade & Slump
Concrete grade & Slump
BBVN-FIVE-S2-SC-AMASA-0003-14/R1
Concrete grade & Slump (Rev.1)
Concrete Grade & Slump Rev.1
BBVN-FIVE-S2-SC-AMASA-0004
Steel (Kyoei Steel Vietnam Co., Ltd) Company profile, Brochure, Inspection certificate of raw material, Transportation capacity of company in Vietnamese
Steel (Kyoei Steel Vietnam Co., LtdO
BBVN-FIVE-S2-SC-AMASA-0004 (ADD)
Letter of Guaranty for Transportation of Dbar to B.Braun Project; Letter of Guaranty for Quality of Billets Using for Production of Steel Dbar Supplied to B. Braun Project
Air Cooled Chiller Rev.1 based on comments AMEP-0001 dated 17Mar2014
BBVN-FIVE-S2-SC-AMEP-0002
AHU (AIR HANDLING UNIT w/VSD) - 2 units Specification, 2 A4size drawings, AL-KO AHU AT6 brochure, Form Material & Equipment Approval record signed by Sub-contractor dated 10-Mar-2014
BBVN-FIVE-S2-SC-AMEP-0002/R1
AHU - 2 units Rev.1
BBVN-FIVE-S2-SC-AMEP-0002/R2
AHU-2units Rev.2 AHU No.3&4 Data sheet, AHU AT6 Catalogue, Supply fan curve diagram, Exhaust fan curve diagram, fan motor catalogue, damper actuator catalogues, heat wheel catalogues
BBVN-FIVE-S2-SC-AMEP-0003
VRVIII Air Conditioning
BBVN-FIVE-S2-SC-AMEP-0003/R1
VRV Tabulation list, 15 catalogues of CDU 1 to 5 and Indoor Cooling/Heating
BBVN-FIVE-S2-SC-AMEP-0004
Canalis KSC, 630A Canalis, 630A End Feed-end cover, Plug in
Intelligent Fire Control Panel, smoke detector, heat detector, alarm bell, manual call point, deam detector, duct smoke detector, laser smoke detector, telephone jack, relay control module, monitor module, control module, fault isolator, horn trobe, phone communication module, lamp driver module (for renovation of MIMIC panel)
BBVN-FIVE-S2-SC-AMEP-0020/R1
(15 items) Fire Alarm System [FM Approval] Intelligent Fire Control Panel IFC 302(E), smoke detector 2951J, heat detector 5951J, alarm bell SSM24-6, manual call point JBG-12LX, beam detector FSB-200/FSB-200s, duct smoke detector D4240, laser smoke detector 7351J, telephone jack FPJ, relay control module M300RJ, monitor module M301MJ, fault isolator M500XJ, horn trobe CHSR, phone communication module M500FPJ, lamp driver module LDM-32
BBVN-FIVE-S2-SC-AMEP-0021
BBVN-FIVE-S2-SC-AMEP-0022
Certificate of Compliance FM Approval Class 4924, Catalogue
BBVN-FIVE-S2-SC-AMEP-0023
BBVN-FIVE-S2-SC-AMEP-0023/R1 (A)
Galvanized Pipe Medium Grade SCHED 40 for Fire Fighting (FM 200 System)_Rev.1 Revised based on comments in AMEP_0023 dated 25-Apr-2014
FM 200 Piping, Tabulation & Catalogue
BBVN-FIVE-S2-SC-AMEP-0023/R1 (B)
Galvanized Pipe Medium Grade SCHED 40 for Fire Fighting (above Ground Floor) _Rev.1 Revised based on comments in AMEP_0023 dated 25-Apr-2014
BBVN-FIVE-S2-SC-AMEP-0023/R1 (C)
Galvanized Pipe Medium Grade SCHED 40 for Fire Fighting (Underground)_Rev.1 Revised based on comments in AMEP_0023 dated 25-Apr-2014
BBVN-FIVE-S2-SC-AMEP-0023/R2 (C)
Galvanized Pipe Medium Grade SCHED 40 for Fire Fighting (Underground)_Rev.2 Revised based on comments in AMEP_0023/R1 (C) dated 15-May-2014Denso TapePipe Fittings (JIS)
Sprinkler Head System (Preaction Sprinkers (Quick Response Upright and Pendant), Quick Response, Sprinkler heads, Standard Sprinkler Heads, Sprinkler Guard )_Rev.1 Revised upon AMEP-0025 dated 21-May-2014
BBVN-FIVE-S2-SC-AMEP-0025/R1(ADD.01)
ESPR Upright Sprinkler for Warehouse Under Duct- VIKING VK520 K14.0 (Additional Material for approved in AMEP_0025 dated 03-July-2014)
14/05/16 14/05/30 14/05/21 Compressed Air System_GI Black Steel Pipe Fittings (DN50, DN80) Tabulation, Catalogue Quang C
14/05/31 14/06/12 14/06/03 Tabulation, Catalogue Quang B
14/05/16 14/05/30 14/06/05 Water Supply System_Water Pump & Water Pump Control Panel Quang B
14/06/14 14/06/20 14/06/20 Quang/Khoa B
14/05/16 14/05/30 14/06/05 Quang B/B/A
14/05/16 14/05/30 14/06/06 Quang B
14/05/19 14/06/02 Randy/Quang
14/06/14 14/06/21 14/06/25 Quang B/B+C
14/10/31 14/11/06 14/11/03 Technical Detail Quang/Ujiie B
14/06/27 14/07/03 14/07/09 Quang/Diem A (SUPERSEDED)
14/08/09 14/08/14 14/08/15 Fiber Optic Cable Quang B
14/08/18 14/08/23 14/08/22 Quang B
14/08/23 14/08/27 14/08/28 Manufacturer Letter, Catalog Quang/Ujiie B
14/05/19 14/06/02 14/05/28 Bare Copper Wire - 70mm2 Quang/Ujiie B/A
BBVN-FIVE-S2-SC-AMEP-0049
Catalogues of Ventilation Fan Equipment No. EAFG-PII-01, EAFG-PII-02; EAF1-PII-01, EAF1-PII-02
BBVN-FIVE-S2-SC-AMEP-0049/R1
Exhaust Fan_Rev.1 revised based on comments in AMEP-0049 dated 28-May-2014) RFC submitted paralelly for this AMEP
Catalogue of Supply Fan Equpment No. EAFG-PII-01; EAFG-PII-02; EAF1-PII-01; EAF1-PII-02
BBVN-FIVE-S2-SC-AMEP-0050
CCTV System (Indoor PTZ IP dome camera, outdoor PTZ IP dome camera, Indoor fixed camera, FOC (fiber optic converter)
BBVN-FIVE-S2-SC-AMEP-0050/R1
BBVN-FIVE-S2-SC-AMEP-0050/R2
CCTV System_Indoor PTZ dome camera, Outdoor PTZ IP dome Camera, IP indoor fixed dome camera, FOC (fiber optic converter)_Rev.2 Revised based on comments in AMEP-0050/R1 dated 13-June-2014
HVAC System: Black carbon steel pipe SCHED 40 for chilled water_Rev.1 Revised based on comments in AMEP-0051 dated 16-May-2014
Technical detail description, Catalogue
BBVN-FIVE-S2-SC-AMEP-0052
Technical detail description, Catalogue
BBVN-FIVE-S2-SC-AMEP-0052/R1
HVAC System: Black carbon steel pipe fittings for chilled water_Rev.1 Revised based on comments in AMEP-0052 dated 19-May-2014
Technical detail description, Catalogue
BBVN-FIVE-S2-SC-AMEP-0053
BBVN-FIVE-S2-SC-AMEP-0054
HVAC_Buffer Tank & Buffer Tank Insulation Location of installation AHU room (Buffer tank capacity 5m3) (NAM AN)
Technical detail description, Catalogue
BBVN-FIVE-S2-SC-AMEP-0054 A
Buffer Tank Insulation - BASF Elastopor MH 2149 (Superseded the approved buffer tank insulation in AMEP-54 dated 5-June-2014
BBVN-FIVE-S2-SC-AMEP-0055
Fire Fighting System_Fire Fighting Tread Seal for Screw type Piping Tread Seal (TOMBO)
BBVN-FIVE-S2-SC-AMEP-0056
Fire Fighting System (Fire Extinguisher CO2&ABC, Fire Hydrant Pillar, Hosereel cabinet (indoor type), Fire Hose reel (Indoor with Accessories), Fire Hydrant cabinet outdoor & Fire hydrant (outdoor with accessories))
BBVN-FIVE-S2-SC-AMEP-0056/R1
Fire Hose Reel & Extinguisher; Drum Hose Reel for Clean Room, Circulation Corridor, Office Ground Floor, Warehouse, above Ceiling Clean Room, Office 1st Floor, External and Transformer Room 1,2,3, Stage 1_Rev.1 Revised based on comments in AMEP-0056 dated 21-May-2014
Tabulation, Catalogue, Drawings
BBVN-FIVE-S2-SC-AMEP-0057
Process Cooling Water System_SUS 304 Pipe Use for Process Cooling Water
Compressed Air System_Copper Pipe Fittings for Compressed Air (Use for Compressor air Piping inside production area and above walkable ceiling connected on GI pipe)
BBVN-FIVE-S2-SC-AMEP-0059/R1
Compressed Air System_Copper Pipe Fittings for Compressed Air (Use for Compressor air Piping inside production area and above walkable ceiling connected on GI pipe)_Rev.1 Revised based on comments in AMEP-0059 dated 21-May-2014
Technical Detail Description, Catalogue
BBVN-FIVE-S2-SC-AMEP-060
Compressed Air System_Copper Pipe for Compressed Air (Use for Compressor air Piping inside production area and above walkable ceiling connected on GI pipe)
BBVN-FIVE-S2-SC-AMEP-060/R1
Compressed Air System_Copper Pipe for Compressed Air (Use for Compressor air Piping inside production area and above walkable ceiling connected on GI pipe)_Rev.1 Revised based on comment in AMEP-60 dated 21-May-2014
Technical Detail Description, Catalogue
BBVN-FIVE-S2-SC-AMEP-061
(1) Network Video Recorder; (2) Reader Controller & Card Reader Interface Module-Lenel LNL-1320 Series, LNL-2220; (3) nput Control Module-Lenel LNL1100 Series 2; (4) Door Contact-Position Sensor 1078C-N; (5)Door Holder-YLI YD-602; (6) Door Alarm - AV Gad Eye spy II pro; (7) Card Reader & Card Reader w/Time Tracking - HID R10; (8) Pir Sensor - AV Gad Eye spy II pro; (9) Emergency Door Release Break Glass - YLI ABK-900A, Fire Proofl (10) Exit Push Button - YLI ABK-802
BBVN-FIVE-S2-SC-AMEP-061/R1
Card Reader & Card Reader with Time Tracking_Rev.1 - HID-R10-900N (Superseded the Card Reader & Card Reader with time tracking- HID-R10-6100B, 6108B, 6109B in AMEP-61 dated 13-June-2014)
BBVN-FIVE-S2-SC-AMEP-062
BBVN-FIVE-S2-SC-AMEP-063
BBVN-FIVE-S2-SC-AMEP-064
Compressed Air System_GI Black Steel Pipe Medium Grade Schedule 40
BBVN-FIVE-S2-SC-AMEP-065
BBVN-FIVE-S2-SC-AMEP-065/R1
Compressed Air System_GI Black Steel Pipe Fittings (DN50, DN80)_Rev.1 Revised based on Comments in AMEP-0065 dated 21-May-2014
BBVN-FIVE-S2-SC-AMEP-066
Catalogue, Manufacturer Letter, Technical Data & Drawing
SUPERSEEDED booster pump Grund Fos Hydro Multi - B/E 2CME 25-41
BBVN-FIVE-S2-SC-AMEP-066/R1
Water Supply System_Water Pump & Water Pump Control Panel_Rev.1 Revised based on Approval RFC-023 dated 6-June-2014 (SMZ-140606/D147)
Catalogue, Manufacturer Letter, Technical Data & Drawing
BBVN-FIVE-S2-SC-AMEP-067
Sewage Pump_SP-01 to SP-02 Pump pit, SP-03 to SP-04 Pump pit (external)
Catalogue, Manufacturer Letter
BBVN-FIVE-S2-SC-AMEP-068
MVAC System_Primary Chilled Water Pump CHWP 03(200x150CNHA), Secondary Chilled Water Pump SCHWP-01-03 150x125 FS4KA5 37
Tabulation, Volume Control Damper, Motorized Damper, Smoke Fire Damper, Non-Return Damper Model BDD-A-R & BDD-A3-R
BBVN-FIVE-S2-SC-AMEP-077
BBVN-FIVE-S2-SC-AMEP-078
HVAC_Wafer Check Valve, Butterfly Valve size up to DN200 lever, Butterfly Valve Gear Type, Y Strainer for DN65 and Above (Flange end type), Y strainer for CDA chilled water supply piping, Thermometer, Pressure Guage, Ball valve for Pressure gauge and temperature gauge, Flow switch for chiller return pipe
Technical Detail Description, Catalogue
BBVN-FIVE-S2-SC-AMEP-078 (A)
HVAC_Butterfly Valve Gear Type, Butterfly valve Lener Type, Lug Type, Wafer Cheeck valve, Y Strainer, Ball balce for Y-Strainer Drain
BBVN-FIVE-S2-SC-AMEP-079
Technical Detail Description, Catalogue
BBVN-FIVE-S2-SC-AMEP-0080
BBVN-FIVE-S2-SC-AMEP-0081
Drainage and Water Supply Valve (PPR Shut Off Valve, Check valve Flange Type, Check Valve Swing Brass Type, Ball Valve Flange Type, Ball Valve Screw Type, Gate Valve Flange Type)
BBVN-FIVE-S2-SC-AMEP-0081 (A)
BBVN-FIVE-S2-SC-AMEP-0081 (B)
BBVN-FIVE-S2-SC-AMEP-0081 ( C )
Gate Valve (Flange Type)_(For Water Supply Pipe in Pump Room), Gate Valve PPR, Gate Valve
BBVN-FIVE-S2-SC-AMEP-0081/R1 ( C )
Brass Gate Valve for Hot Water Supply_Rev.1 Revised based on comments in AMEP-81 (C ) dated 8-July-2014) Refer to RFC-85
Copper Pipe for AHU connection (Use for AHU coil connection) & Copper Pipe Fittings for AHU connection (Use for AHU coil connection)
Technical Detail Description, Catalogue
BBVN-FIVE-S2-SC-AMEP-0098
Technical detail description, Catalogue
BBVN-FIVE-S2-SC-AMEP-0098/R1
Exposed Chiller Pipe Insulation Cladding_Rev.1 Revised based on comments in AMEP-98 dated 20-June-2014
BBVN-FIVE-S2-SC-AMEP-0099
Anchor Bolt (SANKO) for Pipe Support on Trench Pit and Underground Toilet
BBVN-FIVE-S2-SC-AMEP-100
BBVN-FIVE-S2-SC-AMEP-101
Certificate/Test of Quality and Quantity, Product Data Sheet
BBVN-FIVE-S2-SC-AMEP-101/R1
Treaded Rod, Bolt, Nuts, Washer, Pipe Clamp (Tanco/Zhapu)_Rev.1 Revised based on comments in AMEP-101 dated 23-June-2014
BBVN-FIVE-S2-SC-AMEP-101 (A)
Treaded Rod for Indoor Support - TANCO Class 4.8 DIN975 Submitted based on comments in AMEP-101/R1 dated 11-July-2014
BBVN-FIVE-S2-SC-AMEP-102
BBVN-FIVE-S2-SC-AMEP-103
BBVN-FIVE-S2-SC-AMEP-104
BBVN-FIVE-S2-SC-AMEP-105
BBVN-FIVE-S2-SC-AMEP-106
For 7 items, Technical Detail Description
BBVN-FIVE-S2-SC-AMEP-106/R1
BBVN-FIVE-S2-SC-AMEP-106/R2
Spring Isolator (Floor Mounted)_Manufacturer: MASON_Model" SLFH_Rev.2 Revised based on comments in AMEP-106/R1 dated 21-July-2014
Technical Detail Description (for 8 items)
BBVN-FIVE-S2-SC-AMEP-106 (A)
Spring Isolator (Floor Mounted) for Primary & Secondary Pump - MASON SLFH1350 & SLFH1750 (Revised based on comment in AMEP-106/R2 dated 25-August-2014)
BBVN-FIVE-S2-SC-AMEP-106 (A)/R1
Spring Isolator (Floor Mounted) for Primary & Secondary Pump - MASON SLFH1350 & SLFH1750 (Revised based on comment in AMEP-106(A) dated 18-Oct-2014)
BBVN-FIVE-S2-SC-AMEP-106 (A)/R2
Spring Isolator (Floor Mounted) for Primary & Secondary Pump - MASON SLFH1350 & SLFH1750_Rev.2 (Revised based on comment in AMEP-106(A) dated 18-Oct-2014)
BBVN-FIVE-S2-SC-AMEP-107
BBVN-FIVE-S2-SC-AMEP-108
BBVN-FIVE-S2-SC-AMEP-109
BBVN-FIVE-S2-SC-AMEP-109/R1
Fire Fighting Paint (Vinilex Primer)_Nippon Paint (Model: VINILEX 120 ACTIVE Primier)_rev.1 Revised based on comments in AMEP-109 dated 27-June-2014
BBVN-FIVE-S2-SC-AMEP-110
BBVN-FIVE-S2-SC-AMEP-110/R1
Fire Fighting Paint (Primer for Welded Location)_Rev.1 (Revised based on comments in AMEP_110 dated 27-June-2014
BBVN-FIVE-S2-SC-AMEP-111
BBVN-FIVE-S2-SC-AMEP-111/R1
Fire Fighting Paint (Sprinkler, Hydrant and Hose Reel top Coat paint)_Nippon Paint (Model: Bilac B9004 Vermillion)_Rev.1 Revised based on comments in AMEP-111 dated 27-June-2014
BBVN-FIVE-S2-SC-AMEP-112
BBVN-FIVE-S2-SC-AMEP-113
DDC for Compressor Chiller Water Valve, Motorized Valve for compressor chilled water pipe, temperature sensor for compressor chilled water pipe, Solenoid valve for compressor
BBVN-FIVE-S2-SC-AMEP-113 (A)
Solenoid valve for compressor (ASCA) for Compressor Chilled Water Pipe_Model: SCXE238A005-24017 (Supperseded Solenoid valve for compressor in AMEP-113 dated 26-June-2014) Based on comments in AMEP-113
Technical Description and Catalogue
BBVN-FIVE-S2-SC-AMEP-114
BBVN-FIVE-S2-SC-AMEP-114 (A)
Process Chilled Water Valve_Rev.1 Revised based on comments in AMEP-114 dated 7-July-2014
Tabulation, Technical detailed description
BBVN-FIVE-S2-SC-AMEP-114 (A) (FINAL)
Gate Valve (TOYO)_DN80 for water supply Tie-in works; Ball valve (TOYO) for Compressor room Tie-in
BBVN-FIVE-S2-SC-AMEP-115
BBVN-FIVE-S2-SC-AMEP-116
Gavanized Black Carbon steel Pipe Medium Grade Schedule 40 (Use for Water Supply on Pump Room)
BBVN-FIVE-S2-SC-AMEP-117
Gavanized Black Carbon steel Pipe BS-M (Use for Water Supply DN 100mm and Below)
BBVN-FIVE-S2-SC-AMEP-118
Gavanized Black Carbon steel Pipe Fittings (Use for Water Supply in Pump Room)
BBVN-FIVE-S2-SC-AMEP-119
Auto Drain (for Compressor Auto Drain in Compressor Room) (ADCA)_Model FA20
BBVN-FIVE-S2-SC-AMEP-120
Y Strainer (for compressor Chilled Water Supply Piping) (ARITA)_Model Brass-Y-Strainer-Screwed End BSPT
BBVN-FIVE-S2-SC-AMEP-121
BBVN-FIVE-S2-SC-AMEP-122
BBVN-FIVE-S2-SC-AMEP-123
Duct Silencer for AHU Supply Duct (Tan Hung)W4200xH2000mmxL3100mm
BBVN-FIVE-S2-SC-AMEP-124
Duct Silencer for AHU Supply Duct (Tan Hung)W4300xH2000mmxL2800mm
BBVN-FIVE-S2-SC-AMEP-125
Fire Fighting Paint Fire Fighting Paint (Vinilex Primer)_Nippon Paint (Model: VINILEX 120 ACTIVE Primier)_rev.1 Revised based on comments in AMEP-109 dated 27-June-2014Fire Fighting Paint (Primer for Welded Location)_Rev.1 (Revised based on comments in AMEP_110 dated 27-June-2014)Fire Fighting Paint (Sprinkler, Hydrant and Hose Reel top Coat paint)_Nippon Paint (Model: Bilac B9004 Vermillion)_Rev.1 Revised based on comments in AMEP-111 dated 27-June-2014
BBVN-FIVE-S2-SC-AMEP-126
HVAC_Aluminum Insulation Pin Adhesive (TITEBOND)_Model: Titebond Heavy Duty Construction Adhesive
BBVN-FIVE-S2-SC-AMEP-127
Approval for Mechanical, Electrical Plumbing 9
OUTGOIING Rev. Date Delivered Title Attachment Author/Delivered to StatusDate Required Reply
INCOMING Date Received
Date Delivered to Author
14/07/14 14/07/19 14/07/18 Cable Terminal for LV Cable (Big type & Small Type) Tabulation, Catalogue Quang/Randy B/A
14/07/15 14/07/21 14/07/17 Floor Clean Out (1st Floor Toilet)_Model: COB Technical Detail Description Quang/Ujiie C
14/08/01 14/08/06 14/08/12 Technical Detail Description Quang/Ujiie/Khoa C
14/10/27 14/11/01 14/11/04 Catalogue Quang/Ujiie/Khoa B
14/07/15 14/07/21 14/07/17 Floor Clean Out (Ground Floor)_Model: COA Technical Detail Description Quang/Ujiie C
14/07/18 14/07/23 14/07/21 Bitumen For Pipe Protection (Shell Bitumen)_Model: Shell Flintkote 3 Technical Detail Desciption Quang/Ujiie/Trung C
14/08/01 14/08/08 14/08/15 Catalogue Quang/Ujiie/Trung C
14/08/01 14/08/08 14/08/15 Catalogue Quang/Ujiie/Trung C
14/07/18 14/07/23 14/07/21 Technical Detail Desciption Quang/Ujiie/Trung C
14/07/25 B/A
14/07/18 14/07/23 14/07/21 Technical Detail Desciption Quang/Ujiie/Trung C
14/07/25 B
14/07/21 14/07/25 14/07/24 Technical Detail Desciption Quang/Ujiie/Trung B
14/07/22 14/04/24 14/07/28 Quang/Ujiie C
14/08/08 14/08/13 Quang/Ujiie
14/07/25 14/07/31 14/08/04 Bolt, Nuts, Washer for Flange DIN 931, Class 8.8 Technical Detail Desciption Quang/Ujiie C
14/08/21 14/08/25 14/08/28 Drawings Quang/Ujiie/Randy C
14/08/23 14/08/27
14/08/28 14/09/02 Sprinkler Pipe Support and Process Exhaust Duct DN250 and Below Sample
14/08/30 14/09/05 14/09/06 Product Data Sheet Quang/Ujiie C
14/08/30 14/09/01 14/09/04 Drawing & Photos Quang/Ujiie C
14/09/30 14/10/07 14/10/08 Technical Data Quang/Ujiie C
14/10/10 14/10/16 14/10/13 Quang/Ujiie B
14/09/01 14/09/04 Quang/Ujiie
14/09/02 14/09/05 14/09/15 Technical Data Quang/Ujiie B
14/09/03 14/09/05 14/09/17 Fire Hydrant Hose & Fire Hydrant Nozzle (Supplier: PCCC Hanoi) Quang/Ujiie C
14/09/05 14/09/10 14/09/18 Quang/Ujiie C
14/09/09 14/09/11 14/09/22 Catalogue Quang/Ujiie/Trung C
14/10/13 14/10/18 14/10/20 Catalogue, Technical Data Quang/Ujiie/Trung B/A
14/09/10 14/09/17 Quang/Ujiie
14/09/10 14/09/17 14/09/27 Quang/Ujiie C
14/09/11 14/09/13 14/09/18 Denso Primer D for Underground Firefighting Technical Data Sheet Quang/Ujiie B
BBVN-FIVE-S2-SC-AMEP-128
BBVN-FIVE-S2-SC-AMEP-129
BBVN-FIVE-S2-SC-AMEP-129/R1
Floor Clean Out (1st Floor Toilet)_Model: COB(Ground Floor Toilet)_Model: COA_Rev.1 (Revised based on comments in AMEP_129 dated 17-July-2014)
BBVN-FIVE-S2-SC-AMEP-129/R2
Cleanout for First Floor Office - K Product CO 810W Type: CW-43 and CW-25_rev.2 Revised based on comment in AMEP-129/R1 dated 12-August-2014
BBVN-FIVE-S2-SC-AMEP-130
BBVN-FIVE-S2-SC-AMEP-131
BBVN-FIVE-S2-SC-AMEP-131/R1
Bitumen For Pipe Protection (Shell Bitumen)_Model: Shell Flintkote 3_Rev.1 Revised based on comments in AMEP-131 dated 21-July-2014
BBVN-FIVE-S2-SC-AMEP-131 (ADD.01)
Bitumen For Pipe Protection (Shell Bitumen)_Model: Shell Flintkote PF-4_ADD (Additional Document based on EMEP-131 dated 21--July-2014
BBVN-FIVE-S2-SC-AMEP-132
Copper Pipe Welding Rod (Brazing)_Harris [Model: AWS A5.8, BCuP 2]
BBVN-FIVE-S2-SC-AMEP-132/R1
Copper Pipe Welding Rod (Brazing)_Harris [Model: AWS A5.8, BCuP 2]_Rev.1
BBVN-FIVE-S2-SC-AMEP-133
GTAW Welding Rod for Pipe 50mm and Below (Huyndai)_Model: ST-50G
BBVN-FIVE-S2-SC-AMEP-133/R1
GTAW Welding Rod for Pipe 50mm and Below (Huyndai)_Model: ST-50G_Rev.1
BBVN-FIVE-S2-SC-AMEP-134
SMAW Welding Rod for Pipe (Chosun Welding Co.,Ltd)_Model: LC-300
BBVN-FIVE-S2-SC-AMEP-135
Master Tie-in List, Method Statement List, Material and Tool List, Organization Chart for Stage 1
5A3size pages Master Tie-in List, Method Statement List of Tie-in 1A3size page, 8A3size pages Material and Tool List + 26A3size drawings, 2A3size pages Organization Chart for Stage 1 + 2A3pages contact details
Superseed (Replaced by APD-69)
BBVN-FIVE-S2-SC-AMEP-135/R1
Master Tie-in List, Method Statement List, Material and Tool List, Organization Chart for Stage 1_Rev.1 Revised based on comments in AMEP_135 dated 28-Jul-2014
Tie-in Comments List (2A3sizepages), Master Tie-in List for Stage 1 (9S3size pages + 1 A0size colored page), Method Statement List of Tie-in (1A3size page), Organizational Chart, Manpower list (2A3size pages)
BBVN-FIVE-S2-SC-AMEP-136
BBVN-FIVE-S2-SC-AMEP-136/R1
Bolt, Nuts, Washer for Flange -TANCO DIN931 Class 8.8 _Rev.1 Revised based on comments in AMEP-136 dated 4-Aug-2014
BBVN-FIVE-S2-SC-AMEP-137
BBVN-FIVE-S2-SC-AMEP-137/R1
Hose Rack Assembly (Manufacturer: Croker)_Rev.1 Revised based on comments in AMEP-137 dated 18-August-2014
Manufacturer Letter, Catalogue
BBVN-FIVE-S2-SC-AMEP-137/R2
Hose Rack Assembly (Manufacturer: Croker)_Rev.2 Revised based on comments in AMEP-137/R1 dated 20-October-2014
Manufacturer Letter, Catalogue
BBVN-FIVE-S2-SC-AMEP-138
BBVN-FIVE-S2-SC-AMEP-139
Fire Resistance Cable for Fire Alarm Stage 1 Tie-in Connection - Wilson FR-100
BBVN-FIVE-S2-SC-AMEP-140
BBVN-FIVE-S2-SC-AMEP-140/R1
Flexible Canvas for Mechanical Equipment_Prodetech _Rev.1 Revised based on comments in AMEP-140 dated 29-August-2014
BBVN-FIVE-S2-SC-AMEP-140/R2
flexible Canvas for Mechanical Equipment_Prodetech _Rev.2 Revised based on comments in AMEP-140/R1 dated 22-September-2014
BBVN-FIVE-S2-SC-AMEP-141
Sikagrout GP (Sika)_Model: Sikagrout GP& SikaFlex-Construction (AP)_Model: SikaFlex-Construction (AP) for Toilet Sleeve Sealing
BBVN-FIVE-S2-SC-AMEP-142
Access Control Panel Enclosure W560xH700xD250 & W540xH560xD250
Drawing, Picture of Existing Panel for Panel Color
BBVN-FIVE-S2-SC-AMEP-142/R1
Access Control Panel Enclosure W560xH700xD250 & W540xH560xD250_Rev.1 Revised based on comments in AMEP-142 dated 22-August-2014
BBVN-FIVE-S2-SC-AMEP-143
BBVN-FIVE-S2-SC-AMEP-144
Copper Busbar for Modification of LV Panel & Earth Copper Bar- Oriental Copper
BBVN-FIVE-S2-SC-AMEP-145
Tabulation, 1A4size photo, data sheet
BBVN-FIVE-S2-SC-AMEP-146
PV Control Panel for Pre-Action Valve & Schematic Diagram for Operation (Additional Document for AMEP-37A Pre-Action Valve for Fire fighting system double interlock)
BBVN-FIVE-S2-SC-AMEP-147
Hermeseal S-2 for fire fighitng pipe to fittings thear connection (pipe size DN25, DN32, DN40, DN50)
Drop in Anchor (SANKO)_Model: CT-1040; CT1250 Use for Concrete Slab Anchoring
BBVN-FIVE-S2-SC-AMEP-150
Duct Silencer for AHU Supply Duct (W4200xH2000xL3540 & W4300xH2000xL3540) & Duct Silencer for OA Fan Duct (W800xH600xL1200)_TAN HUNG
BBVN-FIVE-S2-SC-AMEP-150/R1
Duct Silencer for AHU Supply Duct (W4200xH2000xL3540 & W4300xH2000xL3540) & Duct Silencer for OA Fan Duct (W800xH600xL1200)_TAN HUNG_Rev.1Revised based on comments in AMEP_150 dated 04-September-2014
BBVN-FIVE-S2-SC-AMEP-150/R2
Duct Silencer for AHU 3 & 4 Supply Duct & OA Duct _ Rev.2 Revised based on comments in AMEP-150/R1 dated 8-Oct-2014
Catalogue, Noise Analysis calculation, Drawing
BBVN-FIVE-S2-SC-AMEP-151
SUS Ball valve Flange type (for process chilled water piping Tie-in 6 worker, Insolation to Stage 2)
BBVN-FIVE-S2-SC-AMEP-152
HILTI Plastic Anchor for Brick- HRD 10x70mm (Use for anchoring on Brick only)
BBVN-FIVE-S2-SC-AMEP-153
Manufacturer Letter, Catalogue
BBVN-FIVE-S2-SC-AMEP-154
Chiller Water and PCW Pipe Insulation Support (AEROFLEX) for supply and return_Model: AEROFIT
Technical detail description (Product Data Sheet)
BBVN-FIVE-S2-SC-AMEP-155
Pressure Reducing Valve for Fire Hydrant System - Malgorani EUROBRASS 143
BBVN-FIVE-S2-SC-AMEP-155/R1
Pressure Reducing Valve for Fire Hydrant System_Rev.1 GOETZE Series 681 (revised based on comment in AMEP-155 dated 22-September-2014)
BBVN-FIVE-S2-SC-AMEP-156
Gate Valve DN80 - TOYO 420E (For Water Supply Tie-in Works only) (Superseded the gate valve DN80 in approved ANEP-81C dated 8-July-2014) Tie-in No.20
14/10/27 14/11/01 14/11/04 Catalogue, Performance Data Quang/Ujiie C
14/11/08 14/11/10 Catalog, Technical Data Quang/Ujiie
14/10/31 14/11/06 14/11/03 Office Power Supply Battery-Altronix OLS120 Technical Data Quang/Ujiie C
14/10/31 14/11/07 14/11/03 Pilot Light Unibody Type- IDEC YW1P- 1BUQ3(2) Catalog Quang/Ujiie B
14/11/07 14/11/14 Quang/Ujiie/Diem
BBVN-FIVE-S2-SC-AMEP-159
BBVN-FIVE-S2-SC-AMEP-160
BBVN-FIVE-S2-SC-AMEP-161
Flexible Canvas for Mechanical Equipment - YEEDAH (Superseded the approved Flexible canvas in AMEP-140 dated 29-August-2014)
Tabulation, Catalogue, Test report
(refer to 140/R1)
BBVN-FIVE-S2-SC-AMEP-162
Female Anchor for Suspended Slab, Office and Clean Room Area - HILTI HKV
BBVN-FIVE-S2-SC-AMEP-163
Quick Response Pendent Sprinkler for Component Production - VIKING VK352 L=8.0 (Additional material for approval in approved AMEP-25/R1 dated 3-July-2014)
BBVN-FIVE-S2-SC-AMEP-164
Flexible Hose for Sprinkler Head - TRONFLEX TCR25BR for Component Production Sprinkler Head K=8.0 (Superseded the approved flexible hose for component production sprinkler head K=14 3/4'' commection in AMEP-89 dated 27-June-2014)
BBVN-FIVE-S2-SC-AMEP-165
BBVN-FIVE-S2-SC-AMEP-165/R1
Electromagnetic Lock_ ALGATECH UL275- SMC_Rev.1Revised based on comments in AMEP_165 dated 01-Oct-2014
BBVN-FIVE-S2-SC-AMEP-166
Technical detail description/ Catalogue
BBVN-FIVE-S2-SC-AMEP-166/R1
Isolators- Schneider Clipdsal WHT35: 3P 35A for RF-P2-01, 02 & Legrand 0 226 27: 4P 100A for SCHWP-01, 02, 03 (Revised and superseded the approval isolator for SCWP in AMEP-166 dated 06-Oct-2014)
OS&Y Gate Valve for Fire Fighting System (Double Interlock Pre-Action)- FIREKING OF200F-400F (Superseded the approved butterfly valve DN100 in AMEP_0035/R1 based on RFC_0024 & RFI_159)
BBVN-FIVE-S2-SC-AMEP-167/R1
OS&Y Gate Valve for Fire Fighting System (Double Interlock Pre-Action)-
BBVN-FIVE-S2-SC-AMEP-167/R2
OS&Y Gate Valve for Fire Fighting System (Double Interlock Pre-Action)_Rev.2
BBVN-FIVE-S2-SC-AMEP-168
BBVN-FIVE-S2-SC-AMEP-168/R1
Fire Stop Foam- HILTI CP660_Rev.1 Revised based on comments in AMEP-168 dated 8-October-2014
BBVN-FIVE-S2-SC-AMEP-169
BBVN-FIVE-S2-SC-AMEP-170
BBVN-FIVE-S2-SC-AMEP-171
BBVN-FIVE-S2-SC-AMEP-172
Pipe and Duct Labelling (Brady) for chilled water and process chilled water pipe (Supply and Return)_Model: B6606 digitally printed plastic
BBVN-FIVE-S2-SC-AMEP-173
Highbay Lighting Emergency Lamp for Warehouse (OSRAM Halostar 50W 12V GY6.35); Lamp for Downlight in Office & Canopy (OSRAM Deluxe D/E); Lamp for Flood Light (Exterior) (OSRAM Powerstar HQI-TS Excellence 150W/NDL); Lamp for Highbay Light (Warehouse) (OSRAM Powerstar HQI-E 150W/NDL/Clear); 14W Flourescent Lamp for Office - Phillips TL5 Essential 14W/840; 28W Flourescent Lamp for Buffer Areas VRV - Phillips TL5 Essential 28W/840; 36W Flourescent Lamp for Cleanroom - Phillips TL-D 36W/840; Ballast 36W for Clean Room-TRIDONIC PC T8 Pro IP; Ballast 28W for Buffer Areas & VRV - THorn Electronic Ballast for Linear T5 FL Lamp; Ballast 14W for Office - TRIDONIC PC T5 Top IP 3x14W
Catalogue; Technical Data sheet
BBVN-FIVE-S2-SC-AMEP-173/R1
Highbay Lighting Emergency Lamp for Warehouse (OSRAM Halostar 50W 12V GY6.35); Lamp for Downlight in Office & Canopy (OSRAM Deluxe D/E); Lamp for Flood Light (Exterior) (OSRAM Powerstar HQI-TS Excellence 150W/NDL); Lamp for Highbay Light (Warehouse) (OSRA
Catalogue, Techinical Data Sheet
BBVN-FIVE-S2-SC-AMEP-174
BBVN-FIVE-S2-SC-AMEP-175
Fire Smoke Supply Air Fan FSFS0PII-01,02 - Drugger TDA-V900-14AA-7-7/22 (Additional Fan - Refer to RFC26)
BBVN-FIVE-S2-SC-AMEP-176
BBVN-FIVE-S2-SC-AMEP-177
BBVN-FIVE-S2-SC-AMEP-177/R1
Badge Printer - Fargo HDP5000 & Accessories_Rev.1 Revised based on comments in AMEP-177 dated 9-October-2014
Technical Detail Description; Catalogue
BBVN-FIVE-S2-SC-AMEP-177/R2
Badge Printer - Fargo HDP5000 & Accessories_Rev.2 Revised based on comments in AMEP-177/R1 dated 07-Nov-2014
BBVN-FIVE-S2-SC-AMEP-178
BBVN-FIVE-S2-SC-AMEP-179
Water Pump Tank - GRUNDFOS GT-H-100 PN10 G1V (Superseded the approved water pump tank in AMEP-66/R1 dated 20-June-2014)
BBVN-FIVE-S2-SC-AMEP-179/R1
Water Pump Tank - GRUNDFOS GT-H-100 PN10 G1V _Rev.1 Revised based on comments in AMEP-179 dated 20-October-2014
BBVN-FIVE-S2-SC-AMEP-180
BTU Meter - ONICON System-10-BAC BTU Meter (Refer to RFC Additional BTU Meter for Chilled Water)
BBVN-FIVE-S2-SC-AMEP-180/r1
BTU Meter - ONICON System-10-BAC BTU Meter_Rev.1 Revised based on comments in AMEP-180 dated 17-October-2014
BBVN-FIVE-S2-SC-AMEP-181
BBVN-FIVE-S2-SC-AMEP-182
BBVN-FIVE-S2-SC-AMEP-182/R1
BBVN-FIVE-S2-SC-AMEP-183
BBVN-FIVE-S2-SC-AMEP-183/R1
ACP Battery Back-up - Phoenix TS1272 (12V-7.2Ah)_Rev.1Revised based on comments in AMEP_182 dated 28-Oct-2014
BBVN-FIVE-S2-SC-AMEP-183/R2
ACP Battery Back-up - Phoenix TS1272 (12V-7.2Ah)_Rev.2Revised based on comments in AMEP_182/R1 dated 03-Nov-2014
MS-21. Fire Fighting System_Remove and Modification Existing Hydrant Pipe Rev.1Remove and Modification Existing Hydrant Pipe, Details schedule for the remove & modification existing hydrant pipe, JSA form1 A3 size drawing
MS-21. Fire Fighting System_Remove and Modification Existing Hydrant Pipe Rev.1
BBVN-FIVE-S2-SC-AMS-0004/R2
MS-21. Fire Fighting System_Remove and Modification Existing Hydrant Pipe Rev.2Remove and Modification Existing Hydrant Pipe, Details schedule for the remove & modification existing hydrant pipe
Existing pile rectification Rev.1 Work Monitoring, HILTI Specification, QPTL-D6:1978, 17 A3 size drawings, JSA form
Existing pile rectification Rev.1
List of Method StatementList of Method Statement
BBVN-FIVE-S2-SC-AMS-0008/R1
List of Method Statement Rev.1
List of Method Statement Rev.1
MS-BLD.04 Earthwork Schedule of Elevation, Site organization Chart, Location & Access, Schedule & Manpower, JSA form
MS-BLD.04 Earthwork
BBVN-FIVE-S2-SC-AMS-0009/R1
MS-BLD.04 Earthwork Rev.1 Schedule of Elevation, Site organization Chart, Location & Access, Schedule & Manpower, Existing Ground Level, JSA form
MS-BLD.04 Earthwork Rev.1
BBVN-FIVE-S2-SC-AMS-0009/R1 (ADD)
Report & Proposal on consulting for soil treatment method (Based on comment SL.16 in General Note Sheet 2 - For Construciton Drawings (Structural Drawings) Nov 2013)
Approval for Method Statement 21OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0010 14/03/18 14/03/19 Toan
14/03/20 C
14/03/21 14/03/22 Toan
14/03/28 MS-11 Sub-con Temporary Site Office _ Rev.1 Toan B
BBVN-FIVE-S2-SC-AMS-0011 14/03/24 14/03/28 Thanh
14/03/26 C
14/04/03 14/04/05 Tuan Anh
12-Apr-14 B
BBVN-FIVE-S2-SC-AMS-0012 14/03/27 14/03/31 R.C Work Equipment List, Schedule & Manpower, JSA Tuan Anh
08-Apr-14 C
14/04/1614/04/19 Tuan Anh
14/04/23 RC Work_Rev.1 Tuan Anh B
BBVN-FIVE-S2-SC-AMS-0013 14/04/04 14/04/09
08-Apr-14C
14/04/28 14/05/05
BBVN-FIVE-S2-SC-AMS-0014 14/04/14 14/04/21
14/04/18 C
MS-11 Subcon Temporary Site Office Schedule of Elevation, Site Organisation Chart, A3 size Drawings Vinaconex 2 4 pages&North Star 17 pages, JSA form
MS-11 Subcon Temporary Site Office
BBVN-FIVE-S2-SC-AMS-0010/R1
MS-11 Subcon Temporary Site Office Rev.1 Site Organisation Chart, Schedule of Works - Vinaconex 2 & North Star, 1 A3 size Drawings Master Plan of site office building, 4 A3 size drawings of Vinaconex 2 & 13 pages North Star, JSA form
MS.BLD-01/Anti-Termite Work Schedule of elevation, Site Organisation Chart, JSA form, 6 A3size drawings
MS.BLD-01/Anti-Termite Work
BBVN-FIVE-S2-SC-AMS-0011/R1
MS.BLD-01/Anti-Termite Work Rev.1 based on comments AMS-0011 dated 26-Mar-2014Schedule of elevation, Site Organisation Chart, JSA form, 5 A3size drawings, Material Safety Data Sheet
MS.BLD-01/Anti-Termite Work Rev.1 based on comments AMS-0011 dated 26-Mar-2014
R.C Work
BBVN-FIVE-S2-SC-AMS-0012/R1 R.C Work Rev.1
Method Statement for Concrete work, Equipment list, JSA
MS-29: Earthing System and Underground System Work Cabling and Piping
Details Schedule/Main Power Requirement, Survey Method, Installation Underground pipe, Method installation earth rod in earth pit, Detail of grounding rod in earth pit, detail of earth pit, connection from test link box to earth rod, details of HDPE conduit installation
Mr. Quang/Mr. Diem
MS-29: Earthing System and Underground System Work Cabling and Piping
BBVN-FIVE-S2-SC-AMS-0013/R1
MS-19 [C]: Air Conditioning & Mechanical Ventilation System[C] Condensation Drain Pipe Underground System Work
Excavation Work, Installaiton pipe work, testing commissioning, Sleeve, Location of the activity, Details Schedule/Manpower requirement
Mr. Quang/Mr. Trung
MS-19: Air Conditioning & Mechanical Ventilation System[C] Condensation Drain Pipe Underground System Work
Approval for Method Statement 22OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
14/04/26 14/04/29 14/05/19 Quang/Trung C
14/05/27 14/05/29 14/06/02 Quang/Trung B
BBVN-FIVE-S2-SC-AMS-0015 14/04/14 14/04/21 MS-20: Water Supply and Drainage Underground System Work
14/04/18 MS-20: Water Supply and Drainage Underground System Work C
14/04/26 14/04/29 14/05/09 Mr. Quang/Trung B
BBVN-FIVE-S2-SC-AMS-0016 14/04/14 14/04/21 MS-21: Fire Fighting Underground System Work
14/04/18 MS-21: Fire Fighting Underground System Work C
14/04/26 14/04/29 14/05/09 Quang/Trung B
BBVN-FIVE-S2-SC-AMS-0017 14/04/22 14/04/24 MS-44 Protection Method for Door & Window at Grid Line 12 Method Statement, JSA/Risk Analysis, Schedule Tuan Anh
14/04/23 MS-44 Protection Method for Door & Window at Grid Line 12 B/C
14/04/25 MS-44 Protectin Method for Door & Window at Grid Line 12_Rev.1 Tuan Anh A/B
BBVN-FIVE-S2-SC-AMS-0018 14/04/28 14/05/05 Quang/Diem C
14/05/07 C
BBVN-FIVE-S2-SC-AMS-0014/R1
MS-19: Air Conditioning & Mechanical Ventilation System [C] Condensation Drain Pipe Underground System Work_Rev.1 Revised based on comments in AMS_0014 dated 18-Apr-2014
BBVN-FIVE-S2-SC-AMS-0014/R2
MS-19: Air Conditioning & Mechanical Ventilation System [C] Condensation Drain Pipe Underground System Work_Rev.1 Revised based on comments in AMS_0014 dated 18-Apr-2014
Excavation Work, Installaiton pipe work, testing commissioning, Sleeve, Location of the activity, Details Schedule/Manpower requirement
Mr. Quang/Mr. Trung
BBVN-FIVE-S2-SC-AMS-0015/R1
MS-20: Water Supply and Drainage Underground System Work_Rev.1 Revised based on comments in AMS_0015 dated 18-Apr-2014
Excavation Work, Installaiton pipe work, testing commissioning, Sleeve, Location of the activity, Details Schedule/Manpower requirement
Mr. Quang/Mr. Trung
BBVN-FIVE-S2-SC-AMS-0016/R1
MS-21: Fire Fighting Underground System Work_Rev.1 Revised based on comments in AMS_0016 dated 18-Apr-2014
BBVN-FIVE-S2-SC-AMS-0017
MS-44 Protection Method for Door & Window at Grid Line 12_Rev1 (Revised based on comment in AMS_0017 dated 23-Apr-2014)
MS-28: External Lighting-Underground Work for Foundation Cabling & Piping
Survey Method, Installation underground pipe, installation underground crossing road, concrete foundation method, JSA, schedule, plan of activity
MS-28: External Lighting-Underground Work for Foundation Cabling & Piping
Approval for Method Statement 23OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
14/05/12 14/05/16 14/05/19 Quang/Diem B
BBVN-FIVE-S2-SC-AMS-0019 14/04/29 14/05/05 14/05/09 MS-25: Underground Piping & Cabling for Pumpit Quang/Diem C
14/05/28 14/05/28 14/06/04 Quang/Diem C
14/11/08 14/11/12 Quang/Diem
BBVN-FIVE-S2-SC-AMS-0020 14/04/29 14/05/05 14/05/09 MS-35: CCTV system-Underground system work cabling and piping Quang/Diem C
14/05/24 14/05/28 14/05/28 Quang/Diem B
BBVN-FIVE-S2-SC-AMS-0021 14/04/29 14/05/3 14/05/07 MS-BLD.05 Method Statement for Temporary Steel Stage Tuan Anh
B
BBVN-FIVE-S2-SC-AMS-0022 14/04/29 14/05/05 MS-30 Lightning System - Underground Work Cabling and Piping Quang/Diem
BBVN-FIVE-S2-SC-AMS-0018/R1
MS-28: External Lighting-Underground Work for Foundation Cabling & Piping_Rev.1 Revised based on comments in AMS-0018 dated 7-May-14
Details schedule/Menpower Requirements, MSE.1: Survey Method, MSE.2: Installation underground pipe, MSE.3: Details of HDPE conduit installation, MSE.4: Method Installation underground pipe across rain water pipe at crossroad, MSE.5: Fabrication of pipe cast foundation, MSE.6: Make concrete foundation method
Survey Method, Installation underground pipe, detail of installation of HDPE conduit, Connect to panel, sleeve for pum pit, JSA, schedule, plan of activity
BBVN-FIVE-S2-SC-AMS-0019/R1
MS-25: Underground Piping & Cabling for Pumpit_Rev.1 Revised based on comments in AMS-19 dated 9-May-2014
Detailed schedule/Manpower Requirement, MSE.1: Survey Method; MSE.2: Installation Underground Pipe (HDPE); MSE.3: Details of HDPE conduit installationl; MSE.4: Connect to electric panel
BBVN-FIVE-S2-SC-AMS-0019/R2
MS-25: Underground Piping & Cabling for Pumpit_Rev.2 Revised based on comments in AMS-19/R1 dated 4-June-2014
Detailed schedule/Manpower Requirement, MSE.1: Survey Method; MSE.2: Installation Underground Pipe (HDPE); MSE.3: Details of HDPE conduit installationl; MSE.4: Connect to electric panel
Survey Method, Installation underground pipe, detail of installation of HDPE conduit, JSA, schedule, plan of activity
BBVN-FIVE-S2-SC-AMS-0020/R1
MS-35: CCTV system-Underground system work cabling and piping_Rev.1 Revised based on comments in AMS-20 dated 9-May-2014
Detailed schedule/Manpower Requirement, MSE.1: Survey Method; MSE.2: Installation Underground Pipe (FEP); MSE.3: Details of HDPE conduit installation; MSE.4: Method installation underground pipe across rain water pipe at crossroad
BBVN-FIVE-S2-SC-AMS-0026 14/05/07 14/05/10 14/05/13 MS-BLD.06-A: Reinforcement Concrete - Trench Pit Tuan Anh C
14/05/14 14/05/16 14/05/16 Tuan Anh B/A
BBVN-FIVE-S2-SC-AMS-0022/R1
MS-30 Lightning System - Underground Work Cabing and Piping _Rev.1 Revised based on comments in AMS_0022 dated 05-May-2014
Details schedule/Manpower requirements, MSE.1: Survey Method, MSE.2: Installation underground pipe, MSE.3: details of HDPE conduit installation, MSE.4.1&4.2: Method installation earth rod in earth pit, MSE.5: Detail of grounding rod in earth pit, MSE.6: detail of earth pit, MSE.7&7.1: Connection from test link box to earth rod, MSE.8&8.1&8.2&8.3: Sleeve for lightning cable, MSE.7: Connection from test link box to earth rod
Approval for Method Statement 25OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0027 14/06/11 14/06/16 MS-BLD.10-Roofing & Waterproofing for Roof Tuan Anh
BBVN-FIVE-S2-SC-AMS-0028 14/05/09 14/05/13 14/05/15 MS-BLD.09_XYPEX Waterproofing for Under Slab Tuan Anh B
BBVN-FIVE-S2-SC-AMS-0029 (A) 14/05/28 MS-34 [A]: Fire Detection and Alarm System for Stage 1 Quang/Diem C
14/07/31 14/08/07 14/08/11 Quang/Diem C
14/08/22 14/08/25 14/08/28 Quang/Diem B
Waterproofing Guarantee; RA & JSA; Introduction Letter from SIKA Ltd Vietnam; Worker Certification/License; SIKA Products Data Sheet; Machinery Catalogue; Drawings for Waterproofing Works; Material Safety Data Sheet - MSDS; Report for Mock-up Application REP-MU-01
Drawings, Specification/Data Sheet, Material Safety Data Sheet, JSA/Risk Assessment
Details Schedule/Manpower Requirement, MSE.1: Scaffolding setup for existing generator and MVSG room, MSE.2: Scaffolding setup for AHU area, MSE.3: Method of installation detector exposed, MSE.4: Installation for BMS room
BBVN-FIVE-S2-SC-AMS-0029 (A)/R1
MS-34 [A]: Fire Detection and Alarm System for Stage 1_Rev.1 Revised based on comments in AMS-29 (A) dated 28-May-2014
Details Schedule/Manpower Requirement, Appendix 1: Location of Activity, Appendix 2: Detail of installation - MV Switchgear room, Appendix 3: Detail of installation - Generator room, Appendix 4: AHU room, Appendix 5: Detail of installation-BMS room, Appendix 6: Detail of installation - SFACP panels, JSA, Risk Assessment and management for change system, RCR services pre-work/task observation sheet, Pre-task planning worksheet
BBVN-FIVE-S2-SC-AMS-0029 (A)/R2
MS-34 [A]: Fire Detection and Alarm System for Stage 1_Rev.2 Revised based on comments in AMS-29 (A)/R1 dated 11-August-2014 (Tie-in No. 31)
Comments response table; Details Schedule/Manpower Requirement, Works detail table; Appendix 1: Location of Activity, Appendix 2: Detail of installation - MV Switchgear room, Appendix 3: Detail of installation - Generator room, Appendix 4: AHU room, Appendix 5: Detail of installation-BMS room, Appendix 6: Connection for BB262B-IFC-320-Z04&BB262-IFC-320-Z05 panel;Appendix 7: Detail of new modules connection to FA system, JSA, Risk Assessment and management for change system, RCR services pre-work/task observation sheet, Pre-task planning worksheet
Approval for Method Statement 26OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0029 (B) 14/05/28 MS-34 [B]: Fire Detection and Alarm System for Stage 2 Quang/Diem B
14/08/22 14/08/25 Quang/Diem
14/10/29 14/11/03 14/11/07 Quang/Diem C
BBVN-FIVE-S2-SC-AMS-0030 14/05/15 14/05/17 14/05/22 MS-46: Fence Relocation Tuan Anh C
14/05/29 14/06/04 14/06/02 B
14/06/12 14/06/13 14/06/13 MS-46: Fence Relocation_Rev.1 (Additional Document) Ba Hoa/Nguyen B
BBVN-FIVE-S2-SC-AMS-0031 14/05/16 14/05/20 14/05/23 MS-21 [A]: Fire Fighting System_Stage 1 Quang/Trung C
Details Schedule/Manpower Requirement, MSE.1: Scaffolding setup for existing generator and MVSG room, MSE.2: Scaffolding setup for AHU area, MSE.3: Method of installation detector exposed, MSE.4: Installation for BMS room
BBVN-FIVE-S2-SC-AMS-0029 (B)/R1
MS-34 [B]: Fire Detection and Alarm System for Stage 2_Rev.1 Revised based on comments in AMS-29 (B) dated 25-May-2014
Comments response table; Details Schedule/Manpower Requirement, Work Detail table; Location of activity; Detail of Installation - MV Switchgear room/Generator room/AHU room/BMS Room; Connection for BB262B-IFC-320-Z04&BB262-IFC-320-Z05 panel; Detail of new modules connection to FA system; JSA; Risk assessment and management for change system; RCR servicers Pre-work/Task observation sheet; Pre-task planning worksheet
BBVN-FIVE-S2-SC-AMS-0029 (B)/R2
MS-34 [B]: Fire Detection and Alarm System for Stage 2_Rev.2 Revised based on comments in AMS-29 (B) /R1
Details Schedule/Manpower Requirement, MSE.1: Method Installation Concealed EMC conduit on the wall; MSE.2: Method of Installation for expose conduit; MSE.3: Method of Installation conduit under sub-beam; MSE.4: Method of Installation detector on ceiling; MSE.5: Method of Installation detector for office, corridor and changing room; MSE.6: Method of Installation equipment for office, corridor and changing room; MSE.7: Method of Installation detector for cleaning room; MSE.8: Method of Installation equipment for cleaning room; MSE.9: Method of Installation beam detector for warehouse; MSE.10: Method of Installation beam detector for warehouse; MSE.11: Cable test form
Method Statement, JSK/Risk Assessment, Schedule
BBVN-FIVE-S2-SC-AMS-0030/R1
MS-46: Fence Relocation_Rev.1 Revised based on comments in AMS-0030 dated 22-May -2014
MS-21 [B]: Fire Fighting System_Stage 2_Rev.1 Revised based on comments in AMS-32 dated 23-May-2014
Installation Equipment, Installation FM200, Installation support & pipe, Inspection Document, Procedure firestop, location of the activity, details schedule/Manpower requirement, JSA
BBVN-FIVE-S2-SC-AMS-0032/R2
MS-21 [B]: Fire Fighting System_Stage 2_Rev.2 Revised based on comments in AMS-32/R1 dated 25-July-2014
Installation Equipment, Installation FM200, Installation support & pipe, Inspection Document, Procedure firestop, location of the activity, details schedule/Manpower requirement, JSA
BBVN-FIVE-S2-SC-AMS-0032/R3
MS-21 [B]: Fire Fighting System_Stage 2_Rev.3 Revised based on comments in AMS-32/R2 dated 16-August-2014
Comments response table; Installation Equipment, Installation support & pipe, Inspection Document, Procedure firestop, location of the activity, details schedule/Manpower requirement, JSA
BBVN-FIVE-S2-SC-AMS-0033/R1
MS-20 [A]: Water Supply and Drainage System for Stage 1_Rev.1 Revised based on comments in AMS-33 dated 28-May-2014
Pump &Pipe install works, location of the activity, Procedure fire stop, Details schedule/Manpower requirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, hot work permit, document reference, risk assessment & management for change system
BBVN-FIVE-S2-SC-AMS-0033/R2
MS-20 [A]: Water Supply and Drainage System for Stage 1_Rev.2 Revised based on comments in AMS-33 dated 1-July-2014
Pump &Pipe install works, location of the activity, Procedure fire stop, Welding Procedure, Details schedule/Manpower requirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, hot work permit, document reference, risk assessment & management for change system
BBVN-FIVE-S2-SC-AMS-0033/R3 (A)
MS-20-A-1: Water Supply System for Stage 1_Rev.3 Revised based on comments in AMS-33/R2 dated 11-July-2014
Pump &Pipe install works, location of the activity, Procedure fire stop, Welding Procedure, Details schedule/Manpower requirement & Tie-in List, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, hot work permit, document referenced, risk assessment & management for change system
BBVN-FIVE-S2-SC-AMS-0033/R4 (A)
MS-20-A-1: Water Supply System for Stage 1_Rev.4 Revised based on comments in AMS-33/R3 (A) dated 12-August-2014
Pump &Pipe install works, Location of the activity, Procedure fire stop, Welding Procedure, Details schedule/Manpower requirement & Tie-in List, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, hot work permit, document referenced, risk assessment & management for change system
Approval for Method Statement 28OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
14/07/30 14/08/06 14/08/12 Quang/Khoa C
14/08/15 14/08/22 14/08/27 Quang/Khoa B
BBVN-FIVE-S2-SC-AMS-0034 14/05/19 14/05/24 14/05/28 MS-20 [B]: Water Supply and Drainage System for Stage 2 Quang/Khoa C
14/06/26 14/07/03 14/07/04 Quang/Khoa B/B+C
BBVN-FIVE-S2-SC-AMS-0035 14/05/21 14/05/26 14/05/28 MS-23: Equipment for Stage 1 Quang/Diem C
14/08/09 14/08/14 14/08/15 Quang/Diem B
BBVN-FIVE-S2-SC-AMS-0036 14/06/16 14/06/20 14/06/23 Quang/Diem C
14/07/23 14/07/26 14/08/01 Quang/Diem C
BBVN-FIVE-S2-SC-AMS-0033/R3 (B)
MS-20-A-1: Drainage System for Stage 1_Rev.3 Revised based on comments in AMS-33/R2 dated 11-July-2014
Installation works, location of the activity, Details schedule/Manpower requirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, document referenced, JSA
BBVN-FIVE-S2-SC-AMS-0033/R4 (B)
MS-20-A-2: Drainage System for Stage 1_Rev.4 Revised based on comments in AMS-33/R3 (B) dated 12-August-2014
Installation works, location of the activity, Details schedule/Manpower requirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, document referenced, JSA
BBVN-FIVE-S2-SC-AMS-0034/R1
MS-20 [B]: Water Supply and Drainage System for Stage 2_Rev.1 Revised based on comments in AMS-34 dated 28-May-2014
Installation Pipe, Procedure firestop, Location of the activity, Document referenced
Detailed Schedule/Manpower Requirement, MSE.1: Method Take out louver of transformer, MSE.2: Method make temporary unloading area, MSE.3: Method unloading transformer and fix transformer, MSE.4: Method reinstallation of louvers for transformer
BBVN-FIVE-S2-SC-AMS-0035/R1
MS-23: Equipment for Stage 1_Rev.1 Revised based on comments in AMS_0035 dated 28-May-2014
Details schedule/Manpower Requirements, MSE.1: Take out louver menthod, MSE.2: Make temporary uploading area, MSE.3: Uploading transformer and fix transformer, MSE.4: Move transformer to foundation, MSE.5: Fix Transformer to concrete base, MSE.6: Re-install louver and finish work
MS-24 [A]: Main Feeder, Cable Rack, Busway and Panel System for Stage 1
Detailed Schedule/Manpower Requirements, MSE.1: Method of unloading busway and cable rack, MSE.2: Method of installation support for cable rack/busway under sub-beam; MSE.3: Method of installation cable rack
BBVN-FIVE-S2-SC-AMS-0036/R1
MS-24 [A]: Main Feeder, Cable Rack, Busway and Panel System for Stage 1_Rev.1 Revised based on comments in AMS-36 dated 23-June-2014
Detailed Schedule/Manpower Requirements, MSE.1: Method of unloading cable rack and panels, MSE.2: Method of Making wall opening holes; MSE.3: Method of making floor opening holes, MSE.4: Method of installation cable rack at AHU room, MSE.5: Method of installing cable rack above walkable ceilingl MSE.6L Method of installing cable rack at utility area, MSE.7: Method of installing LV panels; JSA, RA and Management for change system
Approval for Method Statement 29OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
BBVN-FIVE-S2-SC-AMS-0038 14/05/22 14/05/29 14/05/28 MS-25 [A]: Cable and Trunking for Stage 1 Quang/Diem C
14/07/28 14/08/04 14/08/07 C
14/08/19 14/08/22 14/08/23 B
BBVN-FIVE-S2-SC-AMS-0036/R2
MS-24 [A]: Main Feeder, Cable Rack, Busway and Panel System for Stage 1_Rev.2 Revised based on comments in AMS-36/R1 dated 01-August-2014
Detailed Schedule/Manpower Requirements, MSE.1: Method of unloading cable rack, scaffoldings; MSE.2: Method of Making wall opening holes; MSE.3: Method of making floor opening holes, MSE.4: Method of installation cable rack at AHU room, MSE.5: Method of installing cable rack above walkable ceiling; MSE.6: Method of installing cable racks at utility area; RCR services pre-work/task observation sheet; Pre-task planning sheet; Hot work permit; JSA and Management for change system
MS-24 [B]: Main Feeder, Cable Rack, Busway and Panel System for Stage 2
Detailed Schedule/Manpower Requirements, MSE.1: Method of unloading busway and cable rack, MSE.2: Method of installation support for cable rack/busway under concrete ceiling; MSE.3: Method of installation support for cable rack/busway under sub-beam; MSE.4: Method of installation cable rack; MSE.5: Method of installation LV Busway for production machine; MSE.6: Method of installation panel
Detailed Schedule/Manpower Requirements, MSE.1: Method of unloading cable drum to AHU room; MSE.2: Mehtod of installation pulling cable; MSE.3: Mehtod of installation for termination connection
BBVN-FIVE-S2-SC-AMS-0038/R1
MS-25 [A]: Cable and Trunking for Stage 1_Rev.1 Revised based on comments in AMS-38 dated 28-May-2014
Detailed Schedule/Manpower Requirements, MSE.1: Method of unloading cable drum to AHU room; MSE.2: Mehtod of installation pulling cable; MSE.3: Mehtod of installation for termination connection
BBVN-FIVE-S2-SC-AMS-0038/R2
MS-25 [A]: Cable and Trunking for Stage 1_Rev.2 Revised based on comments in AMS-38/R1 dated 7-August-2014
MSE.1: Method of unloading cables; MSE.2: Mehtod of unloading trunkings; MSE.3: Method of installation trunkings above walkable ceiling; MSE.4: Mehtod of installing trunking at AHU room; MSE.5: Method of cabling works; JSA; Risk Assessment and Managerment for Change system
Quang/Diem/Ujiie
Approval for Method Statement 30OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0039 14/05/22 14/05/29 14/05/28 MS-25 [B]: Cable and Trunking for Stage 2 Quang/Diem C
14/07/28 14/08/04 Quang/Diem
BBVN-FIVE-S2-SC-AMS-0039 ( C ) 14/07/12 14/07/14 14/07/18 B
BBVN-FIVE-S2-SC-AMS-0040 14/05/22 14/05/29 14/05/28 MS-26: Lighting System Quang/Diem C
BBVN-FIVE-S2-SC-AMS-0041 14/05/23 14/05/28 14/06/02 MS-BLD.07 - Structure Steel Erection Works Tuan Anh B
Detailed Schedule/Manpower Requirements, MSE.1: Method of unloading cable and trunking; MSE.2: Method of installation trunking under sub-beam for walkway area; MSE.3: Method of installation trunking under concrete ceiling for office area; MSE.4: Method of installation trunking under purlin for office area: MSE.5: Method of installation cable pulling: MSE.6: Method of installation cable pulling for warehouse and common walkway area: MSE.7: Method of installation for termination connection
BBVN-FIVE-S2-SC-AMS-0039/R1
MS-25 [B]: Cable and Trunking for Stage 1_Rev. 1 Revised based on comments in AMS-39 dated 28-May-2014
Detailed Schedule/Manpower Requirements, MSE.1: Method of unloading cable; MSE.2: Method of installation trunkings ; MSE.3: Method of installation trunkings above walkable ceiling; MSE.4: Method of installation trunkings at AHU Room; MSE.5: Method of cabling works; MSE.6: Method of termination works; JSA; Risk Assessment and Management for change system
MS-39 ( C ): Electrical System Work for Stage 1 Remove Lighting and Trunking
Quang/Ujiie/Diem
Detailed Schedule/Manpower Requirements, MSE.1: Method installation concealed EMC conduit on the wall; MSE.2: Method of installation for expose conduit: MSE.3: Method of installation conduit under sub-beam; MSE.4: Method of installation lighting fixture on ceiling: MSE.5: Method of installation for cleaning room area: MSE.6: Method of installation lighting fixture for warehouse: MSE.7: Method of installation lighting fixture for common area: MSE.8: Method of installation lighting fixture for walkway and outdoor area
Approval for Method Statement 31OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0042 14/06/16 14/06/20 MS-27: Emergency and Exit Lighting System Diem/Quang
BBVN-FIVE-S2-SC-AMS-0043 14/05/24 14/05/30 MS-30: Lightning System Quang/Diem
BBVN-FIVE-S2-SC-AMS-0044 14/06/16 14/06/20 14/06/23 MS-31: Socket Outlet System B
Details schedule/Man Power Requirements; MSE.1 : Method installation concealed EMC conduit on the wall; MSE.2 : Method of installation for expose conduit; MSE.3 : Method of installation conduit under sub-beam; MSE.4 : Method of installation emergency lighting fixture on ceiling; MSE.5 : Method of installation emergency lighting fixture for cleaning room area; MSE.6 : Method of installation emergency lighting fixture for ware house; MSE.7 : Method of installation emergency lighting fixture for common area; MSE.8 : Method of installation emergency lighting fixture for walkway and outdoor area; MSE.9 : Method of installation exit lighting for common area; JSA for emergency and exit lighting system stage 2
Details Schedule/Manpower requirement; MSE.1: connection from testing link box to lightning bar on roof; MSE.2: connection from testing link box to lightning bar on roof; MSE.3: connection from testing link box to lightning bar on roof; MSE.4: installation detail of air terminal; MSE.5: installation detail of connection earthing cable to tape; JSA analysis for lightning system
Details schedule/Man Power Requirements; MSE.1: Method installation concealed EMC conduit on the wall; MSE.2: Method of installation trunking under sub-beam; MSE.3: Method of installation cable and outlet for walkway area; MSE.4 : M Method of installation socket outlet on the floor; MSE.5: Method of installation socket outlet on the wall for cleaning room and office area; MSE.6 : Method of installation isolator at walkway area; MSE.7 : Installation socket and isolator on the wall; MSE.8 : Installation socket and isolator on the wall; Job safety analysis for socket outlet
Approval for Method Statement 32OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0045 14/05/24 14/05/30 MS-28: External Lighting System Quang/Diem
BBVN-FIVE-S2-SC-AMS-0046 14/06/16 14/06/20 14/06/23 MS-32 [A]: BMS System Quang/Diem C
14/09/08 14/09/13 14/09/15 Quang/Diem C
14/09/23 14/09/30 14/10/01 Quang/Diem B
Details schedule/ManPower Requirements; MSE.1 : Method installation plate fix the lighting fixture on the wall; MSE.2 : Method of installation bracket the lighting fixture on the wall; MSE.3: Method of installation support for flood lighting fixture on the wall; MSE.4: Method of installation flood lighting fixture on the wall; MSE.5: Method of installation fix the lighting pole to precast foundation; MSE.6: Method of installation lighting fixture to pole and connection; Job safety analysis for external lighting
Details schedule/ManPower Requirements; MSE.1 : Method installation water temperature sensor; MSE.2: Method of installation air temperature sensor; MSE.3: method of installation modulating dumper; MSE.4: method of installation level switch for tank and temperature humidity sensor; JSA for building management system stage 1
BBVN-FIVE-S2-SC-AMS-0046/R1
MS-32 [A]: BMS System_Rev.1 Revised based on comments in AMS-46 dated 23-June-2014
Details schedule/ManPower Requirements; Appendix 1: Move in path & location of activity plan; Appendix 2: Installation cable; Appendix 3: Installation of devices and panels; Appendix 4: Cable Termination; JSA for BMS stage 1; Risk assessment and Management for change system, RCR services Pre-work/Task observation sheet, Pre-task planning worksheet
BBVN-FIVE-S2-SC-AMS-0046/R2
MS-32 [A]: BMS System_Rev.2 Revised based on comments in AMS-46/R1 dated 15-September-2014
Comments response table; Details schedule/ManPower Requirements; Appendix 1: Move in path & location of activity plan; Appendix 2: Installation cable; Appendix 3: Installation of devices and panels; Appendix 4: Cable Termination; JSA for BMS stage 1; Risk assessment and Management for change system, RCR services Pre-work/Task observation sheet, Pre-task planning worksheet
Approval for Method Statement 33OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0047 14/06/16 14/06/20 14/06/23 MS-32 [B]: BMS System Quang/Diem B
BBVN-FIVE-S2-SC-AMS-0048 14/05/31 14/06/05 14/06/05 C
14/06/27 14/07/03 14/07/04 Quang C
14/08/04 14/08/09 14/09/06 Quang C
14/09/23 14/09/30 14/10/03 Quang/Vuong B+C/B+C
14/06/05 14/07/04 Duct Vuong C
14/07/14 14/07/19 14/07/21 C
14/09/09 14/09/16 14/09/19 B
Details schedule/ManPower Requirements; MSE.1 : Method installation of trunking for walkway ceiling area; MSE.2: Installation of trunking for office area; MSE.3: installation sensor for panel and control FCU; MSE.4: installation temperature, pressure and humidity sensor; MSE.5: installation damper, humidity and pressure sensor; JSA
MS-19 [A]: Air Conditioning & Mechanical Ventilation System Stage 1
General , Methodology, Location, Site Organization Chart, Tools & Equipments list, Detail schedule/manpower, safety management, quality control, appendices, JSA, Schedule
Quang/Ujiie, Randy
BBVN-FIVE-S2-SC-AMS-0048/R1 (A)
MS-19 [A]: Air Conditioning & Mechanical Ventilation System _Rev.1MS-19-A-1: Chiller Area Works_ Revised based on comments in AMS-48 dated 5-June-2014
Unload Chiller, Location of the activity, details schedule/Manpower requirement, RCR service pre-work/task observation sheet, Pre-task planning work sheet (requirement form RCR), Hot work permit, RA and management for change system
BBVN-FIVE-S2-SC-AMS-0048/R2 (A)
MS-19-A-1: Chiller Area Works_Rev.2 Revised based on comments in AMS-48/R1 dated 4-July-2014
Comments response table, Unload Chiller, Location of the activity, details schedule/Manpower requirement, RCR service pre-work/task observation sheet, Pre-task planning work sheet (requirement form RCR), Hot work permit, RA and management for change system
BBVN-FIVE-S2-SC-AMS-0048/R3 (A)
MS-19-A-1: Chiller Area Works_Rev.3 Revised based on omments in AMS-48/R2 dated 6-September-2014
Comments response table, Unload Chiller, Location of the activity, details schedule/Manpower requirement, RCR service pre-work/task observation sheet, Pre-task planning work sheet (requirement form RCR), Hot work permit, RA and management for change system
BBVN-FIVE-S2-SC-AMS-0048/R1 (B)
BBVN-FIVE-S2-SC-AMS-0048/R2 (B)
MS-19 [A]-2: Duct Stage 1 Work on the Ceiling Clean Room Area_Rev.2 Revised based on comments in AMS-0048/R1 (B) dated 4-July-2014
Preparation works, installation platform/Duct, Locaiton of the activity, Details schedule/manpower requirement, RCR servicer pre-work/task observation shet, Pre-task planning work sheet (requirement from RCR), Document reference, RA and management for change system
Quang/Ujiie/Vuong
BBVN-FIVE-S2-SC-AMS-0048/R3 (B)
MS-19 [A]-2: Duct Stage 1 Work on the Ceiling Clean Room Area_Rev.3 Revised based on comments in AMS-0048/R2 (B) dated 21-July-2014
Comments response table; Preparation works, installation Duct, Locaiton of the activity, Details schedule/manpower requirement &Tie-in list, RCR servicer pre-work/task observation shet, Pre-task planning work sheet (requirement from RCR), Document referenced, RA and management for change system
Quang/Ujiie/Vuong
Approval for Method Statement 34OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
14/07/02 14/07/07
14/09/15 14/09/20 14/09/19 C
14/09/18 14/09/20 14/09/19 C
14/09/24 14/10/01 14/10/07 MS-19-A-3.1: Assembly AHU Work Quang/Vuong B
BBVN-FIVE-S2-SC-AMS-0050 14/06/26 14/07/02 MS-49: Aluminum Panel Removal at Gridline 12 Method Statement, JSA/RA, Schedule Tuan Anh
BBVN-FIVE-S2-SC-AMS-0051 14/06/26 14/07/03 14/07/01 MS-22-A-1: Air Compressor System C
14/07/14 14/07/17 14/07/21 C
BBVN-FIVE-S2-SC-AMS-0048/R1 (C )
MS-19 [A]: Air Conditioning & Mechanical Ventilation System _Rev.1MS-19-A-3: AHU Area Works
Unload AHU, PUMP, BUFFER Tank, details schedule/Manpower requirement, Location of the activity, Procedure Firestop, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet (requirement form RCR), Hot work permit, Document Referenced, RA and management for change system
Quang/Ujiie/Vuong
BBVN-FIVE-S2-SC-AMS-0048/R2 (C )
MS-19 [A]: Air Conditioning & Mechanical Ventilation SystemMS-19-A-3: AHU Work Area_Rev.2 _ Revised based on comments in AMS-48/R1 (C ) dated 4-June-2014
Comments response table; Unload AHU, Details schedule/Manpower requirement, Location of the activity, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet (requirement form RCR), RA and management for change system
Quang/Ujiie/Vuong
BBVN-FIVE-S2-SC-AMS-0048/R2 (C ) (ADD.01)
MS-19-A-3: AHU Work Area_Rev.2 _ Revised based on comments in AMS-48/R1 (C ) dated 4-June-2014_Additional Document
Guidance the transportation and installation AHU (13A4pages_VNese), sketch/drawings (10A4size)
Quang/Ujiie/Vuong
BBVN-FIVE-S2-SC-AMS-0048 (D)
Drawing AHU assebly work; AHU assembly instruction manual; List part by part assembly AHU; Factory issue final QC check; Unload AHU; Detail crane AVC 1 ton; Location of the activity; Detail schedule/Manpower requirement; RCR servicer pre-work/task observation sheet; Pre-task planning work sheet (requirement from RCR); Risk assessment and management for change system
Tuan Anh/Ba Hoa
Installation Works, Procedure Fire Stop, Location of the activity, Details shcedule/Manpower Requirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, document referenced, RA and maangement for change system
Quang/Ujiie/Trung
BBVN-FIVE-S2-SC-AMS-0051/R1
MS-22-A-1: Air Compressor System_Rev.1 Revised based on comments in AMS-51 dated 1-July-2014
Installation Works, Procedure Fire Stop, Welding Procedure G.I Pipe, Location of the activity, Details shcedule/Manpower Requirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, document referenced, RA and maangement for change system
Approval for Method Statement 35OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
14/07/30 14/08/06 14/08/12 Quang B
BBVN-FIVE-S2-SC-AMS-0052 14/06/27 14/07/03 14/07/03 MS-23: Installation Assembly Area Quang/Ujiie B
BBVN-FIVE-S2-SC-AMS-0053 14/06/30 14/07/04 14/07/03 MS-19-A-5: Installation Platform Quang/Ujiie B
BBVN-FIVE-S2-SC-AMS-0054 14/06/30 14/07/04 14/07/02 C
14/07/07 14/07/18 14/07/10 C
14/08/07 14/08/11 14/08/18 C
BBVN-FIVE-S2-SC-AMS-0051/R2
MS-22-A-1: Air Compressor System_Rev.2Revised based on comments in AMS-51/R1 dated 21-July-2014
CommentIns table, Installation Works, Procedure FireStop, Function test of Air Compressor, Welding Procedure G.I Pipe & Copper pipe, Location of the activity, Details shcedule/Manpower Requirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, document referenced, RA and maangement for change system
Install Assembly Area, Location of the activity, details schedule/manpower requirement, RCR pre-work/task observation sheet, Pre-task planning work sheet (requirement from RCR)
Install Platform, Install temporary floor, lovation of the activit, Detail schedule/manpower requirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet (Requirement from RCR) & JSA
MS-22-A-2: Installation of RO, Process Cooling Water Pipe above Ceiling Clean Room
Detail installaiton works, Welding procedure PP-H pipe, Welding procedure SUS pipe, Procedure Firestop, Location of the activity, Details scheudle/Manpower reuirement, RCR servicer pre-work/task observation sheet, Pretask planning work sheet, JSA
Quang/Ujiie/Khoa
BBVN-FIVE-S2-SC-AMS-0054/R1 [A]
MS-22-A-2: Installation of Process Cooling water pipe above ceiling clean room _ Rev.1
Quang/Ujiie/Khoa
BBVN-FIVE-S2-SC-AMS-0054/R2 [A]_1
MS-22-A-2.1: Installation of Process Cooling water pipe above ceiling clean room _ Rev.2_STAGE 1 Revised based on comments in AMS-54/R1 [A] dated 10-July-2014
Comments response table, Detail installaiton works, Welding procedure SUS pipe, Procedure Firestop, Location of the activity, Details schedule/Manpower reuirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, Risk Assessment and Management for change system
Quang/Ujiie/Khoa
Approval for Method Statement 36OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
14/09/25 14/10/02 14/10/03 B
14/08/07 14/08/11 14/08/18 C
14/09/25 14/10/02 14/10/03 B
14/07/07 14/07/18 14/07/14 C
14/07/30 14/08/06
BBVN-FIVE-S2-SC-AMS-0055 14/07/01 14/07/05 14/07/08 MS-BLD.06-B: Reinforcement Concrete Septic Tank Tuan Anh B
BBVN-FIVE-S2-SC-AMS-0056 14/07/07 14/07/12 14/07/09 MS-39: Electrical System - Temporary Work for Stage 1 C
14/07/10 14/07/12 14/07/15 B
BBVN-FIVE-S2-SC-AMS-0054/R3 [A]_1
MS-22-A-2.1: Installation of Process Cooling water pipe above ceiling clean room _ Rev.3_STAGE 1 (Close Loop) Revised based on comments in AMS-54/R2 [A] _1 dated 18-August-2014
Detail installaiton works, Welding procedure SUS pipe, Procedure Firestop, Location of the activity, Details schedule/Manpower reuirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, Document referenced; Risk Assessment and Management for change system
Quang/Ujiie/Khoa
BBVN-FIVE-S2-SC-AMS-0054/R2 [A]_2
MS-22-A-2.2: Installation of Process Cooling water (Open Loop) pipe above ceiling clean room _ Rev.2_STAGE 1 Revised based on comments in AMS-57/R1 [A] dated 10-July-2014
Comments response table, Detail installaiton works, Welding procedure SUS pipe, Procedure Firestop, Location of the activity, Details schedule/Manpower reuirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, Hot work permit, Document Referenced, Risk Assessment and Management for change system
Quang/Ujiie/Khoa
BBVN-FIVE-S2-SC-AMS-0054/R3 [A]_2
MS-22-A-2.2: Installation of Process Cooling water (Open Loop) pipe above ceiling clean room _ Rev.3_STAGE 1 Revised based on comments in AMS-57/R2 [A] dated 18-August-2014
Comments response table, Detail installaiton works, Welding procedure SUS pipe, Procedure Firestop, Location of the activity, Details schedule/Manpower reuirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, Hot work permit, Document Referenced, Risk Assessment and Management for change system
Quang/Ujiie/Khoa
BBVN-FIVE-S2-SC-AMS-0054/R1 [B]
MS-22-A-3: Installation of RO Water Pipe above ceiling Clean Room _ Rev.1
Quang/Ujiie/Khoa
BBVN-FIVE-S2-SC-AMS-0054/R2 [B]
MS-22-A-3: Installation of RO Water Pipe above ceiling Clean Room _ Rev.2 Revised based on comments in AMS-54/R1 (B) dated 14-July-2014 (STAGE 1)
Detail installaiton works, Welding procedure PP-H pipe, Procedure Firestop, Location of the activity, Details scheudle/Manpower reuirement, RCR servicer pre-work/task observation sheet, Pretask planning work sheet, Hot work permit, Document reference, JSA
Quang/Ujiie/Khoa
Method Statement for Septic tank, Equipment List, Schedule, JSA/Risk Assessent
Installation works, Welding Procedure G.I pipe, Location of the activity, Details schedule/Manpower requirement, Document referenced, JSA
Quang/Ujiie/Trung
Approval for Method Statement 38OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
14/08/22 14/08/25 14/08/27 B
BBVN-FIVE-S2-SC-AMS-0062 14/07/17 14/07/21 14/07/25 quang/ujiie C
14/08/27 14/09/01 quang/ujiie
BBVN-FIVE-S2-SC-AMS-0063 14/07/17 14/07/21 14/07/28 C
14/09/15 14/09/21 14/09/22 B
BBVN-FIVE-S2-SC-AMS-0064 14/07/18 14/07/23 14/08/18 MS-50: Honeycomb Treatment Product Datasheet Tuan Anh B
BBVN-FIVE-S2-SC-AMS-0065 14/07/25 14/07/30 14/08/07 MS-BLD.51- Demolition Work for Office Area & Column A12 Tuan Anh C
14/09/09 14/09/15 14/09/19 T. Anh C
14/09/25 14/10/02 14/10/09 T. Anh B
BBVN-FIVE-S2-SC-AMS-0066 14/07/30 14/08/06 14/08/04 MS-19-C: Remove Equipment No Used inside AHU Room Ujiie, Quang B
BBVN-FIVE-S2-SC-AMS-0061/R1
MS-22-B-1: Air Compressor System_Rev.1 Revised based on comments in AMS-61 dated 25-July-2014
Comments response table; Installation works, Welding Procedure, Location of the activity, Details schedule/Manpower requirement, Document referenced, JSA
Quang/Ujiie/Trung
MS-22-B-2: Installation of Process Cooling Water Pipe above Ceiling Clean Room (Stage 2)
Detail installation works, welding procedure SUS pipe, Location of the activity, details schedule/Manpower requirement, document reference, JSA
BBVN-FIVE-S2-SC-AMS-0062/R1
MS-22-B-2: Installation of Process Cooling Water Pipe above Ceiling Clean Room (Stage 2)_Rev.1 Revised based on comments in AMS-62 dated 25-July-2014
Comments response table; Detail installation works, welding procedure SUS pipe (GTAW), ITP, Location of the activity, details schedule/Manpower requirement, document reference, JSA
MS-22-B-3: Installation of R.O Water Pipe above Ceiling Clean Room_Stage 2
Detail installation works, welding procedure PP-H pipe, Location of the activity, details schedule/Manpower requirement, document reference, JSA
Quang/Ujiie/Khoa
BBVN-FIVE-S2-SC-AMS-0063/R1
MS-22-B-3: Installation of R.O Water Pipe above Ceiling Clean Room_Stage 2_Rev.1 Revised based on comments in AMS_0063 dated 28-Jul-2014
Detail installation works, welding procedure PP-H pipe, Location of the activity, details schedule/Manpower requirement, document reference, JSA
Quang/Ujiie/Khoa
Method Statement for Demolition Works; Method Statement for Temporary Panel; Risk Assessment and JSA, , Drawings
BBVN-FIVE-S2-SC-AMS-0065/R1
MS-BLD.51- Demolition Work for Office Area & Column A12_Rev.1 Revised based on comments in AMS-65 dated 7-August-2014
Method Statement for Demolition Works; Method Statement for Temporary Panel; Risk Assessment and JSA, Organizational Chart, Schedule
BBVN-FIVE-S2-SC-AMS-0065/R2
MS-BLD.51- Demolition Work for Office Area & Column A12_Rev.2 Revised based on comments in AMS-65/R1 dated 19-September-2014
Appendix 1: Method Statement for Demolition Works; Appendix 2: Method Statement for Temporary Panel; Appendix 3: Risk Assessment and JSA; Appendix 4: Organization Chart, Appendix 5: Schedule
Remove Works, Location of the Activity, Details schedule/Manpower requirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet (requirement from RCR), Hot work permit
Approval for Method Statement 39OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0067 14/07/30 14/08/06 14/07/31 MS-19-A-6: Method Statement for Tie-in No.: 2.1, 2.2, 2.3 Quang C
14/08/05 14/08/09 14/08/07 Quang B
14/08/09 Additional document (refer to TS 179 dated 12-Aug-2014)
BBVN-FIVE-S2-SC-AMS-0068 14/07/30 14/08/06 14/08/06 MS-19-A-7: Method Statement for Tie-in No.: 3.1, 3.2, 3.3 Quang C
14/08/08 14/08/13 14/08/11 Quang B
BBVN-FIVE-S2-SC-AMS-0069 14/08/06 14/08/09 14/08/14 MS-BLD.53_Wall Penetration on Grid 3 B
BBVN-FIVE-S2-SC-AMS-0070 14/08/08 14/08/13 14/08/14 Quang B
Schedule Material List, Tie-in List, Drawing, RCR servicer pre-work/ task observation sheet, pre-task planning work sheet (requirement from RCR), Document referenced, Risk assessment and management for change system
BBVN-FIVE-S2-SC-AMS-0067/R1
MS-19-A-6: Method Statement for Tie-in No.: 2.1, 2.2, 2.3_Rev.1 Revised based on comments in AMS-67 dated 31-July-2014
Comments response table, Schedule Material List, Tie-in List, Drawing, RCR servicer pre-work/ task observation sheet, pre-task planning work sheet (requirement from RCR), Document referenced, Risk assessment and management for change system
BBVN-FIVE-S2-SC-AMS-0067/R1 (ADD01)
Schedule Material List, Tie-in List, Drawing, RCR servicer pre-work/ task observation sheet, pre-task planning work sheet (requirement from RCR), Document referenced, Risk assessment and management for change system
BBVN-FIVE-S2-SC-AMS-0068/R1
MS-19-A-7: Method Statement for Tie-in No.: 3.1, 3.2, 3.3_Rev.1 Revised based on comments in AMS-68 dated 6-Aug-2014
Comments response table, Schedule Material List, Tie-in List, Drawing, RCR servicer pre-work/ task observation sheet, Pre-task planning work sheet (requirement from RCR), Document Referenced, Risk assessment and management for change system
MS for Scaffolding; MS for Wall Penetration on Grid 3; Risk Assessment and JSA
Schedule Material List, Tie-in List, Drawing, Installation Work, Fire Stop mortar, RCR servicer pre-work/ task observation sheet, Pre-task planning work sheet (requirement from RCR), Hot work permit, Red tag permit, Risk assessment and management for change system
Approval for Method Statement 40OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0071 14/08/07 14/08/13 14/08/18 MS-19-D: Relocation Duct Inside Electric Room (Tie-In 22) Quang/Diem B
BBVN-FIVE-S2-SC-AMS-0072 14/08/07 14/08/13 14/08/12 MS-19-A-8: Method Statement for Tie-in No.: 1.1, 1.2 Quang/Trung B
BBVN-FIVE-S2-SC-AMS-0073 14/08/08 14/08/13 14/08/14 MS-19-A-9: Method Statement for Tie-in No.: 9.1, 9.2, 9.3 Quang/Ujiie B
BBVN-FIVE-S2-SC-AMS-0074 14/08/09 14/08/14 14/08/14 MS-19-A-11: Method Statement for Tie-in No: 11.1, 11.2 Quang/Ujiie B
BBVN-FIVE-S2-SC-AMS-0075 14/08/09 14/08/14 MS-24.1 HV Connection for transformer TX-2 Quang/Ujiie
BBVN-FIVE-S2-SC-AMS-0076 14/08/09 14/08/14 14/08/14 MS-21-A-3: Method Statement for Tie-in No: 16.1, 16.2 Quang/Ujiie B
Relocation Works; Location of the activity; Details schedule/Manpower requirement; RCR servicer pre-work/task observation sheet; Pre-task planning work sheet (requirement from RCR), JSA
Schedule Material List, Tie-in List, Drawing, RCR servicer pre-work/ task observation sheet, Pre-task planning work sheet (requirement from RCR), Document Referenced, Risk assessment and management for change system
Schedule Material List, Tie-in List, Drawing, RCR servicer pre-work/ task observation sheet, Pre-task planning work sheet (requirement from RCR), Document Referenced, Risk assessment and management for change system
Schedule Material List, Tie-in List, Drawing, RCR servicer pre-work/ task observation sheet, Pre-task planning work sheet (requirement from RCR), Document Referenced, Risk assessment and management for change system
Detail schedule/ Main Power Requirements, MSE.1: Marking location at site, MSE.2: Method of cutting-off the main power, MSE.3: Method of re-opening the existing holes, MSE.4: Method of cabling works, MSE.5: Method of cable and termination works, Job safety analysis, Risk Assessment and Management for Change System
Schedule Material List, Tie-in List, Drawing, Installation work, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet (Requirement from RCR), Hot work permit, Red tag permit, Risk assessment and management for change system
Approval for Method Statement 41OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0077 14/08/11 14/08/16 14/08/23 MS-19-B-2: Duct Works_Stage 2 Quang/Vuong C
14/08/29 14/09/05 14/09/16 Quang/Vuong C
BBVN-FIVE-S2-SC-AMS-0078 14/08/12 14/08/16 14/08/20 MS-21-A-4: Method Statement for Tie-in No.: 17.1, 17.2 C
14/08/21 14/08/23 14/08/21 B/A
BBVN-FIVE-S2-SC-AMS-0079 14/08/12 14/08/16 14/08/19 MS-31: Tie-in List of Fire Detection and Alarm System Quang/Ujiie B
BBVN-FIVE-S2-SC-AMS-0080 14/08/14 14/08/16 14/08/21 MS-BLD.54: Plinth Construction Nguyen B
BBVN-FIVE-S2-SC-AMS-0081 14/08/15 14/08/22 14/08/28 MS-19-A-10: Method Statement for Tie-in No.: 4.1, 4.2, 4.3 Quang/Khoa B
Method Duct Works; Installation Works; Location of the activity; Details schedule/Manpower requirement; Document referencedl JSA
BBVN-FIVE-S2-SC-AMS-0077/R1
MS-19-B-2: Duct Works_Stage 2_Rev.1 Revised based on comments in AMS-77 dated 23-August-2014
Comments response table; Method Duct Works; Installation Works; Location of the activity; Details schedule/Manpower requirement; Document referenced; JSA
Schedule Material List, Tie-in List, Drawing, Installation work, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet (Requirement from RCR), Risk assessment and management for change system
Quang/Tuan/Trung
BBVN-FIVE-S2-SC-AMS-0078/R1
MS-21-A-4: Method Statement for Tie-in No.: 17.1, 17.2_Rev.1 Revised based on comments in AMS-78 dated 20-August-2014
Appendix4. Plug Sprinkler Head for roof above clean room, JSA
Quang/Tuan/Trung
Details Schedule/Manpower Requirements; Tie-in works detail table; Plan of Tie-in List; Detail of installation for tie-in list; detail of cable termination; JSA; Risk assessment and management for change system; RCR services pre-work/task observation sheet; pre-task planning worksheet; Red tag permit
MS for Temporary Canvas protection; MS for Installing rebar and formwork; MS for casting concrete; JSA and Risk Assessment
Schedule Material List, Tie-in List, Drawing, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet (Requirement from RCR), Document Referenced, Risk assessment and management for change system
Approval for Method Statement 42OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0082 14/08/18 14/08/22 14/08/26 MS-20-A-3: Method Statement for Tie-in No. 20.1, 20.2, 20.3 Quang/Ujiie B
BBVN-FIVE-S2-SC-AMS-0083 14/08/18 14/08/19 14/08/26 Quang/Ujiie B
BBVN-FIVE-S2-SC-AMS-0086 14/08/18 14/08/20 14/08/19 MS-21-A-5: Method Statement for Tie-in No.: 18.1, 18.2 Quang/Ujiie B
14/08/21 14/08/23 Quang/Ujiie
Schedule Material List, Tie-in List, Drawing, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet (Requirement from RCR), Hot work permit, Document Referenced, Risk assessment and management for change system
Schedule Material List, Tie-in List/Details schedule, Drawing, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet (Requirement from RCR), Document Referenced, Risk assessment and management for change system, Hot Work Permit, Red Tag permit
MS-19-A-13: Method Statement for Tie-in No.: 21.1 (R.O Water System)
Tie-in List/Detaila Schedule; Schedule Material List, Drawing, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, Hot work permit, Document Referenced, Risk assessment and management for change system
Tie-in List/Details Schedule; Schedule Material List, Drawing, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, Document Referenced, Risk assessment and management for change system
Schedule Material List, Tie-in List, Drawing, Installation work; RCR servicer pre-work/task observation sheet, Pre-task planning work sheet (Requirement from RCR), Hot Work Permit, Red Tag permit; Risk assessment and management for change system
BBVN-FIVE-S2-SC-AMS-0086 (FINAL)
MS-21-A-5: Method Statement for Tie-in No.: 18.1, 18.2 (FINAL Document)
Comments Response table; Schedule Material List, Tie-in List, Drawing, Installation work; RCR servicer pre-work/task observation sheet, Pre-task planning work sheet (Requirement from RCR), Hot Work Permit, Red Tag permit; Risk assessment and management for change system
Approval for Method Statement 43OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0087 14/08/18 14/08/20 14/08/29 MS-22-A-5: Method Statement for Tie-in No.: 6.1, 6.2 Quang/Ujiie B
BBVN-FIVE-S2-SC-AMS-0088 14/08/19 14/08/22 14/08/22 MS-36-2: LV Busway 3200A Installation B
BBVN-FIVE-S2-SC-AMS-0089 14/08/19 14/08/22 14/08/23 C
14/08/26 14/08/30 14/08/28 B
BBVN-FIVE-S2-SC-AMS-0090 14/08/20 14/08/27 14/09/04 MS-BLD.20: Clean Room - Finishing Works Ceiling & Partition Wall Tuan Anh C
14/09/11 14/09/17 14/09/26 Tuan Anh B
Tie-in List/Details Schedule; Schedule Material List, Welding Procedure SUS Pipe; Drawing, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, Hot work permit; Document Referenced, Risk assessment and management for change system
MSE.1: Method of unloading LV Busway; MSE.2: Mehtod of making wall opening hole; MSE.3: Method of busway installation; JSA; Risk Assessment and management for change system
Quang/Diem/Ujiie
MS-24.2: LV Busway 3200A Connection from Transformer TX-2 to MSB-A/BUS_2
Site organization chart; Detailed schedule/Manpower requirement; Material list; MSE.1: Location plan of work; MSE.2: Method of cutting-off the main power; MSE.3: Method of installing the flanged-end units; MSE.4: Detail of busway connection; JSA; Risk Assessment and Management for Change system
Quang/Ujiie/Diem
BBVN-FIVE-S2-SC-AMS-0089/R1
MS-24.2: LV Busway 3200A Connection from Transformer TX-2 to MSB-A/BUS_2_Rev.1 Revised based on comments in AMS-89 dated 23-August-2014
Comments response table; Site organization chart; Detailed schedule/Manpower requirement; Material list; MSE.1: Location plan of work; MSE.2: Method of cutting-off the main power; MSE.3: Method of installing the flanged-end units; MSE.4: Detail of busway connection; JSA; Risk Assessment and Management for Change system
Quang/Ujiie/Diem
Drawing for ceiling & Partition Wall; Products Data sheet; Risk Assessment and JSA
BBVN-FIVE-S2-SC-AMS-0090/R1
MS-BLD.20: Clean Room - Finishing Works Ceiling & Partition Wall_Rev.1 Revised based on comments in AMS-90 dated 4-September-2014
Appendix 1: Drawing for Ceiling & Partition Wall; Appendix 2: Products Data Sheet; Appendix 3: Risk Assessment and JSA
Approval for Method Statement 44OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0091 14/08/20 14/08/25 14/08/26 MS-19-A-12: Method Statement for Tie-in No.: 8.1,8.2,8.3 B
BBVN-FIVE-S2-SC-AMS-0092 14/08/20 14/08/25 14/08/26 MS-24.1: HV Connection for Transformer TX-2 (Tie-in 24.1) B
BBVN-FIVE-S2-SC-AMS-0093 14/08/20 14/08/25 14/08/26 MS-21-B-2: Welding Procedure Plan (GTAW) B
BBVN-FIVE-S2-SC-AMS-0095 14/08/22 14/08/25 14/08/29 MS-BLD.52: Warehouse Wall Demolition for Roller Shutter T.Anh B
Tie-in List/Details Schedule; Schedule Material List, Drawing, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, Document Referenced, Hot work permit, Risk assessment and management for change system
Quang/Ujiie/Khoa
Site organization chart; Detailed schedule/Manpower requirement; Material list; MSE.1: Working Location at site; MSE.2: Method of cutting-off the main power; MSE.3: Method of re-opening the existing holes; MSE.4: Method of cabling works; MSE.5: Method of cable and termination works; JSA; Risk Assessment and Management for Change system
Quang/Ujiie/Diem
Welding Procedure Specification (WPS); Welder list & Certificates; Welding Report
Quang/Ujiie/Khoa
Schedule Material List, Tie-in List, Drawing, Installation work, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet,Hot work permit, Red tag permit, Risk assessment and management for change system
Drawing for Demolition works, Organization Chart, Risk Assessment and JSA; FRI No.183
Approval for Project Document 45
OUTGOING Rev. Date Issued Title Attachments StatusDate Required Reply
INCOMING Date Issued
Author/Delivered to
Date Delivered to Author
BBVN-FIVE-S2-SC-APD-0013 14/03/18 Mr. Tung
14/03/20 List of Mock-up C
14/03/26 14/04/01 List of Mock-up_rev.1
14/04/02 List of Mock-up_rev.1 B
14/09/19 14/09/26 14/10/04 List of Mock-up_Rev.1 Updated based on actual condition 3A4size pages Tung C
14/10/11 14/10/18 14/10/28 4A4size pages Tung B
BBVN-FIVE-S2-SC-APD-0014 14/03/20 Mr. Mark
14/03/25 C
14/05/02 14/05/06 14/05/07 Tung C
14/05/15 14/05/19 14/05/21 Tung B
BBVN-FIVE-S2-SC-APD-0015 14/03/24 14/03/26 Ms. Hau
A
BBVN-FIVE-S2-SC-APD-0016 14/03/19 Mr. Tung
14/03/25 B
BBVN-FIVE-S2-SC-APD-0017 14/03/24 14/03/25 Mr. Le/Mr. Thanh
BBVN-FIVE-S2-SC-APD-0018 14/03/25 Mrs. Lan
14/03/31 C
14/04/02 14/04/07
11-Apr-14 C 12-Apr-14
14/04/03 14/04/07 QCP for Fabrication Structural Steel in SEICO Factory Mrs. Lan
11-Apr-14 C 12-Apr-14
List of Mock-up
BBVN-FIVE-S2-SC-APD-0013/R1
BBVN-FIVE-S2-SC-APD-0013/R1 (Revised)
BBVN-FIVE-S2-SC-APD-0013/R2 (Revised)
List of Mock-up_Rev.2 Revised based on comments in APD-13/R1 (Revised) dated 4-October-2014
Procurement Plan
Procurement Plan
BBVN-FIVE-S2-SC-APD-0014/R1
Procurement Plan_Rev.1 Revised based on comments in APD-0014 dated 25-Mar-2014
BBVN-FIVE-S2-SC-APD-0014/R2
Procurement Plan_Rev.2 Revised based on comments in APD-0014/R1 dated 07-May-2014
Signature Flowchart
Signature Flowchart
Company profile for Space Frame and Paint (TOA)
Company profile for Space Frame and Paint (TOA)
Road & Drainage System Level based on Pre-condition Survey Result 4A3 drawings for road, 4A3 drawings for drainage system
(Superseded)
QCP for Steel Strutural Work (QCP-3) Quality Control Documents of Seico (Steel Structural Manufacture)
QCP for Steel Strutural Work (QCP-3)
BBVN-FIVE-S2-SC-APD-0018/R1
Profile of Authority Unit for NDT inspector for steel structural works_Rev.1 (based on
Profile of Authority Unit for NDT inspector for steel structural works_Rev.1 (based on
BBVN-FIVE-S2-SC-APD-0018/R1 (II)
Welding Procedure Specification, Welder List & Certificatess
QCP for Fabrication Structural Steel in SEICO Factory
Approval for Project Document 46
OUTGOING Rev. Date Issued Title Attachments StatusDate Required Reply
INCOMING Date Issued
Author/Delivered to
Date Delivered to Author
14/04/19 14/04/25
14/04/28 QCP-3 (full) Mrs. Lan B
BBVN-FIVE-S2-SC-APD-0019 14/03/27
14/03/29 New Gridline based on Survey Existing Factory C
14/03/31 14/04/01 New Gridline 7 A3 size drawings Mr. Nguyen
14/04/02 New Gridline B
BBVN-FIVE-S2-SC-APD-0020 14/03/27 14/03/31 Master Schedule & Manpower 12 A3 size pages Mr. Tu
14/04/15 Master Schedule & Manpower 11A3size pages C
14/04/29 14/05/02 14/05/08 11A3size pages Mr. Tu/Cuong C
14/05/12 14/05/15 14/05/15 11A3size pages Mr. Tu/Cuong B
BBVN-FIVE-S2-SC-APD-0025 14/04/08 14/04/18 Clean Construction Protocol for Clean Room 1A3size page Mrs. Lan
11-Apr-14 C 12-Apr-14
BBVN-FIVE-S2-SC-APD-0018/R2
QCP-3(1): Quality Control Plan for Fabrication structural steel in Seico factory_Rev.2QCP-3(2): Quality Control Plan for Assembly and Erection Structural steel on site_Rev.1NDT Laboratory: THT Technology and Services Engineering JSC (English Version)
New Gridline based on Survey Existing Factory 1 A4 photo, 1 A3 drawing, 1A3 page benchmark layout, 2 A3 size pages of cordinates, 6 A3size drawings
Mr. Nguyen/Mr. Chien
BBVN-FIVE-S2-SC-APD-0019/R1
BBVN-FIVE-S2-SC-APD-0020/R1
Master Schedule & Manpower_Rev.1 Revised based on comments in APD_0021 dated 15-APR-2014
BBVN-FIVE-S2-SC-APD-0020/R2
Master Schedule & Manpower_Rev.2 Revised based on comments in APD_0020/R1 dated 8-May-2014
dated 24-Mar-2014: 2 business certificates(Luong Thanh Dong & Kinh Viet), 2 companies profiles (Vinh Hiep Hung & Doan Thanh)
Package List of the Project
BBVN-FIVE-S2-SC-APD-0024/R1
Package List of the Project_Rev.1 Reivsed based on comments in APD-0024 dated 11-Apr-2014
Clean Construction Protocol for Clean Room
Approval for Project Document 47
OUTGOING Rev. Date Issued Title Attachments StatusDate Required Reply
INCOMING Date Issued
Author/Delivered to
Date Delivered to Author
14/04/29 14/05/05 14/05/09 Access Layout 4A3size drawings Mrs. Lan B/C
BBVN-FIVE-S2-SC-APD-0027 08-Apr-14 11-Apr-14 Mr. Tu
11-Apr-14 B 12-Apr-14
14/04/15 Mr. Tu
BBVN-FIVE-S2-SC-APD-0028 11-Apr-14 12-Apr-14 Mr. Tung
14/04/15 19A3 size drawings C
14/04/28 14/05/02 14/05/14 Mr. Tung B
BBVN-FIVE-S2-SC-APD-0029 14/04/15 14/04/17 Inspection Form for Earthwork & RC Work (7 forms) Mr. Hoang
14/04/21 Inspection Form for Earthwork & RC Work (7 forms) B
14/04/23 14/04/26 Tuan Anh
14/04/29 Tuan Anh A
BBVN-FIVE-S2-SC-APD-0030 14/04/15 14/04/17 Clashing Point Check
BBVN-FIVE-S2-SC-APD-0025/R1
Clean Construction Protocol for Clean Room_Rev.1 Revised based on comments in APD-0025 dated 14-Apr-2014
Work permit forms:Forms including (i) Parent Work Permit, (ii) Hot Work Permit, (iii) Work At Height Permit, (iv) Confined Space Permit, (v) Lifting Permit, (vi) Excavation Permit, (vii) Demolition Permit
Work permit forms:Forms including (i) Parent Work Permit, (ii) Hot Work Permit, (iii) Work At Height Permit, (iv) Confined Space Permit, (v) Lifting Permit, (vi) Excavation Permit, (vii) Demolition Permit
BBVN-FIVE-S2-SC-APD-0026 (ADD)
Work permit forms: Additional 2 Forms (Based on comments in APD-0026 dated 14-Apr-2014)
Chemical Registration, Checmical Use Declaration & Work at Height Permit
Report of Taking Photograph and Surveying actual quality of B. Braun Five AP Construction Site Stage No.2
Report of Taking Photograph and Surveying actual quality of B. Braun Five AP Construction Site Stage No.2
BBVN-FIVE-S2-SC-APD-0027 (ADD)
Report of Taking Photograph and Surveying actual quality of B. Braun Five AP Construction Site Stage No.2
Roofing System for FM Global Approval. Roof Nav Assembly No. 237498-0-0
Roofing System for FM Global Approval. Roof Nav Assembly No. 237498-0-0
BBVN-FIVE-S2-SC-APD-0028/R1
Roofing System for FM Global Approval. Roof Nav Assembly No. 237498-0-0_Rev1 revised based on comments in APD-0028 dated 15-APR-2014
Hard rock 80 for roof insulation, Sika Membrance, Fastener (Catalogue & Datasheet), V125 Decking + 11A3size drawings
Pre-Concrete Inspection, RC Inspection, Formwork Inspection, Puring Concrete on Site, Inspection, Final Concrete Inspection, Backfill Inpection Record, Excavation Inspection Record
BBVN-FIVE-S2-SC-APD-0029 (ADD)
Inspection Form for Earthwork & RC Work (9 forms)_Additional & Revised based on comments in APD_0029 dated 24-Apr-2014
Pre-Concrete Inspection, RC Inspection, Formwork Inspection, Puring Concrete on Site, Inspection, Final Concrete Inspection, Backfill Inpection Record, Excavation Inspection Record, Lean Concrete Inspection, Minutes for Material/Equipment Inspection & Acceptance Reports
Inspection Form for Earthwork & RC Work (9 forms)_Additional & Revised based on comments in APD_0029 dated 24-Apr-2014
Duct vs Steel Structure (11 items), Duct vs Fire Fighting (10 items), Cable Ladder/tray vs Structure (8 items)
Mr. Giang/Mr. Thanh
Approval for Project Document 48
OUTGOING Rev. Date Issued Title Attachments StatusDate Required Reply
INCOMING Date Issued
Author/Delivered to
Date Delivered to Author
14/04/17 Clashing Point Check C
14/04/29 14/05/06 Mr. Giang/An
BBVN-FIVE-S2-SC-APD-0031 14/04/18 14/04/22 LAS298 profile for Geotextile Test LAS 298 Profile Mrs. Lan/Hoang
14/04/25 LAS298 profile for Geotextile Test B
BBVN-FIVE-S2-SC-APD-0032 14/04/18 14/04/22 LAS201 profile for Testing thickness of zinc coat for purlin LAS 201 Profile Mrs. Lan/Hoang
14/04/25 LAS201 profile for Testing thickness of zinc coat for purlin B
BBVN-FIVE-S2-SC-APD-0033 14/04/21 14/04/23 Temporary Road for Construction Work A3 size drawing Mr. Ba Hoa
14/04/23 Temporary Road for Construction Work C/B
14/04/24 14/05/02 Mr. Ba Hoa
14/04/25 B
BBVN-FIVE-S2-SC-APD-0034 14/04/21 14/04/26 General JSA & Risk Assessment Shimizu 31 items of work Mr. Hoang Safety
14/04/23 General JSA & Risk Assessment Shimizu C
14/05/14 14/05/16 14/05/19 61 Activities Hoang Safety C
14/05/28 14/06/02. 14/06/02 Hoang Safety B
BBVN-FIVE-S2-SC-APD-0035 14/04/24 14/04/25 Hoang
14/04/28 A
BBVN-FIVE-S2-SC-APD-0030/R1
Clashing Point Check_Rev.1 Revised based on comments in APD-0030 dated 14-Apr-2014
BBVN-FIVE-S2-SC-APD-0033/R1
Temporary Road for Construction Work_Rev.1 (Revised based on comments in APD-0033 dated 23/04/2014
Temporary Road for Construction Work_Rev.1 (Revised based on comments in APD-0033 dated 23/04/2014
BBVN-FIVE-S2-SC-APD-0034/R1
General JSA & Risk Assessment Shimizu_Rev.1 Revised based on comments in APD-0034 dated 23-Apr-2014
BBVN-FIVE-S2-SC-APD-0034/R2
General JSA & Risk Assessment Shimizu_Rev.2 Revised based on comments in APD-0034 dated 19-May-2014
Additional Document required (9 activities + Fire extinguisher point location on site - 4A3size drawings)
Proportion Mix Concrete for Construction (M20 10±2, M30 10±2, M30 14±2, M40 10±2, M40 14±2)
Concrete Testing report, Cement testing report, Fine aggregate testing report, Coarse aggregate testing report, Water aggregate testing, Admixture specification for trial mix
Proportion Mix Concrete for Construction (M20 10±2, M30 10±2, M30 14±2, M40 10±2, M40 14±2)
Approval for Shop Drawing 49
OUTGOING Rev. Date Issued Title Attachment Author/Delivered to StatusRequired Replied Date
INCOMING Issued Date
Date Delivered to Author
BBVN-FIVE-S2-SC-ASD-173(ADD.01) 14/10/14 14/10/15 14/10/20 5A3size drawings Thanh C
BBVN-FIVE-S2-SC-ASD-173(ADD.02) 14/10/18 14/10/21 14/10/20 6A3 size drawings Thanh B
BBVN-FIVE-S2-SC-TS-00016 14/03/26 Official Electric Meter Number showing dated 19 Feb 2014BBVN-FIVE-S2-SC-TS-00017 14/04/01 Cerfiticate basic scaffolding course (Tubular)_Vu Viet Anh
Quatity (Copies)
BV/SMZ FOR CON Chop
Benchmark Handover (Minutes of handover btw TONE, ACC & BBVN)
CVs & Project Organizational Chart; Quality Management Plan ; Project Execution Plan
1. BBVN-FIVE-S2-SC-AMS-0002-14 Method statement for temporary office, 2. BBVN-FIVE-S2-SC-LET-ENG-0001-14 Pile survey report, 3. BBVN-FIVE-S2-SC-4. BBVN-FIVE-S2-SC-ASD-0003-14 Approval for temporary site office shop drawingASD-0003-14 Approval for signboard shop drawing, RFI_0002, RFI_0003, Project Safety Plan, AME_001, AME_0002
4 Method statements AMS-003-006 (water supply, sewage water, temporary electricity, relocation of fire fighting) ,AMS-0001 (Pesticide), ADP-0006 (QCP-1), APD-0007 (QCP-2), RFI-0004 (Grid line survey)
AMASA_0002 (geotextile), AMS-0001/R1 Pre-condition survey method, RFI_0007 (hard copy of drawing with stamp)
Geotextile additional document (Company profile) + 8 contracts for reference of experience from TEINCO
Giay Chung nhan kiem dinh Dong ho nuoc Zenner- Comma/ Verification Certificate for Water Meter
BBVN-FIVE-S2-SC-TS-00018 14/04/02
BBVN-FIVE-S2-SC-TS-00019 14/04/04
BBVN-FIVE-S2-SC-TS-00020 14/04/05
BBVN-FIVE-S2-SC-TS-00021 14/04/14 RFC-0003 (M&E) Addition FD at ground and first floorBBVN-FIVE-S2-SC-TS/M&E-00022 14/04/15 Document, Drawing regarding ceiling, wall (Soft file)BBVN-FIVE-S2-SC-TS/M&E-00023 14/04/18
BBVN-FIVE-S2-SC-TS/M&E-00024 14/04/18 CD_AMEP (full)BBVN-FIVE-S2-SC-TS-00025 14/04/22 RFI Progress statusBBVN-FIVE-S2-SC-TS-00026 14/04/23 IN_AMEP (0013, 0013/R1, 0014, 0014/R1, 0016, 0019)BBVN-FIVE-S2-SC-TS-00027 14/04/24 IR FORMS for Earth Work & RC Works (9 Forms in total)BBVN-FIVE-S2-SC-TS-00028 14/04/26
Certificate for Pesticide Registration, Material Safety Data Sheet (for AMASA_0002_R1)
Giay chung nhan dang ky thue (Certificate of tax registration) (Notarized copy)
19 A3 size drawings REFERENCE for Space Management (Steel structure, M&E combine)
IN (ASD: 0008_00, AMEP: 0001/R1, 0002/R2, 0003/R1, 0004-00, 0005-00, 0006-00, 0007-00, 0008-00; AMS: 0003//R3, 0004/R1, 0005/R1, 0006/R1, 0007/R1, 0008/R1, 0009/R1, 0013-00); OUT (AMS: 0014, 0015, 0016)_ CD (Soft Files)
ASD_0005/R3 copy Pile cap Rev.3 (Revised based on comments in ASD-0005/R2 dated 03-Apr-2014) dated 12-Apr-2014
IN _ ASD_0006/R1 dated 15-Apr-2014 titled: Steel Structure_Rev.1 revised based on ASD_0006 dated 31-Mar-2014
Report of Taking Photograph and Surveying Actual Quality of B.Braun FIVE AP Construction Site Stage No.2
Report of Taking Photograph and Surveying Actual Quality of B.Braun FIVE AP Construction Site Stage No.2 (4 copies)
M&E Sample Board No.1 _ PPR for Cold Water System, GI Pipe for FF and Air Compressor, BS pipe for Chiller system
M&E Sample Board No. 2 _ u. PVC pipe&fittings for Condensate drain plumbing & Sanitary system, HDPE flexible for electric system, HDPE pipe for drainage system (compacted area)
M&E Sample Board No. 5 _ Steel Pipe & Fittings and Support of M&E Systems
Additional Document for AMASA-11 (Based on comments in AMASA-0011/R3 dated 31-May-2014)_Specification_Interlac 645
Foundation Pit & Concrete Body Plan (CBP).Rev2( Revised based on RFI-072)Drawing Ground Floor Beam Layout Plan (1 of 6)
Tender Submission documents for B. Braun Project from QS Hanoi to Tùng QS filing in construction site (Commercial Part_Original, Rev.1 & Rev.2)
Refer to AMASA-0025 dated 28-May-2014 regarding: Wire Mesh Sl52, SL82_Supplemental documents: (1) Song Hop Luc Weldmesh Co., Ltd - HLC Catalogue; (2) Song Hop Luc Weldmesh Co., Ltd - Certification & (3) Song Hop Luc Weldmesh Co., Ltd - List of Reference Projects
BBVN-FIVE-S2-SC-TS-00082 14/06/10
BBVN-FIVE-S2-SC-TS-00083 14/06/11 IN_ASD-0043/R1 & ASD-0044/R1BBVN-FIVE-S2-SC-TS-00084 14/06/11 List of FM Approved Materials (M&E and Building)BBVN-FIVE-S2-SC-TS-00085 14/06/11 Loose Furniture Quotation (PC sum) [2A3size pages]BBVN-FIVE-S2-SC-TS-00086 14/06/12 IN_ASD_0054/R1 dated 11-Jun-2014 Internal Staircase_Rev.1 For con red chop
BBVN-FIVE-S2-SC-TS-00087 14/06/12 For con red chop
BBVN-FIVE-S2-SC-TS-00088 14/06/12 Shop Drawing for Steel Door Installation (90A3size drawings)
BBVN-FIVE-S2-SC-TS-00089 14/06/12
BBVN-FIVE-S2-SC-TS-00090 14/06/13
BBVN-FIVE-S2-SC-TS-00091 14/06/13 FM Approval Materials (Building Material)_R1BBVN-FIVE-S2-SC-TS-00092 14/06/13 For con red chop
BBVN-FIVE-S2-SC-TS-00093 14/06/13 For con red chop
BBVN-FIVE-S2-SC-TS-00094 14/06/13 For con red chop
Additional Document for TS_91 dated 13/June/2014 regarding FM Approval Materials for Building (refer to Item No. 13 - Fire Resistant Door _ 120 minutes)_ English translation
IN_ASD-0059/R2 dated 19-June-2014 regarding Ground Beam for Zone 3 _ Rev.2
IN_ASD-20 (Replaced 1 drawing, A3size) MEZZ Floor Beam Layour Plan (4 of 6)
IN_ASD-83 dated 25-Jun-2014 Rebar Arrangement for Stormwater System (A, B, D), IN_ASD-85 dated 25-Jun-2014 Rebar Arrangement for Stormwater System ( C )
2 Minutes of Hand-over Material of Owner (Pole Lighting, Lighting Fixture, Pole Camera, Dome Camera)_6 items
IN_ASD-26/R1 dated 19-May-2014 revised 2 A3size drawings following comments
Refer to AMASA-46 dated 12-June-2014; Clean Room Window - Tempered Glass Cerfiticate _ Purchase Order (Stage 1) from Channel Systems
Refer to MOM 20 (item 11.18.2)_ Factory Acceptance for Compress Air
BBVN-FIVE-S2-SC-TS-00120 14/07/03
BBVN-FIVE-S2-SC-TS-00121 14/07/03 For con chop
BBVN-FIVE-S2-SC-TS-00122 14/07/04
BBVN-FIVE-S2-SC-TS-00123 14/07/05
BBVN-FIVE-S2-SC-TS-00124 14/07/05
BBVN-FIVE-S2-SC-TS-00125 14/07/05
BBVN-FIVE-S2-SC-TS-00126 14/07/07 IN_MOM_21BBVN-FIVE-S2-SC-TS-00127 14/07/07 Quotation and Furniture LayoutBBVN-FIVE-S2-SC-TS-00128 14/07/08
Welding Procedure Specification (WPS) and Welding Certificate 6G Refer to AMS-54 dated 2-July -2014IN- ASD-0026R1FIRST FLOOR BEAM LAYOUT PLAN (1 OF 6) -(R.3) SD-Beam -1FL-141-HBPE-S-CD-MB-261-1/6FIRST FLOOR BEAM LAYOUT PLAN (1 OF 6) -(R.3) SD-Beam -1FL-141-HBPE-S-CD-MB-261-1/6IN-ASD-00771FL SLAB TOP X REINFORCEMENT (R.2) SD-BBS-1FL-141-HBPE-S-CD-MB-217 - TOP X1FL SLAB TOP Y REINFORCEMENT (R.2) SD-BBS-1FL-141-HBPE-S-CD-MB-217 - TOP Y1FL SLAB TOP X REINFORCEMENT(R.2) SD-BBS-1FL-141-HBPE-S-CD-MB-218 - BOT X1FL SLAB TOP Y REINFORCEMENT(R.2) SD-BBS-1FL-141-HBPE-S-CD-MB-218 - BOT Y1FL SLAB SECTION AND DETAIL (R.2) SD-BBS-1FL-141-HBPE-S-CD-MB-217-Detail
Refer to Letter BBVN-FIVE-S2-SC-LTR-0016 FM Approval Materials_Rev.2 based on Letter BB-137206/6011/SMZ-140703/D228 List of EM Approved Materials_Rev.2; Catalogue: Automatic air vent c/w gate valve for Pre-action, Heat Detector, Smoke sampling detection system fire alarm; Flow switch, Pressure switch
IN_AMS-28 MS.BLD-09_dated 15-May-2014: XYPEX Waterproofing for Under Slab
IN-APD-37 dated 7-july-2014 Quality Control Plan for Road & Stormwater Works (QCP-9)
Red bill (VAT) for completed amount No.2 for BB Project dated 22-May-2014
IN_NCR-05, 06 dated 11-July-2014: GI Piping Procedure & Welding Procedure
IN_D258 dated 14-July-2014: (RFC-069) Relocation of By-pass valve from Walkable ceiling to inside Toolshop room and additional ball valve (Process Chilled water system)
IN-APD-0008/R3 dated 22-Apr-2014 Inspection and Testing Plan (ITP)_Rev.3
Embeded Plate (PL8, PL12 Q345B) Test Result & Steel Bar (D12, D16) Test Result
Letter to Ministry of Industry & Trade (Goods and products to be imported), Ist of goods and products to be imported, Investment lisence of B. B dated 31-Aug-2011
BBVN-FIVE-S2-RFC-0073Modification of Data and Voice System Schematic Diagram
IN-APD-25/R1 dated 9-May-2014 Clean Construction Protocol for Clean Room& IN-APD-53 dated 19-June-2014 Access Control Layout for Clean Room Revised based on comments in APD-0025/R1 dated 9-May-2014
IN_ASD-96/R2 dated 17-July-2014 Rebar arrangement for Septic tank rev.2 and IN_ASD-117/R1 dated 17-July-2014 Rebar arrangement for Pump Pit No.1
IN_D253 dated 11-July-2014 (RFC-67) IT System Wifi Relocation & IN_D254 dated 11-July-2014 (RFC-68) Process Exhaust System for Toolshop Room
IN_SMZ-140716/D265 dated 16-July-2014 (RFI-159) Pre-action System
IN_AMS-27 dated 20-June-2014 MS-BLD-10 Roofing & Waterproofing for roof
BBVN-FIVE-S2-SC-TS-00150 14/07/21
BBVN-FIVE-S2-SC-TS-00151 14/07/21 IN_ASD-109 dated 21-July-2014 Main Building Phase 2.1 Elevation Red For Conchop
BBVN-FIVE-S2-SC-TS-00152 14/07/22
BBVN-FIVE-S2-SC-TS-00153 14/07/23 IN_ASD-107/R1 dated 22-July-2014 Crane _ Rev.1 For con red chop
BBVN-FIVE-S2-SC-TS-00158 14/07/28 IN_MOM_24BBVN-FIVE-S2-SC-TS-00159 14/07/30 CD_EVN Document (Soft files)BBVN-FIVE-S2-SC-TS-00160 14/07/31 For con red chop
BBVN-FIVE-S2-SC-TS-00161 14/07/31
BBVN-FIVE-S2-SC-TS-00162 14/07/31 For con red chop
BBVN-FIVE-S2-SC-TS-00163 14/07/31 Incident Investigation Report No.1BBVN-FIVE-S2-SC-TS-00164 14/08/01 IN_MOM 25BBVN-FIVE-S2-SC-TS-00165 14/08/01 Pending/Remaining Material for Approval BBVN-FIVE-S2-SC-TS-00166 14/08/02 Purlin Test Result (Zinc coating, Tension strength)BBVN-FIVE-S2-SC-TS-00167 14/08/02
BBVN-FIVE-S2-SC-TS-00168 14/08/04 Cash Flow (end of July) (1A3page)BBVN-FIVE-S2-SC-TS-00169 14/08/04
BBVN-FIVE-S2-SC-TS-00170 14/08/04
IN_SI-34 dated 21-July-2014 Submission of Holiday Tester for FF System (Underground Pipe)
IN_BV-137206/6011/SMZ-140722/D276 dated 22-July-2014 Minutes Project walkthrough Stage 1 on 18th & 21st July 2014
Test Result of Purlin Strength, Decking Strength, Anchor Bolts (M20, M24) Strength
IN_ASD-102/R3_ 1& 2 dated 30-July-2014 Bar Bending for Ground Slab Zone 2, Zone 3_Rev.3_Part 1 &@ (Zone 2 & Zone 3) Revised based on comments in ASD-102/R2 dated 14-July-2014
BBVN-FIVE-S2-SC-TS-00187 14/08/15 IN-ASD-110/R1 (39A3size drawings)BBVN-FIVE-S2-SC-TS-00188 14/08/15BBVN-FIVE-S2-SC-TS-00189 14/08/15 OUT - AMS-64 Dated 18 July 2014 MS-50: Honeycomb treatment
BBVN-FIVE-S2-SC-TS-00190 14/08/16 2 copies/each
BBVN-FIVE-S2-SC-TS-00191 14/08/18 Acceptance Order & Acceptance Board Establishment Decision
BBVN-FIVE-S2-SC-TS-00192 14/08/18
BBVN-FIVE-S2-SC-TS-00193 14/08/18 IN_MOM-26&27BBVN-FIVE-S2-SC-TS-00194 14/08/18 FM Approval Materials (Additional item for FM Approval)BBVN-FIVE-S2-SC-TS-00195 14/08/18 QC Site Check (16 & 18 August 2014)_9pages
BBVN-FIVE-S2-SC-TS-00222 14/08/26 1 For con red chop
BBVN-FIVE-S2-SC-TS-00223 14/08/27 IR-250 & 287 with signature 2 with signatureBBVN-FIVE-S2-SC-TS-00224 14/08/27 1 For con red chop
BBVN-FIVE-S2-SC-TS-00225 14/08/27 06; 06; 02; 02 Original (red chop)
BBVN-FIVE-S2-SC-TS-00226 14/08/28 1
BBVN-FIVE-S2-SC-TS-00227 14/08/28 1 COPPY
Contract on Compensation Insurance for Labor (HUNG TRANG); (ii) Certificate for Construction Machines and Equipment Insurance & Certificate for Personal Accident Insurance (HUNG TRANG); (iii) Construction Machines and Equipment Insurance (SEICO); (iv) Certificate for Personal Accident 24/24 Insurance (VIEN DONG); (v) Contract on Compensation Insurance for Labor (North Star)
Bien ban nghiem thu giai doan hoan thanh (Minutes of Inspection & Acceptance of Stage Completion: Preliminary inspection for substation & MV)
Official Original (Red chop)
Package of Main Contractor (Monthly Statement No.4)_Interim payment
Loose Furniture Quotation (PC sum) [2A3size pages] (Refer to AMASA_0028); Labor Insurance for Dang Minh (SEICO)
Copy (with signature)
FM Approval Materials (Additional item for FM Approval)_FM plan review No. 191722
IN_ASD-129/R1 dated 26-August-2014 AHU Plenum Extension_Stage 1_Rev.1 (1A3size drawing)
IN_Minutes of Inspection & Acceptance of Tie-in Works: Sub-station & MV Inspection record (cable 35kV)Transformer 2000kVA 35(22)/0.4 kVPanel, cable LV, out going (dated 25/08/2014); Minutes of Inspection & Acceptance of Completion and Put into Use (dated 27/08/2014): Correspondence No.01/140826 pertaining Signing of Electrical Contract (dated 25/08/2014); EVN Contract (14/190002)
IN-ASD-128 AHU Concrete Body Plan Extension _ Stage 1_Rev.1 Revised based on comments in ASD-128 dated 7-Aug-2014
BBVN-FIVE-S2-SC-TS-00228 14/08/29 Comments on Site Instructions (28-August-2014)_2A1size photos 1 Color copy
BBVN-FIVE-S2-SC-TS-00229 14/08/30 Result of Checking Slab Level (2A3size pages) 1 CopyBBVN-FIVE-S2-SC-TS-00230 14/09/01 Bảo lãnh thực hiện hợp đồng số 709BG01400357 1 Original (red chop)
Contract Implementation Bank Guarantee (Deutsche Bank for Electricity Sale/Consumption), 2 copies of Electricity Sale/Consumption Contract & 2 original official copies; Minutes of Meeting Checking the electricity sale rate determination
IN_SI-59 dated 5-September-2014 M&E Items at Stage 1 area / Preparation for Saturday 6th power off
IN_SMZ-140905/D353 dated 5-September-2014 (RFI-190) Weight Capacity Suspended on Purlin
6 Original Minutes of handover after 72hour Power on dated 3-Sep-/2014; 2 original EVN Contract (14/190002) dated 5-Sep-2014; 2 original of Electrical Selling Rate (dated 5-Sep-2014)
IN_ASD_0030 dated 19-August-2014 Ground floor and 1st floor ceiling_Rev.3
IN_AMS-95 dated 29-August -2014 MS-BLD.52: Warehouse Wall Demolition for Roller Shutter ; IN_APD-58/R1 dated 9-September-2014 Quality Control Plan for Waterproofing Work (QCP-5)_Rev.1
MOM Item No. 11.32.4Flushing method for Ro, PCW Open loop & Close Loop Tie-in Work
Brick wall elevation axis U (opening locations_design)_1A3size drawing
Integrity Report BBVN-FIVE-S2-SC-New Building Project. Warehouse Area- Water Leakage 20140813- Occurrence, Suspected cause of occurrence, Rectification Procedure, Integrity Checking, Appendix
MOM No.31 Item No.11.30.8 (Production Area Illumination_Calculation)
HEPA Box confirmation letter from INOCHI Technology SDN BHD; Document hand-over for construction finalization
HAFELE lock document (23A4 pages); OUT_ASD-80/R4 dated 6-September-2014 Shop Drawing for Steel Door Installation with Mr. Hoa's signature
BBVN-FIVE-S2-SC-TS-00297 14/10/10 Drawings: 1 CopyClean Room Key Plan
FIKE Design Information - Ckean Agent System W/Impulse Technology HFC-227EA Agent
Ho so hoan cong: Nang cong suat tram bien ap (As-Built document: Improve the transformer capacity) 2000kVA-35(22)/0.4kV
NCR-23 dated 1-October-2014 Unsatisfactory welding quality on sarnafil layer gridline (L-N&20-21) and CSA3-OCT-2014
IN_APD-0008/R3 dated 22-April-2014 ITP rev.3 and IN_APD-68/R1 dated 22-September-2014 Quality Control Plan for Floor Finishing Works_QCP-8 (1)_Rev.1
DKE comments on drawings for PCCC Resubmission (7A3size drawings) (refer to DT119 dated 8-Oct-2014 from BB); DIA Lux Thorn 96 535 724 DUOPRF 3x36W T26 HF IP65 L840 [STD] Luminaire Data Sheet
IN-AMS-65/R1 dated 19-September-2014: MS-BLD.51- Demolition Work for Office Area & Column A12_Rev.1 Revised based on comments in AMS-65 dated 7-August-2014
IN-AMS-110(A)/R1 datd 9-Oct-2014 MS-BLD.14-C-1: Finishing Works- (Flooring Epoxy Floor)Revised based on comments in AMS_110 dated 18- Sep- 2014 and IN-AMS-110 (C )/R1 dated 9-Oct-2014 MS-BLD.14-C-3: Finishing Works- (Moisture Barrier)Revised based on comments in AMS_110 dated 18- Sep- 2014
IN_AMS-120 dated 14-October-2014 MS-55 Waterproofing for bathrooms & Others Wet Areas; IN_APD-77/R1 dated 14-October-2014 Quality Control Plan for Finishing Work_Painting for Wall & Ceiling (QCP-8 (2))_Rev.1; IN_APD-83 dated 14-October-2014 Quality Control Plan for Ceiling Work (QCP-8 (3))
IN_APD-77/R1 dated 14-October-2014 Quality Control Plan for Finishing Work_Painting for Wall & Ceiling (QCP-8 (2))_Rev.1
IN_APD-77/R1 dated 14-October-2014 Quality Control Plan for Finishing Work_Painting for Wall & Ceiling (QCP-8 (2))_Rev.1
IN_APD-77/R1 dated 14-October-2014 Quality Control Plan for Finishing Work_Painting for Wall & Ceiling (QCP-8 (2))_Rev.1; IN_APD-83 dated 14-October-2014 Quality Control Plan for Ceiling Work (QCP-8 (3))
IN_APD-83 dated 14-October-2014 Quality Control Plan for Ceiling Work (QCP-8 (3))
Updated List of Mock-up, Remaining Material List, Main Equipment List (M&E)
IN_APD-85 dated 17-October-2014 Quality Control Plan for Partition Work (QCP-8 (4))
BV-137206/6011/SMZ-141016/D397 (RFC-128 dated 17-OCT-2014) Power Distribution System Modification
(MOM Item 9.42) FM 200 Refilling Station at Hochiminh city, Vietnam
Sprinkler Head Inspection (3A3size photos, checklist/check sheet, 1A3size drawing)
BBVN-FIVE-S2-SC-TS-00333 14/11/07 VAT Red Bill For IPC No.06 1 Original BBVN-FIVE-S2-SC-TS-00334 14/11/07 Monitoring Panel Table for Power On Schedule 1 copyBBVN-FIVE-S2-SC-TS-00335BBVN-FIVE-S2-SC-TS-00336BBVN-FIVE-S2-SC-TS-00337BBVN-FIVE-S2-SC-TS-00338BBVN-FIVE-S2-SC-TS-00339BBVN-FIVE-S2-SC-TS-00340BBVN-FIVE-S2-SC-TS-00341BBVN-FIVE-S2-SC-TS-00342BBVN-FIVE-S2-SC-TS-00343BBVN-FIVE-S2-SC-TS-00344BBVN-FIVE-S2-SC-TS-00345BBVN-FIVE-S2-SC-TS-00346BBVN-FIVE-S2-SC-TS-00347BBVN-FIVE-S2-SC-TS-00348BBVN-FIVE-S2-SC-TS-00349BBVN-FIVE-S2-SC-TS-00350BBVN-FIVE-S2-SC-TS-00351BBVN-FIVE-S2-SC-TS-00352BBVN-FIVE-S2-SC-TS-00353BBVN-FIVE-S2-SC-TS-00354BBVN-FIVE-S2-SC-TS-00355BBVN-FIVE-S2-SC-TS-00356BBVN-FIVE-S2-SC-TS-00357
BV-137206-1009-140428/HSI05 14/04/28 Water Discharge on adjacent Properties Nguyen, Hoang safetyBV-137206-1009-140428/HSI06 14/04/28 Installation for Lightning system (SMZ & Vinaconex Office) Nguyen, Hoang safetyBV-137206-1009-140505/HSI07 14/05/05 Request for Cleaning Up Public road and Drain Stagnant water 4A4size photos Nguyen, Hoang safety
BV-137206-1009-140514/HSI08 14/05/14 Sadety ImprovementBV-137206-1009-140519/HSI09 14/05/19 Request Safety Issue 7A4size photos Nguyen, Hoang safety, QuangBV-137206-1009-140521/HSI10 14/05/22 Incompliance of minimum HSE Equipments 1A4size photo Nguyen, Hoang safetyBV-137206-1009-142305/HSI11 14/05/23 Improvement of Security entrance post Nguyen, Hoang safetyBV-137206-1009-142405/HSI12 14/05/24 Cable isolation and arrangement 3A4size photos Nguyen, Hoang safety, Quang M&EBV-137206-1009-143005/HSI13 14/05/30 Control Speed of Heavy Trucks on Site 1A4size photo Nguyen, Hoang safety, Quang M&EBV-137206-1009-140623/HSI14 14/06/23 Unsafe Access of Ramp 1A4size photo Nguyen, Hoang Safety, TuBV-137206-1009-140623/HSI15 14/06/23 Wearing Safety Glass on Site Nguyen, Hoang Safety, TuBV-137206-1009-140630/HSI16 14/06/30 Set up life line system for working at height 1A4size photo Nguyen, Hoang Safety, TuBV-137206-1009-140702/HSI17 14/07/02 Set up Stable Access for Heavy Crane 2A4size photos Nguyen, Hoang Safety, TuBV-137206-1009-140701/HSI18 14/07/03 Working platform for rebar and transfering material 3A4size photos Nguyen, Hoang Safety, TuBV-137206-1009-140708/HSI19 14/07/08 Protect web sling 2A4size photos Nguyen, Hoang Safety, TuBV-137206-1009-140711/HSI20 14/07/11 Housekeeping at Stage 1 4A4size photos Nguyen, Hoang Safety, TuBV-137206-1009-140711/HSI21 14/07/11 Set up safety net system 1A4size photo Nguyen, Hoang Safety, TuBV-137206-1009-140717/HSI22 14/07/17 Covering all openings of gridline 12 2A4size photos Nguyen, Hoang Safety, TuBV-137206-1009-140718/HSI23 14/07/18 No Smoking at roof of main building 1A4size photo Nguyen, Hoang Safety, TuBV-137206-1009-140723/HSI24 14/07/23 Pumping Stagant Water 2A4size photos Nguyen, Hoang Safety, TuBV-137206-1009-140723/HSI25 14/07/23 Covering the gap for the cladding of column GL 12-A 1A4size photo Nguyen, Hoang Safety, TuBV-137206-1009-140731/HSI26 14/07/31 Sprinkler pipe system protection 1A4size photo Nguyen, Hoang Safety, Tu, QuangBV-137206-1009-140805/HSI27 14/08/05 Missing PPE 2A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140805/HSI28 14/08/05 Housekeeping Materials and tools 2A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140811/HSI29 14/08/11 Washing Bay Improvements 2A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140806/HSI30 14/08/06 Protection the Floor at Storage area 2A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140812/HSI31 14/08/12 HSE Supervisor at night shift Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140822/HSI32 14/08/22 Damage Road at Stage 1 1A4size photo Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140909/HSI33 14/09/09 Housekeeping on site 3A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140910/HSI34 14/09/10 Hard Barricade a visitor balcony area 2A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140910/HSI35 14/09/11 Working with scissor lift 1A4size photo Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140918/HSI36 14/09/18 Concrete beam is impacting the scaffolding 1A4size photo Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140918/HSI37 14/09/18 Housekeeping on site 2A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140918/HSI38 14/09/18 Unsafe Working Conditions 3A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140922/HSI39 14/09/22 Unsafe Working Condition 1A4size photo Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140922/HSI40 14/09/22 Unsafe Working Condition 6A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140922/HSI41 Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140930/HSI42 14/09/30 Unsafe Conditioin at 12 Gridline Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-141003/HSI43 14/10/03 Lifeline System 2A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-141009/HSI44 14/10/09 Lighting Condition 1A4size photo Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-141011/HSI45 14/10/11 Personal Protective Equipment 3A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-141011/HSI46 14/10/11 Housekeeping at AHU area 4A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-141003/HSI47 14/10/20 Working at height 2A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-141103/HSI48 14/11/03 Unsafe Scaffolding at Gridline Z 5A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-141103/HSI49 14/11/03 Concrete on the Top of Column at Gridline 12 2A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-141103/HSI50 14/11/03 Dust on Walkable Ceiling 8A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-141105/HSI51 14/11/05 Unsafe Activities at Stage 1 10A4 photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-141106/HSI52 14/11/06 Training Protocol 1at Clean Stage at Clean Room Area 3A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-141003/HSI53
Request for Installation electric cabinet and warning sign at live cable, stop pumping water at site
Request for installation hard barricade for deep hole, provide rubbish bin and toilet temporary at site
Request for installation drainage system and cover electric wire at washing bay
Request for checking during night time at project area and bilingual permit to work
Correspondence submission to PCI 244
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 245
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 246
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 247
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 248
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 249
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 250
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 251
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 252
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 253
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 254
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 255
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 256
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 257
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 258
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 259
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 260
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 261
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 262
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 263
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 264
Code/Ref. Issued Date Title Attachment Delivered to
45.00
Correspondence submission to PCI 265
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 266
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 267
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 268
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 269
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 270
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 271
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 272
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 273
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 274
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 275
Code/Ref. Issued Date Title Attachment Delivered to
Correspondence submission to PCI 276
Code/Ref. Issued Date Title Attachment Delivered to
+
Correspondence submission to PCI 277
Correspondence submission to PCI 278
Correspondence submission to PCI 279
Correspondence submission to PCI 280
Correspondence submission to PCI 281
Correspondence submission to PCI 282
Correspondence submission to PCI 283
Correspondence submission to PCI 284
Correspondence submission to PCI 285
Correspondence submission to PCI 286
Correspondence submission to PCI 287
Correspondence submission to PCI 288
Correspondence submission to PCI 289
Correspondence submission to PCI 290
Correspondence submission to PCI 291
Correspondence submission to PCI 292
Correspondence submission to PCI 293
Correspondence submission to PCI 294
Correspondence submission to PCI 295
Correspondence submission to PCI 296
Correspondence submission to PCI 297
Correspondence submission to PCI 298
Correspondence submission to PCI 299
Correspondence submission to PCI 300
Correspondence submission to PCI 301
Correspondence submission to PCI 302
Correspondence submission to PCI 303
Correspondence submission to PCI 304
Correspondence submission to PCI 305
Correspondence submission to PCI 306
Correspondence submission to PCI 307
1,244,000
Correspondence submission to PCI 308
Correspondence submission to PCI 309
Correspondence submission to PCI 310
Code/Ref. Issued Date Title Attachment Delivered to
BV-137206/609/130826/SC/SI-01 14/03/12 Mr. Tu, Nguyen, Hoang Safety
BV-137206/609/130826/SC/SI-01 14/07/27 Earthworks. Backfilling of Stage 2 area Mr. Tu, Nguyen, Hoang SafetyBV-137206/609/140516/SC/SI-02 14/05/16 Foundation Works. Improvement for next stages 5A4 photos Mr. Tu, Nguyen, Hoang SafetyBV-137206/609/140521/SC/SI-03 14/05/21 Foundation Works. Waiting bar for ground slad 1A4size photo Mr. Tu, Nguyen, Hoang SafetyBV-137206/609/140526/SC/SI-04 14/05/26 Improvement of Concrete Quality Tu, Nguyen, Tuan Anh/Hoang QCBV-137206/609/140526/SC/SI-05 14/05/26 Schedule Recovery Plan 1A3size page
BV-137206/609/140529/SC/SI-06 14/05/29 Report after Inspection at SEICO (Steel Structure Supplier) Factory All SMZ members (email)
BV-137206/609/140530/SC/SI-07 14/05/31 Ground Beam SleeveBV-137206/609/140609/SC/SI-08 14/06/09 Tu, Nguyen, Tuan Anh
BV-137206/609/140609/SC/SI-09 14/06/09 Concrete Curing Progress Tu. Nguyen, Tuan AnhBV-137206/609/140610/SC/SI-10 14/06/10 Backfilling Method 1A4size photo Tu. Nguyen, Tuan AnhBV-137206/609/140610/SC/SI-11 14/06/10 Backfilling Material 1A4size photo Tu. Nguyen, Tuan AnhBV-137206/609/140618/SC/SI-12 14/06/18 Welding Issue on Factory 1A4size photo Tu, Tuan Anh BV-137206/609/140618/SC/SI-13 14/06/18 Concrete for Footing 1A4size photo Tu, Tuan Anh BV-137206/609/140619/SC/SI-14 14/06/19 Rain Water pipe position Tu. Nguyen, Tuan AnhBV-137206/609/140619/SC/SI-15 14/06/19 Embeded steel plate 1A4size photo Tu. Nguyen, Tuan AnhBV-137206/609/140627/SC/SI-16 14/06/27 Scratch positions during transportation and unloading steel structure 2A4size photos Tu. Nguyen, Tuan Anh
BV-137206/609/140702/SC/SI-18 14/07/02 Submittal of Shop Drawing for M&E opening and embeded item Tu, Quang, Cuong
BV-137206/609/140703/SC/SI-19 14/07/03 3A4size photos Tu. Nguyen, Tuan Anh
BV-137206/609/140703/SC/SI-20 14/07/03 Steel Structure Schedule Tu, Tuan Anh BV-137206/609/140711/SC/SI-21 14/07/11 Removal of Underground GI piping works at warehouse area 2A4size photos Tu, Nguyen, Quang
BV-137206/609/140703/SC/SI-22 14/07/14 Verticalityof concrete column Tu, Nguyen, Tuan AnhBV-137206/609/140717/SC/SI-23 14/07/17 Honeycomb of Column GL21Y 2A4size photos Tu, Nguyen, Tuan AnhBV-137206/609/140703/SC/SI-24 14/07/14 Surface of concrete column 3A4size photos Tu, Nguyen, Tuan AnhBV-137206/609/140717/SC/SI-25 14/07/17 Shop Drawing for bar bending for ground slab Zone 2, Xone 3 Tu, Phuc, Nguyen
BV-137206/609/140703/SC/SI-26 14/07/17 Warning of sub-concrete column along axis 21 1A4size photo Tu, Nguyen, Tuan Anh BV-137206/609/140703/SC/SI-27 14/07/17 Protection for mezzanine floor 1A4size photo Tu, Nguyen, Tuan Anh BV-137206/609/140703/SC/SI-28 14/07/17 Quality of Painting for roof bracing 3A4size photos Tu, Nguyen, Tuan Anh BV-137206/609/140703/SC/SI-29 14/07/17 Lean Concrete surface before applying Xypec 2A4size photos Tu, Nguyen, Tuan Anh BV-137206/609/140703/SC/SI-30 14/07/19 Notice during loading and unloading progress 1A4size photo Tu, Nguyen, Tuan Anh BV-137206/609/140703/SC/SI-31 14/07/19 Aluminum Cladding Material Tu, Nguyen, Tuan Anh BV-137206/609/140703/SC/SI-32 14/07/19 Testing Results Submission Tu, Nguyen, Tuan Anh BV-137206/609/140719/SC/SI-33 14/07/19 Technical document of torque wrench Tu, Nguyen, Tuan Anh BV-137206/609/140721/SC/SI-34 14/07/21 Submission of Holiday Tester for FF System (Underground Pipe) Tu, Nguyen, Quang, (T. Anh), Mike
BV-137206/609/140724/SC/SI-35 14/07/24 5A4 photos Tu, Nguyen, T. Anh, Mike
BV-137206/609/140724/SC/SI-36 14/07/24 Quality Document Control Tu, Nguyen, T. Anh, MikeBV-137206/609/140728/SC/SI-37 14/07/28 Brickwork issues 1A4size photo Tu, Nguyen, T. Anh, MikeBV-137206/609/140731/SC/SI-38 14/07/31 Brickwork issues 2nd time 3A4size photos Tu, Nguyen, T. Anh, MikeBV-137206/609/140731/SC/SI-39 14/07/31 Heavy Rain during Casting Concrete 3A4size photos Tu, Nguyen, T. Anh, MikeBV-137206/609/140731/SC/SI-40 14/07/31 Preventive action for Casting Concrete at Ground Slab Tu, Nguyen, T. Anh, MikeBV-137206/609/140731/SC/SI-41 14/07/31 Correct Damage Rebar at Ground Beam 1A4size photo Tu, Nguyen, T. Anh, MikeBV-137206/609/140802/SC/SI-42 14/08/02 2A4size photos Tu, Nguyen, Mike, Quang
BV-137206/609/140802/SC/SI-43 14/08/02 Submission of Holiday Tester for FF System (Underground Pipe) Tu, Nguyen, Mike, Quang
BV-137206/609/140802/SC/SI-44 14/08/02
Request for Installation electric cabinet and warning sign at live cable, stop pumping water at site
Tu, Nguyen, Tuan Anh, Quang, Thanh, Tung QS
Report after Inspection at SEICO (Steel Structure Supplier) Factory 2nd time
21A4 size page photos (4 photos)
Rainwater pipe joining fusion welding Works for underground rainwater pipe of Stage 2 area
1A4size drawing, 1 A4size schedule
Scratch positions during transportation and unloading steel structure 2nd time)
Protection and Caring of Installed Rain Water Pipe along GL a and GL Z
Protection and Proper Covering of Sewer and rian manhole and stormline and sealing of HDPE pipe sleeve
Correspondence submission to PCI 311
Code/Ref. Issued Date Title Attachment Delivered to
BV-137206/609/140805/SC/SI-47 14/08/05 Concrete Beam B3-axis 14A(E-G) bending 1A4size photo Tu, Nguyen, MikeBV-137206/609/140805/SC/SI-48 14/08/05 Existing roof issues 4A4size photos Tu, Nguyen, MikeBV-137206/609/140805/SC/SI-49 14/08/05 Zone 2 M&E Installation Works Tu, Nguyen, Mike, QuangBV-137206/609/140805/SC/SI-50 14/08/05 Backfilling Issue axis G-E 1A4size photo Tu, Nguyen, MikeBV-137206/609/140805/SC/SI-51 14/08/05 Roof Installation issue 4A4size photos Tu, Nguyen, MikeBV-137206/609/140807/SC/SI-52 14/08/07 Flatness of ground slab 1A4size photo Tu, Nguyen, MikeBV-137206/609/140807/SC/SI-53 14/08/07 Delivered and Accepted Rain Water Pipe Material (HDPE) 1A4size photo Tu, Nguyen, Mike, QuangBV-137206/609/140807/SC/SI-54 14/08/07 Prevent Rain Water Coming to Phase 1-Roof Area 3A4size photos Tu, Nguyen, Mike, QuangBV-137206/609/140809/SC/SI-55 14/08/11 Installation of Exposed rain water pipe along GL Z at warehouse area 2A4size photos Tu, Nguyen, Mike, Quang
BV-137206/609/140812/SC/SI-56 14/08/13 Quality Document Preparation Before Inspection From Authority
BV-137206/609/140822/SC/SI-57 14/08/22 Delivered AHU at Material Assembly Area at Stage 1 (Parking Area) 1A4size photo Tu, Nguyen/Phuc, Mike, Quang, T.Anh
BV-137206/609/140829/SC/SI-58 14/08/29 Store Material Properly 2A4size photos Tu, Nguyen, T.Anh, MikeBV-137206/609/140905/SC/SI-59 14/09/05 M&E Items at Stage 1 area / Preparation for Saturday 6th power off Tu, Nguyen, T.Anh, Mike, Quang NS
BV-137206/609/140922/SC/SI-60 14/09/22 Brickwork Defect 3A4size photos Tu, Nguyen, T.Anh, MikeBV-137206/609/140922/SC/SI-61 14/09/22 Repair water leak on roof before applying insulation layers Tu, Nguyen, T.Anh, MikeBV-137206/609/140923/SC/SI-62 14/09/23 Stainless Steel Piping Work 1A4size photo Tu, Nguyen, Quang, MikeBV-137206/609/140924/SC/SI-63 14/09/24 Stage 1 main air duct installation (Handling & moving) 1A4size page Tu, Nguyen, T.Anh, MikeBV-137206/609/140925/SC/SI-64 14/09/25 Storage material on Site 1A4size photo Tu, Nguyen, T.Anh, MikeBV-137206/609/140926/SC/SI-65 14/09/26 Air Particle Counting inside Stage 1 Clean Room 6A4size photoBV-137206/609/140926/SC/SI-66 14/09/26 Damage of underground sevices at Ramp Extension area 5A4 photosBV-137206/609/141002/SC/SI-67 14/10/02 Underground pipe at technical building stage 1 1A4size photo Tu, Nguyen, Quang, MikeBV-137206/609/141003/SC/SI-68 14/10/03 Unsatisfactory Frame for Dry Wall at gridline E 1A4size photo Tu, Nguyen, T.Anh, MikeBV-137206/609/141008/SC/SI-69 14/10/08 Inadequate Protection of AHU Parts and Other Material 1A4size photo Tu, Nguyen, T.Anh, Mike, QuangBV-137206/609/141104/SC/SI-70 14/11/04 Welding Process Approved Parameters (External Fire Fighting Pipe) Tu, Nguyen, Mike, Quang
BV-13720/802/140621/SC/NCR-09 14/08/11 Column Honeycomb (Axis 21-Y)_FINAL Tu, Nguyen, Tuan Anh
BV-13720/802/140721/SC/NCR-10 14/07/21 Damaged Main Rebar & Tie Bar (GL-16 &Q-R) 1A4size photo Tu, Nguyen, Tuan AnhReply 14/10/01 Damaged Main Rebar & Tie Bar (GL-16 &Q-R) 1A4size photo Tu, Nguyen, Tuan Anh
BV-13720/802/140812/SC/NCR-14 14/08/13 Deformed Anchor Bolt at top of Column (A, E-13A, A-E-14A) 2A4size photos Tu, Nguyen, Tuan Anh, Mike
BV-13720/802/140829/SC/NCR-15 14/08/29 Crack on top of column coordinate E-13A 1A4size photo Tu, Nguyen, Tuan Anh, Mike
BV-13720/802/140915/SC/NCR-16 14/09/15 Electrical Earth Wire Insulation Color Tu, Nguyen, Tuan Anh, Mike
BV-13720/802/140922/SC/NCR-17 14/09/22 Wrong Technic in brick work 1A4size photo Tu, Nguyen, Tuan Anh, Mike
14/09/22 Wrong Technic in brick work Tuan AnhBV-13720/802/140922/SC/NCR-17 14/11/07 wrong Technic in brick work_FINAL (APPROVED) 1A4size photo Mrs. Lan QC
BV-13720/802/140922/SC/NCR-17 (/R1) 14/09/24 Wrong Technic in brick work (not acceptable_Resubmit) Tu, Nguyen, Tuan Anh, Mike
BV-13720/802/140924/SC-NCR-18 14/09/26 Septic tank & Pump pit work 1A4size photoBV-13720/802/140924/SC-NCR-18 14/10/14 Septic tank & Pump pit work_Repair work 1A4size photo Ba HoaBV-13720/802/140924/SC-NCR-18 14/11/05 Septic tank & Pump pit work_Repair work_Rejected 1A4size photo
BV-13720/802/140929/SC-NCR19 14/09/30 Sealant for AHU Cleanroom Grade 7A4size photo
BV-13720/802/140930/SC-NCR-20 14/09/30 Supply Air Duct Method of Fabrication Stage 1 4A4size photo
BV-13720/802/140930/SC/NCR-21 14/09/30 Air Duct Method of Fabrication Stage 2 4A4size photo
BV-13720/802/140930/SC/NCR-22 14/09/30 Air Duct Hanger Support Method 3A4size photo
BV-13720/802/141001/SC/NCR-2314/10/01
3A4size photo
BV-13720/802/140
BV-13720/802/141010/SC/NCR-25 14/10/10 Brickwork defect at gridline 15A (E-G) 1A4size photo Tuan Anh
14/11/07 Brickwork defect at gridline 15A (E-G)_REPLY 2A4size photos Mrs. Lan QC
BV-13720/802/141010/SC/NCR-25 14/11/07 Brickwork defect at gridline 15A (E-G)_FINAL APPROVED 2A4size photos Mrs. Lan QC
Wrong Position of Concrete Beam at Mezzanine Floor Axis E (16A-19A)
Unsatisfactory welding quality on Sarnafil layer gridline (L-N&20-21)
BV-13720/802/141010/SC/NCR-25 (REPLY)
Correspondence submission to PCI 385
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
BV-137206-1009-140428/HSI05 14/04/28 Water Discharge on adjacent Properties Nguyen, Hoang safetyBV-137206-1009-140428/HSI06 14/04/28 Installation for Lightning system (SMZ & Vinaconex Office) Nguyen, Hoang safetyBV-137206-1009-140505/HSI07 14/05/05 Request for Cleaning Up Public road and Drain Stagnant water 4A4size photos Nguyen, Hoang safety
BV-137206-1009-140514/HSI08 14/05/14 Sadety ImprovementBV-137206-1009-140519/HSI09 14/05/19 Request Safety Issue 7A4size photos Nguyen, Hoang safety, QuangBV-137206-1009-140521/HSI10 14/05/22 Incompliance of minimum HSE Equipments 1A4size photo Nguyen, Hoang safetyBV-137206-1009-142305/HSI11 14/05/23 Improvement of Security entrance post Nguyen, Hoang safetyBV-137206-1009-142405/HSI12 14/05/24 Cable isolation and arrangement 3A4size photos Nguyen, Hoang safety, Quang M&EBV-137206-1009-143005/HSI13 14/05/30 Control Speed of Heavy Trucks on Site 1A4size photo Nguyen, Hoang safety, Quang M&EBV-137206-1009-140623/HSI14 14/06/23 Unsafe Access of Ramp 1A4size photo Nguyen, Hoang Safety, TuBV-137206-1009-140623/HSI15 14/06/23 Wearing Safety Glass on Site Nguyen, Hoang Safety, Tu
No.001 Set up life line system for working at height 1A4size photoNo.002No.003No.004No.005 14/10/02 Dust on walkable ceiling 14/09/15 2A4size photos Hoang Tuan Anh Site EngineerNo.006 14/10/20 (Packing Area)_Drop steel pipe from the handrail gap at Stage 1 14/10/18 2A4size photos Vuong
No.007No.008No.009No.010No.011No.012No.013No.014
Request for Installation electric cabinet and warning sign at live cable, stop pumping water at site
Request for installation hard barricade for deep hole, provide rubbish bin and toilet temporary at site
Request for installation drainage system and cover electric wire at washing bay
Request for checking during night time at project area and bilingual permit to work
INCIDENT INVESTIGATION REPORT
Correspondence submission to PCI 613
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 614
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 615
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 616
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 617
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 618
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 619
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 620
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 621
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 622
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 623
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 624
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 625
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 626
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 627
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 628
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 629
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 630
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 631
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 632
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 633
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 634
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 635
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 636
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 637
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 638
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 639
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 640
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 641
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 642
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 643
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 644
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 645
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 646
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
+
Correspondence submission to PCI 647
Correspondence submission to PCI 648
Correspondence submission to PCI 649
Correspondence submission to PCI 650
Correspondence submission to PCI 651
Correspondence submission to PCI 652
Correspondence submission to PCI 653
Correspondence submission to PCI 654
Correspondence submission to PCI 655
Correspondence submission to PCI 656
Correspondence submission to PCI 657
Correspondence submission to PCI 658
Correspondence submission to PCI 659
Correspondence submission to PCI 660
Correspondence submission to PCI 661
Correspondence submission to PCI 662
Correspondence submission to PCI 663
Correspondence submission to PCI 664
Correspondence submission to PCI 665
Correspondence submission to PCI 666
Correspondence submission to PCI 667
Correspondence submission to PCI 668
Correspondence submission to PCI 669
45.00
Correspondence submission to PCI 670
Correspondence submission to PCI 671
Correspondence submission to PCI 672
Correspondence submission to PCI 673
Correspondence submission to PCI 674
Correspondence submission to PCI 675
Correspondence submission to PCI 676
Correspondence submission to PCI 677
Correspondence submission to PCI 678
Correspondence submission to PCI 679
1,244,000
Correspondence submission to PCI 680
Correspondence submission to PCI 681
Correspondence submission to PCI 682
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to Volume
MINUTES FOR MATERIAL/EQUIPMENT INSPECTION & ACCEPTANCE
Correspondence submission to PCI 956
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 957
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 958
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 959
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 960
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 961
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 962
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 963
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 964
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 965
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 966
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 967
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 968
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 969
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 970
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 971
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 972
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 973
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 974
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 975
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 976
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 977
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 978
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 979
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 980
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 981
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 982
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 983
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 984
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 985
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 986
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 987
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 988
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 989
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 990
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 991
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 992
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 993
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 994
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 995
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 996
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 997
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 998
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 999
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 1000
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 1001
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 1002
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 1003
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 1004
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 1005
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 1006
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 1007
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 1008
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 1009
Correspondence submission to PCI 1010
Correspondence submission to PCI 1011
Correspondence submission to PCI 1012
Correspondence submission to PCI 1013
Correspondence submission to PCI 1014
Correspondence submission to PCI 1015
Correspondence submission to PCI 1016
Correspondence submission to PCI 1017
Correspondence submission to PCI 1018
Correspondence submission to PCI 1019
Correspondence submission to PCI 1020
Correspondence submission to PCI 1021
Correspondence submission to PCI 1022
Correspondence submission to PCI 1023
Correspondence submission to PCI 1024
Correspondence submission to PCI 1025
Correspondence submission to PCI 1026
Correspondence submission to PCI 1027
Correspondence submission to PCI 1028
Correspondence submission to PCI 1029
Correspondence submission to PCI 1030
Correspondence submission to PCI 1031
45.00
Correspondence submission to PCI 1032
Correspondence submission to PCI 1033
Correspondence submission to PCI 1034
Correspondence submission to PCI 1035
Correspondence submission to PCI 1036
Correspondence submission to PCI 1037
Correspondence submission to PCI 1038
Correspondence submission to PCI 1039
1,244,000
Correspondence submission to PCI 1040
No. Rev. Date Issued Rev Title Attachment Status
14/03/20 17-23 Mar 2014
14/03/21 24-30 Mar 2014 Toan
14/03/24 24-30 Mar 2014 (Rev.1) Toan
14/04/04 7-13 Apr 2014 Toan
Date Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
BBVN-FIVE-S2-SC-LMS-0001
BBVN-FIVE-S2-SC-LMS-0002
BBVN-FIVE-S2-SC-LMS-0002/R1
BBVN-FIVE-S2-SC-LMS-0003
Correspondence submission to PCI 1041
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1042
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1043
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1044
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1045
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1046
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1047
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1048
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1049
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1050
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1051
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1052
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1053
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1054
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1055
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1056
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1057
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1058
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1059
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1060
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1061
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1062
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1063
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1064
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1065
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1066
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1067
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1068
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1069
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1070
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1071
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1072
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1073
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1074
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1075
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1076
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1077
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1078
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1079
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1080
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1081
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1082
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1083
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1084
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1085
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1086
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1087
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1088
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1089
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1090
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1091
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1092
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1093
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1094
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1095
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1096
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1097
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1098
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1099
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1100
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1101
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1102
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1103
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1104
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1105
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1106
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1107
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1108
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1109
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1110
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1111
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1112
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1113
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1114
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1115
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1116
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1117
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1118
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1119
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1120
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1121
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1122
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1123
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1124
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1125
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1126
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
+
Correspondence submission to PCI 1127
Correspondence submission to PCI 1128
Correspondence submission to PCI 1129
Correspondence submission to PCI 1130
Correspondence submission to PCI 1131
Correspondence submission to PCI 1132
Correspondence submission to PCI 1133
Correspondence submission to PCI 1134
Correspondence submission to PCI 1135
Correspondence submission to PCI 1136
Correspondence submission to PCI 1137
Correspondence submission to PCI 1138
Correspondence submission to PCI 1139
Correspondence submission to PCI 1140
Correspondence submission to PCI 1141
Correspondence submission to PCI 1142
Correspondence submission to PCI 1143
Correspondence submission to PCI 1144
Correspondence submission to PCI 1145
Correspondence submission to PCI 1146
Correspondence submission to PCI 1147
Correspondence submission to PCI 1148
Correspondence submission to PCI 1149
Correspondence submission to PCI 1150
45.00
Correspondence submission to PCI 1151
Correspondence submission to PCI 1152
Correspondence submission to PCI 1153
Correspondence submission to PCI 1154
Correspondence submission to PCI 1155
Correspondence submission to PCI 1156
Correspondence submission to PCI 1157
Correspondence submission to PCI 1158
Correspondence submission to PCI 1159
1,244,000
Correspondence submission to PCI 1160
Correspondence submission to PCI 1161
WEEKLY MEETINGFile Issued Title File Code
M-01-001 06/11/23 Weekly MOM at PCI office. No1 -23 November-2006 MOM-03-01M-01-002 06/11/30 Weekly MOM at PCI office. No1 -30 November-2006 MOM-03-01M-01-003 06/12/07 Weekly MOM at PCI office. No3 -7 December-2006 MOM-03-01M-01-004 06/12/15 Weekly MOM at PCI office. No4 -15 December-2006 MOM-03-01M-01-005 06/12/21 Weekly MOM at PCI office. No 5 -21 December-2006 MOM-03-01M-01-006 06/12/29 Weekly MOM at PCI office. No 6 -28 December-2006 MOM-03-01M-01-007 07/01/04 Weekly MOM at PCI office. No 7 -04 January-2007 MOM-03-01M-01-008 07/01/15 Weekly MOM at PCI office. No 8 -11 January-2007 MOM-03-01M-01-009 07/01/20 Weekly MOM at PCI office. No 9 -18 January-2007 MOM-03-01M-01-010 07/01/25 Weekly MOM at PCI office. No 10 -25 January-2007 MOM-03-01M-01-011 07/02/01 Weekly MOM at PCI office. No 11 -01 February-2007 MOM-03-01M-01-012 07/02/08 Weekly MOM at PCI office. No 12 -08 February-2007 MOM-03-01M-01-013 07/02/14 Weekly MOM at PCI office. No 13 -14 February-2007 MOM-03-01M-01-014 07/03/01 Weekly MOM at PCI office. No 14 -1 March -2007 MOM-03-01M-01-015 07/03/09 Weekly MOM at PCI office. No 15 -8 March -2007 MOM-03-01M-01-016 07/03/15 Weekly MOM at PCI office. No 16 -15 March -2007 MOM-03-01M-01-017 07/03/22 Weekly MOM at PCI office. No 17 -22 March -2007 MOM-03-01M-01-018 07/03/30 Weekly MOM at PCI office. No 18 -30 March -2007 MOM-03-01M-01-019 07/04/05 Weekly MOM at PCI office. No 19 -05 April -2007 MOM-03-01M-01-020 07/04/12 Weekly MOM at PCI office. No 20 -12 April -2007 MOM-03-01M-01-021 07/04/19 Weekly MOM at PCI office. No 21 -19 April -2007 MOM-03-01M-01-022 07/05/02 Weekly MOM at PCI office. No 22 -03 May-2007 MOM-03-01M-01-023 07/05/10 Weekly MOM at PCI office. No 23 -10 May-2007 MOM-03-01M-01-024 07/05/17 Weekly MOM at PCI office. No 24 -17 May-2007 MOM-03-01M-01-025 07/05/24 Weekly MOM at PCI office. No 25 -24 May-2007 MOM-03-01M-01-026 07/05/31 Weekly MOM at PCI office. No 26 -31 May-2007 MOM-03-01M-01-027 07/06/07 Weekly MOM at PCI office. No 27 -7 June-2007 MOM-03-01M-01-028 07/06/21 Weekly MOM at PCI office. No 28 -21 June-2007 MOM-03-01M-01-029 07/06/28 Weekly MOM at PCI office. No 29 -28 June-2007 MOM-03-01M-01-030 07/07/05 Weekly MOM at PCI office. No 30 -05 July-2007 MOM-03-01M-01-031 07/07/12 Weekly MOM at PCI office. No 31 -12 July-2007 MOM-03-01M-01-032 07/07/19 Weekly MOM at PCI office. No 32 -19 July-2007 MOM-03-01M-01-033 07/07/28 Weekly MOM at PCI office. No 33 -26 July-2007 MOM-03-01M-01-034 07/08/02 Weekly MOM at PCI office. No 34 -02 August-2007 MOM-03-01M-01-035 07/08/08 Weekly MOM at PCI office. No 35 -08 August-2007 MOM-03-01M-01-036 07/08/16 Weekly MOM at PCI office. No 36 -16 August-2007 MOM-03-01M-01-037 07/08/23 Weekly MOM at PCI office. No 37 -23 August-2007 MOM-03-01M-01-038 07/08/30 Weekly MOM at PCI office. No 38 -30 August-2007 MOM-03-01M-01-039 07/09/06 Weekly MOM at PCI office. No 39 -06 Sep-2007 MOM-03-01M-01-040 07/09/13 Weekly MOM at PCI office. No 40 -13 Sep-2007 MOM-03-01M-01-041 07/09/20 Weekly MOM at PCI office. No 41 -20 Sep-2007 MOM-03-01M-01-042 07/09/28 Weekly MOM at PCI office. No 42 -28 Sep-2007 MOM-03-01M-01-043 07/10/04 Weekly MOM at PCI office. No 43 -04 October-2007 MOM-03-01M-01-044 07/10/11 Weekly MOM at PCI office. No 44 -11 October-2007 MOM-03-01M-01-045 07/10/18 Weekly MOM at PCI office. No 45 -18 October-2007 MOM-03-01M-01-046 07/10/25 Weekly MOM at PCI office. No 46 -25 October-2007 MOM-03-01M-01-047 07/11/01 Weekly MOM at PCI office. No 47 -01 November-2007 MOM-03-01M-01-048 07/11/08 Weekly MOM at PCI office. No 48 -08 November-2007 MOM-03-01M-01-049 07/11/15 Weekly MOM at PCI office. No 49 -15 November-2007 MOM-03-01M-01-050 07/11/22 Weekly MOM at PCI office. No 50 -22 November-2007 MOM-03-01M-01-052 07/12/08 Weekly MOM at PCI office. No 52 -06 December-2007 MOM-03-01M-01-053 07/12/13 Weekly MOM at PCI office. No 53 -13 December-2007 MOM-03-01
M-01-054 07/12/20 Weekly MOM at PCI office. No 54 -20 December-2007 MOM-03-01M-01-055 07/12/26 Weekly MOM at PCI office. No 55 -26 December-2007 MOM-03-01M-01-056 08/01/10 Weekly MOM at PCI office. No 56 -10 January -2008 MOM-03-01M-01-057 08/01/23 Weekly MOM at PCI office. No 57 -23 January -2008 MOM-03-01M-01-058 08/01/30 Weekly MOM at PCI office. No 58 -30 January -2008 MOM-03-01M-01-059 08/02/20 Weekly MOM at PCI office. No 59 -20 February -2008 MOM-03-01M-01-060 08/02/27 Weekly MOM at PCI office. No 60 -27 February -2008 MOM-03-01M-01-061 08/03/12 Weekly MOM at PCI office. No 61 -12 March -2008 MOM-03-01M-01-062 08/03/19 Weekly MOM at PCI office. No 62 -19 March -2008 MOM-03-01M-01-063 08/03/26 Weekly MOM at PCI office. No 63 -26 March -2008 MOM-03-01M-01-064 08/04/02 Weekly MOM at PCI office. No 64-02 April 2008 MOM-03-01M-01-065 08/04/23 Weekly MOM at PCI office. No 65-22 April 2008 MOM-03-01M-01-066 08/05/07 Weekly MOM at PCI office. No 66-7 May 2008 MOM-03-01M-01-067 08/05/14 Weekly MOM at PCI office. No 67-14 May 2008 MOM-03-01M-01-068 08/05/21 Weekly MOM at PCI office. No 68-21May 2008 MOM-03-01M-01-069 08/06/18 Weekly MOM at PCI office. No 69-18 June 2008 MOM-03-01M-01-070 08/06/25 Weekly MOM at PCI office. No 70-25 June 2008 MOM-03-01M-01-071 08/07/02 Weekly MOM at PCI office. No 71-02 July 2008 MOM-03-01M-01-072 08/07/16 Weekly MOM at PCI office. No 72-16 July 2008 MOM-03-01M-01-074 08/08/06 Weekly MOM at PCI office. No 74-06 August 2008 MOM-03-01M-01-075 08/08/13 Weekly MOM at PCI office. No 75-13 August 2008 MOM-03-01M-01-076 08/08/20 Weekly MOM at PCI office. No 76-20 August 2008 MOM-03-01M-01-077 08/09/03 Weekly MOM at PCI office. No 77-03 Sep 2008 MOM-03-01M-01-078 08/09/10 Weekly MOM at PCI office. No 78-10 Sep 2008 MOM-03-01M-01-079 08/09/17 Weekly MOM at PCI office. No 79-17 Sep 2008 MOM-03-01M-01-080 08/09/24 Weekly MOM at PCI office. No 80-24 Sep 2008 MOM-03-01M-01-082 08/10/08 Weekly MOM at PCI office. No 82- 8 Oct 2008 MOM-03-01M-01-083 08/10/15 Weekly MOM at PCI office. No 83-15 Oct 2008 ( No meeting) MOM-03-01
M-01-084 08/10/22 Weekly MOM at PCI office. No 84-22 Oct 2008 ( no meeting) MOM-03-01
M-01-085 08/10/29 Weekly MOM at PMU office. No 85- 29 Oct 2008 MOM-03-01M-01-086 08/11/19 Weekly MOM at PCI office. No 86-19 Nov 2008 MOM-03-01M-01-087 09/01/14 Weekly MOM at PMU office. No 87-14 Jan 2009 MOM-03-01M-01-088 09/04/06 Weekly MOM at PMU office. No 88-06 Apr 2009 MOM-03-01
WEEKLY MEETING BI-WEEKLY MEETINGVolume File Issued TitleVol 01 MB-01-001 06/12/11 Bi-weekly MOM at PMU office on 12/11/06Vol 01 MB-01-002 06/12/25 Bi-weekly MOM at PMU office on 25/12/06Vol 01 MB-01-003 07/01/08 Bi-weekly MOM at PMU office on 8 Jan 2007Vol 01 MB-01-004 07/01/22 Bi-weekly MOM at PMU office on 22 Jan 2007Vol 01 MB-01-005 07/03/06 Bi-weekly MOM at PMU office on 06/03/07Vol 01 MB-01-006 07/03/19 Bi-weekly MOM at PMU office on 19/03/07Vol 01 MB-01-007 07/04/01 Bi-weekly MOM at PMU office on 01/04/07Vol 01 MB-01-008 07/04/16 Bi-weekly MOM at PMU office on 16/04/07Vol 01 MB-01-009 07/05/07 Bi-weekly MOM at PMU office on 07/05/07Vol 01 MB-01-010 07/06/04 Bi-weekly MOM at PMU office on 04 June 2007Vol 01 MB-01-011 07/07/10 Bi-weekly MOM at PMU office on 10/07/07Vol 01 MB-01-012 07/07/23 Bi-weekly MOM at PMU office on 23 July 2007Vol 01 MB-01-013 07/08/13 Bi-weekly MOM at PMU office on 13 August 2007Vol 01 MB-01-014 07/09/10 Bi-weekly MOM at PMU office on 10 September 2007Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 02 MB-01-015 07/10/01 Bi-weekly MOM at PMU office on 01 October 2007Vol 02 MB-01-016 07/10/22 Bi-weekly MOM at PMU office on 22 October 2007Vol 02 MB-01-016 07/11/12 Bi-weekly MOM at PMU office on 12 November 2007Vol 02 MB-01-017 07/11/26 Bi-weekly MOM at PMU office on 26 November 2007Vol 02 MB-01-018 07/12/24 Bi-weekly MOM at PMU office on 24 December 2007Vol 02 MB-01-019 08/01/14 Bi-weekly MOM at PMU office on 14 January 2008Vol 02 MB-01-020 08/03/03 Bi-weekly MOM at PMU office on 03 March 2008Vol 02Vol 02Vol 02Vol 02
Vol 02Vol 02Vol 02Vol 02Vol 02Vol 02Vol 02Vol 02Vol 02Vol 03 MB-01-021 08/03/31 Bi-weekly MOM at PMU office on 31 March 2008Vol 03 MB-01-022 08/06/02 Bi-weekly MOM at PMU office on 02 June 2008Vol 03 MB-01-023 08/07/07 Bi-weekly MOM at PMU office on 07 July 2008Vol 03 MB-01-024 08/08/25 Bi-weekly MOM at PMU office on 25 August 2008Vol 03Vol 03Vol 03Vol 03Vol 03Vol 03Vol 03Vol 03Vol 03Vol 03Vol 03Vol 03Vol 03Vol 03Vol 03