Our Temple
Jan 15, 2016
Our Temple
Facts ReviewBy Facilities Committee
10 April, 2011
Nani BhowmikBal Gopal
Shiv KapoorPradeep KhannaSrinivas NookalaKiran TopudurtiDeoki Tripathy
Agenda
1. Reference (20 Feb 2011 BOT meeting minutes)2. Construction Estimates
1. B&S Main Floor plus Basement (Reduced base bid + Unfinished side wings + Unfinished basement)
2. HTCSCI Main floor plus Basement(Original base bid + Finished side wings + Finished basement)
3. Comparison/Normalization of Bids4. O&M Costs + Capital Payment5. Q&A6. Where do we go from here?
20 Feb 2011 BOT Minutes Motion: “Option #4 [reduced base bid] with
unfinished basement and unfinished side wings on the first floor as the final plan with an expected cost of $1.36M”
“if we cannot raise enough money in the next 6 weeks, we should revisit and revise the plan”
“takes full responsibility to raise $188,000 required for the construction of the unfinished basement provided that the basement is included in the construction plan”
Construction Estimates - B&S Main Floor Plus Basement (Reduced base bid + Unfinished side wings + Unfinished basement)Reduced base bid: $1,084,580 *
Unfinished side wings: $62,500 **Unfinished basement *** $188,000 Total: $ 1,335,080
* Includes deductions of $143,420 from original base bid of $1,228,000** Option 2 – Option 1 (BOT minutes)
*** Unfinished means….“have restricted access, min heating & A/C”“have stairs entry and blocked for public until it is finished”
Requirement for an Unfinished Basement
According to the Champaign County Planning and Zoning Administration and the Illinois Capitol Development Board, for a Public Building when the Basement Area is more than 1,000 sq ft, we must install an elevator.
Construction Estimates - HTCSCI Main Floor plus Finished Side Wings and Basement Plan(Original base bid + Finished side wings + Finished basement)
Original base bid (no gopurams): $871,460Finished side wings: $200,000Finished basement: $300,000
Total: $1,371,460
Comparison/Normalization – Original Bids
Comparison/Normalization of bidsB&S HTCSCI
Original bid
$1,228,000 $871,460
$50,000
Gopurams $35,000
Additional costs $128,000 $128,000
Total $1,406,000 $1,034,460
Side wings Unfinished $62,500Finished $200,000
Basement Unfinished $188,000Finished $300,000Elevator $50,000
Grand Total $1,706,500 $1,534,460
concrete car parking and drive ( not oil and chip)
Water well, power, appliances, security system, speakers, sod. Etc.,
Comparison/Normalization – Reduced Options
Comparison/Normalization of bids – With ReductionsB&S HTCSCI
original bid $1,228,000 $871,460
Reduced bid credits -$143,420 -$143,420
Gopurams $35,000
Additional costs $128,000 $128,000
Sub total $1,212,580 $891,040
Side wings Unfinished $62,500Finished $200,000
Basement Unfinished $188,000Finished $300,000Elevator $50,000
Grand Total $1,513,080 $1,391,040
Water well, power, appliances, security system, speakers, sod. Etc.,
Summary Comparison
Summary comparisonB&S HTCSCI
Original bid $1,706,500
All finished $1,534,460
Reduced bid $1,513,080
All finished $1,391,040
Unfinshed side wings, Unfinished basement
Unfinshed side wings, Unfinshed basement
O&M Costs - Loan
Community loan @2.00% and Bank loan @8.00%
5 years cost Per year Per monthTerm in years 5
Community $300,000.00 $331,224.24$163,564.85 $13,630.40Bank $400,000.00 $486,600.00
Community $300,000.00 $331,224.24
$285,244.85 $23,770.40Bank $900,000.00 $1,095,000.00
Single floor, no side wings (5072 SFT)
Two floors, finished side wings, finished basement
O&M Costs – Maintenance
Maintenance
Item 5 year total
Maintenance
Total months 60
$50,000 $255,000
$100,000 $510,000Electricity+gas / month $700 $42,000
$300 $18,000
$1,500 $90,000Telephone + internet /month $60 $3,600cleaning per month $1,500 $90,000security+insurance / month $250 $15,000Garbage collection / month $150 $9,000
Total $522,600Monthly costs $8,710
Total $777,600Monthly costs $12,960
Cost per year or per month
1 priest for 3 deities (basic plan) salary + benefits2 priests for all deities (basic plan + side wings) salaries
lawn, snow mowing etc / monthflowers+puja supplies / month
costs with 1 priest
costs with 2 priests
Monthly O&M and Capital Payment Cost Summary
O&M summary
Total$13,630
$8,710 $22,340With 1 priestWith 2 priests $12,960 $26,590
$23,770$32,480With 1 priest $8,710
With 2 priests $12,960 $36,730
Loan payment costs
Maintenance costs
loan of 300k and 400k
loan of 300k and 900k
Q&A