Sharing our experience of Making in India JUNE 2014 16 Oct 2014 Sridhar Krishnamoorthy, Managing Director, Gerdau India
Dec 17, 2014
Sharing our experience of
Making in India
JUNE 2014
16 Oct 2014
Sridhar Krishnamoorthy, Managing Director, Gerdau India
2
Agenda
Gerdau
Who are we?
Our investments in India
Gerdau Steel India Limited, Andhra Pradesh
Challenges faced & how we resolved it Example 1 - Electricity Example 2 – IT & Telecommunications
Key Takeaways
3
Agenda
Gerdau
Who are we?
Our investments in India
Gerdau Steel India Limited, Andhra Pradesh
Challenges faced & how we resolved it Example 1 - Electricity Example 2 – IT & Telecommunications
Key Takeaways
Global Presence
4
Gerdau around the world
Headquartered in Brazil, one of the largest steel producers in the world
Head Office
5
Gerdau in Numbers
113 years of history; started in 1901; HQ in Porto Alegre, Brazil
Operations in Americas, Europe & Asia (in 14 countries)
45,000 employees / ~120,000 customers / ~140,000 shareholders
Installed capacity ~ 25 M tons of steel / year; Globally 15th largest steel producer
Listed on São Paulo, New York, and Madrid Stock Exchanges
Turnover USD 20 Billion, Produced 20 Million tons of Steel 2013
Iron ore operations in Brazil - By 2022 to produce 24 M tons
Major worldwide supplier of special long steel to transportation and energy sectors
First footprint in Asia is in India
Investing in Andhra Pradesh, India, since 2007 – first footprint in Asia
Started operating from 2013
Products and End Use Segments
• Billets, Blooms & Slabs
• Merchant bars
• SBQ
• Wire-rod
• Rebars
• Fabricated steel
• Heavy structural shapes
• Nails
• Wires
• Housing
• Infrastructure
• Agricultural sector
• Automotive industry
• Oil and gas sector
• Shipbuilding
• Wind power generation
• Mining
• Other industrial sectors
Aplicação do produtoSpecial Steel Products Applications
Infrastructure and Buildings
Special steel – Automotive products
Special steel – Energy products
Gerdau Steel India Limited (GSIL)
Jambalapadu Village, Tadipatri, Ananthpur District, Andhra Pradesh
8
Gerdau Steel India Ltd.
Company Name: Gerdau Steel India Ltd. Company Type: Public Ltd. Steel Plant Tadipatri, Andhra Pradesh Corporate Office Bangalore Product Portfolio: Special Steel Bars
General Info
Tadipatri, Ananthapur District, AP
• Crude Steel Capacity:
• Rolled Steel Capacity:
Steel Mill
300,000 t
300,000 t
9
One of the most under developed regions in AP
Investments till date: INR 2700 Crores
Jobs created: 3000
Multiplier effect in the local economy
Andhra Pradesh
10
We are spending INR 1.5-2 Crores during 2012-13 and 2013-14
CSR Activities
11
Ananthapur DistrictReasonable GDP but not the highest in AP; less of a manufacturing hub and more agriculture / live stock
Source: Government of AP
in INR Crores
Ananthapur District
State of Andhra Pradesh
Share in State %
Agriculture 7,329 114,492 6%Industry 12,192 96,563 13%Services 14,966 208,366 7%TOTAL 34,487 419,421 Source: AP Government Papers
12
Agenda
Gerdau
Who are we?
Our investments in India
Gerdau Steel India Limited, Andhra Pradesh
Challenges faced & how we resolved it Example 1 - Electricity Example 2 – IT & Telecommunications
Key Takeaways
13
Infrastructure Needs
Gerdau Tadipatri
Mill
Water
Ports
Road Network
Rail Network
Skilled Workforce
IT & Telecom
Social Amenities
Electricity
2500 m3 per day
35 MW
ERP, multi-location operation
For import of raw materials
Raw materials and shipment of finished goods
~ 3000 employees
Employee attraction and retention
Will focus on 2 examples
1
2
14
Impact of deteriorating power situation on our operations
Power Deficit in the state - lower capacity utilization, high transmission losses,
lack of coal in thermal power stations, priority for crops
Power Holidays – announced without much notice (sometimes over a SMS)
created huge challenges…cannot shut down a furnace operating at 1600 deg C
Too many organizations to interact with – Electricity Regulatory Commission,
Transco, Generation companies and getting NOCs etc every month
Lost value in our operations: We had to optimize and even shut down those
parts of the plant that could be shut, to reduce power consumption
Political Factors: Pro- & Anti- Telengana movements and various bandhs
interrupted our operations numerous occasions throughout from 2010-elections
1
15
Str
ateg
y to
mee
t E
nerg
y D
eman
dOpen Access
Thru’ IEX
Open Access Bilateral Contract
Open Access for Incremental 5 MVA
New Dedicated 132 KV Feeder
Enhance CMD from 17 MVA to 35 MVA
Optimize Consumption using Demand Controls
Captive Power Plant 6 MW
Captive Power Plant 15 MW
Purchased power through open access during power holidays
Commercially not workable
• Built 132 KV line (7.5 km) costing $1.765 M• Access negotiations thru 22 private lands• Took 21 months; 60 jobs
Option not exercised yet and will be possible after the dedicated feeder is ready
• Uses by-product Blast Furnace gas• Capex $ 8 M; Took 36 months; 80 jobs
• Currently under construction• Uses waste heat recovery• Capex $ 14 M; 5 years; 125 jobs
Our Approach to Resolve Electricity Infrastructure Issues 1
16
Existing 132kV Future 132kV
12 3
4 56
7
8
9
10
11
12
13
14
15
16
17
18
19 2
0
21 2
2
23 2
4
25
26
27
28
29
Gerdau Steel India Limited
Construction of the 132 KV Line
Key Data
Distance: 7.5 kms
No of Towers: 28
Start date Dec 2012
Finish date Oct 2014
Capex : USD 1.8 MM
No of jobs: 60
Got excellent cooperation from AP Transco but faced challenges during access negotiations with
various private landowners, getting suitable experienced contractors to work in such remote areas,
managing the construction with little power equipment like cranes, meeting a tight timeline and budget
1
i. Frequent Damage / Disruption to OFC cause Tadipatri plant to isolate from rest
of Gerdau (PRI / WAN Disconnection)
ii. High Attrition due to poor social life and amenities in /around Tadipatri
iii. Power Outages and High range Power fluctuation causes risk to Data center
and Critical and Sensitive Equipments
iv. Shipment delays affecting projects schedule since almost all courier companies
do not deliver in Tadipatri
v. Communication – having 1 communication channel for Gerdau India– VoIP
vii. Most vendor do not find it attractive to take up Annual Maintenance contract
and services at Tadipatri due to long distance from Bangalore or Hyd.
viii. Big challenge to find vendors to do small work - high freight & high travel cost
IT and Telecommunication Challenges 2
Infrastructure Challenges IT & Telecommunications
18
Long distance
WIRELESS point to Point
Helps avoid Civil Work and reduces the
lead time for implementation
Load Balancing and Failover for WAN and
Internet for high availability
Visitor, Contractor and Attendance management and Face Recognition system
Automation IT Infrastructure readiness to support QMOS Phase 1 SMS
Pan India Wide Area Network - better communication and collaboration and access to SAP
E Approval for fast approval cycle
and paperless office
Outsourcing of critical to overcome Local talent scarcity and
Attrition
Desktop Virtualization Project ; Better GovernanceBetter Data securityLower TCO
2
19
Our Infrastructure Spend
Gerdau Tadipatri Mill
Water
Ports
Road Network
Rail Network
Skilled Workforce
IT & Telecom
Social Amenities
Electricity
$ 22 M
$ 29 M
$ 0.5 M
None
$ 2 M
$ 10.5 M
$ 1 M
Total Investment INR 2700 CroresOn infrastructure INR 360 Crores
$ 65 Million ~ 15% of our total investment
20
Agenda
Gerdau
Who are we?
Our investments in India
Gerdau Steel India Limited, Andhra Pradesh
Challenges faced & how we resolved it Example 1 - Electricity Example 2 – IT & Telecommunications
Key Takeaways
The automotive and transportation market in general is poised for strong growth – Make in India initiatives, high speed rail, growing auto sector, smart cities
Also seeing potential for construction sector to grow as the economy picks up
The new state of Andhra Pradesh is also expected to invest in development of new cities and develop infrastructure in ports, airports, rail networks, & transportation
Infrastructure companies can piggyback manufacturers & provide outsourced solutions; build & manage Water infrastructure for manufacturers Social amenities such as townships, canteens And offer energy solutions to serve the needs of manufacturers
Opportunities in engineering and consulting
Opportunity to tap into Indian R&D skills
Key Takeaways - Our experience so farChallenges exist but so do opportunities