PRESENTATION OF OT CONTROL

Page 2: OT CONTROL ....

WHY EXCESS OT

1. Not fulfill Hourly Target.2. Not so good Relation with operator.3. Tendency to get excess OT.4. INPUT DELAY from Cutting Section5. Hourly Packing Production

Monitoring

Page 3: OT CONTROL ....

EFFECTS OF OT

Page 4: OT CONTROL ....

OT CONTROL

Page 5: OT CONTROL ....

OT CONTROL POLICY IN MIPayroll/Floor 275 OP

10% absentism 250 op

Budgeted OT wh 2.5 Hr

Working Day,feb'2016 24 days

Budgeted OT with 10% Absentiesm, Feb'2016 15000 hrs

So , Budgeted OT 625 hrs /Day

Page 6: OT CONTROL ....

What to do for controlling OT1. Try to meet the target within 10 hrs or 10.5 hrs

2. Everyday Leave Operator after 5 pm.

Page 7: OT CONTROL ....

What to do for controlling OT

3. During Layout leave the operator after 5.oo PM. Technician will complete the layout

4. Check the input during 3 to 4 pm ,if input is delay for upcoming hrs or next day ,leave the

operator after 5 PM

5. IF Backlog is occur in the middle of the line, leave the operator before backlog of the process