HIGH DUST SELECTIVE CATALYTIC NOx REDUCTION AT WTE PLANT IN BRESCIA Paolo Rossignoli – Mario Nenci – Lorenzo Zaniboni A2A, Brescia, Italy Oslo, February 17th, 2010
35

Oslo, February 17th, 2010 - SINTEF

May 08, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Oslo, February 17th, 2010 - SINTEF

HIGH DUST SELECTIVE CATALYTIC NOx REDUCTION AT WTE P LANT IN BRESCIA

Paolo Rossignoli – Mario Nenci – Lorenzo Zaniboni A2A, Brescia, Italy

Oslo, February 17th, 2010

Page 2: Oslo, February 17th, 2010 - SINTEF

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

••Waste preventionWaste prevention

••Separate collection (for material recycling)Separate collection (for material recycling)

••Composting of organic wasteComposting of organic waste

••Energy from remaining waste (renewable energy)Energy from remaining waste (renewable energy)

••LandfillingLandfilling minimization (only safe residues)minimization (only safe residues)

INTEGRATED WASTE MANAGEMENT SYSTEM

Page 3: Oslo, February 17th, 2010 - SINTEF

1. ENVIRONMENTAL PROTECTION

2. HIGH EFFICIENCY OF ENERGY RECOVERY

3. SAFETY, RELIABILITY, AVAILABILITY

DESIGN GOALS:

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Page 4: Oslo, February 17th, 2010 - SINTEF

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

584 584 km of double pipekm of double pipe

130.000 inhabitants supplied130.000 inhabitants supplied

38,538,5 MmMm33 heated volumeheated volume

17.391 17.391 connected buildingsconnected buildings

695 695 MWMWthth

230 230 MWMWelel

1 km

P.Plant north

P.Plant south

WTE

DISTRICT HEATING SYSTEM OF BRESCIA

Page 5: Oslo, February 17th, 2010 - SINTEF

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

0

2

4

6

8

10

12

14

16

18

20

22

24

26

28

30

32

34

36

38

Mm3

1972

1973

1974

1975

1976

1977

1978

1979

1980

1981

1982

1983

1984

1985

1986

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2.00

2 2.

003

2.00

4 2.

005

2.00

6

YEARS

CONNECTED BUILDINGS VOLUMES

DISTRICT HEATING SYSTEM OF BRESCIA

Page 6: Oslo, February 17th, 2010 - SINTEF

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

DISTRICT HEATING SYSTEM OF BRESCIA

0

200

400

600

800

1.000

1.200

1.400

1.600

1.800

2.000

2.200

2.400

2.600

2.800

3.000

3.200

3.400

3.600

3.800

4.000

GW

h

1972

1973

1974

1975

1976

1977

1978

1979

1980

1981

1982

1983

1984

1985

1986

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

ANNI

USED FUELS

• NAT. GAS

• OIL

• COAL

• SOLID WASTE and BIOMASSES

Page 7: Oslo, February 17th, 2010 - SINTEF

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Page 8: Oslo, February 17th, 2010 - SINTEF

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

WASTE BUNKER

Page 9: Oslo, February 17th, 2010 - SINTEF

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Combustion grate under construction

Page 10: Oslo, February 17th, 2010 - SINTEF

MAIN TECHNICAL DATA

• Heat capacity of treated waste (3 boilers) 310 MW

• Waste throughput 3 x 33 t/h

• Electrical generation capacity (net) 80 MWel

• Heat generation capacity 170 MWth

ISO 14001 Environmental certification in april 2006

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Page 11: Oslo, February 17th, 2010 - SINTEF

OPERATIONAL DATA 2008

• Treated waste 801,000 tons( of which biomass 270.000 tons )

• Electricity production (net) 570 GWhel

• District heating 568 GWhth

• Fossil fuels saving (Tons of Oil Equivalent) > 150,000 TOE

• CO2 avoided emissions > 400,000 tons

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Page 12: Oslo, February 17th, 2010 - SINTEF

NOx CONTROL METHODS

• PRIMARY (NOx prevention)

- staged combustion (gradual O 2 supply)

- combustion temperature control

• SECONDARY (NOx reduction)

- SNCR (Selective Non-Catalytic Reduction)

- SCR (Selective Catalytic Reduction):- “High dust” (on raw gas)- “Tail-end” (after gas cleaning)- “Low dust” (after gas de-dusting)

Page 13: Oslo, February 17th, 2010 - SINTEF

HIGH DUST SCR LOCATION

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Page 14: Oslo, February 17th, 2010 - SINTEF

HIGH DUST SCR LAYOUT

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

MIXER

CATALYST LAYER

(SPACE FOR UP TO 5LAYERS)

FLUEGAS

DAMPERS

NOx NOx

Page 15: Oslo, February 17th, 2010 - SINTEF

IMPLEMENTED NOx CONTROL IN BRESCIA WTE(starting situation - since 1998)

• PRIMARY

- low combustion excess air

- 30 compartment grate

- infrared camera for optimization of primary andsecondary air supply

- flue gas recirculation

• SECONDARY (NOx reduction)

- SNCR (NH3 injection with 27 nozzles, positioned atthree levels)

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Page 16: Oslo, February 17th, 2010 - SINTEF

SNCR DENOX SYSTEM

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Page 17: Oslo, February 17th, 2010 - SINTEF

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

INSTALLATION AND TESTING OF A SCR “HIGH DUST” SYSTEM(non industrially available yet)

GOALS:

- further NOx reduction (120 ���� 80 mg/Nm 3)

- ammonia slip improvement

- lowering ammonia consumption

- keep high energy plant efficiency

Page 18: Oslo, February 17th, 2010 - SINTEF

PROBLEMS:

- catalyst clogging- catalyst poisoning

ADVANTAGES:

- much higher energy efficiency (no need of gasreheating and lower gas pressure losses)

- simpler installation- lower investment and operating cost

SCR “HIGH DUST” SYSTEM(non industrially available yet)

Page 19: Oslo, February 17th, 2010 - SINTEF

• installation: 2005 Sep. – 2006 Feb.

• operation: started 2006 Mar. (1 st phase – one cat. layer)

• inspection: Sep. 2006 (cleaning and catalyst analysi sshowing some pore plugging and catalystpoisoning with sulphates)

• 2nd phase: started 2006 Oct. after inspection (2 cat. la yer)

• inspections: 2007 Apr. and Sep. (only cleaning)2008 Apr. (erosion starts to become evident)

November: removal of one layer and installation of a new 2008 layer

SCR “HIGH DUST”History highlights

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Page 20: Oslo, February 17th, 2010 - SINTEF

SPACE FOR SCR HIGH DUST INSTALLATION

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Page 21: Oslo, February 17th, 2010 - SINTEF

TERMOUTILIZZATORE(The waste to energy plant of Brescia

HIGH DUST SCR

SPACE FOR

SCR HIGH DUST

INSTALLATION

Page 22: Oslo, February 17th, 2010 - SINTEF

CATALYST UNDER CONSTRUCTION

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Page 23: Oslo, February 17th, 2010 - SINTEF

NOx- NH3 emissions

0

10

20

30

40

50

60

70

80

90

1/1/06 1/5/06 29/8/06 27/12/06 26/4/07 24/8/07 22/12/07 20/4/08 18/8/08 16/12/08 15/4/09 13/8/09 11/12/09

NO

x -

NH 3

stac

k em

issi

ons

[mg/

Nm

³]

0

100

200

300

400

500

600

NH 3

cons

umpt

ion

[l/h]

NOx

NH3slip

NH3cons.

74

12

4,4

8

1,3 1,83,7

SCR operation start (1 layer)

Start with

2nd layer

217

2,5

70

44

33

53

66

61

67

58

69

179

166

184186

219200

44,9

NOx – NH3 consumption – ammonia slip

HIGH DUST SCR RESULTS

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Page 24: Oslo, February 17th, 2010 - SINTEF

HIGH DUST SCR RESULTST , ∆∆∆∆p SCR

0

25

50

75

100

125

150

175

200

225

250

275

300

325

3/7/06 31/10/06 28/2/07 28/6/07 26/10/07 23/2/08 22/6/08 20/10/08 17/2/09 17/6/09 15/10/09

T [°

C]

0,00

0,25

0,50

0,75

1,00

1,25

1,50

1,75

2,00

2,25

2,50

2,75

3,00

∆∆ ∆∆p

[mba

r]

T SCR [°C]

Dp [mbar]

Start with

2nd layer

T gas – ∆p SCR

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Page 25: Oslo, February 17th, 2010 - SINTEF

NOx and NH3 emissions monthly media 2006 - 2007 - 2 008 - 2009

0

10

20

30

40

50

60

70

80

90

100

Jan-06

Mar-06

May-06

Jul-06

Sep-06

Nov-06

Jan-07

Mar-07

May-07

Jul-07

Sep-07

Nov-07

Jan-08

Mar-08

May-08

Jul-08

Sep-08

Nov-08

Jan-09

Mar-09

May-09

month

mg/

Nm

3

L1 NOx

L1 NH3

L2 NOX

L2 NH3

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Page 26: Oslo, February 17th, 2010 - SINTEF

L1: SNCR only ���� L2: SNCR + HD SCR (2 layers)

• NOx: 80 - 90 ���� 60 - 70 mg/Nm 3

• NH3 slip: 10 - 30 ���� 2 - 6 mg/Nm 3

• NH3 consumption: 0.22 ���� 0.18 m3/h (25% concentrated )

• Pressure losses: negligible

SCR “HIGH DUST”

TEST RESULTS

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Page 27: Oslo, February 17th, 2010 - SINTEF

• new geometry in order to increase plates stiffness

• increasing plates thickness

• new composition of the catalyst material in order t o

increase plates hardness

“HIGH DUST” SCR

Modifications of the catalyst to reduce erosion

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Page 28: Oslo, February 17th, 2010 - SINTEF

CATALYST AFTER 2 YEARS OF OPERATION

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Before Cleaning

After Cleaning

Page 29: Oslo, February 17th, 2010 - SINTEF

INSPECTION OCTOBER 2009CATALYST REMOVED AFTER 32 MONTHS OF OPERATION

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

HIGH DUST SCR

Page 30: Oslo, February 17th, 2010 - SINTEF

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

HIGH DUST SCR

INSPECTION OCTOBER

2009

Page 31: Oslo, February 17th, 2010 - SINTEF

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

HIGH DUST SCR

CATALYST REMOVED AFTER 32 MONTHS OF OPERATION

Page 32: Oslo, February 17th, 2010 - SINTEF

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

HIGH DUST SCR

CATALYST REMOVED AFTER 32 MONTHS OF OPERATION

Page 33: Oslo, February 17th, 2010 - SINTEF

HIGH DUST SCR

FUTURE TEST STEPS :

� monitoring of fouling and activity of catalyst with new g eometry

� optimization of catalyst layout (single / multiple la yers)

� optimization of duct cleaning with modified geometry

� lifetime assessment of the catalyst with new materials

� industrial cost evaluation

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Page 34: Oslo, February 17th, 2010 - SINTEF

HIGH DUST SCR

CONCLUSIONS:

� improving the reaction between ammonia and NOx

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

� low impact on the plant efficiency: small pressure l osses and low impact on fan consumption

� life-time rather short, but costs relatively small in comparison with other SCR systems:

• costs for reheating the flue gas and energy for IDf an (vs Tail-end)

• costs for ammonia consumption (vs pure SNCR)

Page 35: Oslo, February 17th, 2010 - SINTEF