11.0 11.5 12.0 12.0 12.0 12.0 12.0 12.0 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.5 13.5 13.5 13.5 13.5 13.5 13.5 13.5 .5 13.5 13.5 13.5 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.5 14.5 14.5 14.5 14.5 14.5 14.5 14.5 14.5 14.5 15.0 15.0 15.0 15.0 IT E M P T Y 250 DIA 250 DIA ( G L I ) IT E M P T Y 250 DIA 250 DIA ( G L I ) 10 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 13.60 13.60 13.80 14.00 16.60 16.80 16.80 16.80 17.00 17.00 17.20 17.20 17.40 17.40 17.40 17.60 10 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 13.60 13.60 13.80 14.00 16.60 16.80 16.80 16.80 17.00 17.00 17.20 17.20 17.40 17.40 17.40 17.60 WAREHOUSE 1A WAREHOUSE 2A WAREHOUSE 1B 10 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 13.60 13.60 13.80 14.00 16.60 16.80 16.80 16.80 17.00 17.00 17.20 17.20 17.40 17.40 17.40 17.60 INTERNAL ROAD MOOREBANK AVENUE DIRECT ROOF CONNECTION (TYP) BATTER 1V : 4H OSD BASIN 10 OSD BASIN 5 Issue Description Date 100mm on Original Project Title Client Project No. Issue Drawing No. Filename: Status Grid Original Size Scales Checked Designed Drawn Height Current Issue Signatures A1 Datum Approved AA009335 MOOREBANK PRECINCT WEST - STAGE 2 Arcadis Australia Pacific Pty Limited Level 16, 580 George St SYDNEY NSW 2000 ABN 76 104 485 289 Tel No: +61 2 8907 9000 Fax No: +61 2 8907 9001 arcadis.com MPW2 ARC CV DWG 0 1 : 1000 20 40 60 80 100m Date Plotted: 11 Oct 2018 - 01:45PM File Name: F:\AA009335\16_MPW2\CV\DWG\MPW2-ARC-CV-DWG-0212-CivilWorksAndStormwaterSheet2.dwg MPW2-ARC-CV-DWG-0212-CivilWorksAndStormwaterSheet2.dwg 0212 01 V1 CIVIL WORKS AND STORMWATER PLAN SHEET 2 PRELIMINARY ONLY NOT TO BE USED FOR CONSTRUCTION D.WALL G.DUNSTAN M.GOSTELOW W.OWERS 1:1000 AHD MGA 01 ISSUE FOR INFORMATION 11/10/2018 REFER TO DRAWING MPW2-ARC-CV-DWG-0213 FOR CONTINUATION LEGEND MPW STAGE 2 CONSTRUCTION AREA PROPOSED CONTOURS EXISTING CONTOURS PROPOSED AREA OF WORKS BY OTHERS ACCESS TRACK PROPOSED STORMWATER CULVERT / PIPE EXISTING STORMWATER CULVERT / PIPE PROPOSED KERB INLET PIT PROPOSED STORMWATER PIT PROPOSED GROSS POLLUTANT TRAP FUTURE PROVISION FOR POTENTIAL NOISE WALL BASIN WALL PROPOSED HEADWALL PROPOSED SCOUR PROTECTION INDICATIVE FUTURE BIORETENTION FILTER AREA (1% OF CONTRIBUTING CATCHMENT AREA) SUBJECT TO MPE STAGE 1 PROPOSAL (SSD 14 - 6766) 14.7 2.0 1 2 3 4 5 6 7 8 9 REFER TO DRAWING MPW2-ARC-CV-DWG-0211 FOR CONTINUATION REFER TO DRAWING MPW2-ARC-CV-DWG-0216 FOR CONTINUATION