ORV - SAGAR KANYA CRUISE REPORT
Cruise No: SN 346
DEPLOYMENT AND RETRIEVAL OF OMNI BUOYS AND TSUNAMI BUOY IN BAY
OF BENGAL (19th FEBRUARY 2018 to 27th MARCH 2018)
Report No. : NIOT/OOS/CR-135/2018/01
समु� � े� ण �णाल� / Ocean Observation Systems रा� ��य समु� �
ौ�यो�गक� सं� थान / National Institute of Ocean Technology
(प�ृ वी �व� ान मं�ालय, भारत सरकार) / (Ministry of Earth
Sciences, Govt. of India) प� ल�करण,ै चे� न ै– 600 100/
Pallikaranai, Chennai – 600 100
�वारा तैयार / Prepared By
�वारा स�या�पत / Verified By
�वारा समी� ा / Reviewed By
�वारा अनमुो�दत / Approved By
K.THIRUMURUGAN
M.SARAVANAN
R.SRIDHARAN
N.SUNDARAVADIVEL
P.RAMESH
एम. अ�ल मुततै्या / M.ARULMUTHIAH
समूह �धान / GROUP HEAD
�नदेशक महोद DIRECTOR
-
द�तावेज़ �नय�ंण शीट / DOCUMENT CONTROL SHEET
1. �रपोट� सं. / Report No. NIOT/OOS/CR-135/2018/01 2. �काशन �त�थ
/ Publication date 3. शीष�क और उपशीष�क / Title and Subtitle SK 346
Cruise Report 4. �रपोट� का �कार / Type of Report Deployment /
Retrieval of OMNI & Tsunami Buoy 5. प�ृठ सं�या / Number of
pages 6. लेखक / Authors K.THIRUMURUGAN M.SARAVANAN R.SRIDHARAN
N.SUNDARAVADIVELU P.RAMESH 7. इकाई का उ� व / Originating Unit समु�
� े� ण �णाल� / Ocean Observation Systems 8. सार / Abstract This
document proves complete cruise activity 9. मु�य श�द / Key words
Deployment and Retrieval of BD14,BD12,TB09,BD09,BD08,BD13, BD11 10.
सुर� ा वग�करण / Security classification Unrestricted to OOS
team
-
पावती / ACKNOWLEDGEMENT
We express our sincere gratitude to our beloved Director
Dr.M.A.Atmanand NIOT for providing us
the opportunity as well as the necessary facilities to carry out
the expedition.
We express our sincere thanks to our Group Head Dr. R.
Venkatesan, Ocean Observation Systems,
NIOT for his constant guidance, encouragement and support during
the entire course of this cruise.
We are very grateful to Director NCAOR and VOM Group Head for
providing ORV Sagar Kanya ship at
the required time for the successful completion of cruise.
Our sincere thanks to Capt.S.R. Lokhande, Officers and Crew of
ORV Sagar Kanya for their valuable
cooperation throughout the cruise and for the help and support
extended us to complete the task.
We are also thankful to NCAOR team, OOS team, NORINCO team and
Electronik lab for helping us at
various stages for successful completion of the cruise.
-
�वषय सूची / TABLE OF CONTENTS
अ�ययन सं. Chapter No.
�ववरण / Description प�ृठ सं. / Page No. 1 � ुज़ ल�य / Objective
of the Cruise 1 2 � ुज़ ट�म / Cruise Team 1 3 � ुज़ � ैक / Cruise
Track 2 4 � ूज साराशं / Cruise summary 3 5 दै�नक ग�त�व�धय� का �ववरण
/ Details of Day to day Activities 4
Annexure I Mooring Layout 13 II Retrieval & Deployment
Photos 20
-
1
CHAPTER 1
� ुज़ ल�य / OBJECTIVES OF THE CRUISE
The cruise SK 346 is dedicated to retrieval and deployment of 7
OMNI buoys and 1 Tsunami buoy system in Bay of Bengal. The cruise
team onboard ORV Sagar Kanya on 19th February 2018 from Tuticorin
to 27th March 2018 Chennai to expedite and to complete this
task.
CHAPTER 2
� ुज़ ट�म / NIOT CRUISE TEAM
� म सं. /
S. No. नाम / Name सगंठन / Organization Designation
1. THIRUMURUGAN KARUPPIAH NIOT, Chennai Chief Scientist
2. SARAVANAN MANICKAM NIOT, Chennai Dy. Chief Scientist
3. SRIDHARAN RAMALINGAM NIOT, Chennai Scientific Assistant
4. SUNDARAVADIVELU NAGARAJAN NIOT,Chennai Scientific
Assistant
5. RAMESH PUNNIAMOORTHY NIOT,Chennai Technician
6. SARAVANAN JAYAVELU M/s Norinco, Chennai Field Engineer
7. KINATTINKARA VEETTIL HARIKRISHNAN
M/s Norinco, Chennai Field Engineer
8. MOHAMED ISMAIL RAJAK M/s Norinco, Chennai Field Engineer
9. BALACHANDRA JATTI PATGAR M/s Norinco, Chennai Technician
10. EMAYAVARAMBAN SELVARAJ M/s Elektronik lab, Chennai
Deployment Assistant
11. UDHAYAKUMAR RAJI M/s Elektronik lab, Chennai Deployment
Assistant
12. PRAVEEN KUMAR M/s Elektronik lab, Chennai Deployment
Assistant
13. THIVAKAR SANKAR M/s Elektronik lab, Chennai Deployment
Assistant
14. JAGAN KUMAR M/s Elektronik lab, Chennai Deployment
Assistant
15. SUBRAMANIAN NATESAN M/s Elektronik lab, Chennai Deployment
Assistant
-
2
CHAPTER 3
ज़ � ैक / CRUISE TRACK
Buoy Id Latitude ( N ) Longitude ( E ) Depth ( m) Remarks BD14
06°34’38.4” 88°14’00” 3830 Retrieval & Deployment BD12
10°26’50.4” 94°01’26.4” 3104 Retrieval & Deployment TB09
17°13’43.15” 90°00’53.52” 2060 Retrieval & Deployment BD09
17°27’59.4” 89°07’00” 2320 Retrieval & Deployment BD08
17°47’28.9” 89°12’59.76” 2142 Retrieval & Deployment BD10
16°28'41.51” 87°58'52.07” 2684 Retrieval & Deployment BD13
13°58'24.98” 86°56'49.8” 3024 Retrieval & Deployment BD11
13°29'50.62” 84°09'40.09” 3260 Retrieval & Deployment
-
3
CHAPTER 4
CRUISE SUMMARY
The cruise operation was arranged by OOS, NIOT during Feb 2018
to deployment and
retrieval of MET, WAVE, Tsunami buoy systems. Cruise team sailed
from Tuticorin port on 19th Feb
2018 onboard ORV Sagar Kanya (SN-346). Team reached each buoy
location on the respective dates
(given in the table) and buoy deployment and retrieval
operations were successfully carried out.
SI. No
DATE STATION
ID OPERATION
LOCATION STATION DEPTH Latitude Longitude
1. 28.02.2018 BD 14 Buoy Retrieval 06°34"78 N 088°12"25 E 3830
m
2. 01.03.2018 BD 14 Buoy
Deployment 06°34.75 N 088°19.16 E 3830 m
3. 04.03.2018 BD 12 Buoy Retrieval 10°23.55 N 093°56.57 E 3104
m
4. 05.03.2018 BD 12 Buoy
Deployment 10°30.23 N 094°02.10 E 3050 m
5. 15.03.2018 TB 09 Buoy Retrieval 17°14.18 N 090°00.75 E 2060
m
6. 15.03.2018 TB 09 Surface Buoy Deployment
17°15.68 N 089°58.84 E 2320 m
7. 16.03.2018 BD 08 Buoy Retrieval 17°47.200'N 89°13.189'E 2142
m
8. 16.03.2018 BD 08 Buoy
Deployment 17°49.868 N 089°13.549 E 2150 m
9. 17.03.2018 BD 09 Buoy Retrieval 17°27.297'N 89°06.207'E 2320
m
10. 17.03.2018 BD 09 Buoy
Deployment 17°29.578 N 089°07.741 E 2300 m
11. 19.03.2018 TB09 BPR
Deployment 17°15.896 N 089°59.105 E 2320 m
12. 23.03.2018 BD 13 Buoy Retrieval 13°59.170" N 086°57.932" E
3024 m
13. 23.03.2018 BD 13 Buoy
Deployment 14°02.023 N 087°00.040 E 3000 m
14. 25.03.2018 BD 11 Buoy Retrieval 13°28.252" N 084°07.382" E
3260 m
15. 25.03.2018 BD 11 Buoy
Deployment 13°30.664 N 084°10.874 E 3235 m
-
4
CHAPTER 5
दै�नक ग�त�व�धय� का �ववरण / DETAILS OF DAY BY DAY ACTIVITIES This
chapter describes the details of day to activities carried out
during the cruise. 19 - February - 2018
14:30 Hrs Scientific cruise participants were completed the
signed on. 16:30 Hrs Scientific cruise participants were reported
ship. 17:00 Hrs Accommodation allotted to all the participants.
18:30 Hrs Chief scientist handed over all the cruise participants
passport and medical certificate
to Master. 19:00 Hrs Started the loading the materials to ship
from 17 trucks
20- February – 2018
02:30 Hrs completed the Materials Loading to ship 10:30 Hrs All
the materials were properly lashed in deck and updated to the
Master and chief officer. 03:00 Hrs CT sensors cleaning work 05:00
Hrs Zinc anodes fixed on keel weight
21 – February – 2018
08:30 Hrs Started the BD14 buoy sensor assembly work. 10:30 Hrs
12:00 Hrs
Mounted the Capstan winch on deck and tested the operational
performance. CT sensors Cleaning and change new batter for BD14
14:00 Hrs Fasteners segregation work 16:00 Hrs Sensor arm
cleaning and fixed all the met sensors on sensor arm
22 – February – 2018
08:30 Hrs Induction cable marking work. 12:30 Hrs Sending for
BD14 BUOY CFG File and Sensors Print short in NIOT. 14:00 Hrs 16:00
Hrs 17:00 Hrs
Started the assembly BD12 Buoy CT sensors Cleaning and change
new batter for BD12 Initiated the BD 14 buoy onboard testing
23 – February – 2018
09:00 Hrs Checked the met sensors and CT,DVS and ADCP . 10:30
Hrs Sending for BD12 BUOY CFG File and Sensors Print screen short
to NIOT 12:00 Hrs 16:00 Hrs 17:00 Hrs
Vessel started sailing towards BD14 location. All the
participants attended the ship safety drill conducted by the Master
BD 12 buoy CT sensors Cupper Guard cleaning and fixed the
sensors.
-
5
24 – February – 2018
09:00 Hrs Mast and sensors assembled on BD14 buoy 10:00 Hrs
Scientific team meeting with Master and ship officials about cruise
plan and activities 11:00 Hrs Started the assembly of keel frame
and keel weight and the attached to BD14 buoy
instrument container. 15:00 Hrs Checked the met sensors and CT
,DVS and ADCP 16:00 Hrs Checking for CFG File and Sensors Print
screen short 17:00 Hrs 18:00 Hrs
Rooted the Mast cable and sensor arm. Anti vandal flange was
fixed. Initiated the BD14 & BD 12 INSAT and CLS ARGO
testing.
25 – February – 2018
09:00 Hrs CT sensors Cleaning and change new batter for BD08.
10:00 Hrs 11:00 Hrs 14:00 Hrs 14:30 Hrs
Assembled sensors on frames. ADCP cable was rooted through
protection hose. Checked the met sensors and CT, DVS and ADCP for
BD 08. Induction cable marking was done for BD 12 buoy.
26 – February – 2018
09:00 Hrs Visual Inspection of Glass floats for BD 14 & BD
12 (Total 12 Nos) Glass floats 06 numbers were assembled with 7.5 m
length chain.
11:00 Hrs 12:00 Hrs 15:00 Hrs 16:00 Hrs 17:00 Hrs
BPR battery changed. Cleaned the CT sensors for BD 08 buoy. The
BD 08 buoy onboard testing was initiated. Changed the BPR battery.
Checked the OBM and Boat. The OBM performance was checked.
27 – February – 2018
09:00 Hrs Cupper guard and nylon bush was assembled with CT
sensors. 10:30 Hrs 12:00 Hrs 16:00 Hrs 17:00 Hrs
Upper mast painting work. Fixed the radar reflector and CT
sensor mounted on hull. BD 14 buoy ID and NIOT logo was painted on
buoy hull and hood. CT sensors 1 m and 5 m was fixed on the keel
frame and ADCP frame.
28 – February – 2018
11:00 Hrs Ship was reached to BD 14 location and sighted the
buoy. 11:10 Hrs 12:30 Hrs 13:00 Hrs 13:50 Hrs 14:00 Hrs 14:40 Hrs
15:00 Hrs 15:15 Hrs 15:30 Hrs
Started ship CTD castle Completed the CTD castle. Position the
Ship for release the BD 14 buoy. Dunker Lowered for release
Command. Release Command executed. Received the Acknowledgement
from acoustic release. Boat on water. Buoy retrieval started at Lat
: 06°34"78 N Long: 088°12"25 E Buoy on deck.
-
6
15:45 Hrs 16:20 Hrs 17:00 Hrs 18:15 Hrs 18:30 Hrs 20:30 Hrs
22:45 Hrs
Boat on deck. Retrieved all CT sensors. Retrieved Nylon rope and
Green floats. Retrieved all PP ropes. Retrieved acoustic release
and Glass floats. Started the Bathymetry Survey in BD 14 deployment
location Completed the Bathymetry survey.
01 – March – 2018
09:00 Hrs 10:00 Hrs 10:28 Hrs 11:00 Hrs 11:25 Hrs 12:25 Hrs
12:30 Hrs 13:00 Hrs 15:00 Hrs 15:30 Hrs
Moved the BD 14 buoy near to the ‘A’ frame. The Ship position
for BD 14 Buoy deployment. Buoy on Water. Lat : 06°34.95 N Long:
088°16.84 E Completed the Induction cable deployment. Completed the
Nylon rope deployment. Completed the PP rope deployment. Anchor
dropped. Lat : 06°34.75 N Long: 088°19.16 E Started the Ship CTD
castle. Completed the Ship CTD castle. Confirmed deployed BD 14
buoy data and vessel started to next location BD 12.
02 – March – 2018
09:00 Hrs 10:00 Hrs 10:30 Hrs 11:00 Hrs 12:00 Hrs 16:00 Hrs
16:45 Hrs 17:30 Hrs
BD 12 buoy was shifted to aft and started the assembly work.
Cable was routed through upper mast and sensor arm. ADCP cable was
routed through the flexible hose. Hood was fixed to the hull. DVS
and 0.45 m CT sensor was fixed on the PVC frame. Glass floats were
fixed on the 7.5 m chain Anti vandal flange, radar reflector and
becon lamp was fixed on the sensor arm. Mooring hardware was fixed
up to ADCP frame.
03 – March – 2018
09:00 Hrs 10:00 Hrs 10:30 Hrs 11:00 Hrs 15:25 Hrs 16:25 Hrs
17:30 Hrs
ADCP was fixed on the frame. Solar panel was opened and routed
the cable. CT sensor 1 m was fixed on the keel frame. Induction
cable was marked for CT sensor mounting. Retrieved BD 14 was
shifted to balloon deck. Shifted the ropes from balloon deck to aft
deck. New anode was fixed on the acoustic release.
04 – March – 2018
09:15 Hrs 09:30 Hrs 09:35 Hrs 09:37 Hrs
Ship was reached to BD 12 location and sighted the buoy. Vessel
in DP and position for release the BD 14 buoy. Dunker Lowered for
release Command. Release Command executed.
-
7
09:45 Hrs 09:50 Hrs 10:10 Hrs 10:20 Hrs 10:45 Hrs 11:30 Hrs
11:50 Hrs 12:15 Hrs 12:30 Hrs 14:30 Hrs 20:30 Hrs 23:00 Hrs
Received the Acknowledgement from acoustic release. Boat on
water. Buoy retrieval started at Lat : 10°23.55 N Long: 093°56.57 E
Buoy on deck. Boat on deck. Retrieved all CT sensors. Retrieved
Nylon rope and Green floats. Retrieved all PP ropes. Retrieved
acoustic release and Glass floats. BD12 final assembly work was
done Bathymetry survey started Completed the Bathymetry survey
05 – March – 2018
07:45 Hrs 08:00 Hrs 08:15 Hrs 08:42 Hrs 09:05 Hrs 10:05 Hrs
10:15 Hrs 11:00 Hrs 12:25 Hrs 13:00 Hrs 13:15 Hrs
Moved the BD 12 buoy near to the ‘A’ frame. The Ship position
for BD 12 Buoy deployment. Buoy on Water at Lat : 10°28.36 N Long:
094°02.63 E Completed the Induction cable deployment with CT
sensors. Completed the Nylon rope deployment at the end attached 10
nos of plastic floats. Completed the PP rope deployment. Anchor
dropped at Lat : 10°30.23 N Long: 094°02.10 E Post deployment ship
CTD castle started Completed the ship CTD castle BD12 buoy watch
circle and data confirmed by the shore team Ship started heading
towards TB09 location
06 – March – 2018
09:00 Hrs 10:30 Hrs 15:00 Hrs 17:00 Hrs 20:00 Hrs 20:30 Hrs
BD08 buoy mechanical assembly was started Retrieved BD 14 and BD
12 Buoys shifted to balloon deck Completed the BD08 buoy assembly
work Materials shifting and arrangement works Ship RO plant was
problem. For the same informed by the Master Chief scientist
informed to office about RO plant problem
07 – March – 2018
12:15 Hrs 12:30 Hrs 09:00 Hrs 10:00 Hrs 12:30 Hrs 16:00 Hrs
18:00
As per the direction of SCI, the ship heading towards Port Blair
for repairing of RO plant. The ship heading towards Port Blair was
informed to office by Chi.Sci Tsunami pipe and keel frame was
cleaned and fixed the anodes Started the TB09 buoy assembly work
Completed the TB09 buoy mechanical assembly work. Upper mast and
sensor arm was connected and fixed the modem. Ship reached to Port
Blair. The ship was drifting due to non availability of berth at
port.
-
8
08 – March – 2018
09:00 Hrs 10:00 Hrs 11:30 Hrs 16:00 Hrs 18:30 Hrs
Cleaned the keel weight and keel frame for BD 09 buoy. Fixed the
anodes on keel weight Keel weight assembly was interfaced with the
main BD09 buoy system. Started ship from drifting to inside port.
The ship was anchored at port inner anchorage area.
09 – March – 2018
09:00 Hrs 10:00 Hrs 11:30 Hrs 16:00 Hrs 17:00 Hrs
Started the Cleaning work of the ADCP frame. Completed the
cleaning and started the painting work. Prepared the pre-deployment
sheet for TB09 and sent to office. Ropes and other materials were
shifted from port side to deck inner side Cleaning of CT
sensors.
10 – March – 2018
09:00 Hrs 10:00 Hrs 16:00 Hrs 15:00 Hrs
Started the induction cable marking. Fixed the anodes on keel
weight BPR float was attached to BPR. Deck space was cleaned
11 – March – 2018
09:00 Hrs 10:00 Hrs 11:30 Hrs 16:00 Hrs
Drilling was done on sensor arm Fixed sensors on sensor arm DVS
was fixed on DVS frame. Flexible hose was cut for ADCP cable
routing
12 – March – 2018
09:00 Hrs 16:00 Hrs 17:30 Hrs
Cleaned the CT sensors. Changed the bush Copper guard on CT
sensors Shifting the in deck place
13 – March – 2018
09:00 Hrs 10:00 Hrs 11:30 Hrs 16:00 Hrs 17:00 Hrs
Cleaned the keel weight and keel frame for BD 08 buoy. Fixed the
anodes on keel weight Keel weight assembly was interfaced with the
main BD08 buoy system. Upper mast and sensor arm assembly work
Cable was routed from sensor arm to buoy
-
9
14 – March – 2018
09:00 Hrs 11:30 Hrs 16:00 Hrs 15:30 Hrs
Final assembly work was carried out on TB09 buoy LID plate was
checked and closed with fasteners Anti fouling paint were applied
at the bottom of the instrument housing Radar reflector was fixed
on the upper mast
15 – March – 2018
05:30 Hrs TB09 Buoy was sighted 06:15 Hrs Position the ship BPR
dropped location 06:30 Hrs Dunker lowered and communicated to BPR
06:36 Hrs CPW command executed 07:10 Hrs BPR was sighted 07:15 Hrs
Boat on water 07:25 Hrs Boat reached near to BPR and started the
towing 07:30 Hrs BPR on deck and cleared using fresh water 07: 35
Hrs Boat reached to buoy and connected the heaving rope 07:50 Hrs
Deep winch cable was connected to buoy 08:00 Hrs Buoy on deck at
Lat: 17°14.18 N Long: 090°00.75 E 08:10 Hrs Boat on deck 12:40 Hrs
The ship positioned near buoy deployment location 12:50 Hrs Buoy
connected to Crane’s wire rope 12:55 Hrs Buoy on Water at Lat:
17°17.02 N Long: 090°00.10 E 13:25 Hrs Combination rope deployment
completed 13:35 Hrs Completed the Nylon rope deployment 14:20 Hrs
Completed the PP rope deployment 14:25 Hrs Anchor dropped at Lat:
17°15.68 N Long: 089°58.84 E 16 – March – 2018
05:30 Hrs Started ship CTD castle 06:30 Hrs Completed the CTD
castle 07:00 Hrs Ship was reached to BD08 location and sighted the
buoy 07:20 Hrs Dunker lowered for release command 07:45 Hrs Release
command executed 07:50 Hrs Boat on Water 08:10 Hrs Glass Float and
Green Floats was Sighted 08:30 Hrs Buoy on Deck at Lat: 17°47.200'N
Long: 89°13.189'E 08:50 Hrs Boat on Deck 09:00 Hrs Started
retrieval of Induction cable and CT sensors 09:45 Hrs Completed the
Induction cable with CT sensors 11:00 Hrs Green Float on Deck 12:25
Hrs Glass Float and acoustic release on Deck 12:30 Hrs Started the
vessel proceeding to bathymetry survey location 16:45 Hrs The Ship
position for BD 08 Buoy deployment 16:55 Hrs Buoy on Water at Lat:
17°50.663 N Long: 089°14.8824 E 17:15 Hrs Completed the Induction
cable deployment 17:25 Hrs Completed the Nylon rope deployment
17:55 Hrs Completed the PP rope deployment 18:00 Hrs Anchor dropped
at Lat: 17°49.868 N Long: 089°13.549 E
-
10
17 – March – 2018
05:30 Hrs Started ship CTD castle 06:15 Hrs Completed the CTD
castle 06:30 Hrs Ship was reached to BD09 location and sighted the
buoy 06:50 Hrs Dunker lowered for release command 07:00 Hrs Release
command was executed 07:15 Hrs Boat on Water 07:45 Hrs Buoy on Deck
at Lat: 17°27.297'N Long: 89°06.207'E 08:10 Hrs Glass Float and
Green Floats was Sighted 08:20 Hrs Boat on Deck 08:25 Hrs Started
retrieval of Induction cable and CT sensors 08:50 Hrs Completed the
Induction cable with CT sensors 09:05 Hrs Green Float on Deck 09:45
Hrs Glass Floats and acoustic release on Deck 09:55 Hrs Started the
vessel proceeding to bathymetry survey location 17:00 Hrs The Ship
position for BD 09 Buoy deployment 17:20 Hrs Buoy on Water at Lat:
17°29.176 N Long: 089°09.578 E 17:35 Hrs Completed the Induction
cable deployment 17:50 Hrs Completed the Nylon rope deployment
18:20 Hrs Completed the PP rope deployment 18:25 Hrs Anchor dropped
at Lat: 17°29.578 N Long: 089°07.741 E
18 – March – 2018
06:30 Hrs TB09 Buoy Sighted 08:00 Hrs Boat on water 09:10 Hrs
BPR near TB 09 Position Lat: 17°15.89 Long: 089°59.10 09:20 Hrs BPR
commands not enhanced by TB09 Surface modem 09:30 Hrs Boat on Deck
12:00 Hrs BPR commands not connect TB09 Surface modem 15:00 Hrs New
BPR was deployed in aft and also tried to communicate Surface modem
15:50 Hrs New BPR also could not communicate Surface modem. 16:00
Hrs New BPR on deck 16:30Hrs Boat on water for checking the wiring
connection in surface buoy 17:15 Hrs Boat on deck 17:30 Hrs Onboard
team decided that surface modem SMT has some problem 18:00 Hrs
started the onboard testing of another SMT with BPR
19 – March – 2018
06:00 Hrs Ship is positioned near to TB09 buoy 06:20 Hrs Boat on
water 06:50 Hrs TB09 Buoy on Deck at Lat: 17°16.371 N Long:
89°58.835 E 07:30 Hrs Boat on Deck 09:00 Hrs New Surface modem
(S/N:272326-004) was interfaced with surface buoy 09:30 Hrs Started
the onboard testing of SMT with BPR. 11:45 Hrs Both were worked
fine and planned to deploy the TB09 buoy 12:00 Hrs Boat on
Water
-
11
12:35 Hrs TB09 Buoy on Water Lat: 17°16.245 N Long: 089°59.013 E
12:45 Hrs Boat on Deck 14:15 Hrs Ship positioned BPR drop position
Lat: 17°15.896 N Long: 089°59.105 E 14:30 Hrs Started lowering the
BPR 14:40 Hrs At 103 m depth the BPR communicated with surface buoy
SMT 15:20 Hrs BPR released at 1340 m water depth 17:45 Hrs Shore
team confirmed the BPR settled on sea bed 20 – March – 2018
16:30 Hrs 17:00 Hrs 17:30 Hrs 20:00 Hrs 22:00 Hrs
Ship is positioned near to BD10 buoy location Dunker was
deployed in sea and enhanced commands for acoustic release for BD10
Due to non availability of sunlight, the ducker was taken from sea
Vassal started to Bathymetry survey location Completed the
bathymetry survey
21 – March – 2018
06:30 Hrs 07:00 Hrs 08:00 Hrs 10:30 Hrs 11:00 Hrs 17:00 Hrs
20:00 Hrs 21:00 Hrs
Ship is positioned near to BD10 buoy location Dunker was
deployed in sea and enhanced commands for acoustic release for BD11
The acoustic release was not received signal from dunker and also
not release the mooring from buoy Planned to do triangularation at
anchor drop position The BD10 could not release from its mooring
Contacted with OEM for problem solving The BD10 buoy could not
retrieved considering various environmental conditions and started
heading to next location BD13
22 – March – 2018
09:00 Hrs 11:30 Hrs 16:00 Hrs
Started the BD11 buoy assembly work All mechanical components
were assembled on buoy system 02 Nos of Induction cable was marked
for sensor fixing
23 – March – 2018
07:25 Hrs Position the Ship for release the BD 13 buoy 07:30 Hrs
Dunker Lowered for release Command 07:45 Hrs Release Command
executed 07:50 Hrs Boat on water 08:05 Hrs Buoy retrieval started
at Lat : 13°59.170" N Long: 086°57.932" E 08:15 Hrs Buoy on deck
08:50 Hrs Retrieved all CT sensors 09:00 Hrs Boat on deck 09:10 Hrs
Retrieved Nylon rope and Green floats 09:50 Hrs Retrieved all PP
ropes 09:55 Hrs Retrieved acoustic release and Glass floats 15:40
Hrs The Ship position for BD 13 Buoy deployment 15:51 Hrs Buoy on
Water at Lat : 14°03.313 N Long: 087°01.592 E 16:10 Hrs Completed
the Induction cable deployment
-
12
16:30 Hrs Completed the Nylon rope deployment 17:05 Hrs
Completed the PP rope deployment 17:10 Hrs Anchor dropped at Lat :
14°02.023 N Long: 087°00.040 E 21:00 Hrs BD13 buoy data was
confirmed by the SSAMC than the vessel started heading
towards BD11 buoy locations 24 – March – 2018
09:00 Hrs 11:30 Hrs 16:00 Hrs 17:00 Hrs
CT sensors were cleaned for BD11 buoy deployment Protection
guards were fixed on the CT sensors BD11 buoy lid was check ADCP
was fixed on frame and routed the cable
25 – March – 2018
06:00 Hrs Position the Ship for release the BD 11 buoy 06:30 Hrs
Dunker Lowered for release Command 06:40 Hrs Release Command
executed and released the mooring 06:50 Hrs Boat on water 06:55 Hrs
Buoy retrieval started at Lat : 13°28.252" N Long: 084°07.382" E
07:05 Hrs Buoy on deck 07:50 Hrs Boat on deck 08:50 Hrs Retrieved
all CT sensors 09:10 Hrs Retrieved Nylon rope and Green floats
09:50 Hrs Retrieved all PP ropes 10:00 Hrs Retrieved acoustic
release and Glass floats 16:00 Hrs The Ship position for BD 11 Buoy
deployment 16:20 Hrs Buoy on Water at Lat : 13°32.609 N Long:
084°09.019 E 16:45 Hrs Completed the Induction cable deployment
17:05 Hrs Completed the Nylon rope deployment 18:05 Hrs Completed
the PP rope deployment 18:10 Hrs Anchor dropped at Lat : 13°30.664
N Long: 084°10.874 E 21:00 Hrs Deployed buoy data was confirmed by
shore team. 21:10 Hrs The vessel started heading towards
Chennai
26 – March – 2018
09:00 Hrs BD11 buoy cleaning work was carried out 10:30 Hrs
Retrieved sensors cleaning work was carried out 11:40 Hrs Ropes and
frames were segregated 12:00 Hrs Rope tied on all the buoy for
transportation purpose 15:00 Hrs Packed the all the met sensors, CT
sensors and ADCP 17:05 Hrs All the sensors boxes keep it on the
deck
27 – October – 2017
07:00 Hrs V/L reached near to Chennai port 07:20 Hrs V/l reached
the Pilot boarding point 07:35 Hrs Pilot onboard 08:25 Hrs V/L
berthed on the Chennai port
-
13
Annexure - I
Mooring Layout
BD14 Buoy
BD12 Buoy
-
14
BD12 Buoy
-
15
BD08 Buoy
BD09 Buoy
BD13 Buoy
-
16
BD09 Buoy
BD11 Buoy
-
17
BD 13 Buoy
-
18
BD11 Buoy
-
19
TB09 Buoy
TB12 Buoy
-
20
Annexure - II
Retrieval & Deployment Photos
BD14 Buoy Retrieval
BD14 Buoy Deployment
-
21
BD12 Buoy Retrieval
BD12 Buoy Deployment
-
22
BD08 Buoy Retrieval
BD08 Buoy Deployment
-
23
BD09 Buoy Retrieval
BD09 Buoy Deployment
-
24
BD13 Buoy Retrieval
BD13 Buoy Deployment
-
25
BD11 Buoy Retrieval
BD11 Buoy Deployment
-
26
TB09 Buoy Retrieval
TB09 Buoy Deployment