Top Banner

of 64

Ortdm Gds Profile

Jun 03, 2018

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 8/12/2019 Ortdm Gds Profile

    1/64

  • 8/12/2019 Ortdm Gds Profile

    2/64

  • 8/12/2019 Ortdm Gds Profile

    3/64

    c o n t e n t s

    I N T R OD U C T I O N . . . . . . . . . . . . . . . . 4

    O B J EC T I V E S O F T H E S U M M I T . . . . . . . . . 5

    B A C K GR O U ND . . . . . . . . . . . . . . . . . 6

    M E T HO D O L OG Y . . . . . . . . . . . . . . . . 6

    D I S T R I C T S N A P S HO T . . . . . . . . . . . . . . 7

    D E L I V E R Y O F B A S I C S E R V I C E S . . . . . . . . 1 0 Water . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

    Sanita tion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11

    Electr icity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

    Housing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

    I M P R O V E P U B L I C S E R V I C E S . . . . . . . . . 2 0

    Health . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

    HIV & AIDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

    Education . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24

    Skills Upgrading . . . . . . . . . . . . . . . . . . . . . . . . . . 25

    Transport . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

    J O B C R E A T I O N A N D

    L I V E L I H O O D O P P OR T U N I T I E S . . . . . . . . 2 8

    Livestock Farming . . . . . . . . . . . . . . . . . . . . . . . . 29

    Dryland Farming and Irrigated Horticulture . . 29

    Forestr y . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30

    Manufac turing . . . . . . . . . . . . . . . . . . . . . . . . . . . 30

    Construction And Mining . . . . . . . . . . . . . . . . . . 31

    Trade and Business Services/ic t . . . . . . . . . . . . . 31

    Tourism . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31

    B U I L D A N D M A I N T A I N I N F R A S T R U C T U R E . . 3 2

    Strategic Infrastructure Project:

    Kei Development Corr idor . . . . . . . . . . . . . . . . 37

    F I G H T P O V E R T Y . . . . . . . . . . . . . . . 4 0

    M U N I C I P A L C A P A C I T Y A ND C O O P E R A T I O N . . 4 1

    C O N C L U S I O N . . . . . . . . . . . . . . . . . 4 4

    A C R O N Y M S . . . . . . . . . . . . . . . . . . 4 6

    G D S AG R E E M EN T . . . . . . . . . . . . . . 4 8

    3

  • 8/12/2019 Ortdm Gds Profile

    4/64

    4

    Building on the results of the National Growth and

    Development Summit in June 2003, government

    proposed that all District and Metropolitan Mu-

    nicipalities hold Growth and Development Summits

    (GDS) in their area of jurisdiction.

    The summits should provide oppor tunities forbuilding partner ships with social partners by bringing

    together represent ati ves from the broadest sec tions

    of society: labour, business, community sector and

    government (local, Province and national).

    I N T R O D U C T I O N Government has identied distric t and metropolitan

    areas as the pivotal sites on which to build an

    understanding of the nature and distribution of

    regional economic potential across the country.

    Collaborative action between government and

    social partners across all the three spheres is vital inforging a common vision for promoting rising levels

    of growth, investment, job creation, and people-

    centred development.

  • 8/12/2019 Ortdm Gds Profile

    5/64

    5

    The aim of the GDS is to reach broad agreement on:

    A development path and development programme

    for the district and

    What each social partner (government, business,

    labour and community sector) should contribute to

    the implementation of the programme.

    Strengthening the strategic thrust of the district IDPto ensure planning and implementation ali gnment

    between the spheres of government, as well as

    public entities

    In this regard the GDS should seek to address the

    following specic questions and issues:

    1. The OR Tambo Distric ts economic potential and

    which sectors of the economy should be promoted

    (this would need, where applicable, to be informed

    by the IDP, LED and the RIDS)

    2. Commitments by government, business, labour

    and community sector to ensure investment in

    each of the sectors

    3. Actions required by government and each partner

    to deal with const ra int s to such inves tments,

    including dealing with bureaucratic delays, EIA

    processes and land use management

    4. Social and economic infrastructure programmes

    required to improve investments and provide basic

    services to communities

    O B J E C T I V E S O F T H E S U M M I T 5. Contribution by each partner to the construction

    of such infrastructure, including possibility of PPP

    6. Second Economy interventions (EPWP including

    roads & ECD, co-operatives, micro-credit,

    procurement, land reform, etc) and the role of

    each sector in such interventions

    7. Promoting local procurement what interven-

    tions are requir ed?

    8. Improving capacity of local government and

    contribution of each social partner: including role

    of public sector unions in ensuring efciency, role

    of all in ghting corruption, contribution by private

    sector and professionals to skills required by the

    district/metro

    9. Establishing a partnerships and/or regional growth

    coalitions which will act as a mechanism for coop-

    erative action at all levels and a robust framework

    for monitoring and evaluating progress

  • 8/12/2019 Ortdm Gds Profile

    6/64

    6

    The document presents the socio-economic

    dynamics of the OR Tambo District Municipality.

    It is a resultant of a consultative process involving

    a number of stakeholders and interest parties

    within the district. The stakeholders were required

    to compile the ir respec tive interpretations of

    the economic conditions and soc ial elementsof the district, and an attempt has been made

    at synchronising, aligning and harmonising their

    inputs.

    In this compilation, the information presented is an

    effort to achieve the following objectives:

    To ensure that discussion on the above issues takes

    place on an informed basis

    To present a coherent picture of the social, demo-

    graphic, and economic prole and service levels of

    the area

    To present a picture of the challenges facing local

    government especially in relation to capacity

    To sugges t the mechanisms & processes for moni-

    tor ing progress on the dec isions reached and the

    governance framework for ongoing dialogue and

    feedback among social partners.

    The district GDS presents a unique opportunity

    for constructing partnerships and harnessing the

    collective energies and contributions of a range of

    actors and role players with a view to enhancing

    accelerated and shared growth.

    The district GDS has the potential to unlock the

    potential of all localities, and ensur e that all sectors

    of society identif y their role and contribute to the

    common national objective to build a better life

    for all.

    This prole for OR Tambo is based on a number of

    documents and information from a range of sources.

    These broadly include the following:

    ECSECC data, publications and reports

    Monitor Group report

    District and local municipal IDPs (& other ofcial

    documents)

    Data from the Rapid Assessment of services in the

    Eastern Cape conducted in 2006)

    Various research reports

    B A C K G R O U N D

    M E T H O D O L O G Y

  • 8/12/2019 Ortdm Gds Profile

    7/64

    7

    The OR Tambo Distr ict stretches from the Indian

    Ocean coastline in the southeast (the Wild Coast)

    to the Mah lah lane and Basiya mountains in the west,

    and from the Umthamvuna River in the nor th to the

    Mbashe River in the south. The entire District was

    part of the former Transkei Bantustan.

    D I S T R I C T S N A P S H O T

  • 8/12/2019 Ortdm Gds Profile

    8/64

    8

    The District has a population of about 1.7 million

    people. The Distric t is rather densely populated (more

    than 100 people per square kilometre , predominantly

    rural (93%), with dispersed homesteads (making

    basic services provision expensive). Access to basic

    services such as potable water, sanitation, electricity

    and access roads is relatively low. Sewage owsinto the Mthatha and Tsolo rivers, and outbreaks of

    cholera and t yphoid occur.

    The GGP per capita of the Distric t is only 30% of

    the Provincia l aver age , and rates of unemployment

    and poverty are very high. Rates of economic

    growth are low and the District lacks an economic

    hub. Private sector activity is largely restricted to

    the trade sector and a smal l timber i ndust ry. Pr iva te

    investment in the Distric t is hindered by a backward

    (communal) land tenure system and a physical

    planning system still in its infancy (the District will

    nalise its Spatial Development Framework later

    thi s year, and this wil l form the bas is of a land-use

    management system).

    On the other hand, because of its poverty prole,

    the Dis tr ic t was, and is , a focus of many Sta te

    development initiatives. These include:

    Wild Coast SDI

    Presidential Projec t Team (in the 1990s)

    Integrated and Sus tainable Rural Development

    Programme (ISRDP)

    Urban Renewal Programme (Ngangelizwe)

    Increasing scal allocations to address infrastructure

    backlogs Project Consolidate

    Proposed N2 Toll road

    Proposed Pondoland National Park

    Kei rail

    PGDP Massive Food Programme

    Proposed AsgiSA programmes, such as Forestry

    Cluster, Umzimvubu Irrigation Project, biofuels, call

    centres etc

    Ntinga OR Tambo Development Agency

    DEAT programmes (Working for Tourism, Working

    for the Coast, Working on Waste, Sustainable land-

    based livelihoods. Total annual budget presently

    nearly R150 million).

    The District is divided into seven local municipal

    areas, each with at least one urban service centre:

    King Sabata Dalindyebo (Mthatha and Mqanduli),

    Nyandeni (Libode), Port St Johns, Mhlontlo (Tsolo

    and Qumbu), Ntabankulu, Mbizana and Qaukeni

    (Flagstaff and Lusikisiki).

  • 8/12/2019 Ortdm Gds Profile

    9/64

    9

    The eight municipalities of OR Tambo had a

    combined capital expenditure budget of R692million in 2005/06. This amounts to a capex per

    capita of R412, slightly below the provincial average.

    70% of this total capex is budgeted by the District

    Municipality. One municipality (PSJ) has a capex

    budget of just R1 million. 93% of the total capex

    budget is to be funded from grants and subsidies.

    This is the highest ratio in the Province.

    The combined municipalities have an operating

    budget of R718 million, equivalent to R428 per

    capita, which is very low by provincial standards.

    54% of operating revenue is grants and subsidies

    (much higher than provincial average). Income

    from property rates accounts for nearly 10% of

    total operating revenue. 84% of total ra tes income

    is budgeted to come from King Sabata Dalindyebo

    (KSD) Municipality. Personnel costs account for

    about 45% of budgeted operating expenditure

    (above average). KSD accounts for 42% of budgeted

    personnel costs. The D istrict Municipality accountsfor 23% of total personnel costs.

    To address Provincial development challenges

    and opportunities, the Provincial Growth and

    Development Plan (PGDP) was launched in 2004,

    and PGDP nds expression in all the Districts

    IDPs. More recently, AsgiSA has been launched

    to accelerate economic growth throughout Sou th

    Africa. The present document aims to outline the

    elements of a development strategy for the OR

    Tambo Distric t. Specically, this document considers

    how to:

    Speed up delivery of basic services

    Improve public services (schools, clinics etc)

    Create jobs and livelihood opportunities

    Build and maintain infrastructure

    Fight poverty

    Augment Municipal capacities and co-operation

  • 8/12/2019 Ortdm Gds Profile

    10/64

    10

    This section briey outlines servi ce delivery with

    respect to water, sanitation, electricity and housing,

    drawing mainly on a provincial household survey

    conducted in 2006 (RSS). These trends are evaluated

    against the benchmark of the 2001 census.

    WAT E R The percentage of households in Or Tambo still

    relying on natur al water sources (62%) is more than

    twice the provincia l Average of 28% . Households

    in Mbizana (94%), Qaukeni (82%) and Nyandeni

    (66%) reect the highest levels of those suffering

    the vulnerabil it y of natur al water sources . All of the

    remaining local municipal areas are well above the

    provincial average and suggest a crisis in household

    water access within the district if RDP standards are

    used as the norm.

    D E L I V E R Y O F B A S I C S E R V I C E S

    Water access by household for the Eastern Capeand loca l Municipalities in OR Ta mbo for 2001 - 2006

    Water on Site Borehole/Tank Community Stand Natural water/dam Water Vendor/other

    Census2001

    RSS 2006Census2001

    RSS 2006Census2001

    RSS 2006Census2001

    RSS 2006Census2001

    RSS 2006

    % % % % % % % % % %

    Eastern Cape 37.4 41.8 4.0 3.8 25.3 25.1 31.4 28.0 1.9 1.4

    O.R.Tambo 10.0 10.2 5.9 4.1 17.9 21.1 64.1 62.4 2.1 2.2

    Mbizana 2.9 0.7 2.9 0.0 14.9 3.8 77.6 94.2 1.8 1.2

    Ntabankulu 3.4 2.3 3.7 9.7 16.1 44.5 75.0 43.5 1.8 0.0

    Qaukeni 8.0 4.1 3.8 1.0 13.8 12.6 72.4 81.9 2.0 0.4

    Port St Johns 5.7 6.5 5.1 2.7 13.7 39.2 73.8 50.8 1.7 0.8

    Nyandeni 3.9 9.3 7.4 5.8 18.7 18.0 67.2 66.0 2.8 0.9

    Mhlontlo 6.4 5.3 5.7 7.1 27.5 27.9 58.7 46.8 1.7 12.9King Sabata

    Dalindyebo24.1 27.8 8.5 5.3 18.6 21.8 46.4 44.1 2.4 0.9

    Source: SSA 2001 and RSS 2006

  • 8/12/2019 Ortdm Gds Profile

    11/64

    S A N I T A T I O N Investment s in household sanitation in the OR

    Tambo district over the period 2001 2006 have

    clearly not yet begun to address the needs of local

    households. Every local municipality in Or Tambo is

    way above the provincial norm (22%) for househo lds

    not having any formal sanitation and way above RDP

    requirements.

    Type of sanitation by household forlocal municipalities in OR Thambo and the Eastern Cape for 2001 2006

    Flush Toilet(connected to sewerage system)

    Flush Toilet(with septic tank)

    Chemical ToiletPit Latrine

    (with ventilation)

    Pit Latrine(without ventilation)

    Bucket Latrine None

    Census2001

    RSS 2006Census2001

    RSS 2006Census2001

    RSS 2006Census2001

    RSS 2006Census2001

    RSS 2006Census2001

    RSS 2006Census2001

    RSS 2006

    % % % % % % % % % % % % % %

    Eastern Cape 30.9 31.1 2.2 1.3 2.0 0.6 5.6 7.2 23.1 33.9 5.6 4.0 30.6 21.8

    O.R .Tambo 7.4 5.8 0.9 0.5 2.8 0.4 6.0 11.0 29.9 44.0 1.4 0.4 51.6 38.0

    Mbizana 1.5 0.0 1.1 0.0 5.6 0.0 7.5 0.7 44.8 70.5 0.7 0.0 38.7 28.8

    Ntabankulu 1.4 0.5 0.7 0.5 2.7 0.0 3.5 2.3 24.6 29.2 2.0 0.6 65.0 67.0

    Qaukeni 2.6 0.0 1.0 0.7 3.1 0.0 5.5 10.0 40.4 61.4 1.8 0.6 45.6 27.3

    Por t St Johns 2.8 0.0 1.7 0.0 2.0 0.4 1.7 35.5 16.7 39.0 1.2 0.4 73.9 24.7

    Nyandeni 2.0 0.4 0.8 0.0 1.9 2.0 4.7 8.2 28.2 37.5 0.6 0.0 61.7 51.9

    Mhlontlo 2.2 0.0 0.5 0.0 3.7 0.0 9.2 11.8 31.9 46.8 1.6 0.0 50.9 41.5

    King Sabata

    Dalindyebo22.7 24.8 0.7 1.1 1.7 0.3 7.1 13.1 22.1 24.2 1.7 0.2 44.2 36.4

    Source: SSA 2001 and RSS 2006

    11

  • 8/12/2019 Ortdm Gds Profile

    12/64

    12

    T H E C O S T S O F E L I M I N A T I N G B A C K L O G S

    The estimates for eliminating the backlogs for water

    and sanitation are pegged at R1 billion. Almost all

    of these backlogs are rural (98% for water and 94%

    for sanitation). The greatest proportion of water

    backlogs in OR Tambo are in Mbizana (21%), KSD

    (19%) and Nyandeni (18%). The remaining local

    municipalities all account for at least 10% of the backlog

    each reinforcing the point that the district as a whole

    suffers from under investment in household water

    access. In terms of sanitation backlogs Qaukeni (19%),

    Mbizana (18%) and KSD (17%) recorded the greatest

    proportion overall.

    costs of eliminating backlogs for Water and sanitation

    Category Water Sanitation

    R % R %

    Mbizana Urban 2 362 950 4 291

    Rural 194 813 550 186 293

    Total 197 176 500 21.0 190 584 17.9

    Ntabankulu Urban 4 145 850 5 413

    Rural 87 228 450 102 637

    Total 91 374 300 9.8 108 050 10.1

    Qaukeni Urban 2 023 650 5 269

    Rural 114 043 550 191 563

    Total 116 067 200 12.6 196 832 18.5

    Port St Johns Urban 645 750 3 761

    Rural 95 996 550 61 690

    Total 96 642 300 10.3 65 451 6.1

    Nyandeni Urban 4 082 850 5 330

    Rural 160 231 950 160 887

    Total 164 314 800 17.5 166 217 15.6

    Mhlontlo Urban 0 2 610

    Rural 97 245 450 151 400Total 97 245 450 10.4 154 010 14.4

    King Sabata Dalindyebo Urban 2 511 000 41 881

    Rural 171 647 550 143 742

    Total 174 158 550 18.6 185.623 17.4

    O.R. Thambo Urban 15 772 050 1.7 68 555 6.4

    Rural 921 207 050 98.3 998 212 93.6

    Total (approx. R 1 billion) 936 979 100 1 066 767

  • 8/12/2019 Ortdm Gds Profile

    13/64

    13

    C L E A R I N G T H E B A C K L O G

    According to DWAFs National Information System

    for Water Services (accessed on the DWAF web

    site, October 2006), it will require R 1 billion to

    eradicate the water supply backlogs and R700m to

    eradicate the sanitation backlog. This will mean an

    annual expenditure of R500m to achieve the 2008water supply target and an additional R175m per

    year to achieve the 2010 sanitation target.

    In the next nancial years, the Municipal Infrastructure

    Grant (MIG) will allocate:

    R295 million for 2006/2007

    R363 million for 2007/2008

    R380 million for 2008/2009

    Even if the total of R 1.6 billion was used by

    municipality for basic services and infrastructure

    investment in the water and sanitation areas, this

    amount falls far short of that necessary to meet

    the required target s. There are also many other

    areas that make financial demands on MIG funds

    (roads, stormwater, electricity, waste management,

    community facilities, etc).

    E R A D I C A T I N G T H E B U C K E T S Y S T E M

    Bucket sanitation has never been widespread in

    OR Tambo and consequently bucket eradica tion is a

    relatively insignicant priority in terms of sanitation

    investments in the District.

    Municipality Total No of Buckets Approx Value toReplace (R000)

    1,011 9,099

    Mbizana 0 0

    Ntabankulu 735 6,615

    Qaukeni 0 0

    Por t St. Johns 0 0

    Nyandeni 0 0

    Mhlontlo 276 2,484

    King Sabata

    Dalindyebo

    0 0

    O.R. Tambo District

    Municipality

    0 0

    Source: DHLGTA September 2005

  • 8/12/2019 Ortdm Gds Profile

    14/64

    14

    M U N I C I P A L I N F R A S T R U C T U R E G R A N T ( M I G )

    The National Government provides infras truc ture

    subsidies to ensure tha t all households have access to

    a basic level of infrastructure services. The benets

    of this intervention are well known, particularly

    in relation to the public good characteristics of

    many municipal services. The key objectives of theMunicipal Infrastructure Grant are to:

    fully subsidise the capital costs of providing basic

    services to poor households: this implies that

    priority must be given to meeting the basic

    infrastructure needs of poor households, through

    the provis ion of appropriate bulk, connec tor and

    internal infrastructure in key services;

    distribute funding for municipal infrastructure in an

    equitable, transparent and efcient manner, which

    support s a co-ordinated approach to local development

    and maximises developmental outcomes;

    assist in enhancing the developmental capacity

    of municipalities, through supporting multi-year

    planning and budgeting systems; and,

    Provide a mechanism for the co-ordinated pursuit

    of national policy priorities with regard to basic

    municipal infrastructure programmes, while

    avoiding the duplication and inefciency associated

    with sectorally fragmented grants.

    An amount of over R1.6bn in MIG funding has been

    allocated within the OR Tambo District over the

    current medium term expenditure framework. O f

    thi s amount, app roximately R646m is alloca ted to

    addressing water infrastructure requirements, and

    over R323m is allocated to sanitation. The balance

    of just above R100m is allocated to other socialinfrastructure services.

    The allocation of the MIG in OR Tambo sugges ts a

    concerted effort to address the social infrastructure

    backlogs in the District. However, given the

    magnitude of the backlogs in some of the local

    municipalities (see earlier section on improving

    social services); these signicant infrastructure

    allocations are necessary but not sufcient to

    eradicate the backlogs in line with Provincial and

    National targets.

  • 8/12/2019 Ortdm Gds Profile

    15/64

    The OR Tambo Distr ict Municipality has identied

    and prioritised the following water and sanitation

    projects that are listed below.

    water and sanitation projects: ortdm

    Projects Strategy/Activity Amount Time Frames Responsible Department

    Water

    Umzimvubu Dam Feasibility Study R300 million 2007 2026 Premiers Ofce

    Rural Water Supply

    (backlog removal)Three-year Infrastructure Plan 2007 2014 ORTDM / DPLG

    Regional Water Scheme (bulk) Master Plan R6 billionNot

    establishedORTDM

    Ten Towns

    Refurbishment ProgrammeTen Towns Audi t Repor t R10 0 million

    Not

    establishedORTDM

    Working fo r Water Programme Thr ee-year Act ion Plan R7 m ill ion 2007 2009 DWAF

    Zaulu Hill DamFeasibility Study

    BP PreparationR11 Million 2007 2011 DWAF

    SanitationRural Sanitation Three-year Infrastructure Plan 2007 2016 ORTDM / DPLG

    Ten Towns

    Refurbishment ProgrammeTen Towns Audi t Repor t R40 0 million

    Not

    establishedORTDM

    OR Tambo District Municipality, 2007

    15

  • 8/12/2019 Ortdm Gds Profile

    16/64

    E L E C T R I C I T Y

    Except for KSD (70%) the remaining local municipalities

    in OR Tambo fall signicantly below the provincial

    average for those who have access to electricity at

    least for lighting (67%), worst off is Ntabankulu with

    only 18% of households using electricity for lighting.

    As is the case in the rest of the country, electri city

    supply nation-wide from ESKOM cannot increasesignicantl y until the new R40bn power stations come

    online in 2010. It is therefore quite unlikely that there

    will be any further electrications in OR Tambo until

    the stabili ty of power supply has been sor ted out by

    ESKOM. There is a good opportunity for ESKOM or

    ay other service provider (if possible) and exploit the

    hydro-electric potential of the Mzimvubu Dam and

    Catchment area.

    energy sources for lighting in the Eastern Capeand loca l Municipalities in OR Ta mbo for 2001 - 2006

    Electricity Gas Para n Candles Solar and other

    Census2001

    RSS 2006Census2001

    RSS 2006Census2001

    RSS 2006Census2001

    RSS 2006Census2001

    RSS 2006

    % % % % % % % % % %

    Eastern Cape 49.7 67.1 0.3 0.4 23.3 14.0 25.9 18.3 0.8 0.2

    O.R.Tambo 28.1 49.6 0.3 0.2 12.1 8.0 58.4 41.6 1.2 0.5

    Mbizana 25.0 37.0 0.3 0.0 2.9 4.1 69.7 57.7 2.1 1.2

    Ntabankulu 14.5 18.4 0.1 0.0 3.4 1.8 80.1 79.4 1.9 0.5

    Qaukeni 13.6 42.7 0.2 0.4 8.0 5.8 76.3 50.0 1.8 1.0

    Port St Johns 17.2 45.6 0.3 0.4 10.5 1.9 70.8 52.1 1.1 0.0

    Nyandeni 32.2 58.4 0.2 0.2 11.5 19.7 55.0 21.7 1.0 0.0

    Mhlontlo 30.1 47.1 0.2 0.6 8.8 2.4 60.0 49.1 0.9 0.9

    King Sabata

    Dalindyebo41.7 70.1 0.4 0.2 24.3 11.5 33.1 18.1 0.6 0.2

    Source: SSA 2001 and RSS 2006

    16

  • 8/12/2019 Ortdm Gds Profile

    17/64

    H O U S I N G

    The provision of formal housing for low and

    middle income residents is a core function of local

    municipalities. Within the urban areas, housing

    development is generally occurring, however,

    within the rural or communal areas, the provision

    of housing is only beginning to be addressed.

    The primary const raint with regards to the provision

    of housing in rural areas relates to issues around

    land ownership and registration of title. The current

    housing regulations also fail to make provision for

    adequate land for making food gardens that these

    poor households need for survival.

    With the promulgat ion of the Communal Land

    Rights Act the process of addressing problems

    surrounding land rights commenced. The table

    below provides an insight on the current status of

    housing delivery in the District.

    level of informal housing

    Census 2001 RSS 2006

    % %

    Eastern Cape 10.9 5.7O.R .Tambo 2.7 1.1

    Mbizana 1.6 1.1

    Ntabankulu 1.6 0.7

    Qaukeni 2.3 1.8

    Por t St Johns 1.2 2.3

    Nyandeni 1.5 0.0

    Mhlontlo 4.2 0.0

    King Sabata Dalindyebo 4.6 2.0

    Source: SSA 2001 and RSS 2006

    Low-cost housing backlogs are less prevalent than

    those for water and sanitation in OR Tambo, and

    the oppor tunit ies provide good st imulus for local

    economic activity.

    There is an obvious link between housing plans and

    existing backlogs with the EPWP and its related

    forward-backward linkages to the construction and

    mining/quarrying industry and job creation.

    17

  • 8/12/2019 Ortdm Gds Profile

    18/64

    18

    C U R R E N T M U N I C I P A L H O U S I N G P R O J E C T S

    The projects listed below are currently implemented

    and were approved in the previous nancial years.

    No new funding to be allocated until completion of

    the cur rently imp lemented projects .

    Committed funds to be utilised to complete the

    existing project.

    For 2007/08 only one new project to be nanced

    i.e. Urban Renewal Upgrading Project

    (NGANGELIZWE Breaking New Ground)

    LocalMunicipality

    ProjectTotalUnits

    Units Units Total BudgetExpenditureTo Date

    Date Of Approval Subsidy Quantum

    KSDM MpekoEagertonLindilePrestonUpper CentuleUpper TabaseOld PayneNew PayneKwenxurhaNdlunkukuNtshabeniNcambeleNgqwala

    ZidindiWater fal l Phase 4Water fal l Cons Phase 1Water fal l Cons Phase 2Zimbane ValleyIlithaZimbane KuyasaMaydene FarmMqanduli

    25045035040 0300300300300300300300300300

    3004505004951482463477969500

    24437029935413716015046196442810

    123

    733934880.00635013

    889500

    780514616314015025410425619

    300177

    2275712

    495847463464800

    5 428 493.2210 925 417.007 211 452.009 223 193.009 623 454.009 639 253.009 629 503.0011 000 361.799 539 192.0010 758 016.0 09 506 227.0011 460 117.009 931 437.58

    9 090 621.038 853 000.009 700 000.00

    0.0044 422 600.0018 506 125.0 07 155 000.0016 731 050.0 08 437 500.00

    5 585 745.948 883 663.197 198 976.448 531 493.907 609 650.867 312 486.517 674 280.53

    57 476.007 871 217.20

    3 256 393.238 420 118.48

    0.006 987 244.62

    4 214 066.348 758 950.005 450 000.00

    0.0021 990 012.3412 571 329.324 830 281.3315 818 375.008 437 500.00

    21/09/200221/09/200221/09/200221/09/200209/07/200409/07/200409/07/200409/07/200409/07/200409/07/200409/07/2004

    09/07/2004

    09/07/200409/07/200401/09/1999

    23/03/200025/09/200213/06/199623/04/199819/01/1999

    20 300.0020 300.0020 300.0020 300.0025 800.0025 800.0025 800.0025 800.0025 800.0025 800.0025 800.00

    25 800.00

    25 800.0025 800.0015 000.0 0

    8 000.0016 000.0 015 000.0 015 000.0 015 000.0 0

    Nyandeni HadiniLibode Rl 3Ngqeleni Ext4

    80 0500420

    371069

    429500351

    22 141 206.0014 684 250.0011 086 926.30

    15 170 199.065 390 308.006 064 988.17

    21/09/2002

    19/01/1998

    20 300.00

    15 000.0 0

    Port StJohns

    Psj Rural (Caguba)Mthumbane TownshipPsj Rural (Caguba & Maneng)

    200425

    1000

    195383

    1000

    5420

    6 008 370.0014 141 250. 0026 937 000.0 0

    5 998 370.006 595 319.50

    26 937 000.0 0

    21/06/200517/10/199720/08/2003

    25 800.0015 000.0 023 100.00

    Mhlontlo Qumbu Ext 5Tsolo

    504425

    179425

    3250

    11 322 398.0 06 360 000.0 0

    8 468 590.625 624 747.11

    14/07/1998 15 000.00

    Qaukeni NkozoMantlaneniFlagstaffLusikisiki

    3003005031117

    116762411117

    1842242620

    9 262 555.009 412 555.0013 708 753.6618 430 500.00

    5 439 595.574 758 954.458 623 826.0717 162 149.41

    09/07/200409/07/200401/06/200012/12/1997

    25 800.0025 800.0016 000.0 015 000.0 0

    Ntabankulu Ntabankulu Ext 5 471 113 358 12 254 424.00 10 851 746.65 01/04/2000 16 000.00

    Mbizana Mbizana Ext 3Mbizana Ext 4

    18880 0

    0400

    188400

    4 850 400.0024 023 687.00

    4 368 300.6016 386 174.34

    19/08/199928/01/2004

    16 000.0 023 100.00

    Total 17739 10079 7660 441 890 060.60 309 299 530.80

  • 8/12/2019 Ortdm Gds Profile

    19/64

    19

    In conclusion, the housing backlogs need to be

    understood in the context of the predominantly rural

    nature of the OR Tambo District. Informal housing1

    does not include rural dwellings, and therefore

    although the District has a very low informal housing

    problem, it has a huge rural housing problem

    underscoring the continued need for RDP housing inrural communities.

    1Informal housing is dened as shacks, and othernon-concrete structures in urban centres.

  • 8/12/2019 Ortdm Gds Profile

    20/64

    20

    The data in the table below are perceptions of those

    surveyed in the RSS survey in 2006

    i m p r o v e p u b l i c s e r v i c e s

    Access toClinics

    Access toPrimary Schools

    Access to Roadsin good Condition

    Access toAmbulance Services

    InformalHousing

    % % % % %

    Mbizana 54.0 92.4 51.7 26.8 0.7

    Ntabankulu 36.7 77.3 17.6 32.0 0.4

    Qaukeni 69.1 72.1 46.0 31.4 1.8

    Port St Johns 38.8 88.5 27.7 22.7 2.3

    Nyandeni 62.2 87.3 9.5 39.0 0.0

    Mhlontlo 44.4 89.1 15.0 32.0 0.0

    King Sabata Dalindyebo 86.6 89.5 22.4 62.1 2.0

    Source: RSS 2006

    H E A L T H

    Access to health care has improved considerably in

    the OR Tambo However, major challenges remain .

    There are 169 clinics in the District resulting in a

    ratio of 10 300 people per clinic. According to

    national norms of one clinic per 10 000 people, the

    OR Tambo District has less clinics than a re needed.

    The distribu tion of human resources at health facilities

    across the District is however, biased in favour of

    the lar ger centres . The national aver age gure fornurses per 100 000 people, is 12 nurses. OR Tambo

    appears to be under-resourced showing gures like

    4.5 nur ses per 100 000 people, and in some areas (

    Ntabankulu) as low as 2.7 nurses per 100 000 people.

    Reported access to health care is greater in KSD,

    Nyandeni and Qaukeni, and lowest in Ntabankulu

    and Port St Johns.

  • 8/12/2019 Ortdm Gds Profile

    21/64

    21

    H I V & A I D S

    OR Tambo District had an antenatal prevalence

    rate1 of 33.8% in 2004, up from 23.6% in 2002,

    which is above the provincial average for the Easter n

    Cape (28.03% in 2004). It can be assumed that

    remnants of the Apartheid migrant labour system

    play a role in this high prevalence rate. HIV is often

    more prevalent in mobile populations, and migrant

    workers return to their homes when they are ill.

    This will increase both the number of new infections

    and the total number of people living with HIV inthe dist rict .

    HIV Prevalencein OR Tambo district

    2002 2003 20042

    OR Tambo 23.60 % 29.20 % 33.80 %

    Eastern Cape 23.60 % 27.10 % 28.03 %

    Source: Dept of Health antenatal survey, 2004

    Estimates for the total population of the Eastern

    Cape, estimate that 10% of the total population

    is HIV positive, and 19.2% of adults (20-64 years)

    (ASSA 2003 Model). For the province as a whole,

    women have higher HIV prevalence than men, the

    African population is at higher risk, and the epidemic

    is growing fastest among youth (15-25 years). It is

    particularly young women that become infected.

    Prevalence for males exceed that of women in the

    30-34 age group (ECAC, 2005). Early sexual debut,age difference between partners and transactional

    relationships is reported to plan a role in driving the

    epidemic (ECAC, 2005). Hence, prevention programs

    should be targeted towards young people.

    1Antenatal prevalence refers to the percentage of pregnant women attending

    public clinics who test positive for HIV. Data is only availab le per district, a nd

    it is difcult to extrapolate this data for the entire populat ion.2Eastern Ca pe Department of Health has not yet made the provincial 2005

    Antenatal survey available.

  • 8/12/2019 Ortdm Gds Profile

    22/64

    22

    According to the HSRC 2003 household survey,

    HIV prevalence is generally higher in urban informal

    and urban formal settlements and lower in farm

    and tribal settlements. There is not a signicant

    difference in HIV prevalence among those working

    and those unemployed, however, HIV and AIDS is

    still closely linked to povert y in its many dimensions.The epidemic in the province is expected to reach

    a peak by 2010, at about 16% of the population,

    before the number of new infections even out

    (ECAC, 2004).

    Knowing your status is an important weapon in

    curbing the spread of HIV. Most public clinics offer

    Voluntary Counselling and Testing (VCT) and in

    2006 69.26% of those attending public clinic s opted

    for VCT (men and women). Only 24.53% of males

    who visited clinics opted for VCT. However this

    gure does not tell us about the percentage of the

    total population who have undergone VCT, the

    quality of the services, or whether patients came

    back to get their results.

    VCT Test r ate (% of peopleattending clinics undergoing VCT)

    %

    OR Tambo DM King Dalindyebo LSA 65.92

    Mhlontlo LSA 75.97

    Nyandeni LSA 68.41

    Qaukeni LSA 66.73

    Total 69.26

    Source: District Health Information System, Januar y 2006

    The Nelson Mandela Academic Hospital in opened

    in Mthatha in 2004, and provide the people of the

    district with a new state of the art tertiary health

    facility, albeit with some challenges. The hospital

    is one of the provincial sites piloting the use of

    telemedicine. The H IV and AIDS centre at Walter s

    Sisulu University (WSU) is a resource beyond thedistrict, both for research and training of health

    professionals and community health workers, and

    receives funding from Department of Health.

    The Depar tment of Health has embarked on a range

    of prevention, care and treatment interventions.

    In OR Tambo 9 service points are accredited for

    dispensing anti-retroviral treatment, treating a total

    of 4934 patients in November 2006. However,

    the re is st ill a need to accredit add itiona l point s

    and increase the number of people on treatment.

    Increasing number of people on TB treatment

    and partner treatment for people with STIs is also

    a challenge. Attraction and retention of health

    professionals is a challenge, at primary as well as

    ter tiary facil ity level .

    The pioneering ARV program in Lusikisiki, as

    collaboration between Doctors without Borders

    (MSF), the Department of Health (ECDOH) and

    the Treatment Action Campaign (TAC), is now being

    handed over to ECDOH. The program provides an

    internationally heralded model of ARV rollout in

    resource poor setting s, and possibilities for scale up

    should be investigated.

  • 8/12/2019 Ortdm Gds Profile

    23/64

    23

    In the distric t, HIV and AIDS is given the highest

    priority, being placed in the ofce of the Executive

    Mayor Programs include awareness, research

    capacity development. One of the awareness and

    prevention programs that the district support is the

    cultural practice of Inkciyo.

    The Non Governmental Organisations (NGOs),

    Community Based organisations (CBOs) and Faith

    Based Organisations (FBOs) play a major role at the

    community level. However, integrated approaches

    and cooperation between actors need to be

    strengthened across the district. The AIDS councils

    play a major role here. Among NGOs, CBOs and

    FBOs there is also a need for focus on quality and

    specialisation in the response to HIV and AIDS

    (ECAC, 2004).

    The district should develop a multisectoral HIV

    and AIDS plan that is integrated into the IDP witha dedicated budget. This should include a response

    to what is sometimes called the orphan ep idemic:

    the growing numbers of chi ld headed households,

    vulnerable children and orphans.

  • 8/12/2019 Ortdm Gds Profile

    24/64

    24

    E D U C A T I O N

    According to the Education Management Information

    System (EMIS), there are a total of 1892 primary

    and secondary institutions in the ORTDMA. There

    is one University in the ORTDMA, which is the

    Walter S isu lu Univers it y of (WSU), which is si tua ted

    in Mthatha.

    It is estimated that 95% of all the learners walk

    to school , of which 36% walk for longer than

    30 minutes. This means that there are 245 000

    Percentage of OR Tambo, rural nodal and non-noda lpopulations (aged 524) attending educational institutions

    children who walk for more than an hour a day

    getting to and from school

    Compared to the rest of SA and especially to the

    other rur al nodes the education level in OR Tambo

    District is very low.

    Percentage of OR Tambo, rural nodal and non-nodalpopulations (aged 524) attending educational institutions

    0%

    24% 25%

    None Pre-School &

    School

    Technikon/University/

    College/Adult Education

    OR Tambo

    Rural Nodes

    Rest of South Africa

    (non-nodes)

    30%

    75% 74%

    67%

    1% 1%3%

    20%

    40%

    60%

    80%

    0%

    38%

    29%

    No Schooling Some Primary/

    Secondary Schooling

    S td 10/Grade 12 Highe r Educat ion

    OR Tambo

    Rural Nodes

    Rest of South Africa

    (non-nodes)

    15%

    49%53% 53%

    9%13%

    22%

    5% 5%9%

    20%

    40%

    60%

    80%

  • 8/12/2019 Ortdm Gds Profile

    25/64

    25

    S K I L L S U P G R A D I N G

    The District has launched a Human Capital Devel-

    opment Approach tha t is based on the following key

    areas:

    Baseline Research and Benchmarkingon government

    impact on lives of local community members.

    Government has invested a lot of money over the

    years in the various communities around the district.

    The challenge is that there is no baseline information

    that the government intervention can been measured

    against. This makes it extremely difculty to measure

    progress and the impact of government services in the

    lives of the people of the region. The lack of baseline

    information is also not helping future planning as future

    budgeting and planning relies on past performance.

    The Baseline and Benchmarking programme is aimed

    at correcting this dilemma and help provide local

    government with the information tools that local

    government need for proper planning.

    Priority Skills Acquisition -The huge backlog in the

    distric t and the need to change the situation around

    requires a workfo rce in local government that posses

    the right sk ill s. The bui lding of roads, br idges, etc

    requires engineers, nancial experts, architects, etc.The Priority Skills Acquisition initiative is a critical

    component of service delivery.

    Life Skills Acquisition members of the community

    need to be trained on life sk ills in order to cope with

    the difcu lt s ituations they are confronted wi th on a

    daily basis. Some of the skills that are needed are:

    Conict management

    Dealing with HIV/AIDS

    Family values

    People relations

    Personal hygiene

    Community Skilling (CS) the community need

    skills that will help them manage community

    projects. They need the skills to play their role as

    monitors of public service performance.

    B U S I N E S S D E V E L O P M E N T S E R V I C E S

    One of the key trends in small enterprise develop-

    ment has been a move away from direct-market

    substitution by international donors and local govern-

    ments towards a focus on facilitating private business

    development service (BDS) market development.

    This approach emphasises the limited ability of the

    public sector and/ or donor organisations to deliver

    services to small enterpr ises effectively.

  • 8/12/2019 Ortdm Gds Profile

    26/64

    26

    This approach is premised on the fact that the

    Municipality should encourage and promote

    private service providers of business development

    services, instead of the municipality itself trying to

    be a provider of such services. So this approach

    emphasises the need to promote the private sector

    suppliers of business services, with the attendant

    benets of efciency and efcacy.

    Facilitating BDS market development means

    conducting an assessment of the BDS market,

    identifying weaknesses and opportunities, and

    identifying interventions that could stimulate

    the provision of more and more relevant BDS

    product offerings1.

    The OR Tambo Distric t Municipality needs to

    strengthen partnerships with the Small Enterprise

    Development Agency (SEDA), the ECDC and other

    national institutions in the delivering of nancial

    and non nancial support to SMMEs. The following

    products and services should be offered at dedicated

    business support centres:

    Information, advice and referrals

    Business registration

    Business plans Tender Information and advice

    Import and Export training

    Trade Information

    Business assessment and technical support

    Business mentoring and

    Market access and business linkages

    1Oxford 2005

    T R A N S P O R T

    Despite some investments in new roads and

    maintenance in the district many local communities

    remain trapped in isolated and disconnected local

    communities with very poor road infrastructure.

    This disconnection has signicant consequences in

    terms of local economic development as wel l as

    services deliver y, most evident from the accessibility

    to emergency ambulance services .

    Currently the process of maintenance and upgrade

    is severely hampered by the lack of clarity with

    regards to roles and responsibilities between

    various roads role players. The process is currently

    under discussion at all levels, thus providing some

    hope for a resolution in the near future.

    Transport whether motorised or non-motorised

    experiences many problems within the OR Tambo

    District. These can be summarised as follows:

    Poor conditions of roads especially rura l

    roads and within former urban townships

    Stray animals

    Inadequate pedestrian signs and markings and off

    loading areas especially within the few urban areas

    Limited trafc calming measures within areas of

    high accidents Low visibility of trafc ofcials and law

    enforcement

    Non-availability of trafc lights,

    let alone at major intersections

  • 8/12/2019 Ortdm Gds Profile

    27/64

    Unavailability of adequate public transport facilities

    especially for the disabled

    Lack of cooperation between public transport

    operators and the municipal authorities

    Lack of institutional capacity at Local and

    district Municipal level to manage transport

    planning and implementation

    Insufcient supply of taxi related infrastructure

    Outdated/non-existent information

    at the taxi registrar

    Lack of pedestrian and non-motorised

    transpor t fa cil iti es

    The road network s in the O. R. Tambo area consists

    of the following categories:

    National Road = 136km (National Roads Agency)

    Provincial Road = 497km (Provincial Department of

    Roads and Public Works)

    District Road = 2792km (Regional Department of

    Roads and Public Works)

    Access Road = 2957km (DM, LMs)

    Street & Internal Road (Local Municipalities)

    In support of Road Construction & Development

    of SMMEs, the O.R. Tambo District Municipality has

    embarked on an emerging contractor development

    programme. Through this programme emerging

    contractors are trained formally on site and in

    classroom to develop to the status of established

    contractors. The initiative commenced with the

    purchasing of road construction plant to the value

    of R15million funded by the then CMIP. The Plant

    items are currently used in the on-site construc tion-

    train ing progr amme. The Leng thman system of road

    maintenance is currently implemented with a view

    of creating employment opportunities.

    A I R P O R T S

    The Mthatha airport needs to be upgraded and

    revitalized in the most cost-effective manner that

    will promote socio-economic activity and tourism

    for this region. In order to achieve improved air

    transport and emergency response in times of

    natural disasters there needs to be upgrading of

    airelds at key nodes.

    27

  • 8/12/2019 Ortdm Gds Profile

    28/64

    28

    Working Age& not working

    Unemployedand lookingfor work

    Householdincome< than

    R1500/month

    % % %

    Eastern Cape 78.1 32.6 65.2

    O.R.Tambo 84.6 34.6 71.6

    Mbizana 89.5 39.5 84.9Ntabankulu 82.1 30.1 73.0

    Qaukeni 87.2 32.8 76.7

    Port St Johns 89.6 44.7 5.2

    Nyandeni 85.0 33.7 67.9

    Mhlontlo 83.2 30.5 71.5

    King Sabata

    Dalindyebo79.3 34.2 56.6

    Source: RSS 2006

    In the context of the very high unemployment and

    poverty rates mentioned above, there is clearly anurgent need for new investments to create jobs and

    improve livelihoods in the OR Tambo Distr ict. Ba sed

    on existing economic activity, market opportunities

    and present resource/assets/sk ill bases the particular

    industries offering potential include:

    J O B C R E A T I O N A N DL I V E L I H O OD OP P O R T U N I T I E S

    Livestock farming

    Dryland farming and irrigated horticulture

    Forestry

    Manufacturing

    Construction and Mining

    Trade and Business Services/ICT

    Tourism

    Each of these industries requires a detailed Action

    Plan, specifyi ng investments to be packaged, timelines

    and milestones, stakeholders and responsibilities.

    Preparatory work has already taken place for all

    these industr ies in the OR Tambo Dis tr ic t, and the

    main challenge is to galvanise industry role-players

    to ensure acceler ated and shared grow th, and good

    quality investments.

    It is notable that only about 13% of the District s

    working-age population have matric or above. This

    points to the critical importance of education and

    train ing for future employment growth.

    Each of the seven industr ies listed above is briey

    proled in the following sections:

  • 8/12/2019 Ortdm Gds Profile

    29/64

    29

    L I V E S T O C K F A R M I N G

    Livestock farming (primarily cattle, sheep and

    goats) is very important in the District, but

    generally provides very low incomes compared

    to commercia l livestock farming elsewhere in the

    Province. Livestock farming is being supported by

    the Provincia l Depar tment of Agriculture through

    construction of stock dams, dipping tanks, shearing

    sheds, fencing (under CASP) and veterinar y services

    etc. The challenge is to increase incomes from

    communal livestock farming. An industr y action plan

    would probably include:

    Expansion of the effective

    NWGA model of support

    Improve existing programmes designed to

    facilitate skills transfer between commercial

    and emerging farmers

    Improved Agricultural Extension Services

    Improved market access (e.g. drawing on

    experience of USAID-funded project in the

    Chris Hani District; Middle Eas t goat market)

    Building animal feeds industry

    Improved veld management

    Move to formal land administration

    Upgrading access roads/farm logistics

    Ntinga Development Agency, in addition to theProvincial Department of Agriculture, is also

    supporting livestock farming.

    While the Distric t is suitable for dairy farming (and

    there is a local market) it is capital and sk ills incentive.

    D R Y L A N D F A R M I N GA N D I R R I G A T E D H O R T I C U L T U R E

    Rainfall and soil quality make much of the District

    well-endowed for agricultural production. Rainfall is

    more than 800mm a year (and signicantly higher

    in the coastal zone). Dryland farming is generally

    of a subsistence nature, and there are large tracts

    of uncultivated arable land. There are two large

    farming projects in the District: Magwa Tea and

    Pondoland Sugar.

    There are several initiatives to suppor t increased

    production by small-scale subsistence farmers:

    PGDP Massive Food Programme

    PGDP Siyazondla Programme (to increase

    homestead garden food production)

    District Municipality programme to support an

    additional 30,000 ha of maize production

    AsgiSA Biofuels initiative

    AsgiSA Umzimvubu Initiative

    There needs to be effective co-operation

    between the Department of Agriculture and

    the Dis tr ic t Munic ipa lit y in supporting inc reased

    maize production, and support measures should

    be thoroughly evaluated, to identify methods of

    improved support.

    The Umzimvubu project contains a cropping

    component, but this project is very large-scale and

    will inevitably take many years to come to fruition.

  • 8/12/2019 Ortdm Gds Profile

    30/64

    30

    Irrig ated horticulture is both capital and skills

    intensive, indica ting that the growth of the subsector

    will require bankable projects, experienced

    management and thorough training. Several small-

    scale irrigation schemes in the District have failed.

    The District also contains larger-scale irrigation

    schemes of the former Bantustan (for example,

    Ncora) that are being rehabilitated.

    Market access for crop-producers has been

    improved as a result of the Mthatha Fresh Produce

    Market, and will be assisted by the Kei Rail Project.

    F O R E S T R Y

    The District contains 30,000 ha of forestry

    plantations (mainly around Langeni and Ntabankulu).

    There is estimated to be a fur ther 50,00 0 ha suitable

    for forestry in the District (the greatest potential

    in South Africa). AsgiSA has identied forestry as

    a priority area for intervention, and the District

    Municipality will be working closely with AsgiSA to

    develop this sector.

    Infrastructure investments for the sector includethe new Langeni-Ugie road and Kei Rail.

    M A N U F A C T U R I N G

    This is a very small sector of the District economy,

    but it does offer growth potential. For example:

    Ntinga Development Agency is suppor ting the

    development of the timber-using industries at

    Langeni (and elsewhere)

    There are many small-scale garment manufacturers

    (e.g. occupying old Transido workshop premises)

    tha t would benet from s tronger business suppor t.

    The existing crafts subsector is not insignicant.

    For example, a basket-making enterprise in Port St

    Johns employs 2,500 home-worker s in the area .

    Craft workers would benet from more support

    with product development and marketing, and from

    growth of the tourism industry in the District.

    The agro-processing subsector has the potential

    to grow on the bas is of inc reasing its pr imary

    production. Examples include the Mthatha Abattoir

    and maize milling.

    There needs to be good co-operation between

    Ntinga, SEDA, ECDC and the Thina Sinako LED

    Programmes to realize growth oppor tunities.

  • 8/12/2019 Ortdm Gds Profile

    31/64

    31

    C O N S T R U C T I O N A ND M I N I N G

    The construction industry in the District is presently

    small, but is likely to provide more job opportunities

    in the future, based on:

    Rapidly increasing scal allocations for public

    infrastructure (see section on Building and

    Maintaining Infrastructure)

    Expansion of the EPWP (there needs to be a

    District EPWP Plan, with an M&E capability)

    Increased house-building and retail infrastructure.

    The District Municipality has initiated a Emergent

    Contractor Development Programme.

    Mining is presently restricted to quarr ying related

    to cons truc tion ac tiv ity. There is also the possi bil ity

    of a heavy sands mining project at Xolobeni on

    the Pondoland coast , which would provide 250

    direct jobs over a 22-year mining period, with an

    investment cost of 220 million US dollars.

    T R A D E A N D B U S I N E S S S ER V I C E S / I C T

    Employment in this sector could be boosted by new

    investment in Business Process Outsourcing and

    call centres. District agencies need to work withAsgiSA to ensure that this takes place. ICT services

    support protable business/co-op growth in all

    other sectors.

    T O U R I S M

    This sector has obvious potential, primarily based on

    the 120 km Wild Coast and home of Nelson Mandela.

    Development initiatives include the following:

    Regional Tourism Organisation established

    Tourism Development Plan in place

    Proposed new N2

    Proposed Pondoland National Park

    Wild Coast Spatial Development Initiative

    EU Pondoland Community Tourism Programme

    Upgrade of Mthatha Airport

    Upgrade of access roads to the coast

    Hluma Development Local Investment Agency (a

    R500 million JV of DBSA and Old Mutual

    to prov ide venture capit al for Wild Coast

    private investments)

    Nelson Mandela Museum/Qunu/Mvezo

    Nelson Mandela Freedom Route from

    Port St Johns to Aliwal North

    Commercialisation of Nature Reserves

    (Mkambati, Hluleka, Silaka etc)

    Efforts to eradicate coastal illegal cottages.

    Despite all these initiatives , potential investors have

    frequently been frus trated in their efforts to develop

    coastal tourism accommodation facilities, due to

    difculties and delays surrounding land acquisitionand planning permission.

  • 8/12/2019 Ortdm Gds Profile

    32/64

    It has been repeatedly suggested that one of the

    major factors contributing to the low level of

    economic competitiveness and social cohesion, and

    in a sense result in a failure to exploit economic

    potential, has been the poor state of infrastructure

    and infrastructure-related services. This section

    of the district prole attempts to summarise thephysical infrastructure development plans that have

    been budgeted for over the medium term , and that

    are likely to contribu te to a more enabling social and

    economic environment in the OR Tambo District.

    Like all other regions in the province, OR Tambo

    District suffers from acute backlogs in social and

    economic infrastructure. The vas t natural land, forest

    and water resources that exist within the district,

    and the existing albeit limited infrastructure base,

    provides the basis for socio-economic development,

    but it is well-planned, prioritised, strategic and

    complementary infrastructure investments that

    will promote social development, and stimulate

    sustainable economic growth.

    Provincial Department Infrastructure expenditure

    plans from 06/07 08/09 in the OR Tambo DistrictMunicipality:

    The total infrastructure spend directed towards the

    OR Tambo District by the Eastern Cape provincial

    government departments amounts to a whopping

    total of approximately R2.9bn over the current

    medium term expenditure cycle. This represents

    signicant public sector infrastructure investment

    that hopefully crowds in private investment.

    b u i l d a n dm a i n t a i n i n f r a s t r u c t u r e

    32

  • 8/12/2019 Ortdm Gds Profile

    33/64

    33

    P R O V I N C I A L D E P A R T M E N T O F E D U C A T I O N

    Education is a key element of social and economic

    development. The Provincial Department of

    Education has planned and budgeted up to R710m

    on education infrastructure in the OR Tambo

    District over the current medium term expenditure

    cycle (06/07 08/09). The Provincial Depar tment is spending R190m

    in 06/07, R200m in 07/08 and R320 in 08/09,

    representing slightly above 25% of total departmental

    education infrastr ucture investment over the current

    medium term cycle.

    The bulk of the spending is targeted at rehabilita tion

    and upgrading (R520m) with recurrent maintenance

    budgeted at R120m emphasizing a focus on improving

    the qua lit y of the education inf ra structure. Up to

    214 schools have been targeted in the District for

    thi s upgrade through prov inc ial government funding,

    involving the eradication of mud-structures and

    general routine maintenance of existing concrete-

    structures. Therefore a shift towards quality as

    opposed to quantity (quantity has been the norm

    for previous medium term expenditure cycles).

    These upgrading and maintenance amounts are crucial

    in two respects, 1) by maintaining and protecting

    existing assets ensuring guarantee of returns well into

    the future , and 2) direc t and indirec t cash injec tions

    boost local economies, as routine maintenance

    activities are generally labour-intensive.

    A total of approximately R70m over the medium

    term is budgeted for New Const ruct ion of ve

    schools public special schools in Mbizana, Mthatha,

    and Lusikisiki.

    Provincial government education infrastructure

    spending per capita in the OR Tambo District over

    the three year per iod , in total, is R405 per per son .

    P R O V I N C I A L D E P A R T M E N T O F H E A L T H

    The provincial health department has planned and

    budgeted for a total health infrastructure spending

    of R685m in the current medium term expenditure

    cycle for the OR Tambo Distric t rising from R190m

    in 06/07 to R265m in 07/08, before falling to R230m

    in 08/09. This provincial health infrastructure expenditure

    in OR Tambo amounts to 30% of total health

    infras truc ture spending by the provincial government

    over the medium term cycle.

    The allocation to the District is divided into New

    Construction (R106m), Rehabilitation and Upgrading

    (R484m), and routine and recurrent maintenance

    (R95m). Rehabilitation and upgrading will involve

    over 40 clinic revamps and 7 hospital revitalizations

    within the District.

    The allocation for new construction will target

    23 clinics and 5 hospitals. These large allocations

    to relati vely few hea lth ins titut ions in the Dis tr ic t

    suggests a strategic shift to focus more on

    improving the quality of health services, as opposed

    to improv ing access to hea lth ser vices . So the issue

    is one of quality, not necessarily access.

    The provincial health infrastructure spending per

    capita in the OR Tambo District over the medium

    term amounts to an approximate R390 per per son .

  • 8/12/2019 Ortdm Gds Profile

    34/64

    34

    P R O V I N C I A L D E P A R T M E N T O F A G R I C U L T U R E

    The OR Tambo Dis trict has huge untapped

    agriculture, forestry and water resources, and these

    resources are at the heart of any sustainable growth

    potential and economic activity in the Distric t.

    Given this existing natural r esource base, the

    Provincial Department of Agriculture plays animportant catalyst role in promoting subsistence

    farming (food security) and small and large scale

    commercial agriculture.

    Over the current medium term pe riod (06/07

    08/09), the Prov inc ial Depar tment of Agr icu ltu re

    will spend approximately R23m on infrastructure

    in the OR Tambo District, representing 11% of the

    total inf ra structure spend (R200m over the medium

    term) by t he prov inc ial depar tment in the D istr ic t.

    The allocation rises from R5.5m in 06/07 to R8m

    in 07/08 and to over R9m in 08/09 and is targeted

    largely at fencing, stock water, irrigation, storage

    and shearing sheds, tunnels, dip-tanks, and soil

    conservation works..

    The Provincial Agriculture infrastructure spend per

    capita amounts to approximately R13 per person in

    the OR Tambo Dis tr ic t.

    P R O V I N C I A L D E P A R T M E N T O F P U B L I C W O R K S

    The OR Tambo District is set to receive up to R75m

    from the Provincial Department of Public Works.

    This amount represents about 17% of the total

    provincial allocation to all Districts and the Metro.

    The per capita spending on public works amounts

    to R43 per per son .

    It is not clear what projects the budgeted money

    will be spend on.

    P R O V I N C I A L D E PA R T M E N T O F R O A D S A N D T R A N S P O R T

    Another key element of required infr astructure

    development in the District is the road network.

    The OR Tambo Distric t suffers from quite signicant

    road infrastructure backlogs given the largely r ural

    character of the District.

    In light of these backlogs, and recognising the keyenabling role that transport infrastructure has for

    economic and social development, the provincial

    roads and transport department has allocated

    approximately R1.4bn to road infrastructure in the

    OR Tambo District area, rising from over R327m

    in 06/07 to R551m in 07/08 and then a drop to jus t

    under R521m in 08/09.

    This total allocation over the medium term represents

    approximately 27% of the total provincial alloca tion

    towards road inf ra structure, and representi ng a per

    capita spend of R800 per person in total over the

    medium term expenditure framework.

    The major transport projec ts envisaged in OR

    Tambo are: Kei Rail phases 3, 4 and 5 (R334m),

    Isilimela Hospi tal road (R147m), Madwaleni hospita l

    road (R136m), Greenville Hospital road (R132m),

    Zithulele Hospital road (R130m), and Ugie-Langeni

    phase 3 (R95m).

    Some of the other spending on road infrastructure

    in OR Tambo by the Provincial Department will be

    on recurrent and routine maintenance (including

    the Vukuzakhe Programme) of R300m, and access

    to resor ts , and access to Great Places (R50m).

  • 8/12/2019 Ortdm Gds Profile

    35/64

    35

    P R O V I N C I A L D E P A R T M E N T O F H O U S I N G ,

    L O C A L G O V E R N M E N T & T R A D I T I O N A L A F F A I R S

    The department has announced expenditure plans

    of R76m in OR Tambo for the 07/08 nancia l year.

    This amount will result in the construction of a

    tota l of 3058 houses in L ibode Ny andeni , Mthatha

    Ilitha, Mthatha Zimbane Valley, Mthatha, WaterfallPark, Mantlaneni Village, Nkozo Village, and

    Ncambele Village.

    P R O V I N C I A L D E P A R T M E N T O F

    S P O R T , R E C R E A T I O N , A R T S A N D C U L T U R E

    The total Provincial Department allocation to OR

    Tambo amounts to just over R12m over the current

    medium term expenditure cycle.

    The OR Tambo District is receiving a tad above

    R4m in the 06/07 financial year for the new

    construction of, 1) Mthatha Archives in KSD

    (R3m), and 2) the Bumbane Cultural Village in KSD

    (R1m). An amount of R5m is allocated for 07/08

    for the continuation of the Mthatha Archives in

    KSD (R2.5m), and the construction of the new

    Flagstaff Arts Centre (R2.5m). Finally, in 08/09, an

    amount of R3m is allocated for the completion of

    the h is tor ic Mthatha Archives .

    The OR Tambo allocation of the Depar tments

    infrastructure budget represents 15% of total

    departmental infrastructure spending throughout

    the Province .

    The infra struc ture per capita spending for the

    department in the district lies at R7 per person of

    infrastructure spend.

    Expenditure on the new Mthatha Library (at an

    estimated cost of R1.4m) has been planned, but

    not budgeted for in the current medium term

    expenditure cycle. P R O V I N C I A L D E P A R T M E N T O F S O C I A L D E V E L O P M E N T

    The provincial department has allocated almost R16m

    in infrastructure spending over the current medium

    term expendi ture cyc le to the OR Tambo Distric t.

    The expenditure is targeted at new construction of

    the Flags taff Service Ofce (R4 .6m over the medium

    term), the Qumbu Secure Care Cen tre (R11m over

    the med ium term)

    A further R0.3m is allocated for maintenance and

    upgrade of parkhomes, and routine maintenance of

    existing social development infrastructure.

    The department has planned, but not yet budgeted

    for, phase 2 of the Qunu Day Care Centre (est. cost

    of R0.8m), and in addition, several service ofces

    (Libode, Port St Johns, Mqanduli and Mbizana at

    an estimated cost of R3m each) have been planned

    but not budgeted for in the current medium term

    expenditure cycle.

    The total infrastructure spending in OR Tambo

    represents 25% of total Social Development

    infrastructure spending in the province.

    The social development infrastructure per capita

    spending over the medium term is approximately

    R9 per person.

  • 8/12/2019 Ortdm Gds Profile

    36/64

    36

    P R O V I N C I A L G O V E R N M E N T

    I N F R A S T R U C T U R E E X P E N D I T U R E S : C O N C L U S I O N S

    The signicant provincial infrastructure expenditure

    plans in the OR Tambo District Municipality will

    provide a meaningful platform for social and

    economic growth and development arising from the

    opportunities such spending opens up in both therst and second economies.

    Compared to other Districts and the Metro in the

    Eastern Cape, OR Tambo District Municipality will

    receive approximately 22% of the total provincial

    infrastructure spend, making it the Distr ict with the

    highest Provincial infrastructure allocation over the

    current medium-term cycle.

    It is import ant for social and economic infrastr ucture

    to complement each other, thereby mutua lly

    reinforcing the sum total of benets derived from

    the inf ra st ructure expend itu re and its economy-

    wide linkages.

    It is necessary, but not sufcient, to just build new

    infrastructure. Maintenance of existing infrastructure

    needs to also be priori tised. Current ly, maintenance

    of the Departments immoveable assets is poor

    inevitably leading to rapid deterioration of buildings

    and other assets. Maintenance funds have always

    and may probably remain limited. Much of thelimitations with respect to maintenance can be

    attributed to poor levels of denition with respect

    to the respons ibi li ty for maintenance budgeting.

    The distinc tion between levels of respons ibility

    between Public Works and User departments as

    reected by the infrastructure plans will go a long

    way towards regularizing maintenance planning.

    Finally, it is commendable that a paradigm shift is

    evident through the infrastructure allocations,

    with the focus on the quality of infrastructure

    and services, as opposed simply to the quantity,

    especially in education and health.

  • 8/12/2019 Ortdm Gds Profile

    37/64

    S T R A T E G I C I N F R A S T R U C T U R E P R O J E C T :K E I D E V E L O P M E N T C O R R I D O R

    The Kei Development Corridor is an initiative

    instigated by the Provincial Department of Roads

    and Transport to promote economic development

    in an area surrounding the Kei Rail link from East

    London to Mthatha. Such is the importance of the

    Kei Development Corridor that over R300m is

    being earmarked for the Kei Rail by the Provincial

    Government over the medium term.

    It is envisaged that the implementation of the

    Kei Rail project will stimulate development of a

    development corridor by:

    Stimulating economic ac tivities where transpor t

    constraints are the primary reason for the

    unsustainability and/or non-viability of the projects;

    Providing an improved transport option for existing

    economic activities and thereby allowing for increased

    prot and sustainability and greater efciency;

    Providing a general economic catalyst to promote

    and develop economic initiatives and improvement s

    in social welfare throughout the economy;

    Creating other forward-backward linkages with other

    major projects (e.g. Bio-fuels, Forestry and Timber)

    The Kei Development Corridor falls predominantly

    within three Distric t Municipalities, namely: Amat-

    hole, Chris Hani and OR Tambo District Municipali-

    ties (ORTDM). ORTDM encompasses seven local

    municipalities, including three (KSD, Mhlontlo and

    Nyandeni) that lie within the KDC project area. The

    main urban centres within the ORTDM that fall in-

    side the KDC area are Libode, Mthatha, Mqanduli,

    and Ngqeleni.

    Mthatha is a rst order node of the KDC, which means

    that it must form the backbone of the KDC and there-

    fore the focus is on industrial and transport related

    infrastructure. Libode, Mqanduli and Nqeleni are sec-

    ond order nodes in KDC. Second order nodes are

    smaller towns or commercial focus points providing in

    the basic needs of the sur rounding set tlements.

    37

  • 8/12/2019 Ortdm Gds Profile

    38/64

    38

    It is recognized that stimulating economic develop-

    ment in the area surrounding the Kei Rail will be

    important in ensuring the viability of the Kei Rail.

    Within thi s contex t, the pr inc iple objectives of the

    KDC Economic Initiative are:

    Identication of the economic acti vities whose

    viability (and hence implementation) are solelydependent on the rail corridor or that would

    substantially benet from the rail development;

    Identica tion of the general economic development

    potential within the hinterland serviced by the Kei

    Rail Development Corridor (KDC) and

    Assessment of potential linkages and benets that

    could accrue from the proposed improvements to

    rail (and supporting transport) infrastructure.

    Identication of key infrastructure investments

    required to support the KDC

    For the OR Tambo Distr ict, the Kei Development

    Corridor provides a unique opportunity for

    focused investment in the Corridor area, as the

    significant provincial investment in this project

    provides a platform for further municipal

    interventions to realize the full potential of the

    Kei Development Corridor.

    Linkages between the KDC and potentially mega

    agship projects in OR Tambo:

    Bio-Fuels Industry:

    The proposed project involves the establishment

    of an integrated food crop and canola bio-diesel

    industry as an economic anchor for accelerated

    agrarian transformation in the Eastern Cape.

    The proposal is to develop extensive integrated

  • 8/12/2019 Ortdm Gds Profile

    39/64

    rotational cropping (canola & maize or equivalent)

    to supp ly a new canola bio -diesel process ing fac ili ty

    in the East London IDZ.

    Canola biodiesel is a potentially attractive product

    in Europe due to its low freezing point and the

    fact that European legislation requires that the

    proportion of bio-fuel consumption (in relation tototal fuel s) ri se to 5.75% by 2010.

    Forestry & Timber Processing Industry:

    Development of timber processing activities around

    the Langeni area to ser ve the proposed development

    of the Ugie/Matiwane forestry area . Facilities include

    saw mills, chipboard manufacturing and potentially

    furniture manufacture. The key anchor is the PG

    Bison/Steinhoff initiative in Ugie-Maclear.

    Essentially, the conservation and efcient utilization

    of Kei Rail can only succeed as a partnership between

    local communities, government and private sector.

    Growth and development in the East London to

    Mthatha corridor will succeed if it is government

    driven (provincial, district and local), private sector

    funded, labour conscious, community based andenvironmentally friendly

    39

  • 8/12/2019 Ortdm Gds Profile

    40/64

    40

    f i gh t p o v e r t y P O V E R T Y I N D I C A T O R S

    Levels of household grant dependence in Or Tambo is

    signicantly higher that the provincial average of 64%

    with three quarters (75%) and more of households

    receiving social grants. The exception is KSD where

    63% of households rely on social grants.

    Household member is receiving social grant

    Yes No

    % %

    Eastern Cape 63.6 36.4

    O.R.Tambo 75.1 24.9

    Mbizana 80.2 19.8

    Ntabankulu 81.3 18.7

    Qaukeni 81.7 18.3

    Port St Johns 77.7 22.3

    Nyandeni 74.5 25.5

    Mhlontlo 77.4 22.6

    King Sabata

    Dalindyebo62.9 37.1

    Source: RSS 2006

    Unemployment levels in the OR Tambo District are

    higher than the provincial average, underscoring

    the levels of chronic pover ty and inequali ty withi n

    the dis tr ic t. As a result, household incomes in the

    district are generally low.

    Working Age& not working

    Unemployedand lookingfor work

    Householdincome< than

    R1500/month

    % % %

    Eastern Cape 78.1 32.6 65.2

    O.R .Tambo 84.6 34.6 71.6

    Mbizana 89.5 39.5 84.9

    Ntabankulu 82.1 30.1 73.0

    Qaukeni 87.2 32.8 76.7

    Por t St Johns 89.6 44.7 5.2

    Nyandeni 85.0 33.7 67.9

    Mhlontlo 83.2 30.5 71.5

    King Sabata

    Dalindyebo79.3 34.2 56.6

    Source: RSS 2006

  • 8/12/2019 Ortdm Gds Profile

    41/64

    41

    M U N I C I P A L - M U N I C I P A L C O O P E R A T I O N

    Engagement meetings between the ORTDM and

    the LMs have rai sed is sues about how municipal ities

    can be brought up to speed to address the prior ities

    interventions required to unlock the social and

    economic potential in the their local areas.

    It was identied that the Municipalities need to

    address by-laws, policies and performance governing/

    in relation to, amongst other issues, trade regulation,

    procurement, land use, zoning, plans for the sector s,

    resources like staff and funding/budgets required to

    implement the priorities.

    I D P A L I G N M E N T

    All Municipal IDPs in OR Tambo give attention to

    building their own delivery capacities. The filling

    of critical vacancies (e.g. Municipal Managers etc)

    is critical, as are measures to attract and retain

    critical skills.

    IDPs have improved over the last few years and

    are generally aligned to PGDP in terms of agrarian

    transformation , public sector transformation, human

    resource development, economic diversication

    and tourism, infrastructure provision, and ghting

    poverty.

    However, there are some impor tant gaps in the

    context of provincial alignment (e.g. housing, EPWP,

    malnutrition).

    IDPs do not yet integrate the activities of all three

    levels of Government (such as Biofuels (ASGISA).

    The OR Tambo IDP devotes considerable attention

    to bui lding its own capacit y and tha t of the local

    municipalities. Perhaps more attention could be

    given to how to improve co-operation with otherarms of Government

    M U N I C I P A L B U S I N E S S C O O P E R A T I O N

    The ORTDM together with the regional ofce of

    the bus iness chamber (NAFCOC) held a work shop

    tha t sought to iron out and remove any existing and

    potential barriers to economic development in the

    region. Studies undertaken indicate hat ORTDM as

    the mos t poorest r egiona l economy in the countr y

    and the major challenge faced by these two par tners

    is turning around this economy.

    In a continuous effor t to promote municipal -

    business cooperation, the key areas of engagement

    were identied as:

    Establishment of a partnership between ORTDM

    and the regional business chamber (NAFCOC).

    Exploration of oppor tunities like, Umzimvubu water

    catchment, N2 toll road, the bio-fuels industry etc.

    Branding of ORTDM as an economic engine of the

    province.

    Establishment of an investment centre in the region

    by NAFCOC.

    m u n i c i p a l c a p ac i t y a n d c o o p e r a t i o n

  • 8/12/2019 Ortdm Gds Profile

    42/64

    42

    Establishment of business incubator and business

    advice centers by NAFCOC.

    A business ownership/leasing survey to be

    undertaken and submitted by NAFCOC.

    Expansion of business afliation networks by

    NAFCOC to the inclusion of all sectors in business.

    The joint development of a regional programme ofaction by the two par ties

    Coordination of departmental programmes for the

    identication of business opportunities therein.

    Development of strategies for business

    development advocacy.

    The development and submission of factory

    occupancy database and submission by ECDC to

    the par tne rship programme.

    Precise role denition of each partner to the

    marriage.

    The creation of an enabling business environment

    by the DM for the business community to thrive.

    Development of by-laws by the DM/LMs

    Council business outreach programme.

    LED forum meetings for coordination, experiences

    and information sharing.

    Observer status accorded to business in the LED

    standing committee.

    Infrastructure development monitoring.

    Establishment PPPs to stimulate growth.

    Business database establishment.

    Business service and advice centre establishment.

    Joint planning and programme setting for strategic

    infrastructure development and rehabilitation

    (airport, transport system, 2010 readiness, airport

    conference facility, umzimvubu water cathment,

    N2 tool road)

    M U N I C I P A L / P R O V I N C I A L

    D E P A R T M E N T / A G E N C I E S C O O P E R A T I O N

    Among the key issues raised at the OR Tambo

    District is the limited participation of provincial

    government in the IDP planning processes. As such,

    efforts to build participative government at the

    local level are being undermined by the provinceoften sending junior ofcials without decision

    making powers. The district expressed concern

    about the role of the Departmen t of Housing, Local

    Government and Traditional Affairs. This revolves

    around the department not providing adequate

    support and guidance to municipalities.

    Other key issues emerged were the provincial

    governments inadequate ability to plan spatially

    (DMs and LMs) and the absence of alignment with

    respect to planning, budgeting and even execution

    between the two spheres. These need to be

    addressed as they curtail the acceleration of service

    delivery wh ich appears to be the major issue need to

    be tackled in OR Tambo among other things . On that

    score, close cooperation of spheres of government

    remains critical as the delivery of social services is

    not an exclusive local government competence but

    depends on other spheres performance.

    It is no doubt that the current Provincial IDP

    Engagement process is the step in the right direction,

    however the challenge would be to factor into results

    of the district GDSs, IDP engagements to feed into

    planning and review of both IDPs and PGDP.

  • 8/12/2019 Ortdm Gds Profile

    43/64

    M U N I C I P A L / N A T I O N A L

    D E P A R T ME N T S / S O E S C O - O P E R A T I O N

    In the case of OR Tambo the Depar tment of Land

    Affairs, Department of Housing, Department of

    Labour and Department of Roads, Department of

    Agriculture is among other key national departments

    that the distric t needs to work with besides theDepartment of Trade and Industry. Although the

    Department of Water Affairs and Forestry has by

    and large been participative at local government level,

    the scale and pace of eradicat ing water and sanitation

    backlogs in the district leave a lot to be desired.

    It goes with out saying that in order to address the huge

    electrication and telephone backlogs particularly in

    the former homeland areas, close cooperation with

    Eskom and Telkom remains critical.

    43

  • 8/12/2019 Ortdm Gds Profile

    44/64

    44

    c o n c l u s i o n The ORTDM is clearly grappling with very

    entrenched problems of poverty and unemployment,

    and progress seems to have been quite slow so far

    in addressing these problems. It is of concern that

    while public investment in the District is increasing,

    there seem to be ver y few substantial pr ivate sector

    projects in the pipe-line.

    The Summit is potentially very important for

    setting in motion processes to improve municipal

    planning and management capacities, particularly

    with respect to co-operation with other arms of

    Government, and with Business. The private sector,

    business-support agencies and the municipalities

    need to work together to develop the detailed

    priority industry action plans mentioned earlier.

    The outcome of the Summit should be the

    development of a Framework Agreement that

    outlines institutional roles and responsibilities to

    accelerate growth and development in the District.

    This Agreement should also suggest the mechanisms

    and processes for monitoring progress on the decisions

    reached and the governance framework for ongoingdialogue and feedback among the social partners.

    The district GDS presents a unique opportunity

    for constructing partnerships and harnessing the

    collective energies and contributions of a range of

    actors and role players with a view to enhancing

    accelerated and shared growth.

  • 8/12/2019 Ortdm Gds Profile

    45/64

    45

    The district GDS has the potential to unlock the

    potential of all localities, and ensur e that all sectors

    of society identif y their role and contribute to the

    common national objective to build a better life

    for all.

    Generally speaking, there are six key drivers tounlocking economic potential and job creation

    as well as enhancing competitiveness in the

    OR Tambo Distric t:

    1. Agriculture and agri-business remains at the heart

    of the district economy in spite of its stagnant and

    even declining contribution to the district economy.

    And its importance could not be more emphasised

    than through its potentia l to contr ibu te towards

    two mega pro jec ts that a re be ing rolled ou t by both

    National and Provincial government:

    a) Forestry and Timber Industries Development,

    b) Bio-fuels,

    c) Umzimvubu Basin

    2. Processed agricul tural goods offer signicant ly

    more economic value than the non-processed

    products. It is therefore important to consider the

    encouragement of the processing and manufacturing

    of goods within the District

    3. Tourism is an untapped resource within the District. An

    integrated approach must be taken in the promotion

    and development of potential tourism sites.

    4. Massive infrastructure roll-outs (including enhance-

    ments and developments in ICT) envisaged under

    ASGI-SA, the PGDP and the district and local in-frastructure development plans to address backlogs

    and maintain existing and refurbish aging infrastruc-

    ture, could be used to st imulate economic activ ity

    throughou t the construc tion value chain .

    5. Local procurement cou ld offer a wide range of

    economic opportunities throughout all sectors of

    the local economy.

    6. Investing in , and aligning skills development to the

    identied key growth sectors will further enhance

    the locationa l compet it ivenes s of the OR Tambo

    District Area.

  • 8/12/2019 Ortdm Gds Profile

    46/64

    46

    A C R O N Y M SASGISA Accelerated Shared Growth

    Initiative of South Afr