Sheet Information Class, if applicable, on pg. 1 et sqq AP Doc Code Document ID Revision Revision Date Originator Equipment Tag Number(s): Projects: OROT RABIN POWER STATION Combined Cycle Power Plant Purchaser The Israel Electric Corporation Limited Contractor General Electric Global Parts & Product GmbH, Switzerland GE International Inc US
3
Embed
OROT RABIN POWER STATION Combined Cycle Power Plant
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Sheet Information Class, if applicable, on pg. 1 et sqq
AP Doc Code
Document ID
Revision Revision Date
Originator
Equipment Tag Number(s):
Projects:
OROT RABIN POWER STATION Combined Cycle Power Plant
Purchaser
The Israel Electric Corporation Limited
Contractor
General Electric Global Parts & Product GmbH, Switzerland
GE International Inc US
up0e4
Text Box
#BM 0/7 132240 REV:0A 02/03/2020
Max. roughness Ra (µm)
Roughness grade
25
N4N5N6N7N8N9N10N11
Range of nominaldimension (mm)
±3±2±1.2±0.8±0.5±0.3±0.2±0.1±0.1
±8±7±6±5±4±3±2±1.2±0.8±0.5±0.3±0.2
Deviationgrade "medium"
.
X
>120...400
>8000...12000
>400...1000
>0.5...3.0
>3.0...6.0
>6.0...30.0
>30...120
>1000...2000
>2000...4000
>4000...8000
>12000...16000
>16000...20000
Deviationgrade "coarse"
12.5 6.3 3.2 1.6 0.8 0.4 0.2
General tolerances (mm): Linear dimension <4000 acc. to ISO 2768-1, >4000 acc. to DIN 7168 Roughness symbols according to ISO 1302
Machining: if necessary prescribed forbidden
Full penetrant weld: 0.7
ASME VIII Div.1, part UW
US-Standards
ASME VIII Div.1, part UW
Fillet weld: 0.5
European Standard
EN ISO 5817
EN ISO 9692
Full penetrant weld: B
Fillet weld: C
Welding quality
Weld preparation
Quality for not
specified welds
0,85/1 0,7
ASME
0,5 0,5 0,6 B,C
EN ISO 5817 BC
D B,C
=Welding circumference
=Full penetrant weld,
=Butt weld with welding
1'000
over 2'000
2'000 4'000 to to
±6 ±4
400
of manufacturer. Openings for nozzles shallWeld seams: Partition of plates is in the responsibility
8'000 to
Deviation limits (mm)
4'000 over 8'000
120
±6
±10
30
±7
±12
16'000 20'000 to 12'000 over
12'000 to
not be crossed by weld seams.
over 16'000 to
±8
±14
20'000 over
to to
over
±3
to to 1'000
±4 ±5
±8
=Single fillet weld
=Butt weldon reverse side
welding on both side
=Double fillet weld
=Welding at site ±16
over over
±1A
B
Tolerance category
2 EN ISO 13920
Set-up
Assembly ±2
30
±2
±3
400 120 over over
±1 ±1
±2
±9
R = min 5mm R = between 2/3 * t1 and 1/4 * t2
General nozzle finish:
Weld thickness t:Fillet welds:
Butt welds: t
t
t 1t2
t2
t 1t2
t 1
RRR
Notes: *1) Detail "n1" & "n2": Pipe, sealing and nuts are part of delivery scope from external partner Detail "n3": Pipe, sealing, bolts and nuts are part of delivery scope from external partner *2) Connection must be tight welded. *3) Weld where accessible. *4) Adjust if necessary. *5) Sliding bearings installed without foam frame, see also Erection Instruction *6) Shown on 2nd sheet *7) Weld under support plates clips *8) Cut the Lifting lug on position after the Neck quarters are assembled and welded together *9) Full penetrant weld as much as possible, the rest should be done with fillet weld *10) Do not weld *11) This connection shall be blanked before operation (see also Erection Instruction) *12) Pipe on Level pipe should be cut and adjusted to fit valve dimensionTitle / Designation Document ID Doc CodeErection Item list 1GC002772 ORO/70/H/MAG01–CA10/MA/001 Erection assembly Overview 3D 1GC002773 ORO/70/H/MAG01–CA10/MD/001 Erection assembly 2D 1GC002774 ORO/70/H/MAG01–CA10/MD/002Shipping and Handling drawing 1GC002775 ORO/70/H/MAG01–CA10/MD/003List of weld seams at site 1GC002776 ORO/70/H/MAG01–CA10/MD/004Erection instruction 1GC002778 ORO/70/H/MAG01–CA10/EI/001 ITPL site assembly 1GC002780 ORO/70/H/MAG01–CA10/EQ/001Insulation clips 1GC002963 ORO/70/H/MAG01–CA10/DD/001
987654321 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
L
K
J
H
G
F
E
D
C
B
A
M
L
K
J
H
G
F
E
D
C
B
A
M
1000
Document No. Revision:
Scale:
Resp. department:
Derived from:
Approval of revision:
Review of revision:
Prepared:
A 02/01Sheet:
Format:
A0
Language:
en
Doc. Type:
MDTitle:
M.Maruski
W. Beuth
A. Sgambati
1GC002774
1:75
CM/S Condenser
Erection Assembly 2D
OROT RABIN
-X. ECCN: US Origin:NO:YES:Export controlled: YES: NO: X.
-GE POWER
PE - MHX
1000
Geometrical tolerances according to ISO 11011GC002774
General tolerances (mm): Linear dimension <4000 acc. to ISO 2768-1, >4000 acc. to DIN 7168 Roughness symbols according to ISO 1302
Machining: if necessary prescribed forbidden
Full penetrant weld: 0.7
ASME VIII Div.1, part UW
US-Standards
ASME VIII Div.1, part UW
Fillet weld: 0.5
European Standard
EN ISO 5817
EN ISO 9692
Full penetrant weld: B
Fillet weld: C
Welding quality
Weld preparation
Quality for not
specified welds
0,85/1 0,7
ASME
0,5 0,5 0,6 B,C
EN ISO 5817 BC
D B,C
=Welding circumference
=Full penetrant weld,
=Butt weld with welding
1'000
over 2'000
2'000 4'000 to to
±6 ±4
400
of manufacturer. Openings for nozzles shallWeld seams: Partition of plates is in the responsibility
8'000 to
Deviation limits (mm)
4'000 over 8'000
120
±6
±10
30
±7
±12
16'000 20'000 to 12'000 over
12'000 to
not be crossed by weld seams.
over 16'000 to
±8
±14
20'000 over
to to
over
±3
to to 1'000
±4 ±5
±8
=Single fillet weld
=Butt weldon reverse side
welding on both side
=Double fillet weld
=Welding at site ±16
over over
±1A
B
Tolerance category
2 EN ISO 13920
Set-up
Assembly ±2
30
±2
±3
400 120 over over
±1 ±1
±2
±9
R = min 5mm R = between 2/3 * t1 and 1/4 * t2
General nozzle finish:
Weld thickness t:Fillet welds:
Butt welds: t
t
t 1t2
t2
t 1t2
t 1
RRR
Notes: *1) Detail "n1" & "n2": Pipe, sealing and nuts are part of delivery scope from external partner Detail "n3": Pipe, sealing, bolts and nuts are part of delivery scope from external partner *2) Connection must be tight welded. *3) Weld where accessible. *4) Adjust if necessary. *5) Sliding bearings installed without foam frame, see also Erection Instruction *6) Shown on 2nd sheet *7) Weld under support plates clips *8) Cut the Lifting lug on position after the Neck quarters are assembled and welded together *9) Full penetrant weld as much as possible, the rest should be done with fillet weld *10) Do not weld *11) This connection shall be blanked before operation (see also Erection Instruction) *12) Pipe on Level pipe should be cut and adjusted to fit valve dimensionTitle / Designation Document ID Doc CodeErection Item list 1GC002772 ORO/70/H/MAG01–CA10/MA/001 Erection assembly Overview 3D 1GC002773 ORO/70/H/MAG01–CA10/MD/001 Erection assembly 2D 1GC002774 ORO/70/H/MAG01–CA10/MD/002Shipping and Handling drawing 1GC002775 ORO/70/H/MAG01–CA10/MD/003List of weld seams at site 1GC002776 ORO/70/H/MAG01–CA10/MD/004Erection instruction 1GC002778 ORO/70/H/MAG01–CA10/EI/001 ITPL site assembly 1GC002780 ORO/70/H/MAG01–CA10/EQ/001Insulation clips 1GC002963 ORO/70/H/MAG01–CA10/DD/001
987654321 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
L
K
J
H
G
F
E
D
C
B
A
M
L
K
J
H
G
F
E
D
C
B
A
M
1000
Document No. Revision:
Scale:
Resp. department:
Derived from:
Approval of revision:
Review of revision:
Prepared:
A 02/02Sheet:
Format:
A0
Language:
en
Doc. Type:
MDTitle:
M.Maruski
W. Beuth
A. Sgambati
1GC002774
1:75
CM/S Condenser
Erection Assembly 2D
OROT RABIN
-X. ECCN: US Origin:NO:YES:Export controlled: YES: NO: X.
-GE POWER
PE - MHX
1000
Geometrical tolerances according to ISO 11011GC002774