Top Banner
The Garden Depot Presented by Razzmatazz Consulting Group
12

Organizational Development Project

Jun 29, 2015

Download

Documents

safinr

These are my power point slides from the group presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Organizational Development Project

The Garden Depot

Presented by Razzmatazz Consulting Group

Page 2: Organizational Development Project

Agenda Issues with the Garden Depot SWOT analysis General recommendations Alternative 1&2 Selection of alternative Timeline implementation Contingencies Q and A

Page 3: Organizational Development Project

Issues to be addressed Lack of standardized hiring practices and

performance standards Managerial underperformance Poor inventory control

Under pricing Can not meet demand, can not meet profit

potential Ms. Bowman is overworked

Senior management hands off management style Recent brand damage

Page 4: Organizational Development Project

SWOT analysis

Page 5: Organizational Development Project

General “Sound Suggestions” * Provide managerial training for Mr. Sinclair

Managerial hiring based on experience and aptitude

Create specific job descriptions Not only a quote, but also a time estimates Customer signature and random service

quality calls to customers Performance standards for customer service King and Sampson need to inspect the ground

level operations

Page 6: Organizational Development Project

“Shuffle the Deck” alternative

Ms. Jenkins: cross-train & ready for possible future promotion Mr. Sinclair: learn the product and material costs, invoicing skills

management, under the supervision of Mr. Sampson.  After a few months of training, Mr. Sinclair will return to

previous post To reduce shrink, Mr. Sinclair should sign for all material used

CONSPossible blowback from Ms. JenkinsPossible blowback from Mr. King,

Mr. SinclairPossible blowback from Mr.

Sampson and his retail staffPossible reduction performance of

Garden Depot retail stores

Temporarily switch Mr. Sinclair to manage the retail store and Ms. Jenkins to manage the landscaping

PROSImproved customer serviceImproved inventory control Improved job quoting skills

Page 7: Organizational Development Project

Alternative’s “X’s and O’s”

Page 8: Organizational Development Project

“Sign on the dotted line” alternative Restructure the company so that its

landscaping division contracts out all landscaping work to independent contractors

CONS•Possible reduction in profit margins, as contractors are paid more that staff•Mr. King and Mr. Sampson may see this as downsizing•Mr. Sinclair may see this as demotion

PROS•Mr. Sinclair to perform the job he is experienced in: that of the dispatcher•Require contractors to buy equipment from Garden Depot•Increased revenue from items sold in retail, as well as portion of contract revenues•Contractors quote the customers•Reduced payroll costs, no benefits or payroll taxes for contractors•Supply of landscaping service more flexible•Standards of service/damages in contract

Page 9: Organizational Development Project

Alternative’s “X’s and O’s”

Page 10: Organizational Development Project

Timeline for Implementation

Page 11: Organizational Development Project

Contingencies If we can not find contractors - hire students

on contracts If contractors are not up to par – terminate

contract If alternative 2 does not meet the timeline -

extend the timeline If alternative 2 doesn't work - alternative 1 is

the back up

Page 12: Organizational Development Project

Questions and Answers