range County Public Schools OCPS Building Program Presentation to Central Florida ABC May 14, 2013 1
Mar 31, 2015
Orange County Public Schools
OCPS Building ProgramPresentation to Central Florida ABC
May 14, 2013
1
Orange County Public Schools
AGENDA
• Facilities Update – Where are we now?
• Recent Facilities Condition Assessment
• Efficiencies
• Questions
2
Orange County Public Schools
In PlanningComprehensive Renovations
3
School Estimated Cost to Complete
Scheduled Substantial Completion
Apopka ES $13.4M September 2015
Grand Avenue ES $7.4M On hold pending K-8 determination
Lake Whitney ES $9.4M December 2015
Orange County Public Schools
In PlanningNew/Replacement Schools
4
School Estimated Cost to Complete
Scheduled Substantial Completion
133-E-E-6 (Audubon Park Area)
$15M On hold pending K-8 determination
27-H-W-4 (WO HS Relief) $78M On hold
Clay Springs ES $15.4M June 2015
63-E-W-4 (Independence)
$14M June 2015
Lake Weston ES $13.6M June 2015
Lovell ES $14.3M November 2015
81-E-SW-5 (Millenia) $16M TBD / Site Selection
Wheatley ES $13.5M July 2014
Orange County Public Schools
In DesignComprehensive Renovations
5
School Estimated Cost to Complete
Scheduled Substantial Completion
Cypress Creek HS $53.6M May 2016
Dr. Phillips ES $13.7M June 2014
Lake Silver ES $14.2M June 2014
Waterford ES $13.8M June 2014
Orange County Public Schools
In DesignNew/Replacement Schools
6
School Estimated Cost to Complete
Scheduled Substantial Completion
John Young ES $14.2M November 2014
Little River ES $13M June 2014
Ocoee ES $13.9M June 2014
Pineloch ES $14.2M June 2014
Shingle Creek ES $14.6M July 2014
Spring Lake ES $13.8M June 2014
Washington Shores ES $15.1M September 2014
Orange County Public Schools
Under ConstructionComprehensive Renovations
7
School Estimated Cost to Complete
Scheduled Substantial Completion
Arbor Ridge K-8 $17.4M June 30, 2013
Brookshire ES $14.1M June 17, 2013
Dr. Phillips HS $62M March 16, 2015
Lancaster ES $18.6M May 10, 2013
Orange County Public Schools
Under ConstructionNew/Replacement Schools
8
School Estimated Cost to Complete
Scheduled Substantial Completion
Eccleston ES $15.4M June 28, 2013
19-E-N-7 (Hackney Prairie)
$16.2M June 28, 2013
Oak Ridge HS $69.8M June 11, 2013
Sun Blaze ES $14.2M June 28, 2013
Orange County Public Schools
Facilities Condition Assessment
9
FCA Process
• Collect Data for District-Wide Inventory
• Develop Database
• Integrate CADD Drawings with Database
• Determine Capital Needs
• Develop Capital Plan Options- Project Scopes / Budgets /
Timelines
Orange County Public Schools
Comprehensive/ Replacement
GROUP 1
GROUP 2
GROUP 3
Capital Renewal
GROUPS 4 & 5
GROUPS 4 & 5
OTHER GROUPS(systems replacement )
Technology Initiative(infrastructure & FFE )
Future Relief Schools(projected growth) $185 M
10
2015 2020 2025 2030
$246 M
$247 M
$765 M
Program Timeline
$264 M
$109 M
2003 Sales TaxProgram Sunsets
$200 M
$Funded$Unfunded
Groups
$160 M$215 M
+
$83 M
$521 M
Orange County Public Schools
Groups 1 & 2 Summary• Group 1 – Remaining Sales Tax List – Funded
– Schools, K-12 (18) $264.2 MGroup 1 Total $264.2 M
• Group 2 – Remaining Sales Tax List – Unfunded– Schools, K-12 (36) $537.7 M– Schools, Specialty (8) $187.0 M– Other (2) $ 40.4 M
Group 2 Total $765.1 M
11
Orange County Public Schools
Group 3 Summary
12
• Group 3 – Pre-2003 Sales Tax ProgramExisting CapitalNeedsRenewal
– Schools, K-12 (20)$187.8 M $247.1 M– Ancillary Facilities (10) $ 58.5 M
$ 40.3 MGroup 3 Total $246.3 M $287.4 M
Orange County Public Schools
Program Summary
• Continue Funded Sales Tax projects thru 2016• Initiate / Implement Capital Renewal Program• Implement Technology Initiative• Forecast Future Relief Schools• Identify Revenue for Unfunded Capital Needs
13
Orange County Public Schools
Efficiencies Stretch Taxpayer Dollars
• Eliminating state oversight gives flexibility to save on renovations
• Bundling projects cuts fees
• Hard bidding projects increases competition and lowers cost
• More involvement by maintenance in design process flags recurring cost issues
• Prototype school design cuts costs
14
Orange County Public Schools
Previous OCPS Prototype Design New Efficient OCPS Prototype Design
15
Orange County Public Schools
prim
ary
clas
sroo
ms
HVAC HVAC
scienceart
kind
erga
rten
media center
resourceskills lab
music
dining / multi-
purpose
kitchen
skills lab
Outline of Previous OCPS Prototype
Central HVAC reduces ducts
Efficient classroom
meets all needs
Right-sized media center
Shorter corridors move
students efficiently
MORE EFFICIENT
FLOOR PLAN
REDUCES GROSS
SQUARE FOOTAGE
By 21,000
16
Orange County Public Schools
Value Engineering
17
Orange County Public Schools
Ways to Save• Building compact designs requires less land and saves
millions in the next 10 years
2 Elementary Schools acquiring 10 acres each in lieu of 15 acres each = savings of 10 acres
2 Middle Schools acquiring 20 acres each in lieu of 25 acres each = savings of 10 acres
1 High School acquiring 45 acres in lieu of 60 acres each = savings of 15 acres
18
Orange County Public Schools
Questions?