REMINDER Check in on the COLLABORATE mobile app Primavera Integrated on EXA – P6 R8.2, CM14, OFM & BI Publisher Prepared by: Verghese Kochummen Principal Solutions Architect Insynchro USA Challenges, Benefits and Lessons Learned of Deploying an Integrated Primavera Solution Session ID#: 15447
22
Embed
Oracle Primavera P6 r8.2 and CM14 on Exa platform using oracle Fusion Middleware and Oracle Business Intelligence - Oracle Primavera P6 Collaborate 1O
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
REMINDER
Check in on the
COLLABORATE mobile app
Primavera Integrated on EXA – P6 R8.2, CM14, OFM & BI Publisher
Prepared by:
Verghese Kochummen
Principal Solutions Architect
Insynchro USA
Challenges, Benefits and Lessons Learned of Deploying an Integrated Primavera Solution
Session ID#: 15447
Product & Service Profile
■ NAME: Insynchro USA
■ CORE: Project Management
Products and Services
■ Primavera Service Portfolio
▪ Consulting, Functional &
Technical Support
▪ Remote Installation
▪ Development of Project
Workflows (BPM)
▪ Configure Project Libraries
(UCM)
▪ Development of Project
Reporting (BI Publisher)
■ inSynchro Integration Manager
▪ ERP Systems: Primavera P6
and CM to ERP [SAP, E-
Business Suite, PeopleSoft,
Ellipse, Computron, …etc]
▪ Asset Management System:
Primavera P6 to Maximo
■ Partial List of Clients
▪ Australia: Yarra Valley Water,
Talisman, RailCorp, Blue Scope
Steel,
▪ Malaysia: Shell, Petronas,
Talisman, Telekom Malaysia
Client Profile: Yarra Valley Water, Melbourne, Australia
This is a subtitle or bulleted list
Profile: Yarra Valley Water
■ Water Utility Company
■ Operating in Melbourne, Australia
■ Major award winners for Operational Efficiencies and Customer Support Services
■ Known for IT Investments that increase productivity and efficiencies
■ Primavera @ YVW
▪ User of Primavera P6 and CM since 2008
▪ Integrated P6, CM with their ERP Application (Computron)
▪ Integration facilitated by Insynchro Integration Manager
middleware
▪ Facilitated heavy corporate governance requirements
Profile: Yarra Valley Water (Cont’d)
■ Applications Procured
▪ Primavera P6.0
▪ Primavera Contract Manager
11
▪ Insynchro Integration
Manager
▪ Primavera Timesheets
▪ iManage project workflows
(bundled with P6.0)
▪ Sybase Infomaker (bundled
with Contract Manager 11)
■ Upgrade Resistance Factors
▪ iManage upgrade not
available
▪ Infomaker application is
phased out by Oracle (post-
acquisition)
▪ Cessation of support for P6.0
▪ Cost of Process and Report
Redevelopment
■ Risk of Not Upgrading
▪ Costly Support
▪ High Risk of Low SLA
▪ Threatens Quality of Service
Alignment with IT Policies & Strategies
This is a subtitle or bulleted list
Alignment with IT Architecture & Strategy
■ Unified Technology Platform
■ Single Enabling Technology per Functional Area
■ “In-Sourced” Skills for each Enabling Technology
■ Push Legacy or Application not in-line with IT Strategy to End-Of-Life
■ Mandate to Procurement
▪ New Applications “pressured” to use Enabling Technologies
▪ New Applications must not use in-built functional enabling