Top Banner

of 79

Oracle Advanced Planning Products 3887

Apr 05, 2018

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 7/31/2019 Oracle Advanced Planning Products 3887

    1/79

  • 7/31/2019 Oracle Advanced Planning Products 3887

    2/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    The following is intended to outline our general product direction. Itis intended for information purposes only, and may not be

    incorporated into any contract. It is not a commitment to deliver anymaterial, code, or functionality, and should not be relied upon in

    making purchasing decision. The development, release, and timingof any features or functionality described for Oracles products

    remains at the sole discretion of Oracle.

    The much-anticipated, action-packed

    ORACLELEGAL DISCLAIMER

  • 7/31/2019 Oracle Advanced Planning Products 3887

    3/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

  • 7/31/2019 Oracle Advanced Planning Products 3887

    4/79

    Tom GreeneSenior Solution ConsultantWest Commercial Apps Region

    Oracle Advanced Planning

    An Overview for NorCal OAUG

    Training Day 2006

  • 7/31/2019 Oracle Advanced Planning Products 3887

    5/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    TRENDS ADAPT YOUR BUSINESS MODEL

    Today: Some Tough Nuts to CrackBusiness trends are forcing you to consider new strategies

    Higher degree of uncertaintyGet visibility to all demand

    Manage to uncertainty by postponing inventory

    Increased global competitionFocus on core competency

    Increase outsourcing

    Mass customizationMove point of product differentiation

    closer to customers

    Focus on customer service toensure brand loyalty

    Provide reliable and accuratecommitments to customers

    Limited money to invest in IT Lower cost of ownership of apps

  • 7/31/2019 Oracle Advanced Planning Products 3887

    6/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Long planning cycles

    Supply PlanningDemand Planning

    Distributionplans

    Sales

    Marketing

    Mfg.

    Response 1:

    Maintain Excess Inventory

    Response 2:Reserve Production Capacity

    Response 3:Expedite Everything!

    Traditional ApproachMulti-step planning processes, high latency, limited collaboration

    Fax

    Tier 2

    Tier 1

    CUSTOMERS SUPPLIERS

    Supply Chains built onINVENTORY

    Productionplans

    Manufacturingplans

    Paper Paper

    ?

    Manualreconciliation

  • 7/31/2019 Oracle Advanced Planning Products 3887

    7/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Move to A More Competitive Model

    Enable closed loopcollaborative planningprocesses across yourvalue chain

    Have complete supplychain visibility

    Make better decisions

    React immediately todisruptions in supply chain

    E-Business planning solution: zero latency, real-time collaboration

    Supply Chains built onINFORMATION instead of

    Inventory

    Consensus forecast andproduction plan

    Supply Planning

    Demand Hub & Multi-dimensional analysis

    Automated Exceptions

    S&OP Process

    Singleholistic plan

    Business Intelligence

    Sales

    Marketing

    Mfg.

    Manufacturing

    PortalPortal

    Tier 2

    Tier 1

    CUSTOMERS SUPPLIERS

  • 7/31/2019 Oracle Advanced Planning Products 3887

    8/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    What Our Customers Say

    Reduced inventories by 20%, increased market share from 50% to 80%

    The most exciting feature of the system to a manufacturer is constraint-basedplanning. Oracle provides the ability to plan, including resource and materialconstraints,based on suppliers' inventories and capacities.

    Mr. V. A. Raghu, Managing Director, Tube Investments Ltd.

    Improved inventory turns by 37%

    With help from Oracle's Advanced Supply Chain Planning (ASCP), we cannow respond to customer change requests within 24 hours. The system alsohelps us check if our suppliers can supply us the components we need.Previously, we've had to collect this data manually using a lot of resources.

    Tan Lai Tong , Business Management GM, TEC Ltd.

    Replaced i2 and cut planning cycles from weekly to dailyWith Oracle E-Business Suite 11i, we have moved from weekly to dailyplanning, which has significantly improved our response time.

    Clair Walizer, Senior Developer and Analyst, Canon Virginia, Inc.

  • 7/31/2019 Oracle Advanced Planning Products 3887

    9/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Oracle Advanced Planning

    Solution

  • 7/31/2019 Oracle Advanced Planning Products 3887

    10/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Oracle Advanced PlanningComplete e-business planning solution

    Collaborative Planning CP

    Sales and OperationsPlanning

    From short-term to long-term

    Fromd

    etailtosumm

    ary

    CPSC Exception Management

    PSProduction Scheduling

    ASCPDistribution Planning

    GOPGlobal Order Promising

    ASCPSupply Chain & Manufacturing Planning

    IO

    Inventory Optimization

    DPDemand Planning

    SCISupply Chain Intelligence

    DevelopMarketSellOrder

    Plan

    Procure

    Make

    Fulfill

    Service

    Maintain

    FinanceHRProjects

    All Product,Customer,& SupplierInformation

    SNONetwork Design

  • 7/31/2019 Oracle Advanced Planning Products 3887

    11/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Key Capabilitiesin Order of a typical High-Tech Adoption Lifecycle

    Sales and operations planning

    Holistic planning and optimization

    Zero downtime global order promising

    Multi-tier collaborative planning

    Inventory postponement optimization

    Strategic network design

    Real-time production scheduling

  • 7/31/2019 Oracle Advanced Planning Products 3887

    12/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Sales and Operations Planning

  • 7/31/2019 Oracle Advanced Planning Products 3887

    13/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Sales and Operations Planning

    Balancing supply and demand

    Synchronization of all operational plans

    Key outputs Consensus forecast

    Bookings forecast new orders expected to be received

    Sales and allocations plan expected shipments

    Production plan Bookings forecast +/- changes in backlog = shipping forecast

    Shipping forecast +/- changes in inventory = production plan

    Definition

  • 7/31/2019 Oracle Advanced Planning Products 3887

    14/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Sales and Operations PlanningComplete and integrated process

    Demand Plan

    Supply Plan

    Inventory andservice levels

    ManagementReports

    Financial planBudget plan

    Sales opportunitiesTrade promotions

    Ship and book historyCurrent order backlog

    Inventory historyProduction historyProduction backlogCustomer forecasts

    Exceptionmanagement

    Sales Plan

    Production PlanBookings Forecast

    Balance supply, demand, andbudgets:- Determine inventory targets- Determine supply plan- Determine allocations

    Capture all demand in one place

    Determine consensus forecast- Determine new product plan

    Evaluate and adjust plans

    INPUTS PLANNING PROCESS

    OUTPUTS

  • 7/31/2019 Oracle Advanced Planning Products 3887

    15/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Sales and Operations Planning

    Demand Hub

    Capture all demand data in a central place

    Collaborate internally and externally

    Drive to a consensus forecast

    Use analytics and intelligence to achieve aconsensus demand

    Balance demand, supply, and budgets

    Make allocation decisions while trading off servicelevels and cost

    Adapt and adjust to changing businessconditions

    Adjust demand or supply plan as conditions change

    Drive continuous improvement

    Integrated solution with built-in businessintelligence

    Key capabilities

  • 7/31/2019 Oracle Advanced Planning Products 3887

    16/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Tier 2

    Tier 1

    CUSTOMERS SUPPLIERS

    S&OP Demand Hub

    Central repository for all demandinformation

    Customer and supplier forecasts

    POS data

    Sales and marketing forecasts

    Financial forecasts and budgets

    User-defined data (spreadsheets)

    Configurable and extensible

    Meta data driven

    User-defined dimensions andhierarchies

    Open

    Spreadsheets, XML, EDI, portal Audit exceptions

    Integrated

    Out-of-the-box loads for Oracle ERP

    Capture all historic and future demand in a single data store

    APIs

    Sales

    Demand

    Hub

    ERP Systems

    Finance Marketing

    Internet

    PortalPortal

    Manufacturing

    ERP TransactionFlat file loadsEDI Transactions

  • 7/31/2019 Oracle Advanced Planning Products 3887

    17/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Compare and consolidate disparate forecasts

    Sales, marketing, manufacturing, customers, suppliers,Point of Sale (in units or $$)

    Use multi-dimensional analysis to adjust, allocate, androllup

    Improve forecast accuracy Better statistical forecasts

    Forecast planning percentages for models and options

    Get visibility to customer demand changes

    Improve demand planning cycle time

    Move from a regimented periodic to a continuousdemand planning process

    Get real-time visibility to demand adjustments viainternal collaboration

    Improve sales promotion planning

    Forecasting integrated with promotion planning

    Measure effectiveness

    S&OP Demand PlanningDrive to accurate consensus forecast

    Collaborativedemand plan

    Automated exceptions

    Consensusforecast

    Sales

    Demand

    Hub

    Finance Marketing

    Tier 2

    Tier 1

    CUSTOMERS SUPPLIERS

    Internet

    PortalPortal

    Demand Planning Process

    Manufacturing

  • 7/31/2019 Oracle Advanced Planning Products 3887

    18/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Manage product life cycles more effectively,with your trading partners

    Introduction of new products

    Phase-out of obsolete products

    Improve delivery performance Include customers in forecasting process

    Publish sales forecast to suppliers at any tier

    Reduce non-value added costs and exceptionoverload

    User-defined exceptions

    Proactive notifications Automated exception handling via workflow

    S&OP Demand PlanningDrive to accurate consensus forecast

    Sales/OrderForecast

    Publish(optional)

    Synchronize

    SalesForecast

    SalesForecast

    Synchronize

    Forecast Collaboration Process

    CUSTOMERS

    SUPPLIERS

    YOU

  • 7/31/2019 Oracle Advanced Planning Products 3887

    19/79

  • 7/31/2019 Oracle Advanced Planning Products 3887

    20/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    S&OP Alcoa

    $20.3 billion in revenues 350 operating locations in 40 countries

    127,000 Alcoans worldwide

    4 Major Rolling Mills - Davenport, Iowa;Lancaster, Pennsylvania; Texarkana, Texas;San Antonio,Texas

    Heat Treating and Blanking Center - Danville,Illinois

    Customer service and distribution centers -Irvine, California;Hutchinson, Kansas

    Extruded Tube for Heat Exchangers - St.

    Louis. Missouri; Monterey, Mexico

    Spreadsheets, not integrated with legacy system, nor withexecution systems

    Manual forecast smoothing

    No system supported sales and operations planning

    Monthly planning cycle, insufficient accuracy in order promisedates

    Determines allocation to produce most profitable product mix withinexisting constraints

    Performs all planning at the family level

    Powerful Integration of supply/demand picture

    Demand Planning & ASCP supply and inventory data

    Drill Down and roll-up capability

    Reporting tools and data analysis

    Export to excel or HTML pages

    Supports the S&OP Process

    Demand planning analysis and pre-work

    Operations planning analysis and pre-work

    S&OP composite picture in real time during review sessions

    Source: Alcoa Presentation at Appsworld 2004

    COMPANY PROFILE BEFORE ORACLE

    AFTER ORACLE

    Benefits

    Reduced plan cycle time Eliminated waste on spreadsheets

    Process integration with other modules resulted in technology pull for new systems

    Integrated sales and operations planning process resulted in one consensus forecast number

  • 7/31/2019 Oracle Advanced Planning Products 3887

    21/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Holistic Planning and Optimization

  • 7/31/2019 Oracle Advanced Planning Products 3887

    22/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Holistic Planning and Optimization

    Unified solution for supply chain andmanufacturing planning

    Segment the problem as needed

    Optimization for planners notprogrammers

    Scalable and reliable

    Short-term planning

    Long-term planning

    Semicon

    Process

    Discrete

    Flow

    ProjectPlants

    Warehouses

    Customers

    Suppliers

    DCs

    Faster and better supply chain plans

    Internet

  • 7/31/2019 Oracle Advanced Planning Products 3887

    23/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Holistic Planning and Optimization

    Supply Chain Planning Product family and item level planning

    Alternate components, resources,processes, suppliers, facilities, and shipmethods

    End-item substitution

    Critical items and resources

    Aggregate resources

    Bills of distribution and transfer rules

    Customer and supplier facilities

    Manufacturing Planning Simultaneous resources

    Batch resources

    Alternate resources

    Minimum transfer quantities Complex, network routings

    By-products and co-products

    Line rates and takt times

    Setup and run

    One solution for comprehensive supply chain and mfg planning

    One supply chain model, one planning engine, one setup

  • 7/31/2019 Oracle Advanced Planning Products 3887

    24/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    One holistic plan

    Holistic Planning and Optimization

    Adapts to your current businessmodel

    Single plan or multiple plans

    Evolve planning model at yourown pace

    Re-configure easily by modifying planoptions instead of re-implementing orre-modeling

    Multiple models can co-exist

    Highly adaptable; segment the problem as needed

    One DRP, multiple MRP

    DRP for all Orgs

    MRP Org 1 MRP Org 2 MRP Org 3

    SCP for all Organizations

    Multiple MPS, multiple MRP

    MPS for BU 1

    MRPOrg 1

    MRPOrg 2

    MRPOrg 3

    MPS for BU 2

    MRPOrg 4

    MRPOrg 5

    MRPOrg 6

  • 7/31/2019 Oracle Advanced Planning Products 3887

    25/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Holistic Planning and Optimization

    Interceramic

    91 Distribution centers, stores, andfranchises

    4 Plant warehouses

    7 Manufacturing plants

    3000 BOMs, 100,000 SKUs

    Run DRP, constrained MPS, and rawmaterial MRP

    Knowles Electronics

    Global planning instance

    2 Locations in the US

    1 Location in Europe

    5 Locations in Asia

    Mixed mode manufacturing

    Make to stock Make to order

    Configure to order

    Global order promising against 1 centralplan

    Highly adaptable Customer examples

    Knowles Electronics hasreduced inventory by $1M permonth after implementingAdvanced Planning

    SuppliersManufacturing

    plantsDistribution

    chain Customers

    ConstrainedSC plan

    DRP plan

    ConstrainedMPS plan for

    all facilities

    Collaborativedemand

    plan

    Inventorypostponement

    plan

  • 7/31/2019 Oracle Advanced Planning Products 3887

    26/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Holistic Planning and Optimization

    Make better decisions faster

    Level load

    Choose alternatives

    Make/buy decisions

    Late demand diagnosis

    Out-of-the-box optimization Use costs or decision rules

    Start quickly

    Planners define the problem to solve

    Flexible defaulting

    Reduce planner workload

    Optimization For planners, not programmers

    GE AE has moved from running separate plans in 36 facilities to runninga single holistic plan across their DCs, end-assembly, contractmanufacturing, and component shops, and as a result has reduced theirplanning organization significantly

  • 7/31/2019 Oracle Advanced Planning Products 3887

    27/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Holistic Planning and Optimization

    Patented memory-based architecture Multi-threaded snapshot

    Optimized end-to-end run time

    Database centric All plan information resides in the database Leverages high performance database capabilities

    Flexible plan scope Telescoping granularity

    Apply constraints selectively

    Subset planning

    Scalable

    High volume customers: Agilent Technologies, Sony SNC, GE AE, NCR, Panasonic, Alcoa

  • 7/31/2019 Oracle Advanced Planning Products 3887

    28/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Zero Downtime Global Order

    Promising

  • 7/31/2019 Oracle Advanced Planning Products 3887

    29/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Zero Downtime Global Order Promising

    Promise orders based on: Material availability

    Manufacturing capacity

    Transportation capacity

    Supplier capacity

    Global statement of availability All facilities, material, resources, and suppliers

    Drive fulfillment decisions based ondemand and supply plans

    Promise based on optimal supply decisions

    Allocate available supply and capacity By channel, customer, or product

    Priority and stealing rules

    Manage commitments to key customers Re-schedule and re-sequence your backlog

  • 7/31/2019 Oracle Advanced Planning Products 3887

    30/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Run new plan

    Zero Downtime Global Order Promising

    Zero downtime

    No order promising downtime whenunderlying supply chain plan isrefreshed

    No sales order is lost, automatically re-

    promise sales orders against new plan

    Open, reliable, and scalable

    Engine runs inside the database

    No memory models to load!

    Multi-threaded

    Integrated with OM, iStore, and CallCenter

    Easily integrate with legacy systems

    Guaranteed uptime and consistency via patent-pending architecture

    Current plan

    Promise Orders Promise Orders

    Copy Run Copy

    ? ? ? ? ? ? ?

    New planDowntime or

    Inaccurate orders

    Typical Approach

    Oracle Approach

    Current plan

    Promise Orders Promise Orders

    Run new plan

    Copy RunSync &

    Re-promise

    New plan

    Swap

  • 7/31/2019 Oracle Advanced Planning Products 3887

    31/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Agilent Technologies Performing multi-level capable-to-promise

    Greatly reduced expedite orders with accurateorder promising dates

    Moved from batch to online order promising

    Increased customer satisfaction of key

    strategic customers by using allocated ATP 24x7 worldwide order operation with zero

    downtime CTP

    Meet customer requirement by utilizingsubstitute components

    Cisco Every order for every router sold worldwide goes

    through GOP

    Complex order promising problem

    Product and channel allocation rules

    Extensive use of ship sets in an assembly to orderenvironment

    High volumes

    Intersil Using material and resource constraints (CTP)

    across virtual supply chain

    Sales people promise orders online in seconds

    Customer examples

    Zero Downtime Global Order Promising

  • 7/31/2019 Oracle Advanced Planning Products 3887

    32/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Multi-Tier Collaborative Planning

  • 7/31/2019 Oracle Advanced Planning Products 3887

    33/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Multi-tier Collaborative Planning

    Plan your extended supply chain Share forecasts and supply commits with

    customers and suppliers

    Get visibility to supplier capacity

    Reallocate key components

    Make alternate sourcing decisions

    Reduce inventory cost and improvefulfillment

    Suppliers manage your inventory

    Manage your customers inventory

    React quickly to supply chainexceptions

    Waterfall analysis

    User-configurable exceptions

    Automated exception handling via workflow

    Full visibility and synchronization across the extended supply chain

    Run plan

    Optional

    Forecast memory

    Supply commit

    boards

    Supply commit memory

    Demand boardsRun plan

    Demandsystems

    Supplyforecast

    Consensusforecast

    SUPPLIERCUSTOMER YOUCONTRACT

    MANUFACTURER

  • 7/31/2019 Oracle Advanced Planning Products 3887

    34/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Automate inventory replenishment with suppliers and customers

    Receive items

    Pay on receipt/use

    Check

    inventorystatus

    Ship items

    VMI Agreement(with supplier)

    VMI AgreementVMI Agreement

    Receive items

    Pay on receipt/use

    Ship items

    VMI Agreement(with customer)

    Send consumptionadvice

    VMI and Consigned Inventory

    CUSTOMER YOU SUPPLIER

  • 7/31/2019 Oracle Advanced Planning Products 3887

    35/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Customer Example: Alcatel eND

    Enabled 100% virtual enterprise

    Plan virtual supply chain

    Planning cycle time reduced by 75%

    Reduced inventory by more than 65%

    Reduced material liability by 80%

    Established global closed-loop process controls

    Improved supply chain visibility

    Projected annual savings of $15M

  • 7/31/2019 Oracle Advanced Planning Products 3887

    36/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Inventory Postponement

    Optimization

  • 7/31/2019 Oracle Advanced Planning Products 3887

    37/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Inventory Postponement Optimization

    Inventory levels and policies aresynchronized across the entiresupply chain

    Manage to uncertainty Demand, supply, and lead-time

    variability

    Pull model, driven by point ofpostponement

    Higher customer service at lowerinventory cost

    Time-phased safety stock buffersat all levels

    Multiple target service levels

    Manage to uncertainty, reduce inventory, improve customer service

    Suppliers

    ContractManufacturers

    FinalAssembly

    CentralDistributionCenters

    RegionalDistributionCenters

    Customers

    Without Postponement With Postponement

  • 7/31/2019 Oracle Advanced Planning Products 3887

    38/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Inventory Postponement Optimization

    Reduced inventory cost

    Increased flexibility to handle supply and demanduncertainty

    Rapidly handle product mix changes

    Reduced average fulfillment lead times

    Reduced material liability

    Ability to absorb yield exposure

    Business benefits

  • 7/31/2019 Oracle Advanced Planning Products 3887

    39/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Inventory Postponement Optimization

    Reduce inventory without sacrificingcustomer service

    Postponement

    Risk pooling

    Manage supply chain variability

    Choose the best service level strategy

    based on cost and revenue Inventory budget constraints

    Invest in profitable channels, products,and customers

    Manage seasonality and product life

    cycle characteristics Recommend time-phased safety stock to supply

    planning

    Out-of-the-box optimization For planners, not programmers

    Key capabilities

    InventoryInvestm

    ent

    Service Level

    10 30 50 75 80 85 90 95 100

    Higher Service Level

    LowerInventoryCost

    WithoutOracle

    WithOracle

  • 7/31/2019 Oracle Advanced Planning Products 3887

    40/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Reduce inventorywithout impactingcustomer service

  • 7/31/2019 Oracle Advanced Planning Products 3887

    41/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Simulate multiple

    scenarios to find theoptimal trade-offbetween cost and

    service level

  • 7/31/2019 Oracle Advanced Planning Products 3887

    42/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Inventory Postponement Optimization

    Focusing on class A parts for service business

    Determining safety stock levels across finishedgoods and raw materials

    Realizing significant benefits Example: reduced inventory for one part by 10%

    Customer example GE Transportation Aircraft Engines, US

  • 7/31/2019 Oracle Advanced Planning Products 3887

    43/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Strategic Network Design

  • 7/31/2019 Oracle Advanced Planning Products 3887

    44/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Strategic Network Design

    Optimize your supply chain network Use demand scenarios as input

    Compare time-phased network configurations

    Model all supply chain elements Distribution centers, processing facilities, ship methods,

    stores, suppliers, and customers

    Costs: transportation, operating, sourcing, facility ramp-upand shut-down, labor, and storage

    Optimize sourcing Output best sourcing strategy for downstream supply chain

    and inventory planning

    Simulate changing business conditions New businesses and new markets

    Outsourcing decisions

    Demand scenarios

    Key capabilities

  • 7/31/2019 Oracle Advanced Planning Products 3887

    45/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Strategic Network Design

    75% Inventory reduction5% Capacity improvement

    50% Inventory reductionPlanning cycle reduced 86%70% Inventory reduction20% Capacity improvement

    20% Inventory reduction $ 350M Inventory reduction

    15% Inventory reduction50% Inventory reductionPlanning cycle reduced 20%

    50% Inventory reduction25% Stock-out reduction

    Carrier rationalization from 200 to 12

    Proven deployment success and ROI: 300+ customers

    BASS BREWERS COCA COLA - FEMSA

    NABISCO FOODS

    OWENS ILLINOIS

    KIMBERLY-CLARK

    KRAFT FOODS - EUROPE

    DOW CHEMICAL

    FORT JAMES

  • 7/31/2019 Oracle Advanced Planning Products 3887

    46/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Real-Time Production Scheduling

  • 7/31/2019 Oracle Advanced Planning Products 3887

    47/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Real-Time Production Scheduling

    Maximize production throughput Optimize your shop floor; detect floating bottlenecks

    Reduce WIP inventory by rapidly synchronizing multi-stageproduction schedules

    Account for complex setup and change-over scenarios,machine breakdown, supply and resource shortages , co-and by-products, alternate resources, routings, and

    operations

    Model all elements of your shop floor Work centers, resources and resource groups, shift capacity,

    operating costs

    Lead times: setup, change-over, and run

    Sequence dependent setups, contiguous operations,production campaigns, batching

    Implement most optimal schedule seamlessintegration with Oracle EBS

    Output best schedule for process (OPM), discrete MFG), andsemi-conductor (OSFM) manufacturing (available 2006)

    Key capabilities

  • 7/31/2019 Oracle Advanced Planning Products 3887

    48/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Real-Time Production Scheduling

    GE Energy Improved schedule accuracy and confidence

    by reflecting real time shop floor constraints

    Finite machine, crew and tool resourceconstraints

    Floating resource bottlenecks due to demand

    mix variability Operation sequence dependent setup times

    Operation buffering to avoid intermittent gluegun usage

    Alternate resources with preferences

    Simulations of hot order impact on existingschedule

    Complex demand priorities

    Toyota Racing Division Reduced schedule creation from 3 weeks to < 2

    hours

    Support re-planning based on constant designchanges during production

    Respect for crew specialization

    Optimized use of un-manned operations duringdowntime

    Nampak Reduction in time lost due to sequence dependent

    press setups for container styles and sizes

    Customer examples

  • 7/31/2019 Oracle Advanced Planning Products 3887

    49/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Integrated Performance Management

    and

    Process Automation

  • 7/31/2019 Oracle Advanced Planning Products 3887

    50/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Integrated Performance Management

    Define targets

    Measureperformance

    Executetransactions

    ManagementReports

    Notify on out

    of tolerance

    Analyze exceptions based on

    facts; take immediate corrective

    action

    Identify key performancemeasures and set targets

    Calculate KPIs and compare to

    plan; notify decision makers of

    exceptions

    Perform trend analysis and

    adjust business plan and targets

    Role-based portals

    DP Forecast accuracy Margin analysis Promotion effectiveness

    ASCP Planned utilization On-time delivery Planned margin

    IO Service level analysis Plan versus profit Postponement savings

    TP Carrier contract utilization Cost per unit weight Cost per unit volume

    CP Supply commit variability Order forecast variability

    PLAN TO PERFORMANCE PROCESSBUSINESS INTELLIGENCE

    OUTPUTS

    Closed-loop plan-execute-measure-adapt process

  • 7/31/2019 Oracle Advanced Planning Products 3887

    51/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Automated end to end planning process Completely integrated business process flows

    across all products

    Automated plan execution Auto-release orders and reschedule

    recommendations

    Configurable exception management Workflow enabled exceptions

    User-defined exceptions

    Configurable thresholds

    Kyocera has workflow-enabled their planning process tothe extent where their planners manage all the planexceptions by responding to email notifications

    Increase planner productivity

    Process Automation

  • 7/31/2019 Oracle Advanced Planning Products 3887

    52/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Scalable and Open Architecture

  • 7/31/2019 Oracle Advanced Planning Products 3887

    53/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Scalable and Open Architecture

    High performance In-memory only when needed

    Multi-threaded snapshot

    Leverages key database features likematerialized views, partitions, andanalytical workspaces

    Reliable All plan information resides in the database

    Hot backup and recovery

    Leverages grid computing infrastructure

    Open and standards based Runs against all versions of Oracle EBS

    11.0, 11i

    Deploy against legacy systems XML, flat file, EDI support

    Database-centric architecture

    APIs

    Oracle ERP

    Legacy Systems

    XMLEDI

    Flat file

    Order PromisingEngine

    AnalyticalWorkspaces

    KPIs Workflows Plans

    Internet

    PortalPortal

    Legacy DeploymentsCochlear, Embraer, FXAP, NCR, Interceramic, Perkin Elmer,GE Transportation Aircraft Engines, Xilinx,

    TRADING PARTNERS INTERNAL USERS

    Advanced Planning

  • 7/31/2019 Oracle Advanced Planning Products 3887

    54/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Momentum

  • 7/31/2019 Oracle Advanced Planning Products 3887

    55/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Ongoing Momentum

    1000+ Advanced Planning customers

    Both new installs and upgrades, several legacy systemdeployments

    50% same instance, 50% distributed architecture

    Broad use of modules

    Worldwide deployments US, Brazil, Mexico, UK, France, Italy, Spain, Switzerland, Belgium, Turkey, Israel, South

    Africa, Singapore, Japan, India, Taiwan, Indonesia, Australia, New Zealand, Korea,China, Malaysia, Netherlands, Denmark,

    Large-scale, complex deployments across all industries

  • 7/31/2019 Oracle Advanced Planning Products 3887

    56/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    A Few Live Customers

    Intersil - ASCP, DP, GOP

    Fuji Xerox Asia Pacific - ASCP, DP

    Perkin Elmer - ASCP, GOP

    NCR - ASCP, DP

    Namitech - ASCP, GOP

    Emerson ASCP, DP

    BMW SNO

    Xilinx - ASCP

    UPS Logistics - ASCP, GOP

    Agilent - ASCP, GOP, DP

    Mykrolis - ASCP

    Knowles Electric - ASCP, GOP

    Panasonic - ASCP

    Honeywell S&C - ASCP, DP

    Embraer - CP, DP

    Tube Investments - ASCP

    Toyota PS Eaton Trucks - ASCP

    Kyocera ASCP

    Nampac PS, SNO

    Hoffman - SNO

    Cisco - ASCP, GOP

    Alcoa - ASCP, DP, GOP

    Canon Virginia ASCP, CP

    GE Energy Power Systems - ASCP, GOP

    GE Transportation Aircraft Engines - ASCP

    GE Energy - PS

    Silgan Plastics - ASCP

    Qualcomm - ASCP, DP, CP

    McGraw-Hill - ASCP, DP

    Alcatel eND - ASCP, DP, CP

    Intersil ASCP, DP

    Cervecera Quilmes - SNO

    Mango - CP

    Rockford - ASCP, DP

    Quantum - ASCP, DP

    GrafTech International - SNO

    Boeing - ASCP Anugra Argon Medica - ASCP, DP

    Cochlear - ASCP, DP

    Inventec - ASCP, GOP, CP

    Dow Chemical SNO, PS

  • 7/31/2019 Oracle Advanced Planning Products 3887

    57/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Adding Value and Assuring ROI

    Intersil reduced inventory by 50%, reduced response time for criticalproducts from 336 to 24 hours, 246% ROI

    Xilinxachieved a 98% delivery performance to promise date

    Alcatel eNDmoved to virtual supply chain model and reducedinventory by more than 65%

    Anugrah Argon Medicaimproved on-time delivery to 98% TEC Electronicsimproved inventory turns by 37% Tube Investments reduced inventories by 20%, ramped up

    production by 20%, increased market share from 50% to 80%

    Dow Chemical reduced inventories by $350M, rationalized carriersfrom 200 to 12

    GrafTech reduced inventories by 40% and lead times by 20%

  • 7/31/2019 Oracle Advanced Planning Products 3887

    58/79

  • 7/31/2019 Oracle Advanced Planning Products 3887

    59/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Retail Services Division (RSD) and Financial ServicesDivision (FSD)

    Manufacturer of point of sale and high-end scanningequipment, and service provider of complete storeautomation, ATMs, and self-service kiosk solutions

    $5.6B revenue FY02

    Demand Planning

    500,000 demand planning composites

    12+ month forecasting horizon

    20Gb memory model

    Supply Chain Planning

    20 orgs

    1,000,000 items

    2,5 hours end-to-end planning run

    Each organization ran individual MRP, 54 ERP instances Integration between orgs was based on buy-sell relationship

    Forecast accuracy < 50%

    Sales and operations planning cycle time: 21 days

    No system supported sales and operations planning process

    WITH ORACLE

    Runs worldwide manufacturing and sales operations using ASCP, DP,and GOP

    Single, global plan for 20 orgs, including worldwide distribution centersand manufacturing plants

    Runs daily constrained enterprise plan (EDD)

    Complex procured configurations

    Using real-time material constrained, multi-org, multi-level ATO orderpromising process

    Benefits

    Synchronization of entire worldwide supply chain with complete global visibility

    Strongly reduced planning cycle time

    Strongly increased forecast accuracy

    System supported sales and operations planning process

    NCR Corporation, US

    COMPANY PROFILE BEFORE ORACLE

    AFTER ORACLEPLANNING BENCHMARK

  • 7/31/2019 Oracle Advanced Planning Products 3887

    60/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Orcl 11.0

    Orcl 11.0

    Orcl 11i

    Toshiba TEC, Worldwide

    $3.1B manufacturer of documentprocessing equipment

    Previous process

    Multiple regional ERP instances

    Decentralized planning process

    Current process

    Global centralized planning model ASCP is cornerstone of Global SCM project

    Uses ASCP to make global productionallocation decisions

    Uses material and resource constrainedplanning

    Benefits

    Moved from a monthly planning cycle to aweekly cycle

    Reduced manufacturing cycle times

    Optimized worldwide inventory levels

    Read their online testimonial

    Global planning deployment Multi Instance

    US

    Europe

    Advanced Planning 11i

    China

    Japan

    Malaysia

    Resource and materialconstrainedProduction Plan (MPS)

    Manufacturing SitesDistribution Sites

    Toner Mfg Plant

    Japan Distribution Sites

    Forecast

    Forecast

    Forecast

    MRP

    MRP

    MRP

    Orcl 11i

    Orcl 11.0

    Orcl 10.7

    http://www.toshibatec.co.jp/joho/copier/english/info/topics2.htmhttp://www.toshibatec.co.jp/joho/copier/english/info/topics2.htm
  • 7/31/2019 Oracle Advanced Planning Products 3887

    61/79

    Highly complex, large scale model

    $1.586B net revenue (FY03)

    Legacy order promising using ATP

    Disparate planning tools across supply chain

    Reactive, manual, and time consuming plan analysis

    1 week planning cycle

    Manual forecast generation No system supported S&OP process

    Runs worldwide manufacturing and sales operations using ASCP, DP,and GOP

    Runs optimized enterprise plan, twice/week Plan includes tier-3 supplier organizations Low cost, high volume and high mix demand Using real-time CTP to promise orders 24x7, with use of complex

    allocation rules Using complex network routings

    Scheduling 2 million operations 6-8 BOM levels, ~25 components per BOM >50,000 items, 6 month planning horizon < 50 ASCP and 10 DP users >20 orgs 25Gb memory model, end-to-end 15 hrs run

    $2.53B and $0.76B net revenue (FY03)

    Legacy order promising using ATP

    Manual order promising with fixed lead-time

    Weekly, cascaded MRPs (4 wk propagation)

    No system supported S&OP process

    Multiple, divergent systems/process statistical forecasting, newproduct introductions, or promotions

    Runs worldwide manufacturing and sales operations using ASCP,DP, and GOP

    Runs weekly unconstrained enterprise plan

    High value, low/moderate volume demand; using 32 sub-plans, newproduct introductions, and promotions

    Using real-time ATP to promise orders

    Using multi-level ATO and PTO models

    Planning ~1,500,000 forecast entries

    6-12 BOM levels, ~1000 components per BOM

    ~400,000 items, 12 month planning horizon

    200 ASCP and 15 DP users

    12 factory orgs, 5 SMI orgs, 1 CM org

    15Gb memory model, end-to-end 12 hrs run

    Agilent, Worldwide

    SEMICONDUCTOR PRODUCTS GROUP (SPG)

    AFTER ORACLE

    BEFORE ORACLE BEFORE ORACLE

    AFTER ORACLE

    TEST and MEASUREMENT, and AUTOMATED TEST GROUP (ACE)

    PLANNING BENCHMARK PLANNING BENCHMARK

  • 7/31/2019 Oracle Advanced Planning Products 3887

    62/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    GrafTech International, Worldwide

    HQ in Wilmington, DL, USA

    Manufacturer of carbon and graphiteproducts, used in steel and other metalsindustries

    $700M revenue

    13 manufacturing facilities on 4 continents

    Customers in 60 countries

    COMPANY PROFILE BEFORE ORACLE

    AFTER ORACLE

    Benefits

    Organization had tremendous challenges keeping up with fastchanging and demanding graphite electrode business climate

    Internationalization issues

    No metrics to drive decisions to improve profitability

    No system supported network design process

    Runs worldwide network design optimization using SNO

    Multiple simulation scenarios across 13 manufacturing facilitiesworldwide

    Improved service levels through lead time reduction

    Using storage, transportation, sourcing, operating, and labor costs

    Optimization of entire worldwide supply chain network

    Reduced inventory by 40%

    Reduced lead times by 20%

    Strongly improved resource utilization, globally

  • 7/31/2019 Oracle Advanced Planning Products 3887

    63/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Dow Chemical, Worldwide

    COMPANY PROFILE BEFORE ORACLE

    AFTER ORACLE

    Benefits

    Optimization of entire worldwide supply chain network

    Reduced inventory by $350 million

    Reduced carriers from 200 to 12

    Strongly improved resource utilization, globally

    HQ in Germany

    Manufacturer of chemicals

    $28B revenue

    7 manufacturing facilities

    Customers worldwide

    Organization had tremendous challenges keeping up with fastchanging business climate

    Inventory levels and logistics costs were proportionally high

    No system supported network design process

    No production scheduling system

    Runs worldwide network design optimization using SNO

    Multiple simulation scenarios

    Improved service levels through lead time reduction

    Using storage, transportation, sourcing, operating, and labor costs

    Improved production throughput in all 7 plants

  • 7/31/2019 Oracle Advanced Planning Products 3887

    64/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Cervecera Quilmes, Latin America

    Market leader in Argentina, dominates beer markets inLatin America (Uruquay, Paraguay, Bolivia, Chile)

    Quilmes supplies 60% of beer in these markets

    Quilmes bottles 90% of PepsiCo branded sales in Argentina

    Annual revenues $940M

    Consolidated assets of $1.5B

    Developed regional SNO model to answer critical logistics questions

  • 7/31/2019 Oracle Advanced Planning Products 3887

    65/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Quilmes Capacity Planning

    Sourcing ofraw materials?

    OW?

    Malt?

    What?

    When?

    How much?

    What?

    When?

    How much

    Interplantmovements?

    Deployment ofinventories?

    When?

    How much?

    Where from?

    Seasonalchanges?Interplant

    movements?

    Increases / divestment ?

    Supplier

    Brewing Bottling Warehouse

    Demand

    Brewing Bottling

    SupplierDemand

    DC

    Warehouse.

    Demand

    Developed regional SNO model to answer critical logistics questions

  • 7/31/2019 Oracle Advanced Planning Products 3887

    66/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Quilmes Capacity Planning

    Quilmes management can evaluate: Impact of changes in demand mix - size (specialization and de-

    specialization of bottling lines)

    Impact of changes in demand mix - brew (specialization and de-specialization of plants)

    Acquisitions: opening and closing of production lines, plants, and DCs

    Responses to demand uncertainty

    Changes in sourcing of critical supplies for a given plant and period

    Integration of processes and acquisition of a supplier or suppliers

    Developed regional SNO model to answer critical logistics questions

  • 7/31/2019 Oracle Advanced Planning Products 3887

    67/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    How To Get There ?

  • 7/31/2019 Oracle Advanced Planning Products 3887

    68/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Start with Unconstrained ASCP

    Improve planner productivity

    New productivity enhancing UI

    Planner collaboration

    Reduce your planning cycle time frommonths to hours

    Holistic planning

    Improved scalability and performance

    Make better decisions faster

    Improved exception resolution

    Improved modeling

    Reduce non-value added costs

    Workflow based exceptions

    Drive continuous improvement

    Integrated business intelligence

    Better MRP solution at low initial cost

    MRP APS Common Infrastructure

    ASCP

    Oracle Applications

    (11.0, 11i)

    Unconstrained

    Foundation for future growthCommon infrastructure

  • 7/31/2019 Oracle Advanced Planning Products 3887

    69/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Unconstrained ASCP

    Use a single plan to plan your entire supply chain to reduceplanning cycle time

    Simultaneous material and capacity planning

    Plan process and discrete mixed models

    Perform forecast consumption inline

    Plan at aggregate level, as well as detailed level in a single plan,with better accuracy

    Time granularity in plan horizon

    Account for yields

    Leverage advanced problem solving and analysis tools

    Comprehensive exception management and automation through workflow Extensive pegging capabilities

    Measure plan to target performance Integrated performance management

    Make better decisions leveraging a more comprehensive model

  • 7/31/2019 Oracle Advanced Planning Products 3887

    70/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Leverage a stronger foundation for

    future growth

  • 7/31/2019 Oracle Advanced Planning Products 3887

    71/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    1. Improve The Quality Of Your Plans

    Improve plan quality Automatically recommend alternative

    suppliers, components, resources, facilities,and routings

    Generate feasible plans that respect yourmaterial and resource constraints

    Make better decisions faster Cost based optimization: maximize profit,

    inventory turns, and customer service

    Out-of-the-box optimization

    Priority based decisions

    Drag-and-drop rescheduling

    Improve resource scheduling Schedule simultaneous resources

    Batch resources

    Minimum transfer quantities

    Use constraints and optimization to improve decision making

    MRP APS Common Infrastructure

    ASCP

    Oracle Applications

    (11.0, 11i)

    Unconstrained

    Constrained

    Optimized

  • 7/31/2019 Oracle Advanced Planning Products 3887

    72/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    2. Expand Your Solution Footprint

    Sales and Operations Planning Balance demand, supply, inventory and budgets

    Network Design Optimize your supply chain network

    Demand Planning

    Improve forecast accuracy Inventory Optimization

    Improve service level at lower inventory cost

    Global Order Promising Promise more reliable dates to customers

    Collaborative Planning

    Automate inventory replenishment and supplychain collaboration with your trading partners

    Production Scheduling Maximize your production throughput

    Start with your most important problem

    MRP APS Common Infrastructure

    Oracle Applications(11.0, 11i)

    ASCP

    Unconstrained

    Constrained

    Optimized

    Demand Planning

    Global OrderPromising

    CollaborativePlanning

    InventoryOptimization

    Sales and Operations Planning

    Network Design

    ProductionScheduling

  • 7/31/2019 Oracle Advanced Planning Products 3887

    73/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Supply Chain and Manufacturing Planning

    Collaborative Planning

    Demand Planning DP

    Inventory Optimization IO

    Global Order Promising GOP

    CP

    ASCP

    Sales and OperationsPlanning

    Forecast

    Customerforecast

    Orderforecast

    Constrained plans

    Supplier capacity

    Time-phased safety stocks

    Forecast anddemand variability

    Supplycommits

    Orderforecast

    Network Design SNOForecast scenarios

    Production Scheduling

    Plannedorders

    Firm supplyschedule

    Sourcingrules

    Sourcingrules

    Today

    Coming

    Leverage integration at incremental investment

    Integrated, yet Modular

    PS

    CUSTOMERS

    PLANNING PROCESS

    SUPPLIERS

  • 7/31/2019 Oracle Advanced Planning Products 3887

    74/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Summary

  • 7/31/2019 Oracle Advanced Planning Products 3887

    75/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Oracle Advanced PlanningE-Business planning solution: zero latency, real time collaboration

    Consensus forecast and

    production plan

    Supply Planning

    Demand Hub & Multi-

    dimensional analysis

    Automated Exceptions

    S&OP Process

    Single

    holistic plan

    Business Intelligence

    Sales

    Marketing

    Mfg.

    Manufacturing

    PortalPortal

    Tier 2

    Tier 1

    CUSTOMERS SUPPLIERS

  • 7/31/2019 Oracle Advanced Planning Products 3887

    76/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Why Oracle!

    Integrated planning, execution, and collaboration

    Holistic planning and optimization

    For planners, not programmers

    Integrated performance management

    Lowest total cost of ownership

    K T k

  • 7/31/2019 Oracle Advanced Planning Products 3887

    77/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Key Takeaways

    Proven and complete planning solution Many live customers on multiple products, across a wide variety of industries

    Large-scale, complex, worldwide deployments

    For Planners, Not Programmers - Out-of-the-box optimization

    Superior architecture - scalable, database-driven planning; common data model across allengines, shared with execution

    Provides significant value Large reduction in planning cycle time

    Significant reductions of inventory and increase in customer service levels

    Enables customers to implement best practices

    Progress at your own pace, transition gradually

    Quickly start with unconstrained planning Move up to constrained or optimized planning

    Leverage out-of-the-box integration to rapidly extend planning footprint

    Low risk, high value transition to a better planning system

  • 7/31/2019 Oracle Advanced Planning Products 3887

    78/79

    This presentation is for informational purposes only and may not be incorporated into a contract or agreement.

    Q U E S T I O N SA N S W E R S

  • 7/31/2019 Oracle Advanced Planning Products 3887

    79/79

    INFORMATION AGE APPLICATIONS