    SREE NARAYANA GURUKULAM COLLEGE OF

    ENGINEERING

    DEPARTMENT OF MANAGEMENT STUDIES

    ASSIGNMENT

    OPERATIONS RESEARCH

    Submitted by:

    ARUN KJ

    MBA, J1 (s2)

    ROLL NO25

  • 8/10/2019 or assign

    2/12

    PHASES OF OPERATION RESEARCH STUDY

    OR studies are rooted in teamwork were the O R analysts and the client work side

    by side. The O R analyst expertise in molding must be complemented by the

    experience and co-operation of the client for whom the study is being carried out.

    As decision making tool O R is both a science and an art. It is science by

    virtue of the mathematical techniques it embodies and it is an art because success

    of the phase leading to the solution of the mathematical model depends large on

    the creativity and the experience of the O R team. Willemain{1994} advice that

    effective practice require more than analytical competence. It also require among

    other attributes, technical, judgment and skill in communication and organizational

    survival.

    It is difficult to prescribe specific course of action for this intangible factors. We

    can however offers general guidelines for the implementation of O R in practice

    The principal phases for implementing OR in practice include the following

    1.

    Definition of the problem.

    2. Construction of the model.

    3. Solution of the model.

    4.

    Validation of the model.

    5.

    Implementation of the solution.

    1.

    Definition of the problem

    Involves defining the scope of the problem under investigation. This

    function should be carried out by the entire OR team. The aim is to identify three

    principle elements of decision making problem

    a) Description of the decision alternatives.

    b) Determination of the objectives of the study.

  • 8/10/2019 or assign

    3/12

    c)

    Specification of the limitation under which the modeled system

    operates.

    2. Model construction

    Entails an attempt to translate the problem definition into mathematical

    relationships. If the resulting model fits one of the standard mathematical models,

    such as linear programming we can usually reach a solution by using available

    algorithms. Alternatively if the mathematical relationship are too complex to

    allow the determination of an analytic solution the O R team may option to

    simplify the model and use a heuristic approach or the team may consider of

    simulation of appropriate.

    3. Model solution

    Is by the far the simplest of all OR phases because it entails the use of

    well- defined optimization algorithms. An important aspects of the model

    solution is sensitivity analysis. It deals with obtaining additional information

    about the behavior of optimum solution when the model undergoes some

    parameters changes. Sensitivity analysis is particularly needed when theparameter of the model cannot be estimated accurately.

    4.

    Model validity

    Check whether or not to be the proposed model does what it purports to do

    i.e.does it predict adequately the behavior of the system under study? Initially

    the O R team should be convinced that the model output does not include

    surprise. In other words does the solution make sense? Are the resultsacceptance? On the formal site, a common method for checking the validity of

    the model is to compare it output with historical inputs data. The model valid if

    under similar input conditions. It reasonably duplicate the past performance .

    Generally however there is a no assurance that future performance will

  • 8/10/2019 or assign

    4/12

    continuous to duplicate the past behavior. Also because the model is usually

    based on careful examination of past data, the proposal comparison is usually

    favorable.

    5.

    Implementation

    Implementation of solution of a validate model involved the translation of the

    result into understandable operating instruction to be issued to the people who

    will administer the recommended system. The burden of this task lies primarily

    with the O R team

  • 8/10/2019 or assign

    5/12

  • 8/10/2019 or assign

    6/12

  • 8/10/2019 or assign

    7/12

  • 8/10/2019 or assign

    8/12

  • 8/10/2019 or assign

    9/12

  • 8/10/2019 or assign

    10/12

  • 8/10/2019 or assign

    11/12

  • 8/10/2019 or assign

    12/12