Pumps are used in virtually all industries and are big uses of energy. This presentation shows methods of condition monitoring and how to optimise time to overhaul.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Optimum overhaul of pumps 2014

How to reduce the energy used by your pumps

Ray Beebe Speaker, trainer, author, including:

Predicting maintenance of pump using condition

monitoring(Elsevier, 2004)

Page 2: Optimum overhaul of pumps 2014

World’s most common machine (after motors)

Use 25% of world’s total motor-driven electricity,

….or about 6.5% of global electricity production!!

Pumps

Page 3: Optimum overhaul of pumps 2014

….for pumps:Bearing degradation - Oil sampling & analysis, vibration analysisCasing wear? - NDTMisalignment? - VibrationInternal wear, impeller and seals? - Performance analysis

Vibra tion ana lysis (ro ta ting m ach ines)

Perform ance ana lysis

Ana lysis o f wear partic les and contam inants

V isua l inspection /N D T

E lectrica l p lan t tests

C ondition m onito ring techn iques

Page 4: Optimum overhaul of pumps 2014

Optimise energy usage – good for business AND greenhouse effect.

Optimise energy usage – good for business AND greenhouse effect.

Choose the best mix of techniques to detect and monitor the modes of degradation you expect.

Choose the best mix of techniques to detect and monitor the modes of degradation you expect.

Page 5: Optimum overhaul of pumps 2014

Pump internal wear

• Erosion of

impeller

• Erosion at sealing/ wearing rings

Increased clearance allows recirculation

Page 6: Optimum overhaul of pumps 2014
Page 7: Optimum overhaul of pumps 2014

Pump internal wear

Sealing rings

Ring section diffuser pump

Internal leakage

Page 8: Optimum overhaul of pumps 2014

Pump internal wear

Head

H

Flow Q

Internal leakagerecirculation

H-Q with wear

Page 9: Optimum overhaul of pumps 2014

Pump internal wear

0

5

10

15

20

0 500 1000 1500

Days in service

% R

ed

uct

ion

in h

ead

Head reduction @ datum flow shows cooling water pump degradation (230kW)

Increasing internal leakage reduces Head at chosen

datum flow

Page 10: Optimum overhaul of pumps 2014

Close to linear for 4500kW pump, too

y = -0.155x2 + 0.4907x - 0.1388

-12

-10

-8

-6

-4

-2

0

2

0 1 2 3 4 5 6 7 8 9 10

% r

ed

uc

tio

n in

He

ad

@ d

atu

m

flo

w

Time: years since overhaul

Boiler Feed Pump wear trend

Page 11: Optimum overhaul of pumps 2014

Effect of increased internal wear in centrifugal pumps relates to Specific Speed:

Using data at Best Efficiency Point:

N = Rotation speed, r/min

Q = flow per impeller eye, m³/h

H = head per stage, m

(Number resulting is close to that you get if US units are used) 75.0H

QNN s

Page 12: Optimum overhaul of pumps 2014
Page 13: Optimum overhaul of pumps 2014

0

2

4

6

8

10

12

14

16

18

20

0 1000 2000 3000 4000 5000

Specific Speed (US units)

% Increase in power

Clearances worn to 2X design

Clearances worn to 1.5X design

Page 14: Optimum overhaul of pumps 2014

1 Head-Flow method for CM

At around normal duty point is enough.

Checks condition of pump AND its system.

Repeatable pressure and flow measurement needed, and speed for variable speed pumps.

Page 15: Optimum overhaul of pumps 2014

• Plant DCS etc may work for monitoring: e.g. boiler feed pump

operating H-Q point

Page 16: Optimum overhaul of pumps 2014

DCS use off-line: historian

Boiler Feed Pump

Page 17: Optimum overhaul of pumps 2014

Pressure measurement

Page 18: Optimum overhaul of pumps 2014

Pressure measurement: quick connect couplings for non-hazardous liquids

Page 19: Optimum overhaul of pumps 2014

Flow measurement:

orifice plate

Repeatability can be OK even if very short straight upstream pipe length!

Page 20: Optimum overhaul of pumps 2014

Annubar™ and similar

Page 21: Optimum overhaul of pumps 2014

Expedient flow measurement: ultrasonic flowmeter

(Several types)

[Note: pipe bore diameter must be known. If test flow seems unusual, check pipe wall thickness for presence of buildup in bore]

Page 22: Optimum overhaul of pumps 2014

Flow measurement: tank in system: measure level change with time.

Page 23: Optimum overhaul of pumps 2014

2 Shut-off Head

Simple test

Not always allowable: high energy pumps can explode if dead-headed too long

Note that pumps with a rising head-flow curve shape can give a greater shutoff head when worn!

Page 24: Optimum overhaul of pumps 2014

Waste water pump, 19kW, Specific Speed 930

Page 25: Optimum overhaul of pumps 2014

3 Measurement of thrust balance leakoff flow Annular clearance

wears: thrust balance flow increases,

……therefore likely that clearances up at the impellers, too.

Page 26: Optimum overhaul of pumps 2014

• Thrust balance flow line is small diameter; low cost permanent flow monitor possible.

• High temp ultrasonic flow sensors available

Page 27: Optimum overhaul of pumps 2014

This corresponds to 250kW wasted !

PLUS any impeller sealing leakage!

Boiler feed pump, variable speed (flow is proportional to speed, therefore was corrected to datum speed).

Page 28: Optimum overhaul of pumps 2014

4 Thermometric method

Assumes inefficiency shows as increase in liquid temperature through pump

Well established in UK etc. water industry Special tapping points, 2D from suction,

discharge flanges (temp, pressure) Power measured: motor efficiency found Flow can be calculated Proprietary systems available

Page 29: Optimum overhaul of pumps 2014

Thermodynamic process: use liquid properties (water/steam: www.pepse.com)

Entropy

Enthalpy

3 2: P2 T2

1: P1 T1

Page 30: Optimum overhaul of pumps 2014

or use Whillier equation: for water up to 54 degC

(Units: degC, kPa, K)

]4160)2(003.01[

100

HeadTotal

riseTemptempInlet

Page 31: Optimum overhaul of pumps 2014

Yatesmeter, also Robertson’s kit…

Page 32: Optimum overhaul of pumps 2014

Precision power meter

Notebook takes data, calculates flow, efficiency

Pressure, temperature transducers at suction and discharge, away from pump flanges

Page 33: Optimum overhaul of pumps 2014

Thermometric tests on boiler feed pump with pipe surface temperature

• Usable results, BUTmust allow time for outlet

metal temp to stabilise.

Page 34: Optimum overhaul of pumps 2014

Optimum time for overhaul - on energy saving basis (1)

1 Pump wear causes drop in plant production

2 Pump duty is intermittent to meet demand

• Overhaul readily justified

• Wear means extra service time and extra energy

Page 35: Optimum overhaul of pumps 2014

Optimum time for overhaul - on energy saving basis (2)

3 Pump wear does not affect plant production, at least initially.

Constant speed, output controlled by throttling – monitor control valve position

4 Pump wear does not affect plant production, at least initially.

Output controlled by varying speed –monitor pump speed

• Same basic method applies...

Page 36: Optimum overhaul of pumps 2014

An example:

Overhaul would cost $50 000.

Cost of power 10c/kWh.

Pump runs for 27% of time on average

Test at 24 months since last overhaul

Page 37: Optimum overhaul of pumps 2014
Page 38: Optimum overhaul of pumps 2014

Motor efficiency is 90%, so the extra power consumed by motor/pump combined (WORN) is:

2300 – 2150 = 150kW ÷ motor efficiency

= 167kW

Page 39: Optimum overhaul of pumps 2014

Calculate the current extra cost of electricity: (720h is average month):

167 × 0.10 × 0.27 × 720

kW $ % h

= $3240/month

Page 40: Optimum overhaul of pumps 2014

Calculate the average cost rate of deterioration:

$ 3240 ÷ 24 = $ 135 /month/month.

Can now find the optimum time for overhaul:

= 27.2 months

C

OT

2

Page 41: Optimum overhaul of pumps 2014

Total cost curve often fairly flat

around the optimum

Page 42: Optimum overhaul of pumps 2014

Variable speed pump (1)

Page 43: Optimum overhaul of pumps 2014

Variable speed pump (2)• Same method as before used, but with speed change.

Here, 31% increase in power to maintain constant system flow, as speed increases from 1490 to 1660 r/min

Page 44: Optimum overhaul of pumps 2014

The method does not apply to all pumps…..

Small pumps may cost more to test than overhaul, and energy costs may be just too small to justify work

Pumps of Specific Speed above about 2000 (r/min, m3/h, m or US units) have a flat or declining Power-Flow curve, and increased leakage does not use more power

Page 45: Optimum overhaul of pumps 2014

Is the pump always at fault?

Page 46: Optimum overhaul of pumps 2014

Maybe the system has changed?

Page 47: Optimum overhaul of pumps 2014

Note that a lower system resistance is also possible

Page 48: Optimum overhaul of pumps 2014

Is the rotation correct?

(DC motor drive)

Page 49: Optimum overhaul of pumps 2014

Condition monitoring is much more than vibration analysis

Performance analysis adds the energy-saving dimension - USE IT !

Conclusion

Page 50: Optimum overhaul of pumps 2014

Happy Monitoring !

[email protected]

[Co-ordinator for 16 years of Monash University’s postgrad programs in maintenance and

reliability engineering: off campus learning (open to all: conditions

apply).

From Jan 2014, programs owned and run by Federation University

Australia]