Opportunities for Methane Drainage & CMM Extraction in India · 2018. 7. 4. · OPPORTUNITIES IN INDIA FOR CMM Pre-drainage of CMM –Pre drainage is possible in Jharia, Raniganj

Jan 23, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Opportunities for Methane Drainage & CMM Extraction in India · 2018. 7. 4. · OPPORTUNITIES IN INDIA FOR CMM Pre-drainage of CMM –Pre drainage is possible in Jharia, Raniganj

Peeyush KumarDirector (Technical)

Ministry of Coal

Opportunities for Methane Drainage & CMM Extraction in India

Page 2: Opportunities for Methane Drainage & CMM Extraction in India · 2018. 7. 4. · OPPORTUNITIES IN INDIA FOR CMM Pre-drainage of CMM –Pre drainage is possible in Jharia, Raniganj

2

Coal;

Contributes:• about 57% of

primary energy

• over 80% of power Generation

• India’s GDP: US$ 2.26 Trillion

• Mining Sector : 2.5%;

• Coal : 30% of all mineralproduction

539 Coal and 19 lignite mines; PSUs :90% of Coal production

Page 3: Opportunities for Methane Drainage & CMM Extraction in India · 2018. 7. 4. · OPPORTUNITIES IN INDIA FOR CMM Pre-drainage of CMM –Pre drainage is possible in Jharia, Raniganj

Inventory of Geological Resources of Indian Coal (upto a

depth of 1,200 meters)

(as on 01-Apr-2017)

Source : Inventory of geological resources of Indian coal prepared by Geological Survey of

India on the basis of resources estimated by CMPDI, MECL, SCCL, GSI and DGM (Maharashtra) and DGM (Chattisgarh) as on 01-Apr-2017

Page 4: Opportunities for Methane Drainage & CMM Extraction in India · 2018. 7. 4. · OPPORTUNITIES IN INDIA FOR CMM Pre-drainage of CMM –Pre drainage is possible in Jharia, Raniganj

CIL :COAL PRODUCING SUBSIDIARIES

EASTERN COALFIELDS LTD. (1)BHARAT COKING COAL LTD. (2)CENTRAL COALFIELDS LTD. (3)NORTHERN COALFIELDS LTD. (4)WESTERN COALFIELDS LTD. (5)SOUTH EASTERN COALFIELDS LTD. (6)MAHANADI COALFIELDS LTD. (7)NORTH EASTERN COALFIELDS. (8)

( A UNIT UNDER CIL(HQ) )

OTHER COAL COMPANIES

SINGARENI COLLIERIES CO. LTD. (9)

NLC INDIA LIMITED (10)

1

2

345

6

7

9

8

10

COALLIGNITE

LOCATION OF COAL & LIGNITE RESOURCES OF INDIA

4

Page 5: Opportunities for Methane Drainage & CMM Extraction in India · 2018. 7. 4. · OPPORTUNITIES IN INDIA FOR CMM Pre-drainage of CMM –Pre drainage is possible in Jharia, Raniganj

Coal Bed Methane(CBM) Policy in India

▪ CBM Policy1997; MoP&NG to administer in consultation with MoC.

▪ GoI in July, 2015 permitted Coal India Limited (CIL) for exploration and

exploitation of Coal bed Methane (CBM) from areas under coal mining lease

allotted to CIL;

▪ MoP&NG issued Policy Framework for Early Monetization of CBM in April,

2017 to provide marketing and pricing freedom to sell CBM at Arm’s Length

Price in the domestic market.

▪ Cabinet approved exemption of applicability of the Oilfields (Regulations &

Development) Act and P&NG Rules within coal mining leasehold areas and

engagement of MDO in the command area of CIL.

▪ Coal India Ltd.(CIL) operates over 394 coal mines of which 60 are Degree-II

and 4 are Degree-III mines;

Page 6: Opportunities for Methane Drainage & CMM Extraction in India · 2018. 7. 4. · OPPORTUNITIES IN INDIA FOR CMM Pre-drainage of CMM –Pre drainage is possible in Jharia, Raniganj

Development of CMM: Indian Scenario

• India CBM/CMM Clearinghouse, established under the aegis of USEPA and

Ministry of Coal, Govt of India in 2008;

• MoC has made CMPDI the Nodal Agency in July, 2010;

• CMM demonstration project successfully implemented in Moonidih Mine of

BCCL, Jharia coalfield;

• CBM Laboratory established in Sept, 2008 at CMPDI, Ranchi for carrying

out gas related studies on coal and shale i.e; Field desorption studies with

“Adsorption Isotherm” through high end instruments, “Automatic Porosi-

cum-Permeameter, “ToC (Total Organic Carbon) Analyzer” and “Source

Rock Analyzer (Rock Eval 6)”.

• Resource assessment done for Jharia and Raniganj CBM/CMM block;

Page 7: Opportunities for Methane Drainage & CMM Extraction in India · 2018. 7. 4. · OPPORTUNITIES IN INDIA FOR CMM Pre-drainage of CMM –Pre drainage is possible in Jharia, Raniganj

7

Opportunities for methane drainage and CMM extraction:

• Pre-drainage of Methane• Simultaneous Extraction: Coal & Methane• Jharia CBM/CMM Block (BCCL Area)

Page 8: Opportunities for Methane Drainage & CMM Extraction in India · 2018. 7. 4. · OPPORTUNITIES IN INDIA FOR CMM Pre-drainage of CMM –Pre drainage is possible in Jharia, Raniganj

OPPORTUNITIES IN INDIA FOR CMM

▪ Pre-drainage of CMM

–Pre drainage is possible in Jharia, Raniganj and NE Coalfields.

–BCCL is likely to invite Bids through Global e-tendering for selection of

experienced developer for Pre-drainage of methane from Moonidih UG mine on

concept to commissioning basis including operation and maintenance.

▪ Simultaneous Extraction of Coal and Methane

Possibility for simultaneous harnessing of methane (CMM) and

extraction of coal from gassy coal seams (deep seated) in potential

coalfields through single operator.

▪ Jharia and Raniganj CBM block

For CBM extraction a block of about 24.32Sq. Km has been

delineated for development of CBM in BCCL area having resource of

25.22 BCM.

Page 9: Opportunities for Methane Drainage & CMM Extraction in India · 2018. 7. 4. · OPPORTUNITIES IN INDIA FOR CMM Pre-drainage of CMM –Pre drainage is possible in Jharia, Raniganj

Location of Moonidih Mine (BCCL) in Jharia Cf

Moonidih CMM Project Area

Page 10: Opportunities for Methane Drainage & CMM Extraction in India · 2018. 7. 4. · OPPORTUNITIES IN INDIA FOR CMM Pre-drainage of CMM –Pre drainage is possible in Jharia, Raniganj

10

1. PRE-DRAINAGE OF METHANE IN MOONIDIH UG MINE

▪ Moonidih UG mine is located in South-Central part of Jharia Coalfield in

Dhanbad district of Jharkhand state.

▪ It is Degree-III Mine (methane >10 Cum M/tonne)

▪ Gross Geological Coal Reserve (XVI Top Seam): 28.00 Million Tonne

▪ XVI Top Seam (within CMM Project Boundary)

▪ Net Geological Coal Reserve : 12.48 MT (million tonne)

▪ Extractable Coal Reserve : 5.7 MT

▪ Average In-situ Gas content of XVI Top : 8.30 m3/tonne

▪ It is proposed to undertake methane pre-drainage from Seam XVI Top and

adjoining areas contributing to methane in the coal face.

Page 11: Opportunities for Methane Drainage & CMM Extraction in India · 2018. 7. 4. · OPPORTUNITIES IN INDIA FOR CMM Pre-drainage of CMM –Pre drainage is possible in Jharia, Raniganj

2. Simultaneous Extraction of Coal and methane

▪ Presently highly gassy seams in Kapuria, Moonidih

and Singra in BCCL areas is a challenge for Coal

extraction;

▪ Kapuria UG Mine:

▪ Area : 6.4 Sq.Km

▪ Coal resource: 196.46MT;

▪ Total Seams: 27nos (Depth upto 950m)

▪ Seams planned: 7 nos (upto Seam XV, Depth: 500m)

▪ Simultaneous Extraction of CBM/CMM and Coal is an

opportunity in BCCL;

▪ Plan to develop through experience Operator for

simultaneous extraction of CMM and Coal;

▪ Bidders Meet for opinion and option(s) to develop;

▪ Bid Document to prepare to select Developer globally;

Page 12: Opportunities for Methane Drainage & CMM Extraction in India · 2018. 7. 4. · OPPORTUNITIES IN INDIA FOR CMM Pre-drainage of CMM –Pre drainage is possible in Jharia, Raniganj

3. Location of Jharia CMM/CBM block in Jharia CF

Jharia CMM/CBM Block

Page 13: Opportunities for Methane Drainage & CMM Extraction in India · 2018. 7. 4. · OPPORTUNITIES IN INDIA FOR CMM Pre-drainage of CMM –Pre drainage is possible in Jharia, Raniganj

3. Jharia CMM/CBM Block (BCCL Area)

▪ Area of the block : 24.3 Sq. Km;

▪ Seams: 14 nos (Seam XV and below);

▪ Net Coal resource: 1961.85 million tonne

▪ Prognosticated CBM Resource: 25.22 BCM;

▪ Seams: 14 nos (Seam XV and below);

▪ Bid document prepared on revenue sharing model;

▪ Planned to develop block under MDO route;

▪ Bidders Meet/Pre NIT Meet has been planned.

Page 14: Opportunities for Methane Drainage & CMM Extraction in India · 2018. 7. 4. · OPPORTUNITIES IN INDIA FOR CMM Pre-drainage of CMM –Pre drainage is possible in Jharia, Raniganj

14

Jharia CMM/CBM Block – Economic Analysis

Gas Price considered $/MMBTU USD 5.70

Gas Price Inflation % 0%

Cost Inflation % 0%

IRR % 52%

NPV-12 $ million 470

BEP (Break Even Price) $/MMBTU 1.56

Total Wells (Vertical) Wells 145

Total CAPEX

Undiscounted $ million 289

Discounted @10% $ million 147

Total OPEX

Undiscounted $ million 169

Discounted@10% $ million 31

Recoverable Volume BCM 19.9

Average Prod. MMSCMD 1.3

Gas Price considered $/MMBTU USD 8.00

Gas Price Inflation % 0%

Cost Inflation % 0%

IRR % 72%

NPV-12 $ million 731

BEP (Break Even Price) $/MMBTU 1.56

Total Wells (Vertical) Wells 145

Total CAPEX

Undiscounted $ million 289

Discounted @10% $ million 147

Total OPEX

Undiscounted $ million 169

Discounted@10% $ million 31

Recoverable Volume BCM 19.9

Average Prod. MMSCMD 1.3

Page 15: Opportunities for Methane Drainage & CMM Extraction in India · 2018. 7. 4. · OPPORTUNITIES IN INDIA FOR CMM Pre-drainage of CMM –Pre drainage is possible in Jharia, Raniganj

15

Challenges in Methane drainage and CMM in India

Page 16: Opportunities for Methane Drainage & CMM Extraction in India · 2018. 7. 4. · OPPORTUNITIES IN INDIA FOR CMM Pre-drainage of CMM –Pre drainage is possible in Jharia, Raniganj

Challanges

▪ Engagement of technical service provider for pre

drainage of methane

▪ Finalisation of tender document on revenue sharing

model for extraction of methane

▪ Engagement of MDO for simultaneous extraction of

Coal and methane

Page 17: Opportunities for Methane Drainage & CMM Extraction in India · 2018. 7. 4. · OPPORTUNITIES IN INDIA FOR CMM Pre-drainage of CMM –Pre drainage is possible in Jharia, Raniganj

Way forward

▪ Engagement of suitable Operator for Pre-drainage of

methane (CMM);

▪ On successfully implementation, further replication in other

gassy mines (ECL Area (Bengal), NECfs (Assam));

▪ Delineation of prospective CBM/CMM blocks in CIL

command areas (BCCL, CCL, SECL Areas);

▪ Finalisation of Global Bid Document (TSD) for CBM/CMM

extraction on MDO model;

▪ Bidders Meet for Simultaneous Extraction of CBM and

Coal planned;

▪ Resource Assessment of Methane in the relinquished

CBM blocks and Coal Mining (de-stressed) Areas;

▪ Feasibility studies of delineated CMM/CBM Blocks of CIL.