Operator Reports for New Technologies Vanessa Wike, P.E. Statewide Engineering Coordinator (907) 269-7696 555 Cordova St. Anchorage, AK 99501 [email protected] Department of Environmental Conservation Drinking Water Program
18

Operator Reports for New Technologies

Dec 30, 2015

Download

Documents

kim-park

Department of Environmental Conservation Drinking Water Program. Operator Reports for New Technologies. Vanessa Wike, P.E. Statewide Engineering Coordinator (907) 269-7696 555 Cordova St. Anchorage, AK 99501 [email protected]. Overview. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Operator Reports  for New Technologies

Operator Reports for New Technologies

Vanessa Wike, P.E.Statewide Engineering Coordinator(907) 269-7696555 Cordova St.Anchorage, AK [email protected]

Department of Environmental ConservationDrinking Water Program

Page 2: Operator Reports  for New Technologies

Overview• New rules are placing a greater emphasis on the

QA/QC of the treatment processes:– A strong focus is being placed on whether the plant is

operating within the approved design/construction specifications.

• Biggest change will be for UV systems:– Additional training requirements will be included in

operational approvals.• Manufacturer Training (bulb change-out, etc).• Consultant Training (dosage calculations, operator reports).

– MOR’s:• “Set Point” MOR’s.• “Calculated Dose” MOR’s.

Page 3: Operator Reports  for New Technologies

MOR’s• MOR’s for newer Surface Water Treatment

technologies will be custom made for each system.• The format of the MOR will depend on parameters

set during the design of the system.• Instead of monitoring to identify when things go

wrong, monitoring will now be more important in identifying when things are starting to go wrong.

Going > Going > Going > Gone

Page 4: Operator Reports  for New Technologies

Example “Daily” ReportMonthly Operator Report, for “Set Point” Designed UV Treatment Plant

Page 5: Operator Reports  for New Technologies

Example “Daily” ReportMonthly Operator Report, for “Set Point” Designed UV Treatment Plant

Page 6: Operator Reports  for New Technologies

Example “Daily” ReportMonthly Operator Report, for “Set Point” Designed UV Treatment Plant

Intensity (Dosage) is set during engineering plan review, for specific flow rate. Every 4 hours:** Time** Intensity** Flow

Page 7: Operator Reports  for New Technologies

Example “Daily” ReportMonthly Operator Report, for “Set Point” Designed UV Treatment Plant

Intensity

Page 8: Operator Reports  for New Technologies

* Chapter 6 EPA UV Guidance Manual, 2006.

Example “Daily” ReportMonthly Operator Report, for “Set Point” Designed UV Treatment Plant

Every MONTH do sensor calibration check.Must Report amount of “Off-Spec” water.

Page 9: Operator Reports  for New Technologies

Example “Daily” Report Monthly Operator Report, for “Calculated Dose” Designed UV Treatment Plant*

* Chapter 6 EPA UV Guidance Manual, 2006.

Page 10: Operator Reports  for New Technologies

Example “Daily” Report Monthly Operator Report, for “Calculated Dose” Designed UV Treatment Plant*

* Chapter 6 EPA UV Guidance Manual, 2006.

Page 11: Operator Reports  for New Technologies

Example “Daily” Report Monthly Operator Report, for “Calculated Dose” Designed UV Treatment Plant*

* Chapter 6 EPA UV Guidance Manual, 2006.

•A required dose is set during engineering plan review.

•A “Validated Dose” is then calculated, by dividing the calculated dose by a verification factor and a correction factor. This is done for every recorded dose on the MOR.

•The “Calculated Dose” approach does not have a single compliance point, but instead has an approved envelope of operational parameters (flow, dose, transmittance).

Page 12: Operator Reports  for New Technologies

Example “Daily” Report Monthly Operator Report, for “Calculated Dose” Designed UV Treatment Plant*

* Chapter 6 EPA UV Guidance Manual, 2006.

Page 13: Operator Reports  for New Technologies

Example “Daily” Report Monthly Operator Report, for “Calculated Dose” Designed UV Treatment Plant*

* Chapter 6 EPA UV Guidance Manual, 2006.

•Each UV Reactor will have a separate MOR.

•“Off-Spec” production must be indicated on each report.

•Separate forms are required for calibration/verification of the sensor, UVT analyzer and flow meter

Page 14: Operator Reports  for New Technologies

Example “Off-Spec” Report Monthly Operator Report, for “Calculated Dose” Designed UV Treatment Plant*

* Chapter 6 EPA UV Guidance Manual, 2006.

Page 15: Operator Reports  for New Technologies

Example “Off-Spec” Report Monthly Operator Report, for “Calculated Dose” Designed UV Treatment Plant*

* Chapter 6 EPA UV Guidance Manual, 2006.

Page 16: Operator Reports  for New Technologies

Example “Off-Spec” Report Monthly Operator Report, for “Calculated Dose” Designed UV Treatment Plant*

* Chapter 6 EPA UV Guidance Manual, 2006.

“Off-Spec” operations must be reported (number of events and volume of water produced).

“Off-Spec” can occur because:• Sensor is not in calibration, or is outside approved limits.• Analyzer is not in calibration, or is outside approved limits.• Flow meter is not in calibration, or is outside approved limits.

To meet LT2, 95% of the water must be treated to validated limits.

Page 17: Operator Reports  for New Technologies

Keys to Succeeding with New Technologies

• Monitoring: Residual > Process Control LimitsAccurate, Consistent Readings

• Be Wary of ComplacencyDon’t let the instruments think for you!

• Treat your instruments with respect:Calibrate, Verify, Maintain

If you have questions, please give us a call.

Page 18: Operator Reports  for New Technologies

Operator Reports for New Technologies

Vanessa Wike, P.E.Statewide Engineering Coordinator(907) 269-7696555 Cordova St.Anchorage, AK [email protected]

Department of Environmental ConservationDrinking Water Program