Top Banner
BDS | Supplier Quality Copyright © 2009 Boeing. All rights reserved. BCA RMC Workshop Long Beach, 16 – 17 July 2014 Digital Product Definition- A Summary for Aerospace Auditors Ralph Gamble The Boeing Company
35

Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

Apr 20, 2018

Download

Documents

truongbao
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

RMC Workshop Long Beach, 16 – 17 July 2014

Digital Product Definition- A Summary for Aerospace Auditors

Ralph GambleThe Boeing Company

Page 2: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

Introduction

RMC Workshop Long Beach, 16 – 17 July 2014

Digital Product Definition, or DPD, is a function of a quality system that is in constant change according to revised international standards, technologies and methods. Suppliers must annually review their digital processes and procedures to assure there is synchronization with customers that is reflected in their quality system.

RMC Workshop Long Beach, 16 – 17 July 2014

Page 3: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

AS9100 – First Article Inspection A validation of DPD Processes

RMC Workshop Long Beach, 16 – 17 July 2014RMC Workshop Long Beach, 16 – 17 July 2014

7.5.1.1 Production Process VerificationThe organization shall use a representative item from the first production run of a new part or assembly to verify that the production processes, production documentation and tooling are capable of producing parts and assemblies that meet requirements. This process shall be repeated when changes occur that invalidate the original results (e.g., engineering changes, manufacturing process changes, tooling changes).NOTE This activity is often referred to as First Article Inspection (FAI).

Page 4: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

How One Company Responds to AS9100:D6-51991 – QUALITY ASSURANCE STANDARD

FOR DPD AT BOEING SUPPLIERS

D6-51991 has 11 sections responding to AS9100 when building parts and assemblies for Boeing. This presentation highlights AS9100non-conforming activities found by the FAA during site audits of Boeing suppliers and summarized in a DPD Brochure available today.

Be DPD Aware

RMC Workshop Long Beach, 16 – 17 July 2014

Page 5: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

WHAT TO LOOK OUT FOR

RMC Workshop Long Beach, 16 – 17 July 2014

Page 6: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

DOCUMENTED PROCESSES

1. Digital Product Definition QA Procedures and Documented Processes2. Configuration Management and Media Security 3. Product Acceptance Software 4. Internal Quality Audits 5. Problem Reporting and Corrective Action 6. Procurement Control 7. Control of Measurement Equipment 8. Inspection Media 9. Data Exchange Methods 10. Tooling 11. Training and Process Performer

Is my process up to date, reflect current practices, map to and included in my AS9100 documentation?

RMC Workshop Long Beach, 16 – 17 July 2014

Page 7: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

NOTIFICATION OF DPD CHANGES

BOEING PROPRIETARY

Expectation:Provide Customer Supplier Quality 30 day notification to synchronize with Customer CAD platform

Provide Notification of changes to Coordinate Measurement Systems (CMS) software or hardware. (new Laser Tracker, Articulating Arm, Scanner, Spatial Analyzer, PCDMIS, etc.

Do I notify the Customer when my CAD, CAM or CAI software or hardware is changed?

RMC Workshop Long Beach, 16 – 17 July 2014

Page 8: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

CONFIGURATION MANAGEMENT ANDMEDIA SECURITY

1. NC Programs – Must be revision controlled and associated to FAI or Delta FAI at any revision change.2. Manufacturing Planning3. Measurement Planning4. Screen Captures5. Procedures6. Model Conversions from V4 to V57. Measurement Reports8. Special Tooling

Are we maintaining configuration control, change control and trace-ability of derivative data?

Examples

RMC Workshop Long Beach, 16 – 17 July 2014

Page 9: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

CAD SYSTEM

Is there a CAD system synchronization requirement?

• For Boeing, an Engineering Distribution Group provides only Native CATIA V4 – V5. If V5 type design occurred in a later version of CATIA, models cannot be opened or used.

• V4 models will require saving as step or iges and translations must be verified.

• If converted to V5, models must be verified to the authority 2D Drawing and any authoritative 3D geometry.

RMC Workshop Long Beach, 16 – 17 July 2014

Page 10: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

CAD SYSTEMIf I have to convert from CATIA V4.model to V5.CATpart, do I have adequate procedures and verification steps in place to insure a successful, complete and accurate translation?

• Has REFERENCE ONLY information been identified?

• Has the resultant model be compared to authoritative drawing and 3D data?

• Has the resultant model been configured and has trace-ability?

RMC Workshop Long Beach, 16 – 17 July 2014

Page 11: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

AS9100 - PRODUCT ACCEPTANCE SOFTWARE (PAS)When used in the monitoring and measurement of specified requirements, the ability of computer software to satisfy the intended application shall be confirmed. This shall be undertaken prior to initial use and reconfirmed as necessary.NOTE Confirmation of the ability of computer software to satisfy the intended application would typically include its verification and configuration management to maintain its suitability for use.

BOEING PROPRIETARY

Has my CMS (Coordinate Measurement System) software been validated as required?

RMC Workshop Long Beach, 16 – 17 July 2014

PRODUCT ACCEPTANCE SOFTWARE

Page 12: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

What to Test – Native, IGS, STPGD&T using Artifact321 Alignment using ArtifactBest Fit using ArtifactScale (temperature compensation)Security

Planning Includes: Purpose of TestScope of TestDescription of the TestResult of Test - PASS/ FAIL

PRODUCT ACCEPTANCE SOFTWAREMake a Plan

RMC Workshop Long Beach, 16 – 17 July 2014

Page 13: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

PROCUREMENT CONTROL

Do I flow down DPD requirements and have adequate oversight of my sub-tiers?

How Does Boeing Document Supplier Compliance?

RMC Workshop Long Beach, 16 – 17 July 2014

Page 14: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

Control of Measurement EquipmentDo I have complete procedures for all my Coordinate Measurement system equipment?

CMS requirements are as follows:

1. Provide a method to complete or a procedure for calibration of measurement equipment.

2. Provide an inventory list for your measurement systems including scale bars, adaptors, thermometers and equipment.

3. Provide an operator reference parameter guideline for equipment handling, set-up, field checks and establish special targeting and target adapter requirements

4. Provide documented acceptance criteria for use of scale factors to compensate measurements for coefficient of thermal expansion and to verify accuracy as well as establish, transform and manipulate coordinate systems establish data collection parameters and requirements.

5. Provide a process for data analysis, format, storage and reporting.

6. Provide training syllabus with curriculum to assure those using the equipment have been adequately educated on the use of CMS and PAS as well as Boeing requirements.

RMC Workshop Long Beach, 16 – 17 July 2014

Page 15: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

INSPECTION MEDIA

Is my CMS data aligned to engineering datums or datum targets?

RMC Workshop Long Beach, 16 – 17 July 2014

Page 16: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

8.4.1. Supplier’s QA must verify that all design requirements; e.g., all features defined byfeature control frames, annotation, specifications, notes and other specified requirementsin the authority MBD dataset and associated parts list including dimensional and otherproperties are identified and planned for inspection/validation.

Inspection Media

RMC Workshop Long Beach, 16 – 17 July 2014

Page 17: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

A 3-2-1 datum scheme or datum reference frame is comprised by the following:

– The primary datum feature relates the part to the datum reference frame by bringing a minimum of three points on the surface into contact with the first datum plane. See Fig. (a).

– The part is further related to the frame by bringing at least two points of the secondary datum feature into contact with the second datum plane. See Fig. (b)

– The relationship is completed by bringing at least one point of the tertiary datum feature into contact with the third datum plane. See Fig. (c)

Note: Actual X,Y, Z callout can change as long the alignment is to the Primary, Secondary and Tertiary datum.

Datum Alignment

Fig. (a) Fig. (b) Fig. (c)

RMC Workshop Long Beach, 16 – 17 July 2014

Page 18: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

A 3-2-1 requires mutually perpendicular planes (primary, secondary, and tertiary datum planes).

This 3-2-1 Rule defines the minimum number of contact points necessary to properly locate a part.

If Datum targets are called out, these datum points usually have basic dimensions locating them. With Model Based Definition, the basics may not be shown, but they are implied.

Engineering Datum features are usually related to the actual function or relationship of other parts being assembled.

Datum Alignment

RMC Workshop Long Beach, 16 – 17 July 2014

Page 19: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

Datum Alignment CMS Datum Alignment

Example 1– The Nominal (model data) and

Actual (as inspected) datum values A1, A2, A3, B1, B2, C1 show little to no Delta (deviation) when aligning to the part datum features.

– Note the location of the 4 Out of Tolerance (OT) hole location conditions.

* Not all inspection points are shown for illustration purposes.

RMC Workshop Long Beach, 16 – 17 July 2014

Page 20: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

Best-Fit Alignment

RMC Workshop Long Beach, 16 – 17 July 2014

Page 21: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

Best-Fit simply takes the operator chosen alignment features and spreads their error equally around all the chosen alignment setup features. Best-Fit allows you to choose certain features to concentrate on the alignment direction.

Best-Fit alignment is used to align inspection data to the CAD model. Best-Fit alignment looks at all the scanned data and does an average fit to the CAD model.

Best-Fit Alignments can only be used if the engineering dataset is NOT datum controlled.

NOTE: When GD&T callouts exist on the engineering dataset, you must use a datum alignment for product acceptance. The GD&T callouts will direct you to the associated datum alignment requirements.

Best-Fit Alignment

RMC Workshop Long Beach, 16 – 17 July 2014

Page 22: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

Best-Fit Alignment CMM Best Fit Alignment to

inner surface points to make Out of Tolerance (OT) holes CONFORMING - Example 1A– Assume a Best Fit Alignment

direction to the inner surface along B1 & B2 was used due to an out of tolerance hole (h1, h2, h3, h4) location condition when setup to the established Datum features.

NOTE: This particular Best Fit alignment will shift the Actual B1 and B2 datum locations from the inner surface values causing the actual alignment values to be non-conforming. BUT the 4 holes will now be CONFORMING.

* Not all inspection points are shown for illustration purposes.

RMC Workshop Long Beach, 16 – 17 July 2014

Page 23: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

MODEL BASED DEFINITION

Are my FAIs complete – Have I accounted for all explicit and implicit design characteristics?

Page 24: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

TRAINING

Have all employees working with DPD or MBD been trained in the DPD or MBD requirements that apply to their specific area of responsibility?

Page 25: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

RMC Workshop Long Beach, 16 – 17 July 2014

Summary:In this presentation, we have reviewed the followingFAA Identified DPD Non-Conformances:

DOCUMENTED PROCESSESNOTIFICATION OF DPD CHANGESCONFIGURATION MANAGEMENT AND MEDIA SECURITYCAD SYSTEMPRODUCT ACCEPTANCE SOFTWAREPROCUREMENT CONTROLCONTROL OF MEASUREMENT EQUIPMENTINSPECTION MEDIAMODEL BASE DEFINITIONTRAINING

Please see brochure or contact RMC to receive one.

Page 26: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

END

RMC Workshop Long Beach, 16 – 17 July 2014

Page 27: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

Boeing Defense, Space & SecuritySupplier Quality

BOEING is a trademark of Boeing Management Company.Copyright © 2009 Boeing. All rights reserved.

2D Drawing Examples- Note: CATIA V4 models are made up of 255 layers like a book. Some pages contain reliable KUTD info…some don’t and are marked.

This Drawing indicates ALL layers in the 3D model are use-able for manufacturing and inspection

This Drawing indicates ALL layers in the 3D model are use-able for manufacturing and inspectionEXCEPT LAYERS 161 and 162

1

2

3

RMC Workshop Long Beach, 16 – 17 July 2014

Page 28: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

CATIA V5 CAT.part CATIA V4.model

RMC Workshop Long Beach, 16 – 17 July 2014

Page 29: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

Configuring Conversions

RMC Workshop Long Beach, 16 – 17 July 2014

Page 30: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

Sub-tier Control Example

Sub-tier Supplier Activity – how one aerospace company controls.The Boeing tier 1 supplier will flow down the requirements of D6-51991 or equivalent document to sub-tier suppliers and document sub-tier supplier compliance when Boeing authority datasets or dataset derivatives are used for manufacturing or product acceptance.

RMC Workshop Long Beach, 16 – 17 July 2014

Page 31: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

Sub-tier Control – Use a Checklist

RMC Workshop Long Beach, 16 – 17 July 2014

Page 32: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

Sub-tier Control – Maintain Records

RMC Workshop Long Beach, 16 – 17 July 2014

Page 33: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

BCA

Sub-tier Control – Maintain Detail Information

RMC Workshop Long Beach, 16 – 17 July 2014

Page 34: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

Boeing Defense, Space & SecuritySupplier Quality

BOEING is a trademark of Boeing Management Company.Copyright © 2009 Boeing. All rights reserved.

RMC Workshop Long Beach, 16 – 17 July 2014

Implicit vs. Explicit

Page 35: Operations & Supplier Management Mission Statement€¦ · PPT file · Web view · 2014-07-21Introduction. RMC Workshop Long Beach, 16 – 17 July 2014. Digital Product Definition,

BDS | Supplier Quality

Copyright © 2009 Boeing. All rights reserved.

IMPLICIT FEATURES

RMC Workshop Long Beach, 16 – 17 July 2014