23

Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

Oct 05, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

Operation, Maintenance and Replacement of AMD Passive

Treatment Systems

Pam Pam MilavecMilavec, PA DEP Bureau of , PA DEP Bureau of Abandoned Mine ReclamationAbandoned Mine Reclamation

Page 2: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

The Need?

NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0 $0 $0 $0 $0 $150,000 $275,000 1990 $0 $75,000 $0 $0 $0 $0 $0 $75,000 $350,000 1991 $75,000 $200,000 $0 $0 $0 $0 $0 $275,000 $625,000 1992 $12,000 $225,000 $0 $0 $0 $0 $0 $237,000 $862,000 1993 $0 $400,000 $0 $0 $0 $0 $0 $400,000 $1,262,000 1994 $0 $675,000 $0 $0 $0 $0 $0 $675,000 $1,937,000 1995 $152,066 $850,000 $0 $0 $0 $0 $0 $1,002,066 $2,939,066 1996 $0 $1,000,000 $0 $0 $0 $0 $0 $1,000,000 $3,939,066 1997 $183,959 $275,000 $1,498,036 $0 $0 $0 $0 $1,961,585 $5,900,651 1998 $34,314 $1,700,000 $1,645,922 $0 $0 $0 $0 $3,399,051 $9,299,702 1999 $274,454 $3,400,000 $2,820,839 $688,458 $262,240 $25,904,601 $0 $32,445,193 $41,744,8952000 $109,284 $2,700,000 $378,902 $296,558 $567,800 $22,796,533 $0 $26,849,077 $68,593,9722001 $200,000 $3,700,000 $2,726,957 $0 $321,400 $25,074,405 $0 $32,022,762 $100,616,7342002 $683,000 $4,000,000 $392,234 $0 $925,721 $21,115,282 $2,390,000 $29,506,237 $130,122,9712003 $885,000 $4,000,000 $1,890,000 $0 $919,747 $14,119,308 $4,400,000 $26,214,055 $156,337,0262004 $1,597,000 $4,000,000 $3,400,000 $0 $750,000 $15,000,000 $4,000,000 $28,747,000 $185,084,0262005 $1,275,000 $4,000,000 $2,000,000 $0 $750,000 $15,000,000 $4,000,000 $27,025,000 $212,109,0262006 $485,000 $4,000,000 $2,000,000 $0 $750,000 $17,000,000 $3,000,000 $27,245,000 $239,354,0262007 $455,000 $4,000,000 $2,000,000 $0 $750,000 $20,000,000 $3,000,000 $30,205,000 $269,559,0262008 $589,000 $4,000,000 $2,000,000 $0 $750,000 $21,000,000 $3,000,000 $31,339,000 $300,898,0262009 $336,000 $4,000,000 $2,000,000 $0 $750,000 $21,000,000 $3,000,000 $31,086,000 $331,984,0262010 $300,000 $4,000,000 $2,000,000 $0 $750,000 $22,000,000 $3,000,000 $32,050,000 $364,034,0262011 $300,000 $4,000,000 $2,000,000 $0 $750,000 $23,000,000 $3,000,000 $33,050,000 $397,084,0262012 $300,000 $4,000,000 $2,000,000 $0 $750,000 $25,000,000 $3,000,000 $35,050,000 $430,134,026

Page 3: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

Why Operation and Maintenance?

““An ounce of prevention is worth a pound An ounce of prevention is worth a pound of cure.” of cure.” -- Ben FranklinBen FranklinSystems that are not maintained are Systems that are not maintained are destined to fail!!destined to fail!!Failed systems can have significant Failed systems can have significant environmental consequences. environmental consequences.

Page 4: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

What Does O, M & R Involve?

Page 5: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

Operation Examples

InspectionsInspectionsLitter controlLitter controlVegetation controlVegetation controlMechanical maintenance Mechanical maintenance -- flushingflushingInsect and vector controlInsect and vector controlMonitoring Monitoring –– water samplingwater samplingPhysical stability and erosion controlPhysical stability and erosion control

Page 6: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

Routine Operations: Treatment System Sampling

Page 7: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

Routine Operations: Stream Sampling

Page 8: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

Routine Operations: Debris Removal

Page 9: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

Routine Operations: Flushing

Page 10: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

Maintenance Examples

Dredging and sediment removalDredging and sediment removalRepairing damage after major storm eventsRepairing damage after major storm eventsRepairing cracks or leaksRepairing cracks or leaksRepairing damage from vandalismRepairing damage from vandalismAdding limestone, compost, sand, or gravelAdding limestone, compost, sand, or gravelAdjusting grade or outlet structuresAdjusting grade or outlet structuresSystem modifications/improvementsSystem modifications/improvements

Page 11: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

Maintenance:Baffle Repair

Page 12: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

Maintenance: Influent Modification

Page 13: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

Replacement Concerns

Estimate BMP design lifeEstimate BMP design lifeIncorporate new technologyIncorporate new technologyWhat is the cost to replace?What is the cost to replace?Who will replace?Who will replace?

Page 14: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

Operation & Maintenance PlanOperation & Maintenance Plan

Page 15: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

What Does O, M & R Cost?

Page 16: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

Calculating O, M & R Costs

Calculation of factorCalculation of factor: [(actual total O,M&R : [(actual total O,M&R costs)/(life of system)/(construction cost)] X 100costs)/(life of system)/(construction cost)] X 100Calculated an Average O, M & R Factor of 4%Calculated an Average O, M & R Factor of 4%Use of factor:Use of factor: Construction Cost X (O,M&R Construction Cost X (O,M&R factor) = average annual O,M&R for projectfactor) = average annual O,M&R for projectExample:Example: $100,000 project with 4% factor will $100,000 project with 4% factor will cost an average $4,000 per year for O,M&Rcost an average $4,000 per year for O,M&R

Page 17: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

Breakdown of O, M & R Costs forVertical Flow Systems

Routine operations (sampling,...........Routine operations (sampling,........... 20.0%20.0%inspections, flushing)inspections, flushing)Water sample lab analyses ...............Water sample lab analyses ............... 10%10%Maintenance Maintenance –– repairs & supplies .....repairs & supplies ..... 30%30%System reconstruction......................System reconstruction...................... 40%40%

Note: This is a breakdown of the expected 4% of Note: This is a breakdown of the expected 4% of construction costs needed for maintenance of construction costs needed for maintenance of passive systems over the life of the systempassive systems over the life of the system

Page 18: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

How Can Costs Be Reduced?

Sponsor who takes on projected O & M activities Sponsor who takes on projected O & M activities would lessen the O, M & R costs by 20%would lessen the O, M & R costs by 20%--60%60%

Examples:Examples:Sponsor handles routine operation and Sponsor handles routine operation and maintenance (monitoring, sampling, etc.)maintenance (monitoring, sampling, etc.)Major maintenance and replacement costs Major maintenance and replacement costs are based on government bid projects; are based on government bid projects; sponsors who are creative with local sponsors who are creative with local resources may decrease these costsresources may decrease these costs

Page 19: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

Guiding Principle for Projects in Pennsylvania

True Sustainable Operation, True Sustainable Operation, Maintenance & Replacement Maintenance & Replacement

is based onis based on LOCAL LOCAL COMMUNITYCOMMUNITY Ownership Ownership

& Involvement& Involvement

Page 20: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

Workgroup Breakdown of Responsibilities

Routine Operations (20%) : Local GroupRoutine Operations (20%) : Local GroupLab Analyses (10%): Lab Analyses (10%): Gov’tGov’t sourcesourceMaintenance (30%): Maintenance (30%): Gov’tGov’t & Local Group& Local GroupReplacement Cost (40%): Replacement Cost (40%): Gov’tGov’tTotal Cost: DEP or other Total Cost: DEP or other gov’t gov’t source source ––65%, Local Group 65%, Local Group –– 35% (can be in35% (can be in--kind)kind)

Page 21: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

Summary of Committee Recomemdations:

Select a funding option and appropriate funds for Select a funding option and appropriate funds for O, M & RO, M & RDevelop a funding management systemDevelop a funding management systemRequire the development of O, M & R plansRequire the development of O, M & R plansProvide O, M & R training at conferences, etc.Provide O, M & R training at conferences, etc.Improve DEP capacity to assist with lab analysis Improve DEP capacity to assist with lab analysis & with major maintenance using BAMR & with major maintenance using BAMR construction crewsconstruction crews

Page 22: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

Revised 11/5/03 Recommendations:• Request that the Legislature establish a non-lapsing O, M & R fund within the

Growing Greener program, establish the fund and initiate deposits to the fund from Growing Greener or other sources;

• Establish an O, M & R quick response contract and procedures for accessing the contract;

• Encourage EPCAMR and WPCAMR to submit Growing Greener grant applications to disburse funds to watershed groups to cover lab analyses costs;

• Provide staff assistance to OSM in developing a web-based GIS database for all AMD treatment projects;

• Continue to provide support for watershed restoration technology transfer conferences.

Page 23: Operation, Maintenance and Replacement of AMD Passive ... · NRCS 319 BAMR WRPA OSM G2 ACOE Totals* Cum. Total 1988 $125,000 $0 $0 $0 $0 $0 $0 $125,000 $125,000 1989 $150,000 $0 $0

Questions for the Audience

Do you believe there is a need to establish a longDo you believe there is a need to establish a long--term fund for OMR?term fund for OMR?Is there a need to provide “quick response” Is there a need to provide “quick response” funding to address sudden system malfunctions?funding to address sudden system malfunctions?Is there a need for funding assistance for lab Is there a need for funding assistance for lab analysis?analysis?Are your systems receiving adequate OMR?Are your systems receiving adequate OMR?If not, why not?If not, why not?If not, has it resulted in performance reductions?If not, has it resulted in performance reductions?What suggestions do you have to improve the What suggestions do you have to improve the current situation?current situation?