Operating Instructions for Honeywell DVC
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • DVC100 (I) MK2 Termination Unit

    Installation Guide

  • 1. INTRODUCTION

    The DVC100 (I) MK2 Termination Unit is an ATEX and IECEx Certified junction box that provides a signal connection point and mounting point for the Honeywell Analytics Searchpoint Optima Plus gas detectors.

    Caution: The DVC100 (I) MK2 Termination Unit can only be used with Searchpoint Optima Plus gas detectors.

    The unit is ATEX and IECEx certified and is intended for use in hazardous areas.

    The DVC100 (I) MK2 provides:

    terminalsforconnectingthegasdetectorandthefieldcabling anIntrinsicallySafe(IS)connectionpointfortheHoneywellAnalytics HandHeldInterrogator(SHC1) alocalmountingpointfortheSearchpointOptimaPlus gasdetector

    The unit features:

    threecableentries twoterminalblocks avoltageclampandacommunicationslinkentrysocket

    The large (M25) entry is used to mount the Searchpoint Optima Plus gas detector directly to the box. The Optima Plus outputs a 4-20mA signal that is sent via the Termination Unit field wiring back to the controller.

    The voltage clamp and the external socket provide the IS connection to the Honeywell Analytics Handheld Interrogator (SHC1). The SHC1 allows the operator to communicate with the attached gas detector to commission, calibrate or diagnose the system.

    Full details about the Searchpoint Optima Plus units can be found in their documentation, which includes operation of the SHC1.

    Caution: Only the Honeywell Analytics SHC1 Handheld Interrogator must be connected to the DVC100 (I) MK2 Communications Link Entry Socket.

    Honeywell Analytics Limited reserve the right to change or revise the information supplied in this document without notice and without obligation to notify any person or organisation of such revision or change. If further details are required that do not appear in this document contact Honeywell Analytics Limited or one of its agents.

    1

  • 2. SAFETY

    Ensure that you read and understand this document BEFORE installing/ operating the equipment. Pay particular attention to the Safety Warnings.

    WARNINGS

    1. TheDVC100(I)MK2TerminationUnitiscertifiedforandintended foruseinpotentiallyhazardousareas.Installandusethe DVC100(I)MK2TerminationUnitinaccordancewiththelatest regulations.Nomodificationstotheunitispermittedwithout referencetotherelevantcertifyingauthority

    2. InEuropeinstalltocomplywithEN60079-14

    3. Forinstallationselsewhere,theappropriatelocalornational regulationsshouldbeused.

    4. TheDVC100(I)MK2TerminationUnitmustbeproperlyearthedto protectagainstelectricalshock,minimiseelectricalinterference andcomplywithISSafetyRequirements.

    5. Dismantlingorrepairofequipmentshouldbecarriedoutinthe safeareaonly.

    6. Donotdrillholesinthehousingasthiswillinvalidatethe explosionprotection.

    7. Inordertomaintainelectricalsafety,theunitmustnotbe operatedinatmosphereswithmorethan21%oxygen.

    8. Donotopentheenclosurewhileenergised.

    9. Exceedingthemaximumworkingvoltagemaydamagethe equipmentandwillinvalidatethewarranty.

    10.Thepotentialbetweenground(earth)andsignalconnections mustnever exceed 350V.

    CAUTION

    1. Only the Honeywell Analytics Handheld Interrogator (SHC1) must be connected to the Termination Units communication link entry socket.

    2

  • 3. MAIN FEATURES

    This section identifies the main features of the Termination Unit and also details important dimensions for the unit when installing.

    3

    160mm

    160m

    m30

    mm

    110mm

    140m

    m

    M25 Blanking Plug

    M20 Blanking PlugM20 Blanking Plug

    Handheld Interragator Socket

  • 4. INSTALLATION

    GeneralInstallationGuidelines

    1. Read the Warnings and Cautions at the beginning of this document and all the relevant instructions before starting any of the installation procedures.

    2. Identify external cable requirements and the necessary cable entry ports to be used on the Termination Unit.

    3. Refer to the documentation for the associated control system for details about external network connection information, field wiring, interconnections, etc.

    4. Refer to the associated Searchpoint Optima handbook for details about the gas detector.

    MECHANICAL INSTALLATION

    MechanicalInstallationGuidelines

    1. Identify a suitable location where the Termination Unit can be mounted. The unit should be fitted to a flat surface.

    2. When fitting a Termination Unit consideration should be made regarding the probability of mechanical impacts and interference from other equipment and apparatus.

    Procedure

    This procedure describes how the DVC100 (I) MK2 is installed at the mounting location and then the Optima Plus gas detector is fitted to the Termination Unit.

    (1) Securely fit the Termination Unit at the required monitoring point.

    Use the four Termination Unit mounting holes (visible after the lid is removed). Ensure the communications link entry socket connector is located at the bottom. This is to fulfil the requirement to position the Optima Plus sensor horizontally so that the risk of fouling the gas detector's optical surfaces is reduced.

    (2) Remove the Termination Unit lid.

    4

  • INSTALLATION (CONT)

    (3) Fit the Optima Plus detector to the left-hand (M25) entry.

    (4) Fit ATEX / IECEx approved cable glands to the Termination Unit cable entries as required.

    (5) Fit the external field wiring through the cable glands and secure.

    (6) Terminate the Optima Plus and field wiring.

    Refer to ElectricalInstallation.

    The diagram shows a typical Searchpoint Optima Plus and DVC100 (I) MK2 installation.

    5

    Searchpoint Optima Plus

    M20 Blanking Plug

    Handheld Interrogator

    Socket

    M20 Blanking Plug

  • INSTALLATION (CONT)

    ELECTRICAL INSTALLATION

    ElectricalInstallationGuidelines

    1. Isolate all associated power supplies and ensure that they remain OFF during the procedures.

    2. Ensure that approved and certified cable glands have been fitted to the Termination Unit cable entries where used for field wiring, with sealing washers where necessary to maintain the ingress protection rating.

    3. Ensure that any cable gland locking rings are fitted before terminating the cables.

    4. Ensure that approved and certified blanking plugs are fitted to all unused Termination Unit cable entries.

    5. The Termination Unit must be earthed using the internal earth terminal.

    6. Suitable crimps and/or ferrules must be fitted when connecting more than one wire to a Termination Unit terminal.

    7. The field terminals of the Termination Unit accept single or multi-stranded wire up to 2.5mm2 (14AWG). Cables should be routed carefully to avoid physical and environmental hazards such as mechanical stress and high temperatures.

    8. In order to ensure correct operation and to meet requirements for EMC, it is recommended that all field cables are screened with the cable screen connected at one end only.

    9. Avoid cabling schemes that create earth loops.

    6

  • INSTALLATION (CONT)

    Procedure

    Connect the gas detector and field wiring to the terminal blocks in the DVC100 (I) MK2 Termination Unit according to the following wiring diagram and table.

    Optima Wiring

    +24VDC (Red) (Terminal 1)0V (Black) (Terminal 3)

    4-20mA (White) (Terminal 5)RS485 (A) (Orange) (Terminal 7)

    RS485 (B) (Terminal 8)Earth Terminal (Green/Yellow)

    Field Wiring

    Earth Terminal+24VDC IN (Terminal 2)

    0V (Terminal 4)4-20mA OUT (Terminal 6)

    7

    Optima Wiring Diagram

  • INSTALLATION (CONT)

    Terminal Number

    Gas Detector Wiring Field Wiring

    Function Colour

    1 +24V Red -

    2 - - +24VDC Supply

    3 0V Black -

    4 - - 0V - Supply

    5 4-20mA White -

    6 - - 4-20mA Output

    7 RS485 (A) Orange -

    8 RS485 (B) Blue -

    9 - - -

    10 - - -

    11 - - -

    12 - - -

    Earth Terminal Earth Green/Yellow Earth

    1. Avoid earth loops

    2. Surge voltages in excess of 350V between ground (earth) and other connections can permanently damage the equipment and invalidates the warranty.

    3. The DVC100 (I) MK2 must be earthed using the internal earth terminal.

    8

  • 5. SPECIFICATIONS

    Connections

    Inputs Searchpoint Optima Plus and Field wiring.

    Outputs IS protected Honeywell Analytics SHC1 Handheld Interrogator communications (RS485) 4-20mA (Non-isolated).

    Power Supply 19-32Vdc.

    Environmental

    Operating temperature -40C to +65C

    Enclosure

    Entry Socket One IS protected Communications Link Entry Socket for connecting the SHC1 Honeywell Analytics Handheld interrogator.

    Cable One M25 sensor entry and three M20 cable entries (two fitted with ATEX / IECEx approved blanking plugs).

    Size 160mm (61") wide x 160mm (61") high x 104mm (411/16") deep. Add approximately 30mm (13/16") to the height for the Communications Link Entry Socket.

    Weight 2.1kg

    Material Polyester

    Ingress Protection IP67

    Certification Baseefa 03ATEX0261

    IECEx BAS 09.0124

    II 2G Ex e (ia) mb IIC T5 Gb

    -40C Ta +65C

    V-MAX 32 V

    9

  • 6. CERTIFICATION

    CertificationLabels

    KU ,ZR0 71HB ,ELOOP

    NOITANIMRET ROTCETED2KM )I( 001CVD TINU

    bG 5T CII bm )ai( e xE G2 IIC 56+ aT C 04-

    XXXXB4012XXXX / XX .ON .RES

    V 23 XAM-V

    DESIGRENE ELIHW NEPO TON OD

    4210.90 SAB xECEI & 1620XETA30 afeesaB

    10

  • CERTIFICATION (CONT)

    Connections

    11

  • CERTIFICATION (CONT)

    AlternativeConnections

    12

  • CERTIFICATION (CONT)

    SystemConnections

    13

  • 7. NOTES

    14

  • 1214

    6

    Issue 03 04/2010H_MAN08412104M0408_A03289 2010 Honeywell Analytics

    Please Note:While every effort has been made to ensure accuracy in this publication, no responsibility can be accepted for errors or omissions. Data may change, as well as legislation and you are strongly advised to obtain copies of the most recently issued regulations, standards and guidelines. This publication is not intended to form the basis of a contract.

    Contact Honeywell Analytics:

    Find out more

    www.honeywellanalytics.com

    Europe, Middle East, Africa, IndiaLife Safety Distribution AGWeiherallee 11aCH-8610 UsterSwitzerlandTel: +41 (0)44 943 4300Fax: +41 (0)44 943 [email protected]

    AmericasHoneywell Analytics Inc. 405 Barclay Blvd.Lincolnshire, IL 60069USATel: +1 847 955 8200 Toll free: +1 800 538 0363 Fax: +1 847 955 [email protected]

    www.honeywell.com

    Technical ServicesEMEAI: [email protected]: [email protected]: [email protected]

    Asia Pacific Honeywell Analytics Asia Pacific #508, Kolon Science Valley (I) 187-10 Guro-Dong, Guro-Gu Seoul, 152-050 Korea Tel: +82 (0)2 2025 0300Fax: +82 (0)2 2025 [email protected]