Tacoma Narrows Bridge Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc130030 Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012
20

Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc130030 Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.

Dec 25, 2015

Download

Documents

Austen French
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc130030 Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.

Tacoma Narrows Bridge

Opened to traffic: July 1, 1940Collapsed: November 7, 1940

Lewis Cluck - lxc130030Advanced Requirements Engineering – SE 6361.Z01Oct. 26, 2012

Page 2: Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc130030 Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.

Design of Collapsed Bridge

Modified Tacoma Narrows design used 8-foot deep girders and increased span to width ratio allowing for a slimmer and more elegant look. Also cheaper: $7 million

Page 3: Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc130030 Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.

Problems Noticed

The structure experienced considerable vertical oscillations while it was still under construction, several strategies were used, in vain, to reduce the motion of the bridge. They included:[2]

attachment of tie-down cables to the plate girders, which were anchored to 50-ton concrete blocks on the shore. This measure proved ineffective, as the cables snapped shortly after installation.

addition of a pair of inclined cable stays that connected the main cables to the bridge deck at mid-span. These remained in place until the collapse, but were also ineffective at reducing the oscillations.

finally, the structure was equipped with hydraulic buffers installed between the towers and the floor system of the deck to damp longitudinal motion of the main span. The effectiveness of the hydraulic dampers was nullified, however, because the seals of the units were damaged when the bridge was sand-blasted before being painted.

Page 4: Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc130030 Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.

Investigating the Issue

Professor Frederick Burt Farquharson from the at the University of Washington hired to perform wind-tunnel tests and recommend solutions in order to reduce the oscillations of the bridge. 

1:200 scale model of bridge1:20 scale model of deck section

Page 5: Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc130030 Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.

Aeroelastic Flutter

Fluttering is a physical phenomenon in which several degrees of freedom of a structure become coupled in an unstable oscillation driven by the wind.

This movement inserts energy to the bridge during each cycle so that it neutralizes the natural damping of the structure; the composed system (bridge-fluid) therefore behaves as if it had an effective negative damping (or positive feedback), leading to an exponentially growing response.

The wind speed that causes the beginning of the fluttering phenomenon (when the effective damping becomes zero) is known as the flutter velocity. Fluttering occurs even in low-velocity winds with steady flow. Hence, bridge design must ensure that flutter velocity will be higher than the maximum mean wind speed present at the site.

Page 6: Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc130030 Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.

Suggested Fixes

Five days before the collapse, the test studies are concluded.

Page 7: Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc130030 Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.

Aeroelastic Flutter (cont)

In other words, the oscillations increase in amplitude with each cycle because the wind pumps in more energy than the flexing of the structure can dissipate, and finally drives the bridge toward failure due to excessive deflection and stress.

Page 8: Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc130030 Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.

Torsional Motion

Page 9: Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc130030 Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.

Changes to Bridge Design

Dampening Mechanisms

Page 10: Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc130030 Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.

Changes to Bridge Design

Stiffening Trusses with lateral bracing

Page 11: Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc130030 Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.

Changes to Bridge Design

Differences in roadway support

Page 12: Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc130030 Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.

Changes to Bridge Design

Wind grates function as vents to alleviate oscillations caused by wind

Page 13: Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc130030 Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.

Changes in Bridge Design

Tower height increased to reduce cable sag ratio for 1:10 to 1:12

Old tower: 425 ft

New tower: 467 ft

Page 14: Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc130030 Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.

Wind Tunnel Testing

In designing this structure, bridge engineers first used wind tunnel tests to determine the behavior and stability of a physical model of a proposed bridge.

The research and design provided significant information to suspension bridge engineers nationwide and had an important effect on all suspension bridge designs that followed.

Page 15: Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc130030 Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.

Changes in Design Practice

The United States government requires that all bridges built with federal funds must first have their preliminary design subjected to wind tunnel analysis using a 3-dimensional model.

Page 16: Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc130030 Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.

Span Ratio Comparison

Bridge Width to Length (of Center Span)

Girder Depth to Length (of Center Span)

1940 Narrows Bridge 1:72 1:350

Current Narrows Bridge 1:46 1:112

Golden Gate Bridge 1:47 1:168

George Washington Bridge 1:33 1:120

Bronx-Whitestone Bridge 1:31 1:209

Page 17: Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc130030 Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.

Tacoma Narrows Bridges Today

Page 18: Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc130030 Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.

Current Tacoma Narrows Bridges

Page 19: Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc130030 Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.

2007 Construction

Page 20: Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc130030 Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.

References

1. ^ Washington State Department of Transportation (2005). “1940 Narrows Bridge – The Machine". Retrieved 2012-11-20.

2. Rita Robison. "Tacoma Narrows Bridge Collapse." In When Technology Fails, edited by Neil Schlager, pp. 18–190. Detroit: Gale Research, 1994.