Page 1: Open BIM Benefits - Howard Jeffrey

Open BIM Learning Xchange

Dr. Howard Jeffrey

1

Dr. Howard Jeffrey

BIM Specialist

Skanska

Page 2: Open BIM Benefits - Howard Jeffrey

Presentation content

- Approach to BIM

- Interpretation of BIM

- Challenges

- Opportunities- Opportunities

- Implementation of BIM

- Benefits on Projects

- Open BIM

2

Page 3: Open BIM Benefits - Howard Jeffrey

Building Information Modelling

BIM at Skanska

BIM – The Skanska AB Definition:

Building Information Modelling is a method to describe the building and its spaces, structures, components and materials with their essential information and properties. The model is a container for the information.

BIM can also be described as a collaborative approach making sure the right people get the right project information at the right time.

“From January 1st 2009 all new Design and Build projects where design has not yet started – shall adopt Building Information Modelling”

Page 4: Open BIM Benefits - Howard Jeffrey

BIM Plan based upon 16 Areas

Intelligent Modelling

DesignSafety Planning Facilities Mgt.

As Constructed

Records

Asset RegisterO&M Manuals

RecordsManagementGreen BIM

Quantity take-Off, costing

Visualizations

ClashProductionSimulations, energy,

Fire etc.

15

4

Off, costing

Detection

4D-Scheduling

Production

BIMProcurement

Supply Chain Management

Fire etc.

Quality Commercial

17

Page 5: Open BIM Benefits - Howard Jeffrey

UK BIM Implementation Structure

AB

UKBU

Mandate

PolicyUKBU requires BIM on all appropriate projects

going forward

Strategic decision to adopt BIM

across all BU’sPresident & CEO

UK President

5

OU’s / EF’s

PROJECTS

Strategy

PlanDetailed plans for those elements of BIM to be adopted

Individual strategies formed, respecting the

different markets

going forward UK President

BIM Rep’s

Project Directors

Page 6: Open BIM Benefits - Howard Jeffrey

1. People2. Process3.

Technology

Some relative proportions in BIM delivery

1. Strategic

Process Monitoring2. Detailed process

Monitoring

3. Tech

Coord

Coordination of BIM Delivery

Page 7: Open BIM Benefits - Howard Jeffrey

BIM During Design and Construction

Co-ordinated

3D Models

WordDocuments

ExcelSpreadSheets

Databases

Electronic data managementBIM MODEL

CAFMCAD

Intelligent2D

7

‘Foundation’: Created by the application of BIM standards, Design Agreement clauses,Project BIM Plan and BIM Guidance Notes

3D Models

Architectural

Structural

MEP

2DDrawings

PDFTextDocs

Electronic data managementBIM MODEL

Electronic

Production Methods

eg Tablet PC’s, GPS

Machine control

Laser scanning

Page 8: Open BIM Benefits - Howard Jeffrey

BIM within Broad Information Management

.

ClientInformation Management

WEB WEB

8

INFORMATION MANAGEMENT

Services ProvisionInformation Management

BIMBuilding Information Modelling

CAFM

Page 9: Open BIM Benefits - Howard Jeffrey

Challenges

- Timing in relation to projects

- Common understanding of BIM

- How much BIM to Implement

- Levels of Details within the models- Levels of Details within the models

- Articulation of what is required

- Investment in the process

- Management of the process

9

Page 10: Open BIM Benefits - Howard Jeffrey

Proportion and Hierarchy of BIM Understanding

1%

4%Clients

Strategy

Edict to adopt BIM

What is BIM, What Extent, Articulation of

Requirements

Mandate BIM Concept

Government

Public and private

10

5%

90%Supply Chain

Contractors

Practical Application on projects

What do I have to do?

Management Philosophy and

protocols, Defining requirements

Implementation Policy

Public and private

Large

SME’s, subs etc.

Bulk of people not interested in BIM wedges, Protocols, Standards Process and Flowcharts They want TO DO LISTS

Page 11: Open BIM Benefits - Howard Jeffrey

Opportunities

- Not having to wait for perfect BIM for Benefits

- Better understanding of other’s needs/perspectives

- Enhanced Collaboration

- Un-envisaged advantages and usages - Un-envisaged advantages and usages

- Increasing benefits on subsequent projects

- Vehicle for lessons learned

- Potential Differentiator

- Client Engagement

11

Page 12: Open BIM Benefits - Howard Jeffrey

Feedback Lessons Legacy

Hospitals

Walsall Hospital

Barts & The RoyalCase Study

Lessons

Case Study

Lessons

Learned

Case Studies

capture ongoing

Implementation

Benefits

Challenges/Lessons

Quantifiable

EvidenceOther legacy

projects

Implementation

Onto Legacy

Hospitals

Derby

Mansfield

Lessons

Learned

Interrogate

Rationalise

and Implement

OutcomesBIM

(Building Information

Modelling) provides a

‘vehicle’ to help

Articulate and transfer

The Benefits for:

ClientsBarts & The Royal

London HospitalLessons

Learned

OTHER NEWPROJECTS

Including NKS

Post Occupancy Evaluation(POE) of the design

Review Initiatives/Protocols

Processes/Existing practices

Clients

User groups

Estates Management

Supply Chain

Designers

Skanska

Academic/University engagement

For Research and Innovation

Lessons

Learned

New Project

Page 13: Open BIM Benefits - Howard Jeffrey

Formulating BIM Plan

Project

Agreement of

Project BIM Plan

Incorporates the agreed

requirements of stakeholders

For the Design, Construction,

Operational and Maintenance

Periods of the projectDeliberation and articulation

Of BIM requirements for

Designers

Deliberation and articulation

Of BIM requirements for

Facilities Services Hard and Soft

Dialogue and Interactive

Engagement of Participants to

Understand and Accommodate Each others’

Deliberation and articulation

Of BIM requirements for Client

Confidential

BIM

PlanDeliberation and articulation

Of BIM requirements for

Contractor

Deliberation and articulation

Of BIM requirements for SPV

Each others’Practical and

Also BIMRequirements

Deliberation and articulation

Of BIM requirements for

Other stakeholders

BIM Plan Route Plan

To manage Implementation,

Compliance Auditing,

Development

And Updating

Inputs to the BIM

Plan as project

Progresses eg.

Subcontractors

Suppliers

Commissioners

Page 14: Open BIM Benefits - Howard Jeffrey

Project BIM Plan Example

Required by Lead Application Benefits Expected

Client ID CJV FM CJV FM

Comments/requirements

• Accurate and visual design, no shortcuts (completed design in all details)

• Standardized components in use, libraries and catalogs

• Information on materials and components available from model to meet O&M/FM & Investor’s needs

• Required under Skanska

Group BIM Strategy

• Must support requirements of

the BIM applications detailed

below

• CJV to determine optimum

technical solutions

• Must agree and adopt an

object/asset coding system

Intelligent

3D-Modelling

Confidential14

object/asset coding system

at the commencement of

design to be used throughout

the life of the project

• Analyze alternative design/construction/maintenance options

• Select options on basis of optimized capital and ownership costs

• Ensures most attractive / affordable whole life cost solution

• Accurate life cycle cost estimation

• Reduced risk in life cycle fund management

• Required under ID BIM

Strategy

• BIM to facilitate rapid re-

assessment of implications

and quantities of design

options

• Suggested that a member of

the BIM team should attend

all optioneering workshops in

order to facilitate BIM

support

Page 15: Open BIM Benefits - Howard Jeffrey

Steps in Creating and Managing Project BIM Plan

2

BIM Plan

Stage 1

PrincipalsEngagement

Inform ofStandards &Templates

3

Approve

BIM Plan

AgreeExtent of

BIMApplications

4

Resource

Plan

Identify Resources Required to Implement

plan

5

Technical

Needs

IdentifyHardwareSoftware

requirements

6

Training

Needs

IdentifyTraining needs

1

Draf t

BIM Plan

BIM DesignAssessment

DesignAgreements

Links to Documents

7

BIM Plan

Stage 2

Finalise BIMPlan

8

Monitor

Comply

StructureMonitoringBIM PlanStatus

On Agendas

9

Criticality

Assess

AssetCriticality

AssessmentAlignmentWith PolicyDocuments

10

Model

Operating

Construction

OperationAnd

Maintenance

Client BIM,Contractual &Agreement

BIMRequirements

Project Timeline

PreORARFQPQQ

Project Launch

Commercial Review

BID Review

FinancialClose

ORAConstruction

PhaseOperational

Phase

1515

OptioneeringConcept

DesignDesign

DevelopmentDetailed

design

Level of Detail LODClick to link

Optioneering Optioneering

Life Cycle Optioneering

Joint safety reviews

Strategic Process Monitoring

Coordination of BIM Delivery

Detailed Process Monitoring

Technical Co-ordination

TemplatesDocuments Documents

Page 16: Open BIM Benefits - Howard Jeffrey

Benefits on Accommodation projects

− On the Barts Hospital(383 beds) project the M&E package cost was avoided

average scope increase of circa £1.7m by improved design co-ordination and

clash prevention

16

− Use of Tablet PC’s at the Royal London Hospital (905 beds)reduced the

management time in office to site and back by circa 50%

− Efficient take-off of quantities from the model saved £350,000 in QS time

Page 17: Open BIM Benefits - Howard Jeffrey

Utilisation of BIM at NKS

− Beneficial way of working throughout the project, facilitating a safer, greener,

faster, leaner project deliveryIdentify specific search setsVisualisations Tracking RDD Process

After ReviewImproving the design

Clash PreventionSafety Reviews

Page 18: Open BIM Benefits - Howard Jeffrey

Benefits on Highways

• On M25 model illustrated where batter could replace proposed piling and saved £3.0m

• GPS machine control via the model eliminated profile so saved 3 engineers for the duration of the project

• Laser scanning of existing bridges provided a complete and retrievable database of information including dimensions in a safe manner. Saved £1000 per day in traffic management

• Improved engagement/understanding with the emergency services, fire police etc. on M25

• Efficient and accurate schedules production of drainage, barriers lighting etc. on M25 75% more efficient

• Design is optimised by active modelling. Sign Location Gantries reduced from 46 to 35 on

18

• Design is optimised by active modelling. Sign Location Gantries reduced from 46 to 35 on M25 saving £3.5m

− The Return on Investment in BIM processes at the M25 is calculated at10 to 1

Page 19: Open BIM Benefits - Howard Jeffrey

Benefits to Designers

− Able to visualise road layouts

− Checking the visibility positioning of signs and signals

− Positioning gantries efficiently

− Clash prevention of infrastructure− Clash prevention of infrastructure

− Assists with third party engagement and understanding

− Buildability verification and construction sequences confirmed

− Reduction of environmental impacts

19

Page 20: Open BIM Benefits - Howard Jeffrey

BIM on the A1 in Poland

3D survey and control system supported by GPS

23

• Haul road on Phase 2 of the A1 in Poland was modelled and saved circa £3.5m in accurate location and construction

Page 21: Open BIM Benefits - Howard Jeffrey

Benefits during bids

− Fewer Room Layout reviews: The 3D and the live updates generally got the rooms agreed in principle in a single meeting ( previously 3 to 4 meeting required !)

− The client asked us to do about 50 rooms we achieved 130 including equipment and this gave confidence to the 1:200 area schedules. Modelling made this easy

− Touch screens were really liked by those who used them. Others preferred the architect to update and watch the items move on screen and direct.

− A significant difference was the loading 3-D as the client understood better and the live − A significant difference was the loading 3-D as the client understood better and the live updates ensured all their directions were tested then, rather than taking them away and finding it did not work.

− Able to market test 26 works packages (90%) of project because of meaningful images of project illustrating the project and reducing risk.

− Facilitated submission requirements

− Permitted earlier design decisions e.g. Façade with thermal modelling based on architectural and frame models

21

Page 22: Open BIM Benefits - Howard Jeffrey

Interactive touch screen 1:50 process

− BIM Design− Captures the information from the 3D planning, review and adjustment of spaces

22

Page 23: Open BIM Benefits - Howard Jeffrey

3D Room Elevations

− BIM Design− Captures the details of the 3D elevations including equipment requirements

23

Page 24: Open BIM Benefits - Howard Jeffrey

Virtual Samples/Mock-ups

− BIM Design− Data collected allows for virtual mock-ups to be built and tested

2424

Page 25: Open BIM Benefits - Howard Jeffrey

Guide to Level of detail

LEVELS OF DETAIL RELATING TO THE PROJECT SPECIFIC BIM STRATEGY AND PLAN

Tender process Finalise Bid Final Construction Construction Operation & Maintenance

Project Specific BIM 1 2 3 4 5 6 7 8 Price 9 9 10

Plan stages DRAFT DEVELOP STAGE 1 Approve Resource Technical Training DEVELOP STAGE 2 Comply INPUT INPUT MODEL

Levels of Detail

(Development) LOD

LOD LOD 100 LOD 200 LOD 300 LOD 400 LOD 500

Architectural BIM: 100 - Concept planning 200 - Schematic 300 - Design development 400 - Construction ready 500 - Virtual prototype

Assessment 150 - Space planning 350 - Fully coordinated design documentation 600 - As built

Into Design 700 - Operations documentation

RIBA Stage Plan Agreement A, B, C D,E,F,G,H J K L

25

Services BIM: Specifications Plantrooms, risers, distribution Spatial Co-ordination Co-ordinated details As Installed

Assessment Schematics Builders w ork Manufacturers details

Into Design Utilities

Agreement

Structural BIM: Foundations/frame Outline Design Detail Design As Constructed

Assessment Checking subcontract design

Into Design Co-ordinated details

Agreement

Sub-contractor Component spacial dimensions BIM into design agreement Create links to models/databases

Including future access space Detail Design Detail Design As Constructed

Note: Create Component attributes/spacial Component attributes As Installed

Links to dims inc access space dims inc access space

Documents

Standards Room Numbering Drawing numbering' Change Control

Articulating Asset Coding (empty Clash Prevention Retrievable Legible

BIM: SFS fields if necessary) Useful Data to be available

Asset Register

O&M template Handover 'Timelined' versions

Articulating of models and databases for

Optioneering BIM: ID Concept Options Design Options Detail Options FM usage

Page 26: Open BIM Benefits - Howard Jeffrey

The Model as a Graphical Route Map

Linked Data

Local Area Network

Hosted Data

Within the Modele.g. What, where, unique identifier

Sample 3D Model

Local Area Networke.g. Room data, spec’s, doc’s

Referenced Data

Wide Area Network / Webe.g. Manufacturers data, QA / QC

Page 27: Open BIM Benefits - Howard Jeffrey

What is OPEN BIM?OPEN BIM is a universal approach to the collaborative design, realisation and operation of buildings based on open standards and

workflows. OPEN BIM is an initiative of buildingSMART International (bSI) and several leading software vendors using the open

buildingSMART Data Model.

Why is it important?•OPEN BIM supports a transparent, open workflow, allowing project members to participate regardless of the software tools they use.

•OPEN BIM creates a common language for widely referenced processes, allowing industry and government to procure projects in

transparent commercial engagement, comparable service evaluation and assured data quality.

•OPEN BIM provides enduring project data for use throughout the asset life-cycle, avoiding multiple input of the same data and

consequential errors.

•OPEN BIM enables small and large (platform) software vendors to participate and compete on system independent, ‘best of breed’

solutions.

•OPEN BIM energises the on-line product supply side with more exact user demand searches and delivers the product data directly into

the BIM.

OpenBIM and Skanska: (Imported Slide)

SmartBIM Solutions

the BIM.

Skanska

• supports these principles

• remains platform neutral

• embraces BIM in its broadest context

Page 28: Open BIM Benefits - Howard Jeffrey

Open BIM Learning Xchange

Thank you

28