Online Network Serviceschanging the world - one network at a time

Page 2: Ons Corporate Presentation 2009

Network Deployment – Quality Completion

Projects - Fully Managed Resource & Logistics

Operating Internationally – Global Environments

Professional Engineers (inc SC Cleared)

“Our Key Strengths”Highly Responsive - Rapid Mobilisation

Flexibility - Managing Change and Variation

Can Do Attitude - Delivering Customer Requirements

Online Network Services Ltd

Page 3: Ons Corporate Presentation 2009

Online Network Services Ltd

Atlantic House, Imperial Way, Reading, Berkshire, UK, RG2 0TDTel : 01189 036040 Fax : 01189 036100

Company Reg : 5953055

Operating Internationally UK, France, Japan, Hong Kong, Eire, Germany, Singapore, Papua New

Guinea, Sweden, Netherlands, Seychelles, Albania, Australia

Global Ground Operator (GO) support structure

Engineers Installation, Commissioning, Integration (+45)

Plus Additional Project to Project Variations

Based Reading, Berkshire, UK

Page 4: Ons Corporate Presentation 2009

OrganisationGeoff FinchChairman

Matthew WickensOperations

Director

David PennSales &

CommercialDirector

David TwynhamOperations Manager

David NorthAccountant

Tara TwynhamProject Mgr

Installation & CommissioningEngineers

Chris BishopProject Support

Mike NugentQuality Assurance

SalesTeam

Ben HallProject Mgr

Page 5: Ons Corporate Presentation 2009

Our Focus is IP Technology Fixed, Optical, Wireless Data Networks & Telecoms Implementation Managed Services & Bespoke Projects Project Managers, Engineers, Field Technicians and Project Support Emphasis on Quality & First Time Completion on Schedule

ONS Service Overview

Page 6: Ons Corporate Presentation 2009

Our Core Objective“First Time Completion”

Quality System

Qualified Persons List (QPL)

First Aid Appointed person

Health & Safety

Skills Assessment

Training

Field Audits

SC cleared staff

ResourcingInduction, Skills Assessment, Training, Reference, QPL, AuditTrainingCisco, Juniper, Ciena, Huawei, Navini, Nokia, AlvarionEffective Field ManagementLeadership, Expectations, Best Practice & Standards

Page 8: Ons Corporate Presentation 2009

Reference Projects

1. 50Mb Broadband - UBR National Rollout2. Cisco Core Router - CRS1's I&C across Europe & Asia Pac3. Huawei FMSAN MSAN & EvoTAM Installation - BT21CN4. Juniper T Series & M Series - BT21CN5. Ciena - Fibre Network Deployment , Eire6. MVNO IP Core Network7. ISDN / ADSL Swap across Greater London

Page 9: Ons Corporate Presentation 2009

Broadband 50Mb Rollout Project

Primary Areas of Responsibility1. Project Management, including Customer Interface, Resource

Planning & Management, Controlling, and Closeout

2. ONS - Rollout ImplementationSurvey, Rollout Planning, Logistics, I&C, Integration, Acceptance

Documents, Installation Quality, Health & Safety

Page 10: Ons Corporate Presentation 2009

50Mb Broadband Network Implementation

Project Implementation has four primary functions Engineering Survey & Design:

Responsible for survey and design of engineering (Core, Access & Transmission).

Installation: Responsible for the operation of equipment installation.

Commissioning: Responsible for software testing and system integration.

Technical Support: Responsible for technical support and customer consultation during

equipment commissioning and operation.

Page 11: Ons Corporate Presentation 2009

50Mb Broadband Project Handover Documentation

Handover Pack comprises Survey Documentation Pre-Installation Bill of Materials Risk Assessment Method Statement Site Readiness Site Diary As-Built Document Red Line Drawings Inventory / Serial Numbers Test Results, Screen Shots & Logs Deficiencies Site Acceptance

Handover Docs

Page 12: Ons Corporate Presentation 2009

Project Critical Success Factors Project Management

Detailed Planning & Thorough Initialisation Requirements and Expectations Setting Responsibility Assignment Matrix (RAM)

Teamwork Shared Objectives Integrated Field Force Open Communications

Trusted Partner First Time Right Quality Critical Success

Factors

Page 13: Ons Corporate Presentation 2009

Reference Project #1 International Core Network

CISCO Carrier Routing System CRS-1 across Europe/Asia Dusseldorf, Tokyo, Amsterdam, Hong Kong, London, Frankfurt & Paris

Scope of Work Site Surveys, Installation and Commissioning, associated optical ODF's, Documentation 

Requires focus on Site Management, Planning Work Flow, Quality Practices and Health & Safety

Team structure Lead Engineer, Senior Engineer, Installation Engineer

Page 14: Ons Corporate Presentation 2009

Reference Project #2BT 21CN Implementation

200,000 Lines Installed Field Management - Parallel Installations Site Implementation – 4 weeks to 16 weeks, 3 Stages BT / Huawei Site Build Guidelines & Quality Audit Team Leader + Engineers (team size flexible) Rack Installation , Power ,Test and Certify Commissioning of Equipment–

• Live Operation Centre Integration• Provision of test documentation

MSAN

Page 15: Ons Corporate Presentation 2009

Reference Project #3Juniper BT 21CN Implementation

ID Task Name1 Award / Puchase Order2 Customer Project Kick Off Meeting3 Deployment Planning4 Resourcing5 Project Induction & Training6 Site Surveys - Risk Assessment & Methods7 Purchasing8 Project Meeting - Pre-Rollout 9 Hardware Delivery to ONS10 Batch 111 Batch 212 Batch 313 Juniper Rollout14 Ashford15 Bishop Stortford16 Taunton Toneside17 Braintree18 Exeter TE19 Exeter Rougemont20 Ipswich21 Crownhill22 Plymouth23 Norwich West24 Barnstaple25 Norwich Russell Hse26 Portsmouth Trunk27 Bristol West28 Chichester29 Salisbury30 Brighton31 Aldershot32 Horsham33 Guildford TE 34 Canterbury35 London Esher36 Sheffield Eldon Hse37 Chesterfield38 Sevenoaks39 Newark On Trent 40 Tunbridge wells41 Chatham42 Maidstone43 Closeout44 Rollout Site Acceptance Packs45 Project Meeting - Closeout46 Customer Acceptance Sign-Off

03/09

Team 1Team 1Team 2

Team 1Team 2Team 2

Team 1Team 2Team 2

Team 1Team 2

Team 1Team 1Team 2

Team 1Team 2

Team 1Team 2

Team 1Team 2

Team 1Team 2

Team 1Team 1

Team 1Team 1

Team 1Team 1Team 1

02/11

03/09 10/09 17/09 24/09 01/10 08/10 15/10 22/10 29/10 05/11 12/1103 Sep '0710 Sep '0717 Sep '0724 Sep '0701 Oct '0708 Oct '0715 Oct '0722 Oct '0729 Oct '0705 Nov '0712 Nov '07

29 Exchanges Parallel Installations Gated by GE Availability 2 Teams Team Leader + Engineer Installation, Power, Test

• BS7671 IEE

Commissioning• JUNOS 8.2R3.5• NOC Integration• Test Results

Page 16: Ons Corporate Presentation 2009

CN 4200 FlexSelect Installation & Commissioning Rapid Deployment, 4 weeks, 7 day working ODF, Splicing, OTDR tests, Optical Spectrum Analyser validation

Reference Project #4Regional Core Network , Ireland

Page 17: Ons Corporate Presentation 2009

Huawei NGN Core Network InstallationSoftswitches (MSS) , MSOFTX3000Media Gateways (MGW), UMG8900IN Platform / VoicemailShort Message Service Centre (SMSC)Power installationODF / DDF connectivity3 person team (Lead + 3 Installers2 Sites, 17 Cabinets full build, cable and commission - 10 days

Reference Project #5Mobile Virtual Network Operator (MVNO )

Page 18: Ons Corporate Presentation 2009

2000 Site Programme, Virtual Access GW5310 ADSL Gateways Aggressive timescales and challenging environment 20 Engineers & Project Manager Project complete ahead of fixed deadline (ISDN Service withdrawn) Field Logistics and Resource Planning Technical Fault Finding and Resolution

Reference Project #6 ISDN / ADSL replacement programme 

Page 19: Ons Corporate Presentation 2009

Public Transport Project ISDN to DSL Transition

TimePM Plan

Project implementation plan consists of 2000 network upgrades at bus stops

Objectives will be complete, 5 months from start date

Major challenges overcome = short notice schedule changes, site specific

configuration, short term peak

July 2008 Oct2008June 2008

Staging

Initiation

50

Design

Project Phases Completion On Schedule

Sept2008Aug2008

50

100

100

100

100

100

100

150

150

150

150

150

300

300

Page 20: Ons Corporate Presentation 2009

Summary

A Trusted Partner for Implementation Projects

We Take Responsibility for Rollout Deliverables

Fully Supported Engineering Teams

Managing Rollout & Demand Variations

Emphasis on Quality & Continuous Improvement

First Time Completion on Schedule