Top Banner
ONDO STATE GOVERNMENT ONDO STATE UNIVERSAL BASIC EDUCATION ODA ROAD, AKURE INVITATION FOR PRE-QUALIFICATION OF CONTRACTORS AND TENDER FOR 2013/2014/2015/2016 (MERGED) UBEC/SUBEB PROJECTS ONDO STATE UNIVERSAL BASIC EDUCATION The Ondo State Universal Basic Education Board hereby invites registered, experienced and reputable contractors to pre-qualify and tender for the under listed jobs. 2013 ACTION PLAN UBEC/SUBEB LOTS JOB DESCRIPTION TENDER FEE 1 Constriction of 6 Classroom with office at St. Stephens’ Primary School, Akure 100,000.00 2 Construction of 6 Classroom with Office at DayoJegele Primary School, Orojuda 100,000.00 3 Construction of 6 Classroom with Office at St. Peters’ Primary School, Bolorunduro 100,000.00 4 Construction of 6 Classroom with Office at Mount Bethel Primary School, Ondo 100,000.00 5 Construction of 6 Classroom with Office at St. James’ Primary School, Opasorun, Idanre 100,000.00 6 Construction of 6 Classroom with Office at St. Michael’s C&S Primary School, Ifon 100,000.00 7 Construction of 6 Classroom with Office at Community Primary School, Ayepe, Iwaro Oka 100.000.00 8 Construction of 6 Classroom with Office at ST. Michael Anglican Primary School, Ilale-Ikeji, Owo 100,000.00 9 Construction of 6 Classroom with Office at ST. Paul’s Primary School, Annex, Ore. 100,000.00 10 Construction of 6 Classroom with Office at Methodist Primary School, Mulekan-Igbo, Odigbo 100,000.00 11 Construction of 6 Classroom with Office at ST. Peter’s RCM, Ode-Irele 100,000.00 12 Construction of 6 Classroom with Office at ST. Syverious Primary School, Simerin-Oka 100,000.00 13 Construction of 6 Classroom with Office at Community Primary School, Ago Ajayi 100,000.00
28

ondo state government

Apr 29, 2023

Download

Documents

Khang Minh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ondo state government

ONDO STATE GOVERNMENT

ONDO STATE UNIVERSAL BASIC EDUCATION

ODA ROAD, AKURE

INVITATION FOR PRE-QUALIFICATION OF CONTRACTORS AND TENDER FOR

2013/2014/2015/2016 (MERGED) UBEC/SUBEB PROJECTS ONDO STATE UNIVERSAL

BASIC EDUCATION

The Ondo State Universal Basic Education Board hereby invites registered, experienced and

reputable contractors to pre-qualify and tender for the under listed jobs.

2013 ACTION PLAN UBEC/SUBEB

LOTS JOB DESCRIPTION TENDER FEE

1 Constriction of 6 Classroom with office at St. Stephens’ Primary School, Akure

100,000.00

2 Construction of 6 Classroom with Office at DayoJegele Primary School, Orojuda

100,000.00

3 Construction of 6 Classroom with Office at St. Peters’ Primary School, Bolorunduro

100,000.00

4 Construction of 6 Classroom with Office at Mount Bethel Primary School, Ondo

100,000.00

5 Construction of 6 Classroom with Office at St. James’ Primary School, Opasorun, Idanre

100,000.00

6 Construction of 6 Classroom with Office at St. Michael’s C&S Primary School, Ifon

100,000.00

7 Construction of 6 Classroom with Office at Community Primary School, Ayepe, Iwaro Oka

100.000.00

8 Construction of 6 Classroom with Office at ST. Michael Anglican Primary School, Ilale-Ikeji, Owo

100,000.00

9 Construction of 6 Classroom with Office at ST. Paul’s Primary School, Annex, Ore.

100,000.00

10 Construction of 6 Classroom with Office at Methodist Primary School, Mulekan-Igbo, Odigbo

100,000.00

11 Construction of 6 Classroom with Office at ST. Peter’s RCM, Ode-Irele

100,000.00

12 Construction of 6 Classroom with Office at ST. Syverious Primary School, Simerin-Oka

100,000.00

13 Construction of 6 Classroom with Office at Community Primary School, Ago Ajayi

100,000.00

Page 2: ondo state government

14 Construction of 6 Classrooms with Office at Community Primary School, Ugbe Akoko.

100,000.00

15 Construction of 6 Classroom with Office at ST. Anne’s Igbo-Egunrin

100,000.00

16 Construction of 6 Classroom with Office at Community Primary School, Kofawe

100,000.00

17 Construction of 6 Classroom with Office at Salvation Army Primary School, Igbobini

100,000.00

18 Construction of Perimeter Fence at ST. David’s Primary School, Akure

30,000.00

19 Construction of Perimeter Fence at ST. Augustine RCM Primary School, Ipinsa

30,000.00

20 Construction of Perimeter Fence at ST. Luke’s Primary School, Akure

10,000.00

21 Construction of Perimeter Fence at St. Mary’s Primary School, Ijare

30,000.00

22 Construction of Perimeter Fence at ST. Jude’s Primary School, Ipogun

50,000.00

23 Construction of Perimeter Fence ST. David’s Primary School, Ijare

20,000.00

24 Construction of Perimeter Fence at ST. Peter’s Primary School, Bolorunduro

10,000.00

25 Construction of Perimeter Fence at St. Mary’s Primary School, Gbose, Ondo

20,000.00

26 Construction of Perimeter Fence at Community Primary School, Ayepelwaro-Oka

20,000.00

27 Construction of Perimeter Fence at ST, Jude’s A/C Primary School, Iku-Ikare

50,000.00

28 Construction of Perimeter Fence at Community Primary School, Iku-Tkare

30,000.00

29 Construction of Perimeter Fence at ST. James’ C.A.C Primary School, Imo-Arigidi

30,000.00

30 Construction of Perimeter Fence at Adeolu Public Primary School, Okeogun-Owo

20,000.00

31 Construction of Perimeter Fence at ST. Peter’s RCM Ode Irele

30,000.00

32 Construction of Perimeter Fence at C.A.C Primary School Ode Irele

30,000.00

33 Construction of Perimeter Fence at Methodist Primary School, Idepe Okitipupa

30,000.00

34 Construction of Perimeter Fence at ST. Raphael C8iS Primary School, Okelgbala, okitipupa

30,000.00

35 Construction of Perimeter Fence at Community Primary School, Kofawe

20,000.00

36 Construction of Perimeter Fence at Salvation Army Primary School, Igbobini

30,000.00

37 Construction of 6 classroom with Office at Comprehensive High School, Isarun

100,000.00

Page 3: ondo state government

38 Construction of 6 classroom with Office at Lennon Jubilee High School, Ikare

100,000.00

39 Renovation of 6 Classrooms with Office at Subeb Primary school, Okuta Elerinla, Akure

50,000.00

40 Renovation of 3 Classroom (A) at Subeb Primary school, Okuta Elerinla, Akure

20,000.00

41 Renovation of 3 Classroom (B) at Subeb Primary school, Elerinla, Akure

20,000.00

42 Renovation of 3 Classroom with Office at Subeb Primary School, Elerinla, Akure

30,000.00

43 Renovation of 6 Classrooms with Office at ST. Mathias Primary School, Ibuji

50,000.00

44 Renovation of 6 Classrooms at ST. Michael’s Primary School, Ijare

50,000.00

45 Renovation of 3 Classrooms at ST. Michael’s Primary School, Ijare

20,000.00

46 Renovation of Computer Room at ST Peter’s Primary School, Bolorunduro

10,000.00

47 Renovation of a block of 4 Classrooms at ST Peter’s Primary School, Bolorunduro

30,000.00

48 Renovation of 6 Classrooms with Office at ST. Paul’s Primary School, Wasimi

50,000.00

49 Renovation of a block 6 Classroom block (A) with Office at St. Mary’s Primary School, Gbose, Ondo

50,000.00

50 Renovation of 3 Classrooms with Store at St Mary’s Primary School, Gbose, Ondo

30,000.00

51 Renovation of 6 Classrooms with Office/store at St. Mary’s Primary School, Gbose, Ondo

30,000.00

52 Renovation of 6 Classrooms with Office at ST. Jame’s Primary School, Opasorun, Idanre

50,000.00

53 Renovation of 6 Classrooms Model Block( Agagu) at ADD Primary School, Ifon

50,000.00

54 Renovation of 3 Classrooms with Office (UBE) at AUD Primary School, Ifon

20,000.00

55 Renovation of 6 Classrooms Model Block( Agagu) at ST. Peter’s C.A.C Primary School, Ikun-Akoko

30,000.00

56 Renovation of 3 Classrooms with at ST. Peter’s C.A.C Primary School, Ikun-Akoko Office/Store

20,000.00

57 Renovation of 6 Classrooms Model Block( Agagu) at Christ Ang. Primary School, Akungba-Akoko

50,000.00

58 Renovation of Six Classroom Block with Office (UBE) at Christ Ang. Primary School, Akungba-Akoko

50,000.00

59 Renovation of 6 Classrooms Model Block( Agagu) at AUD Primary School III, Igbede-Ikare

50,000.00

60 Renovation of Four Classroom Block at AUD Primary School III, Igbede-Ikare

20,000.00

61 Renovation of 6 classrooms Model Block( Agagu) at ST. Jude’s A/C Primary School, Iku-Ikare

30,000.00

Page 4: ondo state government

62 Renovation of 3 Classrooms with Office/Store at ST. Jude’s A/C Primary School, Iku-Ikare

20,000.00

63 Renovation of 2 classrooms block with Office at ST. Jude’s A/C Primary School, Iku-Ikare

10,000.00

64 Renovation of 6 classrooms Model Block( Agagu) at Community Primary School, Iku-Ikare

50,000.00

65 Renovation of 3 classrooms block at Community Primary School, Iku-Ikare

20,000.00

66 Renovation of 2 classrooms block with Office at Community Primary School, Iku-Ikare

10,000.00

67 Renovation of 6 classrooms Model Block( Agagu) at AUD Primary School II, Iku-Ikare

50,000.00

68 Renovation of 3 classrooms block at AUD Primary School n, Iku-Ikare

10,000.00

69 Renovation of 6 classrooms Model Block( Agagu) at Ansar-UI Islam Primary School, Okoja-Ikare

50,000.00

70 Renovation of 2 classrooms block with Store at Ansar-UL- Islam Primary School, Okoja-Ikare

10,000.00

71 Renovation of Admin Block at ST. Thomas Ang. Primary School, Erusu-Akoko

10,000.00

72 Renovation of six classroom block with office at ST. Thomas Ang. Primary School, Erusu-Akoko (MDG)

30,000.00

73 Renovation of six classroom block at ST. Thomas Ang. Primary School, Erusu-Akoko with office (Block A)

30,000.00

74 Renovation of six classroom block with office (Block B) at ST. Thomas Ang. Primary School, Erusu-Akoko

30,000.00

75 Renovation of 6 classrooms Model at ST. Peter’s C.A.C Primary School, Irun-Akoko Block( Agagu)

30,000.00

76 Renovation of Four Classroom block with office at ST. Peter’s C.A.C Primary School, Irun-Akoko

20,000.00

77 Renovation of six classroom model block (Agagu) at Community Primary School, Irun Akoko

50,000.00

78 Renovation of Six classroom model blocks (Agagu) at Our Saviour’s Primary School, Ogbagi Akoko.

50,000.00

79 Renovation of 2 Classrooms at Our Saviour’s Primary School, Ogbagi-Akoko

10,000.00

80 Renovation of three classroom block at ST. John’s Anglican Primary School, Ipe Akoko

20,000.00

81 Renovation of 6 classrooms Model block (Agagu) at ST. Jame’s RCM Primary School, Ipe-Akoko

50,000.00

82 Renovation of 3 Classroom block with office/store at ST. Jame’s RCM Primary School, Ipe-Akoko

20,000.00

83 Renovation of three classroom block at ST. James RCM Primary School, Ipe-Akoko

10,000.00

84 Renovation of seven classroom Block with office at Adeolu Public Primary School, Okeogun-Owo

30,000.00

85 Completion of three classroom block with office at Adeolu Public Primary School, Okeogun-Owo

20,000.00

Page 5: ondo state government

86 Renovation of three classroom Block at Adeolu Public Primary School, Okeogun-Owo

10,000.00

87 Renovation of two classroom block at Adeolu Public Primary School, Okeogun-Owo

10,000.00

88 Renovation of six classroom Block with office at Adeolu Public Primary School, Okeogun-Owo

30,000.00

89 Renovation of 6 classrooms Model Block( Agagu) at Methodist Primary School II, EhinOgbe, Owo

30,000.00

90 Renovation of three classrooms block A at Methodist Primary School II, EhinOgbe, Owo

10,000.00

91 Renovation of three classrooms block B at Methodist Primary School II, EhinOgbe, Owo

10,000.00

92 Renovation of six classrooms with office at Muslim Primary School, Bamikemo, Ile-Oluji

50,000.00

93 Renovation of two classrooms with office at Muslim Primary School, Bamikemo, Ile-Oluji

20,000.00

94 Renovation of three classrooms with office at Muslim Primary School, Bamikemo, Ile-Oluji

20,000.00

95 Renovation of six classrooms block B at CAC Primary School, Ode Irele

50,000.00

96 Renovation of two classrooms at CAC Primary School, Ode Irele

20,000.00

97 Renovation of two classroom block at ST. Paul’s RCM Primary School, Ajagba-Irele

20,000.00

98 Renovation of 6 Classrooms Model Block( Agagu) at ST. Paul’s RCM Primary School, Ajagba-Irele

50,000.00

99 Renovation of six classrooms with office at Methodist Primary School, Idepe Okitipupa

50,000.00

100 Renovation of four Classrooms with no office at Methodist Primary School, Idepe Okitipupa

30,000.00

101 Renovation of three classrooms with office (A) at Methodist Primary School, Idepe Okitipupa

20,000.00

102 Renovation of three classrooms with office (B) at Methodist Primary School, Idepe Okitipupa

20,000.00

103 Renovation of three classrooms with office at ST. Raphael C&S Primary School, Okelgbala, Okitipupa

20,000.00

104 Renovation of six classrooms with office at ST, Raphael C&5 Primary School, Okelgbala, Okitipupa

50,000.00

105 Renovation of five Classrooms with office (Self-help) at ST, Raphael C&S Primary School, Okelgbala, Okitipupa

30,000.00

106 Renovation of six classrooms with office at ST. Anne’s Igbo-Egunrin

50,000.00

107 Renovation of three classrooms with office (2Nr) at ST. Anne’s Igbo-Egunrin

50,000.00

108 Renovation of six classrooms block with office at Salvation Army Primary School, Igbobini

50,000.00

109 Renovation of four Classrooms block at Salvation Army Primary School, Igbobini

30,000.00

Page 6: ondo state government

110 Supply and put in place Pupils Furniture at AUD Primary School, Ifon and St. Monica’s RCM Primary School, Ikaro

20,000.00

111 Supply and put in place Pupils Furniture at St. Davids/James Primary School, Ugbe-Afo and Catholic/Methodist Primary School, Idoani

20,000.00

112 Supply and put in place Pupils Furniture at AUD Primary School, Idogun and Baptist Day Primary School, Oba-Akoko

20,000.00

113 Supply and put in place Pupils Furniture at Community Primary School, Ayepelwaro-Oka and ST. Patrick RCM Primary School, Ebirin-Oka

20,000.00

114 Supply and put in place Pupils Furniture at Community Primary School, Ikanmu -Oka and Saviour A/C Primary School, Oka-Akoko

20,000.00

115 Supply and put in place Pupils Furniture at AUD Primary School III, Igbede -Ikare and St. Jude’s A/C Primary School, Iku-Ikare

20,000.00

116 Supply and put in place Pupils Furniture at Community Primary School, Iku-Ikare and Zummurat-Deen Primary School, Ilepalkare

20,000.00

117 Supply and put in place Pupils Furniture at Community Primary School, Ise Akoko and ST John’s Ang. Primary School, Ipe Akoko

20,000.00

118 Supply and put in place Pupils Furniture at St. Michael African Primary School Oyaralsua, Alao Ademua Memorial Model P/S Isua and ST Peter P/S, Ifira Akoko

20,000.00

119 Supply and put in place ECCDE Furniture to selected Schools

10,000.00

120

Purchase and supply Information Technology facilities (Computer System and other Accessories)at AUD Primary School, Ifon and ST Monica’s RCM Primary School, Ikaro

20,000.00

121

Purchase and supply Information Technology facilities (Computer System and other Accessories) at St David’s/Jame’s Primary School, Ugbe AJo and The Apostolic Primary School, Idogun

20,000.00

122

Purchase and supply Information Technology facilities (Computer System and other Accessories) at Christ Anglican Primary School, Akungba-Akoko and Community Primary School, Ayepe, Iwaro-Oka

20,000.00

123

Purchase and supply Information Technology facilities (Computer System and other Accessories)at L AII Primary School, Iwaro -Oka and Saviours A/C Primary School Ikanmu Oka

20,000.00

124

Purchase and supply information Technology facilities (Computer System and other Accessories) at St Jude’s A/C Primary School, Iku-Ikare and Community Primary School, Iku-Ikare

20,000.00

Page 7: ondo state government

125

Purchase and Supply Information Technology facilities (Computer System and other Accessories)at Ansar-UI Islam Primary School, Okoja-Ikare and St Thomas RCM Primary School, Oyinmo Ikare

20,000.00

126

Purchase and supply Information facilities (Computer System and other Accessories) at Muslim Primary School, Ese Ikare and Community Demonstration Primary School, Epinmi Akoko

20,000.00

127

Purchase and supply Information Technology facilities (Computer System and other Accessories) at ST Michael African Primary School Oyara-Isua and Alao Ademua Memorial Model Primary School, Isua

20,000.00

128 Purchase and supply Information facilities (Computer System and other Accessories) at L AI Primary School, Isua-Akoko and Ebenezer Primary School, Isua Akoko

20,000.00

129

Purchase and supply Information Technology facilities (Computer System and other Accessories) at St. Thomas Anglican Primary School, Erusu-Akoko and St. Jame’s CAC Primary School, Imo-Arigidi

20,000.00

130

Purchase and supply Information Technology facilities (Computer System and other Accessories) at Our Saviour’s Primary School, Ogbagi Akoko and United Primary School, Ibaram-Akoko

20,000.00

131

Purchase and Supply Play Ground Equipment at St. Jacob’s C&S Primary School, Ifon, St, Monica’s RCM Primary School, Ikaro and St. Paul’s Anglican Primary School, Ijagba

20,000.00

132

Purchase and Supply Play Ground Equipment at St Jame’s Anglican Primary School, Ijagba, AUD Primary School, Idogun and Baptist Day Primary School, Oba Akoko

20,000.00

133

Purchase and Supply Play Ground Equipment at Christ Anglican Primary School, Akungba Akoko, Holy Trinity Anglican Primary School, Iwaro Oka and Community Primary School, Ikanmu Oka

20,000.00

134

Purchase and Supply Play Ground Equipment at Saviour AC Primary School, Ikanmu Oka, St. Jude’s A/C Primary School, Iku-Ikare and Community Primary School, Iku-Ikare

20,000.00

135

Purchase and Supply Play Ground Equipment at Ebenezer A/C Primary School, Okorun Ikare, Community Primary School, Ugbe Akoko and Community Primary School Ise Akoko

20,000.00

136

Purchase and Supply Play Ground Equipment at St. John’s Anglican Primary School, Ipe-Akoko, Community Demonstration Primary School, Epinmi Akoko and St. Michael African Primary School, Oyara-Isua

20,000.00

137 Purchase and Supply Play Ground Equipment at St Peter Primary School, Ifira Akoko, St. Ursulas Primary

20,000.00

Page 8: ondo state government

School, Ipesi Akoko and L.A Primary School, Ajowa Akoko

138

Purchase and Supply Play Ground Equipment at St. Thomas Anglican Primary School, Erusu Akoko, St, Peter’s C.A.C Primary School, Irun Akoko and Our Saviour’s Primary School, Ogbagi Akoko

20,000.00

139

Purchase and Supply Play Ground Equipment at AUD Primary School, Arigidi Akoko, Adeolu Public Primary School,Okeogun- Owo and St. Peter’s CAC Primary School, Owo

20,000.00

140

Purchase and Supply Play Ground equipment at New Church Primary School, Fajuyi Owo, AUD III Primary School, Owatowose-Owo, LA Primary School, Ijebu Owo and St. Michael African Primary School, Idaniken-Owo

20,000.00

141 Provision of Borehole at L.A Primary School, Iju-Odo 10,000.00

142 Provision of Borehole at Salvation Army P/S Igbobini, Eseodo

10,000.00

143 Construction of 6 Classroom with office at St. Benedict’s RCM Primary School, Ojojo, Ondo East.

100,000.00

144 Construction of 6 Classroom with Office at ST Matthew’s RCM Primary School, Ondo

100,000.00

145 Construction of 6 Classroom with Office at LA II Primary School, Iwaro-Oka

100,000.00

146 Construction of 6 Classroom with Office at St. Michael RCM Primary School, Iwaro-Oka

100,000.00

147 Construction of 6 Classroom with Office at St. Andrew Ang. Primary School, Okeruwa-Ikare

100,000.00

148 Construction of 6 Classroom with Office at Zummurat-Deen Primary School, Ilepa-Ikare

100,000.00

149 Construction of 6 Classroom with Office at LA Primary School, Igasi-Akoko

100,000.00

150 Construction of 6 Classroom with Office at ST. James’ Primary School, Isaipen- Owo

100,000.00

151 Construction of 6 Classroom with Office at ST. Peter’s Primary School, Oloruntele, Oke Igbo.

100,000.00

152 Construction of 6 Classroom with Office at Community Primary School, Orisunmibare, AraromhObu

100,000.00

153 Construction of 6 Classroom with Office at ST. Pius RCM, Igbotako

100,000.00

154 Construction of 6 Classroom with Office at Community Primary School, Kelema

100,000.00

155 Construction of three Classroom with Office at LA Primary School II, Oke-Bola, Akure

50,000.00

156 Construction of Perimeter Fence at St. Peter’s Primary School, Ilaramokin

30,000.00

157 Construction of Perimeter Fence at LA Primary School, Owode Owena

30,000.00

158 Construction of Perimeter Fence at Muslim Primary School, Ipogun

50,000.00

Page 9: ondo state government

159 Construction of Perimeter Fence at The Apostolic Primary School, Ilaramokin

50,000.00

160 Construction of Perimeter Fence at St Joseph’s Primary School, Igbara-Oke

10,000.00

161 Construction of Perimeter Fence at St John Primary School, Oba-Ile

30,000.00

162 Construction of Perimeter Fence at AUD Primary School, Ondo

5,000.00

163 Construction of Perimeter Fence at St. Monica’s RCM Primary School, Ikaro

20,000.00

164 Construction of Perimeter Fence at ST. Andrew Ang. P/S, Okeruwa-Ikare

30,000.00

165 Construction of Perimeter Fence at St James’ Primary School, Isaipen-Owo

20,000.00

166 Construction of Perimeter Fence at New Church Primary School, Fajuyi-Owo

50,000.00

167 Construction of Perimeter Fence at C.A.C Primary School, Ode Irele

30,000.00

168 Construction of Perimeter Fence at St MattewIgbinsinP/S, Oloto

30,000.00

169 Construction of Perimeter Fence at ST. Luke’s Primary school, Igbo Egunrin

30,000.00

170 Construction of Perimeter Fence at L A Primary School, Arogbo

30,000.00

171 Construction of Perimeter Fence at LA Primary School, Iju Odo

50,000.00

172 Construction of six classroom with office at Army Comprehensive High School, Akure

100,000.00

173 Construction of six classroom with office at AUD Grammar School, Ondo

100,000.00

174 Construction of six classroom with office at Manuwa Grammar School, Iju-Odo

100,000.00

175 Renovation of six classroom with office at Salvation Army Primary School, Akure

50,000.00

176 Renovation of six classroom with office at Ijigba Primary School, Annex Akure

50,000.00

177 Renovation of six classroom with office at St. Joseph’s Primary School, Igbara-Oke

50,000.00

178 Renovation of six classroom with office at LA Primar School, Owode-Owena

50,000.00

179 Renovation of six classroom with office A at Temidire Community Grammar School, Igbo-Oja

100,000.00

180 Renovation of six classroom with office B at Temidire Community Grammar School, Igbo-Oja

50,000.00

181 Renovation of Two classrooms at St. David Primary School, Agamo, Ondo East.

20,000.00

182 Renovation of six classroom with office at St. John Primary School, Obaile

50,000.00

Page 10: ondo state government

183 Renovation of four classroom at St, John Primary School, Obaile

30,000.00

184 Renovation of block of four classroom at St Philips Primary School, Omiluri, Ondo East.

30,000.00

185 Renovation of six classroom with office at AUD Primary School, Ondo

50,000.00

186 Renovation of five classroom with office at AUD Primary School, Ondo

50,000.00

187 Renovation of four classroom at St Michael’s P/S Yabaldanre

50,000.00

188 Renovation of six classroom with office St Michael’s P/S Yabaldanre

50,000.00

189 Renovation of 6 Classrooms Model Block (Agagu) at St. Jacob’s C&S Primary School, Ifon

50,000.00

190 Renovation of six classroom block at St Monica’s RCM Primary School, Ikaro

30,000.00

191 Renovation of 6 Classrooms Model Block (Agagu) at Holy Trinity Anglican Primary School, Iwaro-Oka

50,000.00

192 Renovation of three classroom block at Holy Trinity Anglican Primary School, Iwaro-Oka

10,000.00

193 Renovation of three classroom block at L.A II Primary School, Iwaro-Oka

20,000,00

194 Renovation of two classroom block at L.A II Primary School, Iwaro-Oka

10,000.00

195 Renovation of three classroom block with Veranda at L.A II Primary School, Iwaro-Oka

10,000,00

196 Renovation of two classroom block with store at ST. Andrew Ang. Primary School, Okeruwa-Ikare

10,000.00

197 Renovation of 6 Classrooms Model Block (Agagu) at Community Demonstration P/S, Epinmi-Akoko

30,000.00

198 Renovation of two classroom block with office/store at Community Demonstration P/S, Epinmi-Akoko

10,000.00

199 Renovation of 6 Classrooms Model Block (Agagu) at ST. Peter’s C.A.C Primary School, Owo

50,000.00

200 Renovation of four classroom block at ST, Peter’s C.A.C Primary School, Owo

20,000.00

201 Renovation of two classroom block at ST. James’ Primary School, Isaipen Owo

10,000.00

202 Renovation of two classroom block with office/store at ST, James’ Primary School, Isaipen Owo.

10,000.00

203 Renovation of 6 Classrooms Model Block (Agagu) New Church Primary School, Fajuyi, Owo

50,000.00

204 Renovation of 6 Classroom block at ST. Paul’s Primary School, Bamikemo, Ile Oluji

50,000.00

205 Renovation of 3 Classroom block ST. Paul’s Primary School, Bamikemo, Ile Oluji

20,000.00

206 Renovation of 6 Classrooms Model Block (Agagu) at L A II Primary School, Iju Odo

50,000.00

Page 11: ondo state government

207 Renovation of 6 Classroom block with 2 offices at L.A Primary School, Iju Odo

30,000.00

208 Renovation of four classroom block at Army Children Primary School, Constain, Ore

30,000.00

209 Renovation of two classroom block with two offices blocks 5Nr at Army Children Primary School, Constain, Ore

100,000,00

210 Renovation of two classroom block at Army Children Primary School, Constain, Ore

20,000.00

211 Renovation of three Classroom block at St. John P/S Gburuwo, Odigbo

50,000.00

212 Renovation of 6 Classroom block with office at ST, Thomas Primary School, Odigbo

50,000.00

213 Renovation of three Classroom block with no office at ST, Thomas Primary School, Odigbo

20,000.00

214 Renovation of three Classroom block with office at ST, Thomas Primary School, Odigbo

20,000.00

215 Renovation of 6 Classroom block with office at Community P/S Lijoka, Odigbo

20,000.00

216 Renovation of two Classroom block Bat C.A.C Primary School, Ode Irele

50,000.00

217 Renovation of 6 Classroom block at C.A.C Primary School, Ode Irele

20,000.00

218 Renovation of two classroom block at ST Paul RCM P/S, Ajagba-Irele

20,000.00

219 Renovation of 6 Classrooms Model Block (Agagu) at ST Paul RCM P/S, Ajagba-Irele

50,000.00

220 Renovation of six classroom block (Agagu model) at Obinehin Primary School, Ilaje

50,000.00

221 Renovation of 6 Classrooms Model Block (Agagu) at First African Church (FAC) P/S Igbokoda

50,000,00

222 Renovation of two classroom block A at L.A Primary School, Arogbo

20,000.00

223 Renovation of two classroom block B at LA Primary School, Arogbo

20,000.00

224 Renovation of six classroom block (Agagu model) at LA Primary School, Arogbo

50,000.00

225 Renovation of 6 Classrooms Model Block (Agagu) at First African Church Primary School, Arogbo Ese- Odo

50,000.00

226 Renovation of two classroom block with office – 2Nr at First African Church P/S, Arogbo Ese Odo

50,000.00

227 Supply and put in place Pupils Furniture at L.A Primary School, Ajowa-Akoko and ST, Thomas Ang. Primary School, Erusu-Akoko

20,000.00

228 Supply and put in place Pupils Furniture at AUD Primary School, Afin-Akoko and ST Peter’s C.A.C P/S, Irun-Akoko

20,000.00

Page 12: ondo state government

229 Supply and put in place Pupils Furniture at AUD Primary School, Arigidi-Akoko and Adeolu Public Primary School, Okeogun-Owo.

20,000.00

230 Supply and put in place Pupils Furniture at AUD III Primary School, Owatowose-Owo and AUD I Primary School, Owatowose-Owo

20,000.00

231 Supply and put in place Pupils Furniture at ST. Michael African P/S, Idaniken-Owo and New Church Primary School, Fajuyi Owo

20,000.00

232 Supply and put in place Pupils Furniture at St Peter’s RCM Ode Irele and C.A.C Primary School, Ode Irele

20,000.00

233 Supply and put in place Pupils Furniture at Apostolic Church Primary School, Ajagba and Salvation Army Primary School Ode Omi

20,000.00

234 Supply and put in place Pupils Furniture at L A Primary School, Ode Irele and Muslim Primary School Bamikemo, Ile-Oluji

20,000.00

235 Supply and put in place Pupils Furniture at St, Mathias Primary School, Ile Oluji and Muslim Primary School, Oke Alafia, lie Oluji

20,000.00

236 Supply and put in place Pupils Furniture at Community Primary School Gberinlegi and C.A.C Primary School, Ile-Oluji

20,000.00

237 Supply and put in place ECCDE to selected Schools 10,000.00

238

Purchase and supply Information Technology facilities (Computer System and other Accessories) at Adeolu Public Primary School, Okeogun-Owo and New Church Primary School, FajuyiOwo

10,000.00

239

Purchase and Supply Information Technology facilities (Computer System and other Accessories) at AUD III Primary School Owatowose-Owo and L A Primary School, Ijebu-Owo

10,000.00

240

Purchase and Supply information Technology facilities (Computer System and other Accessories) at St Michael Ang. P/S Ahoro-Upenmen and AUD Primary School, Sanusi-Owo

10,000.00

241

Purchase and Supply information Technology facilities (Computer System and other Accessories) at ST. Michael African Primary School, Idaniken-Owo and ST. Peter’s RCM Ode Irele

10,000.00

242

Purchase and Supply information Technology facilities (Computer System and other Accessories) at C.A.C Primary School Ode Irele and ST. Paul RCM P/S Ajagba-Irele

10,000.00

243 Purchase and Supply information Technology facilities (Computer System and other Accessories) at C.A.C

10,000.00

Page 13: ondo state government

Primary School, Ajagba and Baptist Day Primary School, Ode Irele

244

Purchase and Supply information Technology facilities (Computer System and other Accessories) at L A Primary School, Ode Irele and ST Paul Primary Sch. Bamikemo, Ile Oluji

10,000.00

245

Purchase and Supply information Technology facilities (Computer System and other Accessories) at Muslim Primary School, Oke Alafia lie Oluji and C.A.C Primary School, Ile Oluji

10,000.00

246

Purchase and Supply Information Technology facilities (Computer System and other Accessories) at Baptist Day Primary School, Ile-Oluji and CAC Primary School, Oke-igbo

10,000.00

247

Purchase and Supply information Technology facilities (Computer System and other Accessories) at St. Paul RCM Primary School, Ore and Army Children Primary school, Constain Ore

10,000.00

248

Purchase and Supply information Technology facilities (Computer System and other Accessories) at Methodist Primary School, Ore and L A Primary School, Araromi-Obu

10,000.00

249 Purchase and Supply Play Ground Equipment at ST Peter’s RCM Ode Irele, CAC Primary School and ST Paul RCM Primary School, Ajagba lrele

20,000.00

250

Purchase and Supply Play Ground Equipment at Salvation Army Primary School, Ode Omi, L A Primary School Ode Irele and ST Paul Ang. Primary School, Bamikemo, Ile Oluji

20,000.00

251

Purchase and Supply Play Ground Equipment at ST Peter’s Primary School Oloruntele Oke-Igbo and Muslim Primary school Oke Alafia, Ile Oluji and Community Primary School, Gberinlegi

20,000.00

252

Purchase and Supply Play Ground Equipment at CAC Primary School, Ile-Oluji, Community Primary School, Agbabu Odigbo and ST, Paul Primary School, Annex Ore

20,000.00

253

Purchase and Supply Play Ground Equipment at Army Children Primary School Constain Ore, Methodist Primary School, Ore and L A Primary School Araromi Obu

20,000.00

254 Purchase and Supply Play Ground Equipment at L A IjuOdo, St. Mattew P/S Igbinsi, Oloto and Methodist P/S Idepe Okitipupa

20,000.00

255

Purchase and Supply Play Ground Equipment at ST Barnabas Primary School, Ode Erinje, St Gregory RCM Primary School, Ode Aye, St Mary RCM Primary School and Methodist Primary School, Okitipupa

20,000.00

Page 14: ondo state government

256 Provision of Borehole at Salvation Army Primary School, Igbobini

10,000.00

2015 ACTION PLAN UBEC/SUBEB LOTS JOB DESCRIPTION TENDER FEE 257

Construction of 6 Classroom with office at Dayo-Jegele Primary School, Igoba

100,000.00

258 Construction of 6 Classroom with Office at St. Anne’s Primary School, Ondo

100,000.00

259 Construction of 6 Classroom with Office at St. Paul’s Anglican Primary School, Ijagba

100,000.00

260 Construction of 6 Classroom with Office at Community Primary School, Ikanmu-Oka

100,000.00

261 Construction of 6 Classroom with Office at Salvation Army Primary School, Etioro-Supare

100,000.00

262 Construction of 6 classrooms with Office at ST. Philip’s Anglican Primary School, Ikakumo-Akoko

100,000.00

263 Construction of 6 classrooms with Office at ST. Michael African Primary School Oyara-Isua.

100,000.00

264 Construction of 6 classrooms with Office at AUD I Primary School, Owatowose-Owo

100,000.00

265 Construction of 6 Classroom with Office at ST. Michael Anglican Primary School, Ahoro-Upenmen

100,000.00

266 Construction of 6 classrooms with Office at Community Primary School, AdelogbeKomowa, Ile Oluji

100,000.00

267 Construction of 6 classrooms with Office at ST. Gregory RCM Ode Aye

100,000.00

268 Construction of 6 classrooms with Office at ST. Barnabas Primary School, Ode Erinje

1M,000.00

269 Construction of 6 classrooms with Office at ST. Peter Demonstration Primary School, Akure

100,000.00

270 Construction of 3 classrooms with Office at Elemuletu Community Primary School, Akure

50,000.00

271 Construction of 3 classrooms with Office at Iloro Community Primary School, Akure

50,000.00

272 Construction of 3 classrooms with Office at Methodist Primary School, Ondo

50,000.00

273 Construction of 3 classrooms with Office at L.A Primary School, Owobamibo Ofosu, Idanre

50,000.00

274 Construction of Perimeter Fence at MT. Carmel Primary School, Annex Akure

20,000.00

275 Construction of Perimeter Fence at Holy Trinity Primary School, Omoladan, Ifedore

50,000.00

276 Construction of Perimeter Fence at Our Saviour’s Anglican Primary School, Owena Idanre

30,000.00

277 Construction of Perimeter Fence at AlaoAdemua Memorial Model Primary School, Isua

20,000.00

Page 15: ondo state government

278 Construction of Perimeter Fence at AUD III Primary School, Owatowose-Owo

20,000.00

279 Construction of Perimeter Fence LA Primary School, Ijebu-Owo

20,000.00

280 Construction of a six classroom block with office at United High School, Ikota, Ifedore

100,000.00

281

Construction of a block of 6 classrooms with office at Holy Trinity Grammar School, Italurowo, Ondo East

100,000.00

282 Construction of a block of 6 classrooms with office at ldepe Methodist Junior High School, Okitipupa

100,000.00

283 Renovation of 4 classrooms with office at MT Carmel Primary School, Annex Akure

30,000.00

284 Renovation of 6 classrooms with office at Muslim Primary School, Akure

50,000.00

285 Renovation of 3 classrooms at Holy Trinity Primary School, Omoladan, Ifedore

30,000.00

286 Renovation of 6 classrooms with office at Holy Trinity Primary School, Omoladan, Ifedore

50,000.00

287 Renovation of 6 classrooms with office Muslim Primary School, Ita-Ogbolu

50,000.00

288 Renovation of 3 classrooms at St, Matthew’s Primary School, Iju

20,000.00

289 Renovation of 2 classrooms at St. Matthew’s Primary School, Iju

20,000.00

290 Renovation of 6 classrooms Model Block (Agagu) at St. Luke Primary School, Irun-Akoko

50,000.00

291 Renovation of 3 classrooms (A) at St. Luke Primary School, Irun-Akoko

10,000.00

292 Renovation of 3 classrooms (B) at St. Luke Primary School, Irun-Akoko

10,000.00

293 Renovation of 6 classrooms Model Block (Agagu) at St. Paul’s Primary School, Ikare-Akoko

50,000.00

294 Renovation of 6 classrooms Model Block (Agagu) at St. Peter Primary School, Ikare-Akoko

50,000.00

295 Renovation of 3 classrooms (A) at St. Peter Primary School, Ikare-Akoko

10,000.00

296 Renovation of 3 classrooms (B) at St. Peter Primary School, Ikare-Akoko

10,000.00

297 Renovation of 4 classrooms at St. Gerard Primary school, Awodiyilemi, Bolorunduro, Ondo

30,000.00

298 Renovation of 6 classrooms with Office at St. Gerard Primary school, Awodiyilemi, Bolorunduro, Ondo

50,000.00

299 Renovation of 6 classrooms with Office at Methodist Primary School, Ondo

50,000.00

300 Renovation of One Classroom at ST. Peter’s RCM Primary School, Oke-Igbala, Ondo

10,000.00

Page 16: ondo state government

301 Renovation of Storey Building (8) classrooms at ST. Peter’s RCM Primary School, Oke-Igbala, Ondo

30,000.00

302 Renovation of six classrooms with office at Our Saviour’s Anglican Primary School, Owena-Idanre

50,000.00

303 Renovation of six Classrooms (FGN) at Our Saviour’s Anglican Primary School, Owenaidanre

50,000.00

304 Renovation of 2 Classrooms block at ST. Paul’s Anglican Primary School, Ijagba

10,000.00

305 Renovation of 6 Classroom Model block (Agagu) at St. James’ Anglican Primary School, Ijagba

50,000.00

306 Renovation of 2 Classrooms block at St. Patrick RCM Primary School, Ebirin-Oka

10,000.00

307 Renovation of one Classroom with office at St Patrick RCM Primary School, Ebirin-Oka

10,000.00

308 Renovation of 2 Classrooms with Office (hilltop) at ST. Patrick RCM Primary School, Ebirin-Oka

10,000.00

309 Renovation of 2 Classrooms Block A at Community Primary School, Ikanmu-Oka

10,000.00

310 Renovation of 2 Classrooms Block B at Community Primary School, Ikanmu-Oka

10,000.00

311 Completion of Six classroom model block (Agagu) at St. Matthew’s Anglian Primary School, Agba-Oka

50,000.00

312 Renovation of Three Classrooms block at Salvation Army Primary School, Etioro-Supare

20,000.00

313 Renovation of Five Classroom block with office at Saviour A/C Primary School, Ikanmu-Oka

20,000.00

314 Renovation of Three Classroom Block with Office at Saviour A/C Primary School, Ikanmu-Oka

20,000.00

315 Renovation of 6 Classrooms Model Block( Agagu) at St. Andrew’s Primary School, Akunnu-Akoko

30,000.00

316 Renovation of two Classroom Block with store at St. Andrew’s Primary School, Akunnu-Akoko

10,000.00

317 Renovation of three Classroom Block at United Primary School, Ibaram-Akoko

10,000.00

318 Renovation of 3 Classroom block with Office at United Primary School, Ibaram-Akoko

10,000.00

319 Renovation of six Classroom block at United Primary School, Ibaram-Akoko

20,000.00

320 Renovation of 6 Classrooms Model Block( Agagu) at AUD Primary School, Arigidi-Akoko

50,000.00

321 Renovation of five Classroom block (Agagu) at A/C Unity Junior High School, Epinmi

50,000.00

Page 17: ondo state government

322 Renovation of 4 Classrooms block with Office/store at A/C Unity Junior High School, Epinmi

30,000.00

323 Renovation of 6 Classrooms Model Block ( Agagu) at AlaoAdemu Memorial Model Primary School, Isua-Akoko

50,000.00

324 Renovation of 4 Classrooms block with office/store at AlaoAdemua Memorial Model Primary School, Isua-Akoko

20,000.00

325 Renovation of 6 Classrooms Block at Community Primary School, Owajaye Ute

50,000.00

326 Renovation of 6 Classrooms Model Block ( Agagu) at AUD III Primary School, Owatowose Owo

50,000.00

327 Renovation of 6 Classrooms Model Block( Agagu) at AUD I Primary School, Owatowose-Owo

30,000.00

328 Renovation of 6 Classrooms Model Block ( Agagu) at LA Primary School, Ijebu-Owo

30,000.00

329 Renovation of three classroom block at LA Primary School, Ijebu-Owo

20,000.00

330 Renovation of four classroom block at LA Primary School, Ijebu-Owo

20,000.00

331 Renovation of 6 Classrooms block with office at Methodist Primary School, Ore

50,000.00

332 Renovation of three Classroom block with office at Methodist Primary School, Ore

20,000.00

333 Renovation of 3 Classrooms block with office at LA Primary School, Orile Oyo, Irele

20,000.00

334 Renovation of two Classroom block with office at L.A Primary School, Orile Oyo, Irele

20,000.00

335 Completion of Three Classrooms block at ST. Edward RCM Primary School, Idepe

30,000.00

336 Renovation of Three Classrooms block with 2Nr Toilet at ST. Edward’s RCM Primary School, Idepe

20,000.00

337 Completion of three classroom block -(2008) at ST. Edward RCM Primary School, Idepe

30,000.00

338 Renovation of six classroom block with office at ST Edward RCM Primary School, Idepe

50,000.00

339 Renovation of 6 Classrooms Model Block ( Agagu) at St. Columbus Ojuala

30,000.00

340 Completion of three classroom block (A) at Methodist Primary School, Okitipupa

20,000.00

Page 18: ondo state government

341 Renovation of three classroom (B) at Methodist Primary School, Okitipupa

20,000.00

342 Renovation of six classroom block with office at Methodist Primary School, Okitipupa

50,000.00

343 Renovation of 6 Classrooms Model Block ( Agagu) at Methodist Primary School, Okitipupa

50,000.00

344 Renovation of two Classroom Block with office at ST. Gregory RCM Ode Aye

20,000.00

345 Renovation of three classroom block with office at L.A Primary School, Ajowa-Akoko

20,000.00

346 Renovation of three classroom block at L.A Primary School, Ajowa-Akoko

20,000.00

347 Supply and put in place Pupils Furniture at Community Primary School, Agbabu, Odigbo and Community Primary School, Oladosa, Odigbo

20,000.00

348 Supply and put in place Pupils Furniture at Army Children Primary School, Constain, Ore and L.A Primary School, Araromi Obu

20,000.00

349 Supply and put in place Pupils Furniture at L.A IjuOdo and Methodist Primary School, Idepe, Okitipupa

20,000.00

350 Supply and put in place Pupils Furniture at ST. Barnabas Primary School, Ode- Erinje and ST. Gregory RCM Primary School, Ode Aye

20,000.00

351 Supply and put in place Pupils Furniture at St. Mary RCM Primary School, Okitipupa and St. Anne’s Igbo-Egunrin

20,000.00

352 Supply and put in place Pupils Furniture at FAC Primary School, Igbokoda and Methodist Primary School, Orereara, Ilaje

20,000.00

353 Supply and put in place Pupils Furniture at L.A Primary school, AraromiSea side and Methodist Primary School, Kiribo, Ese Odo

20,000.00

354 Supply and put in place Pupils Furniture at Salvation Army Primary School, Igbobini and Methodist Primary School, Igbotu, Ese Odo

20,000.00

355 Supply and put in place Pupils Furniture at St. Columbus Ojuala and Ebenezer FAC Primary School, Igbotu

20,000.00

356 Supply and put in place ECCDE Furniture to selected Schools

10,000.00

357 Purchase and supply Information Technology facilities (Computer System and other Accessories) at L.AIjuOdo and St. Matthew Primary School Igbinsin, Oloto

10,000.00

358

Purchase and supply Information Technology facilities (Computer System and other Accessories) at Methodist Primary School, Idepe and ST. Mary RCM Primary School,Okitipupa

10,000.00

Page 19: ondo state government

359

Purchase and supply Information Technology facilities (Computer System and other Accessories) at Methodist Primary School, Okitipupa and Ebenezer Anglican Primary School, Ilutuntun

10,000.00

360 Purchase and supply Information Technology facilities (Computer System and other Accessories) at ST. Anne’s Igbo Egunrin and Community Primary School, Kofawe

10,000.00

361

Purchase and supply Information facilities (Computer System and other Accessories) at St Luke’s Primary School, Igbo Egunrin and Community Primary School, Kurugbene

10,000.00

362

Purchase and supply Information Technology facilities (Computer System and other Accessories) at Methodist Primary School, Kiribo, Ese Odo and Salvation Army Primary School, Igbobini

10,000.00

363

Purchase and supply Information Technology facilities (Computer System and other Accessories) at Subeb Model Primary School, OkutaElerinla, Akure and Christ Anglican Primary School, Shagari, Akure

10,000.00

364

Purchase and supply Information Technology facilities (Computer System and other Accessories) at St. Luke’s Primary School, Akure and Elemuletu Community Primary School, Akure

10,000.00

365

Purchase and supply Information Technology facilities (Computer System and other Accessories) at St. James’ Primary School, Oda Road, Akure, St. Benedict’s RCM Primary School Ojojo and St. Pius Primary School, Lipepeye

10,000.00

366 Purchase and Supply Play Ground Equipment at ST, Anne’s Igbo Egunrin, FAC Primary School, Igbokoda and Community Primary School, OkeEwa, Ilaje

20,000.00

367

Purchase and Supply Play Ground Equipment at Community Primary School, Kofawe, Community Primary School, Kurugbene and L.A Primary School, Araromi Sea Side

20,000.00

368

Purchase and Supply Play Ground Equipment at Methodist Primary School, Kiribo, Ese Edo, Salvation Army Primary School, Igbobini and L.A Primary School, Arogbo

20,000.00

369 Purchase and Supply of Play Ground Equipment at Baptist Primary School, Ajapa, Ese Odo, St. Columbus Ojuala and Apostolic Primary School, Igbobini

20,000.00

370

Purchase and Supply of Play Ground Equipment at Community Primary School, Agadagba, St, Stephen’s Primary School, Akure and St David’s Primary School, Akure

371 Purchase and Supply Play Ground Equipment at Christ Anglican Primary School, Shagari, Akure, St. Benedict

20,000.00

Page 20: ondo state government

RCM P/S Ojojo, Ondo East and St. James Primary School, Oda Road

372

Purchase and Supply Play Ground Equipment at ST. John’s Primary School, LAAGBA, St. John Anglican Primary School, Igbo Oja and St. Gerrard Primary School, Awodiyilemi, Ondo

20,000.00

2016 ACTION PLAN UBEC/SUBEB

LOT JOB DESCRIPTION TENDER FEE

373 Construction of 6 classrooms with office at St. James’ Pry School, Oda Road, Akure.

100,000,00

374 Construction of 6 classrooms with office at Salvation Army Pry School, Ondo.

100,000.00

375 Construction of 6 classrooms with office at St David’s/ James’ Pry School, Ugbe-Afo.

100,000.00

376 Construction of 6 Classrooms block at Moslem Pry School, Ilepa-Ikare.

100,000.00

377 Construction of 6 classrooms block at ZI Pry School, Ifira-Akoko.

100,000.00

378 Construction of 6 classrooms block at St. Stephen Pry School, Ipele.

100,000.00

379 Construction of 6 classrooms block at AUD Pry School, Sanusi-Owo.

100,000.00

380 Construction of 6 classrooms block at St. Michael African Pry School, Idaniken Owo.

100,000.00

381 Construction of 6 classrooms with office at St. Mathias Pry School, Ile-Oluji.

100,000.00

382 Construction of 6 classrooms with office at Muslim Pry School Oke Alaafia, Ile-Oluji.

100,000.00

383 Construction of 6 classroom block with office at Community Pry School, Gberinlegi, Oke-igbo.

100,000.00

384 Construction of 6 Classrooms block with office at Community Pry School Ajana Annex.

100,000.00

385 Construction of 6 classrooms block with office at St. Mary RCM Primary School, Okitipupa.

100,000.00

386 Contraction of 6 classrooms block at L.A Primary School Igbo-Olofin, Ode Aye.

100,000.00

387 Construction of 3 classrooms block with office at Community Pry School Erigi, Odigbo

50,000.00

388 Construction of 3 classrooms block with office at Christ Anglican Pry School Ajagoto.

50,000.00

389 Construction of 3 classrooms with office at Methodist Pry School Abusoro Okitipupa.

50,000.00

390 Construction of Perimeter fence at Christ Ang. Pry School, Shagari Village, Akure.

30,000.00

391 Construction of perimeter fence of St. James’ Pry School, Oda.

50,000.00

Page 21: ondo state government

392 Completion of Perimeter Fence of St. Paul’s Pry School, Oba-ile, Akure.

10,000.00

393 Construction of perimeter fence at St. Andrew’s Pry School, Ayede Ogbese.

50,000,00

394 Construction of Perimeter fence. LA Pry School, Owode Araromi.

30,000.00

395 Construction of Perimeter fence at St Mathew Pry School Owena Elesin.

30,000.00

396 Construction of Perimeter fence at St John’s Anglican Pry School Igbo-Oja.

30,000.00

397 Construction of Perimeter fence at Muslim Pry School, Idanre.

30,000.00

398 Construction of Perimeter fence at L.A Pry School, Ita- Olorun, Idanre.

30,000.00

399 Construction of Perimeter fence at St Theresa Pry School, Alade, Idanre.

30,000.00

400 Construction of Perimeter fence. St. Peter’s Pry School, Ifira-Akoko.

30,000.00

401 Construction of Perimeter fence at Muslim Pry School Oke-Alaafia, Ile-Oluji.

30,000.00

402 Construction of Perimeter fence at Methodist Pry School Okitipupa,

30,000.00

403 Construction of Perimeter fence at Community Pry School Kurugbene.

50,000.00

404 Construction of Perimeter fence at St. Mary RCM Pry School, Okitipupa.

30,000.00

405 Construction of 6 Classrooms block at Comprehensive Junior Secondary Schl Erusu, Akoko.

100,000.00

406 Construction of 6 Classrooms block at Juwiri Junior High School, Irele.

100,000.00

407 Construction of 6 Classrooms block with office at Unity High School, Ode Aye.

100,000.00

408 Renovation of Six Classrooms block with office at Christ Anglican Primary School, Sagari Village, Akure.

50,000.00

409 Renovation of 2 Classrooms at Christ Anglican Primary School, Sagari Village, Akure.

20,000.00

410 Renovation of Six Classrooms block with office at St. James’ Primary School, Oda

50,000.00

411 Renovation of Six Classrooms block with office at St. Paul’s Primary School, Ibule

50,000.00

412 Renovation of 3 Classrooms at St. Paul’s Pry School, Ibule

30,000.00

413 Renovation of 8 bay toilet at St. Paul’s Pry School, Ibule 10,000.00

414 Renovation of 4 Classrooms block with office and store at Community Pry School Ero.

50,000.00

415 Renovation of 3 Classrooms at St. Paul’s Pry School, Oba-Ile.

30,000.00

416 Renovation of 2 Classrooms at St. Paul’s Pry School, Oba-Ile.

20,000.00

Page 22: ondo state government

417 Renovation 3 Classrooms with office at St. Paul’s Pry School, Oba-Ile.

20,000.00

418 Renovation 2 Classrooms with office at L.A Pry School, Owode Araromi.

20,000,00

419 Renovation 2 Classrooms. LA Pry School, Owode Araromi.

20,000,00

420 Renovation of 3 Classrooms block at St John’s Anglican Pry School, Igbo-Oja, Ondo East

20,000.00

421 Renovation of 2 Classrooms block at St. John’s Anglican Pry School, Igbo-Oja, Ondo East

20,000.00

422 Renovation of 6 Classrooms block with office at Muslim Pry School, Idanre.

50,000.00

423 Renovation of 6 Classrooms block with office at Holy Flock Pry School, Ondo.

50,000,00

424 Renovation of 8 bay toilet at Holy Flock Pry School, Ondo.

10,000,00

425 Renovation of 4 Classrooms block at St. Paul’s RCM Pry School, Mosunmola Ondo.

50,000.00

426 Renovation of 2 Classrooms block at St. Pauls RCM Pry School, Mosunmola Ondo.

20,000.00

427 Renovation of 2 Classrooms block at St. David’s/James’ Primary School, Ugbe-Afo.

10,000.00

428 Renovation of 6 Classrooms Model block (Agagu) at Catholic/ Methodist Pry School, Ido-Ani.

50,000.00

429 Renovation of 3 Classroom with office/store at Catholic/Methodist Pry School, Ido-Ani.

20,000.00

430 Renovation of 2 Classrooms block with store at Catholic/Methodist Pry School, Ido-Ani.

10,000.00

431 Renovation of 6 Classrooms Model block (Agagu) at Baptist Day Pry School, Oba-Akoko.

30,000.00

432 Renovation of 3 Classrooms block with office/store at Baptist Day Pry School, Oba-Akoko.

20,000.00

433 Renovation of 6 Classrooms Model block (Agagu) at AUD Pry School, Idogun.

50,000.00

434 Renovation of 3 Classrooms block at AUD Pry School, Idogun.

20,000.00

435 Renovation of 6 Classrooms Model block (Agagu) at Muslim Primary School, Ilepa-Ikare.

50,000.00

436 Renovation of 4 Classrooms block at Muslim Primary School, Ilepa-Ikare.

20,000.00

437 Renovation of 6 Classrooms block at AUD I Primary School. Odoruwa Ikare. Model (Agagu).

50,000.00

438 Renovation of 2 Classrooms block AUD I Primary School, Odoruwa, Ikare-Akoko

10,000.00

439 Renovation of 4 Classrooms block at St Peter’s Pry School, Ifira-Akoko.

20,000.00

440 Renovation of 6 Classrooms block model (Agagu) at St Ursula’s Pry School, Ipesi-Akoko.

30,000.00

Page 23: ondo state government

441 Renovation of 2 Classrooms block at St. Ursula’s Pry School, Ipesi-Akoko.

10,000.00

442 Renovation of 6 Classrooms block Model (Agagu) at St Michael Anglican Pry School, Ipe-Akoko,

50,000,00

443 Renovation of 2 Classrooms block A. At St Michael Anglican Pry School, Ipe-Akoto.

10,000.00

444 Renovation of 2 Classrooms block B. At St. Michael Anglican Pry School, Ipe-Akoko.

10,000.00

445 Renovation of Library block at St Michael Anglican Pry School, Ipe-Akoko.

10,000.00

446 Completion of Hostel block at St. Michael Anglican Pry School, Ipe-Akoko.

10,000.00

447 Renovation of 6 Classrooms block model (Agagu) at St Andrew A/C Pry School, Ipe-Akoko.

30,000.00

448 Renovation of 2 Classrooms block at St. Andrew A/C Pry School, Ipe-Akoko.

10,000,00

449 Renovation of 4 Classrooms block at L.A Pry School, Ilu. Abo.

20,000.00

450 Renovation of 2 Classrooms block at L.A Pry School, Ilu. Abo.

20,000.00

451 Renovation of 4 Classrooms block with store at St. Mary’s Pry School, Gbose, and Ondo.

20,000.00

452 Renovation of 6 Classrooms model block (Agagu) at AUD Pry School, Afin-Akoko.

50,000.00

453 Renovation of 2 Classrooms block at AUD Pry School, Afin-Akoko.

10,000.00

454 Renovation of 2 Classrooms block with office at AUD Pry School, Afin-Akoko.

10,000.00

455 Renovation of 3 Classrooms block with one veranda (Block A) at St. Stephen’s Pry School, Idaniken, Owo.

20,000.00

456 Renovation of 3 Classrooms block without veranda at St Stephen’s Pry School, Idaniken, Owo.

10,000.00

457 Renovation of 3 Classrooms block with one veranda, (with existing roof) at St. Stephen’s Pry School, Idaniken, Owo.

10,000.00

458 Renovation of 4 Classrooms block at St Stephen’s Pry School Idaniken, Owo

20,000.00

459 Renovation of 3 Classrooms block with two verandas at St. Stephen’s Pry School, Idaniken, Owo.

20,000.00

460 Renovation of 6 Classrooms blocks a Community Pry School, Owajaye Ute

50,000.00

461 Renovation of 6 Classrooms block at St. Matthias Pry School Ile-Oluji

50,000.00

462 Renovation of one Classroom block at St. Matthias Pry School Ile-Oluji

20,000.00

463 Renovation of 6 Classrooms block at Muslim Pry School, Oke AJafia, Ile-Oluji

50,000.00

Page 24: ondo state government

464 Renovation of UBE building (3 Classrooms) at Muslim Pry School, Oke Alafia Ile-Oluji

20,000.00

465 Renovation of 3 Classrooms block-Nr at Muslim Pry School Oke Alafia, Ile-Oluji

20,000.00

466 Renovation of UBE building (3 Classrooms block) at Community Pry School, Gberinlegi, Oke-Igbo

20,000.00

467 Renovation of 3 Classrooms block with no office at LA. Pry School Araromi Obu

20,000.00

468 Renovation of 3 Classrooms block with office-A. At LA. Pry School Araromi Obu

20,000.00

469 Renovation of 3 Classrooms block with office-B. At LA. Pry School Araromi Obu

20,000.00

470 Renovation of 6 Classrooms block with office at C.A.C Pry School

50,000.00

471 Renovation of 2 Classrooms block at C.A.C Pry School Ajagba.

20,000.00

472 Renovation of 6 Classrooms block with office at St. Mary RCM Pry School Okitipupa

50,000.00

473 Renovation of 2 Classrooms block at SL Mary RCM Pry School Okitipupa

20,000.00

474 Renovation of 4 Classrooms block at St. Mary RCM Pry School Okitipupa

30,000.00

475 Renovation of 3 Classrooms block at SL Paul Pry School Okerisa, Ilutitun

30,000.00

476 Renovation of 6 Classrooms block with office at St. Paul Pry School Okerisa, Ilutitun

50,000.00

477 Renovation of 6 Classrooms block with office at St. Paul Pry School, Erekiti

50,000.00

478 Renovation of 6 Classrooms block model block (Agagu) at St Paul Pry School, Erekiti

50,000.00

479 Renovation of 6 Classrooms block with office at Community Pry School, Agadagba

30,000.00

480 Renovation of 6 Classrooms block with office at Apostolic Pry School, Igbobini

50,000.00

481 Renovation of 6 Classrooms model block (Agagu) at Apostolic Pry School, Igbobini

30,000.00

482 Renovation of 6 Classrooms block (2Nr) at LA. Pry School, Araromi Sea Side

50,000.00

483 Renovation of 6 Classrooms model block (Agagu) at LA. Pry School, Araromi Sea Side

50,000.00

484 Renovation of 3 Classrooms at African Church Unity Grammar School, Epinmi

10,000.00

Page 25: ondo state government

485 Pupils Furniture at St. Stephen’s Pry Schl Akure and Christ Anglican Pry Schl Shagari, Akure

20,000.00

486 Pupils Furniture at Ijigba Annex Pry School Akure and St Luke’s Pry School Akure

20,000.00

487 Pupils Furniture at LA. Pry School, II, Oke Bola Akure and St John’s Pry School Laagba, Ondo East

20,000.00

488 Pupils Furniture at St. Williams Pry School, Omifunfun and St. Philips Pry School Omiluri

20,000.00

489 Pupils Furniture at St. Gerrard Pry School, Awodiyilemi and St Mary Pry School Gbose Ondo

20,000.00

490 Pupils Furniture at Mt Bethel Pry Schl Ondo and Salvation Pry School Ondo

20,000.00

491 Pupils Furniture at St. RCM School Oke Igbala, Ondo and Methodist Pry School Oke Agunla, Ondo

20,000.00

492 Pupils Furniture at St Jude Primary School Ipogun, and St David Aglican Pry School Ijare

20,000.00

493 Pupils Furniture at St. Mathias Primary School Ibuji, and St Michael’s Pry School Ijare

10,000.00

494 Pupils Furniture at St Paul’s RCM Ibule, and Dayo Jegele Pry School Orojuda

20,000.00

495 Pupils Furniture at L.A. Primary School Ilu-Abo, and St. John Primary School, Oba-Ile

20,000,00

496 Pupils Furniture at Muslim Primary School, Ita-Ogbolu and St Paul’s Primary School, Oba-Ile

20,000.00

497 Pupils Furniture at St. James Anglican Primary School, Opasorun, Idanre and St Michael C&S Primary School, Yaba, Idanre

20,000.00

498 Pupils Furniture at L.A Primary School, Ita Oloorun, and L.A Primary School, Owobamibo, Ofosu

20,000.00

499 Supply and Put in place ECCDE Furniture to Selected Schools

10,000.00

500

Purchase and Supply Information Technology facilities (Computer System and other Accessories) at L.A Primary School II, Oke Bola and St. Mary’s Primary School, Gbose Ondo

10,000.00

501

Purchase and Supply Information Technology facilities (Computer System and other Accessories) at Mt. Bethel Primary School, Ondo and St. Matthew’s RCM Primary School, Ondo

10.000.00

502

Purchase and Supply Information Technology facilities (Computer System and other Accessories) at St. Anne’s RCM School Ondo and St Peter’s RCM School, Oke Igbala, Ondo

10,000.00

Page 26: ondo state government

503 Purchase and Supply Information Technology (ICT) Facilities at Methodist Primary School, Oke Agunla Ondo and St. Mary’s Primary School, Ijare

10,000.00

504

Purchase and Supply Information Technology facilities (Computer System and other Accessories) at St. Mathias Primary School, Ibuji and St. Peter’s Claver Primary School, Ilaramokin

10,000.00

505 Purchase and Supply Information Technology (ICT) Facilities at St, Joseph’s Primary School, Igbara-Oke and St. Paul’s RCM, Ibule

10,000.00

506 Purchase and Supply Information Technology facilities (Computer System and other Accessories) at St. Nathaniel Oba lie and St. John Primary School, Oba-Ile

10,000.00

507

Purchase and Supply Information Technology facilities (Computer System and other Accessories) at St. Matthew’s Primary School, Iju and St. Andrew’s Primary School, Ayede Ogbese

10,000.00

508

Purchase and Supply Information Technology facilities (Computer System and other Accessories) at St. Michael’s C81S Primary School, Yaba, Idanre and LA Primary School, Ita Oloorun

10,000.00

509

Purchase and Supply Information Technology facilities (Computer System and other Accessories) at Our Saviuor C81S Primary School, Owena Idanre, St. Theresa’s RCM Primary School Alade idanre and Muslim Primary School, Idanre

10,000.00

510 Purchase and Supply of Play Ground Equipment at St. Mary’s Primary School, Gbose Ondo, Mt. Bethel Primary School, Ondo and Holy Flock Primary School, Ondo

20,000.00

511

Purchase and Supply of Play Ground Equipment at Salvation Army Primary School, Ondo, Methodist Primary School, Oke Agunla, Ondo and St, Jude Primary School, Ipogun

20,000.00

512

Purchase and Supply of Play Ground Equipment at St. David Anglican Primary School, Ijare, St. Peter’s Claver Primary School, Ilaramokin and St. Joseph’s Primary School, Iqbara-Oke

20,000.00

513 Purchase and Supply of Play Ground Equipment at L.A Primary School, Owode Owena, Dayo Jegele Primary School, Orojuda and St John Primary School, Oba Ile

20,000.00

514

Purchase and Supply of Play Ground Equipment at St. Matthew’s Primary School, Iju, St. Andrew’s Primary School, Ayede Ogbese and St. James Anglican Primary School, Opasorun, Idanres

20,000.00

515 Purchase and Supply of Play Ground Equipment at St Michael’s C&S Primary School, Yaba Idanre, St.

Page 27: ondo state government

Theresa’s RCM Primary School, Alade Idanre and Our Saviour Primary School, Owena Idanre

20,000.00

516 Completion of Six classroom with Office at St. William’s RCM, Omifunfun

50,000.00

517 Provision of Borehole at L.A Primary School, St. Pius RCM, Igbotako

10,000.00

518 Provision of Borehole at Methodist Primary School, Idepe

10,000.00

519 Carry Out Geophysical Survey for the Provision of Borehole in some Selected Schools

5,000.00

(2) REQUIREMENTS FOR TENDERING

Interested contractors must submit alongside with their tenders the following

documents:

(I) Evidence of registration of company in Nigeria with Corporate Affairs Commission

(II) Current registration with Ondo State Ministry of Works for 2017 depending on the value

of contract to be done.

(III) Current 3 years Tax clearance Certificate (2014, 2015, 2016) having expiring date of 31st

December, 2017.

(IV) Evidence of payment of 3 years Development Levy (2015, 2016 and 2017)

(V) Original receipt of payment of non-refundable tender fee

(3) Interested bidders can obtain contract details from the State Universal Basic Education

Board (SUBEB) Planning Research and Statistics Department, Oke-Eda Akure after showing

evidence of payment of Tender Fees. Tenderers are to visit the sites before tendering as

variation under any guise will not be entertained on the projects.

(4) All tender documents should be submitted in waxed-sealed envelope marked

UBEC/SUBEB/PRS/13/14/15/16 with LOT Number indicated on top left corner of the

envelope to the address below:

The Secretary,

Page 28: ondo state government

State Tenders’ Board

Cabinet and Special Services Department,

Governor’s Office

Akure, Ondo State

(5) Submission date: All Tenders must be submitted on or before Thursday, 28th

December, 2017. Please, note that violation of any of the above conditions may render a

tender invalid and Government is not bound to accept the lowest bid or give reasons for

rejecting any tender.

SIGNED:

O.I. Oni (Mrs)

PERMANENT SECRETARY