Oncor LED Streetlight Pilot & Technical Evaluation Update March 15, 2012 Michael Navarro
27

Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

Apr 15, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

Oncor LED Streetlight Pilot & Technical Evaluation Update

March 15, 2012 Michael Navarro

Page 2: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

Michael D. Navarro Manager Streetlight Maintenance

Oncor Electric Delivery [email protected]

214.486.4142 1616 Woodall Rodgers Suite 5L-001

Dallas, Texas 75202

Page 3: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation Future Evaluation & Analysis Questions

Page 4: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

August 2009 Request for Information (RFI) sent to 28 potential suppliers. Supplier RFI submittals were evaluated on price, business and technical attributes, and supplier diversity.

December 2009 Nine suppliers were selected and received the Request for Proposal (RFP), including two Diversity Suppliers.

March 2010 Notifications sent to all RFP participants. Three suppliers had successful RFP submittals. Worked with two other suppliers to resolve RF emission and other concerns. Five vendors selected for pilot.

May 2010 Five cities, six locations selected and Pilot agreements executed with cities. Total 506 LED streetlights (Dallas, Plano, North Richland Hills, Cedar Hill, Grand Prairie)

July 2010 Procured third party validation testing agreement with Frontier Associates LLC September 2010 Pilot Project deployment completed

Key LED Pilot Milestones

Page 5: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

$0

$100

$200

$300

$400

$500

$600

$700

$800

HPS MH LEDVendor

1

LEDVendor

2

LEDVendor

3

LEDVendor

4

LEDVendor

5

LED Avg. Cost

Cos

t per

Lum

inai

re

LED prices are significantly higher than existing luminaires…Start of Pilot

Page 6: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

GE Lighting Science Group Betaway

Sample LED Fixtures

Page 7: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

Lighting Installations • Three conditions were measured, photographed and modeled with computer

lighting modeling software for comparison: 1. High Pressure Sodium: Oncor replaced the 4 selected luminaires identified by

Frontier with new luminaires. 2. Selected LED product burned for 100 hours: Oncor installed new LED products

on the same poles at each site. 3. Same LED product burned for 6,000 hours: after 6,000 hours of burn time

Frontier took measurements again at each site.

Computer Modeling • Computer models were performed for HPS, LED at 100 hours, and LED at 6,000

hours. The models calculate the following metrics: Illuminance averages, minimums, and maximums were compared to the site measured values.

Power Monitoring: • Oncor placed power meters at each site to measure power consumed by each

product.

Frontier Associates LLC validation testing

Page 8: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

ROAM installation • 546 Nodes • 7 Gateways

Installed ROAM monitoring system on LED Pilot Locations

Streetlight Monitoring & Outage Notification System

Page 9: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

Grand Prairie

Main Street & Jefferson

Page 10: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

Grand Prairie

Main Street & Jefferson

Page 11: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

Grand Prairie

Main Street

Page 12: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

North Richland Hills Mid Cities Blvd

Page 13: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

North Richland Hills Mid Cities Blvd

Page 14: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

Prior to implementation, there were concerns regarding the ability of the LED products to withstand our extreme Texas temperatures, both cold and hot. In addition, there were concerns regarding our severe thunderstorms; lightning and associated fault current. 43 fixtures failed through February 2012. This equates to a 8.53% failure

rate Conventional lighting failure rate (HPS) is 7.25% through February 2012

Seasonal Breakdown of Failures 15 Fall (September – November) 7 Winter (December – February) 17 Spring (March - May) 4 Summer (June – August) Percentage of degradation of LED by average of illumination (foot candles)

= 11.66% (includes dirt depreciation)

Pilot Summary - LED Lights

Page 15: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

Provide good quality lighting

Used less energy compared to the HPS lights

Are not yet as reliable as HPS lights

Projected energy savings alone does not off-set high initial costs

Almost no industry standardization

Pilot cities have had a favorable response to the lights and would like to have

as an option once a suitable price point can be established

Pilot Summary - LED Lights

Page 16: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

Installed 36 lights in Colleyville in November 2011 Residential Subdivision 3 Manufacturers Replaced mixture of 100 watt HPS & 175 watt Mercury Vapor

with 57, 78, & 86 watt LEDs ROAM System installed No LED failures reported to date

LED Post Top Evaluation

Page 17: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

+ .1 ft c. 32 ft

+ .1 ft c. 32 ft

+ .2 ft c. 16 ft

+ .4 ft c.

16 ft

+ .5 ft c. 16 ft

+ .4 ft c. 16 ft

+ .2 ft c.

+ .2 ft c.

+ .2 ft c.

+ .2 ft c.

+ .1 ft c. 32 ft

+ .1 ft c. 32 ft

High Pressure Sodium (HPS) Mfg Watts: 100

Mercury Vapor (MV) Mfg Watts: 175

Street side

House side

+ .6 ft c. 32 ft

+ .2 ft c. 32 ft

+ .2 ft c. 16 ft

+ 1.0 ft c. 16 ft

+ 1.1 ft c. 16 ft

+ 1.2 ft c. 16 ft

+ .4 ft c.

+ .5 ft c.

+ .4 ft c.

+ .4 ft c.

+ 0 ft c. 32 ft

+ .3 ft c. 32 ft

House side

Street side

Note: Mercury Vapor not an available option currently being phased out

Page 18: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

+ 1.5 ft c.

+ 1.4 ft c.

+ .2 ft c. 32 ft

+ .3 ft c. 16 ft

+ .0 ft c. 32 ft

+ .3 ft c. 32 ft

+ 1.7 ft c. 16 ft

+ 1.6 ft c. 16 ft

+ 1.7 ft c.

+ .9 ft c.

+ 1.3 ft c. 16 ft

+ .2 ft c. 32 ft

MFG: A Type III

+ .4 ft c.

+ .4 ft c.

+ .3 ft c.

+ .3 ft c.

+ .7 ft c. 16 ft

+ 1.0 ft c. 16 ft

+ .7 ft c. 16 ft

+ .7 ft c. 16 ft

+ .3 ft c. 32 ft

+ .3 ft c. 32 ft

+ .1 ft c. 32 ft

+ .4 ft c. 32 ft

MFG: B Type II

+ 0 ft c. 32 ft

+ .5 ft c. 32 ft

+ .6 ft c. 32 ft

+ 1.2 ft c. 32 ft

+ .1 ft c. 16 ft

+ 1.9 ft c. 16 ft

+ 1.3 ft c. 16 ft

+ 3.8 ft c. 16 ft

+ .3 ft c.

+ .3 ft c.

+ .4 ft c.

+ .3 ft c.

MFG: C Type III

Street side

House side

Street side Street side

House side House side

Page 19: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

Before: 100 W HPS & 175 W Mercury Vapor

Page 20: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

LED

Page 21: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

Before: 100 W HPS

Page 22: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

LED

Page 23: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

Before: 100 W HPS & 175 W Mercury Vapor

Page 24: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

LED

Page 25: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

Future Evaluation & Analysis

Page 26: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

Continue to evaluate the performance of LED luminaires to determine viability and proper “jumping in point”

Evaluate feasibility of creating LED street lighting tariff and offering LED street lighting options to municipalities

Financials

January 2008 average LED fixture cost $975

June 2010 average LED fixture cost $687 (30% decrease)

December 2011 LED fixture cost $425 (56% decrease)

Standardization of LED street lighting products

Future Evaluation & Analysis, cont.

Page 27: Oncor LED Streetlight Pilot & Technical Evaluation …...LED Pilot Program, Key Milestones and Pilot Chronology LED Pilot Program Summary Post Top LED Streetlight Technical Evaluation

March 15, 2012

Questions?