1 PRESENTATION PRESENTATION ON ON POWER SECTOR DEVELOPMENT POWER SECTOR DEVELOPMENT IN IN PAKISTAN PAKISTAN By By AFTAB AHMAD KHAN SHERPAO AFTAB AHMAD KHAN SHERPAO Minister for Water and Power Minister for Water and Power At At Pakistan Development Forum Pakistan Development Forum March 18, 2004 March 18, 2004
14
Embed
ON POWER SECTOR DEVELOPMENT IN PAKISTANsiteresources.worldbank.org/PAKISTANEXTN/Resources/Pakistan... · GHAZI BROTHA POWER HOUSE. 8 GHAZI BROTHA POWER CHANNEL. 9 PROSPECTIVE HYDROPOWER
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1
PRESENTATIONPRESENTATIONONON
POWER SECTOR DEVELOPMENT POWER SECTOR DEVELOPMENT IN IN
PAKISTANPAKISTANByBy
AFTAB AHMAD KHAN SHERPAOAFTAB AHMAD KHAN SHERPAO
Minister for Water and PowerMinister for Water and PowerAtAt
Pakistan Development ForumPakistan Development Forum
March 18, 2004March 18, 2004
2
PAKISTAN POWER SECTOR PROFILEPAKISTAN POWER SECTOR PROFILE
•• TOTAL POWER GENERATION TOTAL POWER GENERATION (INSTALLED CAPACITY):(INSTALLED CAPACITY): 19,404 MW19,404 MW
POWER SECTOR POWER SECTOR -- INSTALLED CAPACITYINSTALLED CAPACITY
IPPs6012 MW
Public SectorThermal
6441 MW
Public Sector Hydel
6489 MW
Nuclear462 MWTotal Installed
Capacity 19,404 MW
4
Gas35.7%
Hydel33%Oil
28.7%
Coal0.3%
Nuclear2.3%
OVERVIEW OF POWER SECTOROVERVIEW OF POWER SECTOR
GENERATION PATTERNGENERATION PATTERN
5
•• By year 2010 additional power required will be 5529 MW.By year 2010 additional power required will be 5529 MW.•• The additional power generation will need an investment of aboutThe additional power generation will need an investment of about
5 billion dollars for five years (20065 billion dollars for five years (2006--2010).2010).